Construction of residential building By Sharique
-
Upload
md-sharique -
Category
Engineering
-
view
93 -
download
4
Transcript of Construction of residential building By Sharique
![Page 1: Construction of residential building By Sharique](https://reader035.fdocuments.net/reader035/viewer/2022062219/587319271a28ab673e8b5cf9/html5/thumbnails/1.jpg)
1
Presentation on six weeks internship at NKG Infrastructures Limited
“Construction of army residential building”
Jalandhar Cantt
Submitted by :-Md Sharique(11306175) School Of Civil Engg. Lovely Professional University
![Page 2: Construction of residential building By Sharique](https://reader035.fdocuments.net/reader035/viewer/2022062219/587319271a28ab673e8b5cf9/html5/thumbnails/2.jpg)
2
CONTENTS Learning objectives
About project Lap joints Water Tank Batching plant Plastering(Grit wash) Defects
Conclusion
![Page 3: Construction of residential building By Sharique](https://reader035.fdocuments.net/reader035/viewer/2022062219/587319271a28ab673e8b5cf9/html5/thumbnails/3.jpg)
3
ABOUT PROJECT Grade of concrete used - M25 Lateral ties - 10 mm and
8mm Design life - 80 years Type/Class of structure - Class A Type of foundation - Raft Designed for fire resistance - 1.5 hours
![Page 4: Construction of residential building By Sharique](https://reader035.fdocuments.net/reader035/viewer/2022062219/587319271a28ab673e8b5cf9/html5/thumbnails/4.jpg)
4
LEARNING OBJECTIVES All reinforcement bars should be Thermo Mechanically treated steel bars of
Fe-500 grade Clear Cover to Reinforcement 1. For Footing bottom face -75mm2. Footing side and top face - 50mm3. Column - 40mm4. Beam - 25mm5. Slab - 20mm For faces of members likely to be in direct contact with ground clear cover
should be greater of either Dia of Main reinforcement bar or Equal to 50mm
![Page 5: Construction of residential building By Sharique](https://reader035.fdocuments.net/reader035/viewer/2022062219/587319271a28ab673e8b5cf9/html5/thumbnails/5.jpg)
5
LAP JOINTS
Grade of conc.
Tension bars Compression bars
Remarks
M-25 40.5 x D 32.5 x D D is dia. Of reinforcement bars
![Page 6: Construction of residential building By Sharique](https://reader035.fdocuments.net/reader035/viewer/2022062219/587319271a28ab673e8b5cf9/html5/thumbnails/6.jpg)
6
WATER TANK Capacity - 30,000 ltrs Material - Rcc and concrete Reinforcement used - 8 mm for tie bars and 10mm as
distribution bars bothway and 12 mm as main bars in beams.
Size of Beam - 230× 450 mm
Grade of concrete –M25 Tank is divided in 3 equal portions i.e 10,000 ltrs in each
portion and baffel walls are made. Two portions are used for drinking and other purposes while
1 portion is used as reserved for fire and other mishaps.
![Page 7: Construction of residential building By Sharique](https://reader035.fdocuments.net/reader035/viewer/2022062219/587319271a28ab673e8b5cf9/html5/thumbnails/7.jpg)
7
15 cm
20 cm
15 cm
![Page 8: Construction of residential building By Sharique](https://reader035.fdocuments.net/reader035/viewer/2022062219/587319271a28ab673e8b5cf9/html5/thumbnails/8.jpg)
8
200 mm c/c spacing
8 mm dia.12 mm main bars in Beam
![Page 9: Construction of residential building By Sharique](https://reader035.fdocuments.net/reader035/viewer/2022062219/587319271a28ab673e8b5cf9/html5/thumbnails/9.jpg)
9
Fig showing 10 mm dia steel Fe500 D
![Page 10: Construction of residential building By Sharique](https://reader035.fdocuments.net/reader035/viewer/2022062219/587319271a28ab673e8b5cf9/html5/thumbnails/10.jpg)
10
Machine Room
Water Tank
Binding wire
Hook used to tie reinforcement with help of binding wire
![Page 11: Construction of residential building By Sharique](https://reader035.fdocuments.net/reader035/viewer/2022062219/587319271a28ab673e8b5cf9/html5/thumbnails/11.jpg)
12
Reinforcement
![Page 12: Construction of residential building By Sharique](https://reader035.fdocuments.net/reader035/viewer/2022062219/587319271a28ab673e8b5cf9/html5/thumbnails/12.jpg)
13
Concreting
![Page 13: Construction of residential building By Sharique](https://reader035.fdocuments.net/reader035/viewer/2022062219/587319271a28ab673e8b5cf9/html5/thumbnails/13.jpg)
14
Concreting done with concrete pump
![Page 14: Construction of residential building By Sharique](https://reader035.fdocuments.net/reader035/viewer/2022062219/587319271a28ab673e8b5cf9/html5/thumbnails/14.jpg)
15
Beams & slab after concreting Slab after casting 15 cm
thick
Further reinforcement
Further formwork
![Page 15: Construction of residential building By Sharique](https://reader035.fdocuments.net/reader035/viewer/2022062219/587319271a28ab673e8b5cf9/html5/thumbnails/15.jpg)
16
BATCHING PLANT
![Page 16: Construction of residential building By Sharique](https://reader035.fdocuments.net/reader035/viewer/2022062219/587319271a28ab673e8b5cf9/html5/thumbnails/16.jpg)
17
Water Tank
Mixing unit
![Page 17: Construction of residential building By Sharique](https://reader035.fdocuments.net/reader035/viewer/2022062219/587319271a28ab673e8b5cf9/html5/thumbnails/17.jpg)
18Conveyor belt
Operating UnitCement Storage
Mixing Unit
![Page 18: Construction of residential building By Sharique](https://reader035.fdocuments.net/reader035/viewer/2022062219/587319271a28ab673e8b5cf9/html5/thumbnails/18.jpg)
19
PLASTERING - GRIT WASH (EXTERNAL PLASTER) Plaster to be applied in two layers i.e after
raking first layer of 15 mm thick cement mortar (1:4) and again make surface rough.
Curing to be done for atleast 7 days
![Page 19: Construction of residential building By Sharique](https://reader035.fdocuments.net/reader035/viewer/2022062219/587319271a28ab673e8b5cf9/html5/thumbnails/19.jpg)
20
SECOND LAYERMaking square boxes as per design using thin tapered wooden batten fixed over previous layer with nails. Battens must be removed with great care so that edges are not damaged.
Wash marble chipping with clean water before application.
Wet the previous layer with water and then apply mix.Mix should be made with marble chipping 12mm mixed in grey 65% approx. and white cement 35% approx.
1:0.5:2 where 1 proportion is of mixed grey and white cement, 0.5 is marble powder and 2 represent marble chipping of 12mm size.
![Page 20: Construction of residential building By Sharique](https://reader035.fdocuments.net/reader035/viewer/2022062219/587319271a28ab673e8b5cf9/html5/thumbnails/20.jpg)
21
1:1/2:2
1=.65 grey cement+.35 white cement
½=marble powder
2=marble chipping
Marble chipping 12mm
![Page 21: Construction of residential building By Sharique](https://reader035.fdocuments.net/reader035/viewer/2022062219/587319271a28ab673e8b5cf9/html5/thumbnails/21.jpg)
22
Mix made is applied in uniform thickness and is pressed properly with wooden float for proper bonding with previous layer and is finished upto true surface.After initial setting it is watered to achieve strength.H2SO4 mixed with water is used for washing and scrubbing purposes. Suitable brushes are used and top layer is scrubbed until natural colour of marble chipping is achieved.
![Page 22: Construction of residential building By Sharique](https://reader035.fdocuments.net/reader035/viewer/2022062219/587319271a28ab673e8b5cf9/html5/thumbnails/22.jpg)
23
DEFECTS
Concrete not filled properly
![Page 23: Construction of residential building By Sharique](https://reader035.fdocuments.net/reader035/viewer/2022062219/587319271a28ab673e8b5cf9/html5/thumbnails/23.jpg)
24Honeycombing
![Page 24: Construction of residential building By Sharique](https://reader035.fdocuments.net/reader035/viewer/2022062219/587319271a28ab673e8b5cf9/html5/thumbnails/24.jpg)
25
CONCLUSION Six weeks internship was very helpful to me.
I get practical knowledge that how task is executed.
I learnt about working of concrete pump, batching plant, water tank, grit wash and some defects.
![Page 25: Construction of residential building By Sharique](https://reader035.fdocuments.net/reader035/viewer/2022062219/587319271a28ab673e8b5cf9/html5/thumbnails/25.jpg)