Construction of a Neutron Ball for Exclusive Electron Scattering Experiments at the S-DALINAC*

10
23.10.2008 | Institut für Kernphysik | Project C2 | Anna Maria Heilmann | 1 Construction of a Neutron Ball for Exclusive Electron Scattering Experiments at the S-DALINAC* A.M. Heilmann, M. Chernykh, P. von Neumann-Cosel, A. Richter SFB 634 Motivation Experimental setup Experiments Results Summary and outlook *Supported by the DFG within SFB 634

description

Construction of a Neutron Ball for Exclusive Electron Scattering Experiments at the S-DALINAC*. A.M. Heilmann, M. Chernykh, P. von Neumann-Cosel, A. Richter. Motivation Experimental setup Experiments Results Summary and outlook. SFB 634. *Supported by the DFG within SFB 634. - PowerPoint PPT Presentation

Transcript of Construction of a Neutron Ball for Exclusive Electron Scattering Experiments at the S-DALINAC*

Page 1: Construction of a Neutron Ball  for Exclusive Electron Scattering Experiments at the S-DALINAC*

23.10.2008 | Institut für Kernphysik | Project C2 | Anna Maria Heilmann | 1

Construction of a Neutron Ball for Exclusive Electron Scattering Experiments at the S-DALINAC*

A.M. Heilmann, M. Chernykh, P. von Neumann-Cosel, A. Richter

SFB 634

Motivation

Experimental setup

Experiments

Results

Summary and outlook

*Supported by the DFG within SFB 634

Page 2: Construction of a Neutron Ball  for Exclusive Electron Scattering Experiments at the S-DALINAC*

23.10.2008 | Institut für Kernphysik | Project C2 | Anna Maria Heilmann | 2

Motivation Isoscalar Giant Dipole Resonance Measurements

exclusive electron coincidence

measurements (e,e'n)

almost background-free spectra

supression of the radiative tail

veto detector

with a large solid angleS.Strauch, Dissertation, TU Darmstadt (1998)

Page 3: Construction of a Neutron Ball  for Exclusive Electron Scattering Experiments at the S-DALINAC*

23.10.2008 | Institut für Kernphysik | Project C2 | Anna Maria Heilmann | 3

Requirements for the Neutron Ball

fast detector response

high neutron efficiency

n/-discrimination

compact geometry

secondary: energy resolution

Page 4: Construction of a Neutron Ball  for Exclusive Electron Scattering Experiments at the S-DALINAC*

23.10.2008 | Institut für Kernphysik | Project C2 | Anna Maria Heilmann | 4

Construction of the Neutron Ball

13 liquid scintillators of the type

Bircon BC501A for neutron detection

solid angle of about 1.3 π (for 20 cm)

Page 5: Construction of a Neutron Ball  for Exclusive Electron Scattering Experiments at the S-DALINAC*

23.10.2008 | Institut für Kernphysik | Project C2 | Anna Maria Heilmann | 5

Test of the Neutron Balln/-Discrimination

AmBe neutron source

zero crossing method

Page 6: Construction of a Neutron Ball  for Exclusive Electron Scattering Experiments at the S-DALINAC*

23.10.2008 | Institut für Kernphysik | Project C2 | Anna Maria Heilmann | 6

Test of the Neutron BallPulse-Height Calibration

measurement:

(1) background

(2) monoenergetic

sources

analysis:

(1) dead-time correction

(2) background subtraction

(3) unfolding starting from

high energies

Page 7: Construction of a Neutron Ball  for Exclusive Electron Scattering Experiments at the S-DALINAC*

23.10.2008 | Institut für Kernphysik | Project C2 | Anna Maria Heilmann | 7

Test of the Neutron BallUnfolding of Measured Spectra

procedure:

pulse-height simulation NRESP

folding with detector resolution

fit to measured spectra

results:

energy dependent detector resolution

position of the compton edge

pulse-height calibration

Page 8: Construction of a Neutron Ball  for Exclusive Electron Scattering Experiments at the S-DALINAC*

23.10.2008 | Institut für Kernphysik | Project C2 | Anna Maria Heilmann | 8

Summary

design and construction finished

tests performed

n/-discrimination

pulse-height calibration

Page 9: Construction of a Neutron Ball  for Exclusive Electron Scattering Experiments at the S-DALINAC*

23.10.2008 | Institut für Kernphysik | Project C2 | Anna Maria Heilmann | 9

Fission ChamberPreparation for Efficiency Determination with 252Cf

Page 10: Construction of a Neutron Ball  for Exclusive Electron Scattering Experiments at the S-DALINAC*

23.10.2008 | Institut für Kernphysik | Project C2 | Anna Maria Heilmann | 10

Outlook

efficiency determination with 252Cf

(1) ToF method

(2) single detectors

(3) whole setup

(4) simulations

first measurements with heavy nuclei SFB 634