CONSTRUCTION METHODS - VIADUCT ELEVATED VIADUCT ELEVATED VIADUCT Superstructure - Precast Segmental

Transcript of CONSTRUCTION METHODS - VIADUCTindianrailways.gov.in/railwayboard/uploads/directorate/infra/... ·...

Page 1: CONSTRUCTION METHODS - VIADUCTindianrailways.gov.in/railwayboard/uploads/directorate/infra/... · CONSTRUCTION METHODS - VIADUCT PROPOSED CONCEPT Special Bridges - Crossing of existing

CONSTRUCTION METHODS - VIADUCTELEVATED VIADUCTELEVATED VIADUCT

Superstructure- Precast Segmental

Page 2: CONSTRUCTION METHODS - VIADUCTindianrailways.gov.in/railwayboard/uploads/directorate/infra/... · CONSTRUCTION METHODS - VIADUCT PROPOSED CONCEPT Special Bridges - Crossing of existing

CONSTRUCTION METHODS - VIADUCT

Page 3: CONSTRUCTION METHODS - VIADUCTindianrailways.gov.in/railwayboard/uploads/directorate/infra/... · CONSTRUCTION METHODS - VIADUCT PROPOSED CONCEPT Special Bridges - Crossing of existing

CONSTRUCTION METHODS - VIADUCT

Page 4: CONSTRUCTION METHODS - VIADUCTindianrailways.gov.in/railwayboard/uploads/directorate/infra/... · CONSTRUCTION METHODS - VIADUCT PROPOSED CONCEPT Special Bridges - Crossing of existing
Page 5: CONSTRUCTION METHODS - VIADUCTindianrailways.gov.in/railwayboard/uploads/directorate/infra/... · CONSTRUCTION METHODS - VIADUCT PROPOSED CONCEPT Special Bridges - Crossing of existing

CONSTRUCTION METHODS - VIADUCT

Page 6: CONSTRUCTION METHODS - VIADUCTindianrailways.gov.in/railwayboard/uploads/directorate/infra/... · CONSTRUCTION METHODS - VIADUCT PROPOSED CONCEPT Special Bridges - Crossing of existing

CONSTRUCTION METHODS - VIADUCT

ELEVATED VIADUCTELEVATED VIADUCT Foundation and Substructure Foundation and Substructure

Technical Feasibility Study on Elevated Suburban Rail CorridorMahalaxmi - Virar, Mumbai

Page 7: CONSTRUCTION METHODS - VIADUCTindianrailways.gov.in/railwayboard/uploads/directorate/infra/... · CONSTRUCTION METHODS - VIADUCT PROPOSED CONCEPT Special Bridges - Crossing of existing

CONSTRUCTION CONCEPT - VIADUCT

PROPOSED CONCEPTPROPOSED CONCEPTSubstructure with Multiple piles/mono pile foundationp p p

H < 17m, D = 2.0 m

17m< H < 21m, D = 2.5m,

21m< H < 25m, D = 3.0m

Page 8: CONSTRUCTION METHODS - VIADUCTindianrailways.gov.in/railwayboard/uploads/directorate/infra/... · CONSTRUCTION METHODS - VIADUCT PROPOSED CONCEPT Special Bridges - Crossing of existing

CONSTRUCTION METHODS - VIADUCT

PROPOSED CONCEPTPROPOSED CONCEPTSpecial Bridges

- Crossing of existing ROBs

Crossing of Tracks from east to west and vice versa- Crossing of Tracks from east to west and vice versa

Bridge to cross Swami Vivekanand ROB (50 + 90 + 50)

Plan ViewPlan View

Page 9: CONSTRUCTION METHODS - VIADUCTindianrailways.gov.in/railwayboard/uploads/directorate/infra/... · CONSTRUCTION METHODS - VIADUCT PROPOSED CONCEPT Special Bridges - Crossing of existing

CONSTRUCTION METHODS - VIADUCT

ELEVATED VIADUCTELEVATED VIADUCT Special Bridges Special Bridges

Segments Brought to siteLifted and Erected in position by Segment Loader

Page 10: CONSTRUCTION METHODS - VIADUCTindianrailways.gov.in/railwayboard/uploads/directorate/infra/... · CONSTRUCTION METHODS - VIADUCT PROPOSED CONCEPT Special Bridges - Crossing of existing

CONSTRUCTION METHODS - VIADUCTELEVATED STATIONSELEVATED STATIONS

Foundations and Piers constructed same as for viaduct Station superstructure is constructed using self supporting form work

Page 11: CONSTRUCTION METHODS - VIADUCTindianrailways.gov.in/railwayboard/uploads/directorate/infra/... · CONSTRUCTION METHODS - VIADUCT PROPOSED CONCEPT Special Bridges - Crossing of existing

ARCHITECTURAL CONCEPT - VIADUCT

PROPOSED CONCEPTPROPOSED CONCEPTP t lPortals

- Avoid infringement with existing tracks

Page 12: CONSTRUCTION METHODS - VIADUCTindianrailways.gov.in/railwayboard/uploads/directorate/infra/... · CONSTRUCTION METHODS - VIADUCT PROPOSED CONCEPT Special Bridges - Crossing of existing

ARCHITECTURAL CONCEPT - VIADUCT

PROPOSED CONCEPTPROPOSED CONCEPTC tilCantilevers

- Avoid infringement with existing tracks

Page 13: CONSTRUCTION METHODS - VIADUCTindianrailways.gov.in/railwayboard/uploads/directorate/infra/... · CONSTRUCTION METHODS - VIADUCT PROPOSED CONCEPT Special Bridges - Crossing of existing

ARCHITECTURAL CONCEPT - VIADUCT

PROPOSED CONCEPTPROPOSED CONCEPTSpecial Bridges

- Crossing of existing ROBs

Crossing of Tracks from east to west and vice versa- Crossing of Tracks from east to west and vice versa

Bridge to cross Swami Vivekanand ROB (50 + 90 + 50)

Plan View

Page 14: CONSTRUCTION METHODS - VIADUCTindianrailways.gov.in/railwayboard/uploads/directorate/infra/... · CONSTRUCTION METHODS - VIADUCT PROPOSED CONCEPT Special Bridges - Crossing of existing

ARCHITECTURAL CONCEPT - VIADUCT

Bridge Across Vasai Creek (South)Bridge Across Vasai Creek (South)

Page 15: CONSTRUCTION METHODS - VIADUCTindianrailways.gov.in/railwayboard/uploads/directorate/infra/... · CONSTRUCTION METHODS - VIADUCT PROPOSED CONCEPT Special Bridges - Crossing of existing

ARCHITECTURAL CONCEPT - VIADUCT

Bridge Across Vasai Creek (North)

Page 16: CONSTRUCTION METHODS - VIADUCTindianrailways.gov.in/railwayboard/uploads/directorate/infra/... · CONSTRUCTION METHODS - VIADUCT PROPOSED CONCEPT Special Bridges - Crossing of existing

LAND REQUIREMENTQAND

AFFECTED STRUCTURES

Page 17: CONSTRUCTION METHODS - VIADUCTindianrailways.gov.in/railwayboard/uploads/directorate/infra/... · CONSTRUCTION METHODS - VIADUCT PROPOSED CONCEPT Special Bridges - Crossing of existing

SUMMARY OF LAND REQUIREMENT

PRIVATE GOVT LAND TOTAL

SECTION LAND(IN HAC.)

GOVT. LAND (IN HAC.)

TOTAL (IN HAC.)

CCG MAHALAXMICCG - MAHALAXMI - - -

MAHALAXMI -BORIVALI

4.797 2.914 7.711BORIVALI

BORIVALI - VIRAR 5.475 12.918 18.393

TOTAL 10.272 15.832 26.034

Land for Depot(about 65 Hec.) is identified at north of Virar

The alignment is being reviewed to reduce land & structure acquisition.

Page 18: CONSTRUCTION METHODS - VIADUCTindianrailways.gov.in/railwayboard/uploads/directorate/infra/... · CONSTRUCTION METHODS - VIADUCT PROPOSED CONCEPT Special Bridges - Crossing of existing

SUMMARY OF AFFECTED STRUCTURES

SECTION PRIVATE STRUCTURES (IN SQM)

GOVT. STRUCTURES(IN SQM)( ) ( )

GROUND FLOOR

TOTAL BUILDING

GROUND FLOOR

TOTAL BUILDING

AREA AREA AREA AREA

CCG - - - - -MAHALAXMI

MAHALAXMI 23666 40562 3517 3517- BORIVALI

BORIVALI - 5120 12242 352 352VIRAR

TOTAL 28786 52804 3869 3869

Page 19: CONSTRUCTION METHODS - VIADUCTindianrailways.gov.in/railwayboard/uploads/directorate/infra/... · CONSTRUCTION METHODS - VIADUCT PROPOSED CONCEPT Special Bridges - Crossing of existing

UTILITY DIVERSION

Page 20: CONSTRUCTION METHODS - VIADUCTindianrailways.gov.in/railwayboard/uploads/directorate/infra/... · CONSTRUCTION METHODS - VIADUCT PROPOSED CONCEPT Special Bridges - Crossing of existing

UTILITY OWNING AGENCIESUTILITY OWNING AGENCIESSr. No. ORGANISATION/ Area UTILITY SERVICESSr. No. ORGANISATION/

DEPARTMENTArea UTILITY SERVICES

1. BEST Churchgate -Mahim Underground Electrical cables2. Reliance Energy Ltd Mahim - Bhayandar Electrical cable, H.T Lines, LT Lines3. Maharastra State

Electricity Distribution Company Limited

Bhayandar-Virar Electrical cables

4 TATA Power Co Ltd Mahalaxmi Borivali Electrical cables H V power transmission Lines4. TATA Power Co Ltd. Mahalaxmi -Borivali Electrical cables, H.V power transmission Lines

5. MCGM- SWD Churchgate-Dahisar Storm water drainages6. MCGM sewerage Churchgate-Dahisar Sewerage pipe lines7 MCGM t Ch h t D hi W t i t i li h7 MCGM water Churchgate-Dahisar Water mains , water pipe lines, pump houses

etc.8. MTNL Churchgate-Dahisar Telecommunication cables, junction boxes,

telephone posts, O.H. lines, etc.p p , ,9. BSNL Mira - Bhayandar Telecommunication cables, junction boxes,

telephone posts, O.H. lines, etc.10. GAIL Mira - Bhayandar Gas pipe line11. MGL Mira - Bhayandar Gas pipe line12 Western Railway’s Churchgate-Virar DC and AC Traction PSI (TSS, SP, SSP, AC

TSS) Electrical cables 22kV, 2.2 KV & Signalingcable Location boxescable, Location boxes,

Page 21: CONSTRUCTION METHODS - VIADUCTindianrailways.gov.in/railwayboard/uploads/directorate/infra/... · CONSTRUCTION METHODS - VIADUCT PROPOSED CONCEPT Special Bridges - Crossing of existing

GUIDELINES FOR UTILITY DIVERSIONGUIDELINES FOR UTILITY DIVERSION• The details of various utilities have been collected from concerned organizations.

GUIDLINES FOR UTILITY DIVERSION

• Utility services have to be kept operational during the entire construction periodUtility services have to be kept operational during the entire construction period and after completion of the project.

• The elevated proposal does not pose much of a difficulty in negotiating the u/g utility services, especially those running accros the alignment. The utilities infringing at Pier location can be easility diverted away from the pipe cap location.

• In case major utility is nunning along / across the alignement which cannot be• In case major utility is nunning along / across the alignement which cannot be diverted or the diversion of which is difficult, time consuming and uneconomical the spanning arrangement of the viaduct and layout of piles in the foundation will be suitably adjusted.

• For u/g section by cut & cover, the utilities are proposed to be maintained temporarilty by replacing with CI/steel pipes and supporting them during const.

Page 22: CONSTRUCTION METHODS - VIADUCTindianrailways.gov.in/railwayboard/uploads/directorate/infra/... · CONSTRUCTION METHODS - VIADUCT PROPOSED CONCEPT Special Bridges - Crossing of existing

DETAILS OF EXISTING SEWER LINESDETAILS OF EXISTING SEWER LINESCHURCHGATE TO MAHALAXMICHURCHGATE TO MAHALAXMI

S No From To Affected Dia/ Size Position w r t Alignment RemarkS No. From Chainage

To Chainage

Affected Length(in m)

Dia/ Size Position w.r.t. Alignment Remark

1 247 2630 2383 900mm Along from ch.2000 (2 lines running) B2 865 875 22 900mm Across B3 900 905 22 900mm Across B4 925 937 22 900mm Across B5 1111 1115 22 900mm Across B6 1190 1195 22 900mm Across B7 1202 1205 22 900mm Across B8 1615 1625 22 900mm Across 2 Lines B9 2005 900mm Major junction at a distance 12m from CL of

proposed alignment on east sideB

10 2405 2410 22 900mm Across B11 2907 2912 22 900mm Across B12 3015 3035 20 900mm Along alignment at distance 10m from CL of

proposed alignment on east sideB

13 3035 4117 1082 900mm with variable distance min. -30m Max -113m from CL of proposed alignment oneast side

B

14 4090 4170 80 900mm with variable distance min, - 30m max. -48m from CL of proposed alignment on east

B48m from CL of proposed alignment on eastside

“A” Sewer lines running parallel/across the alignment are proposed to be diverted away from the alignment or supportedproperly before work is taken in hand at each location.

B” Sewer lines running parallel/across the alignment is not proposed for diversion, but due care will be required to avoidany damage to above linesany damage to above lines.

Page 23: CONSTRUCTION METHODS - VIADUCTindianrailways.gov.in/railwayboard/uploads/directorate/infra/... · CONSTRUCTION METHODS - VIADUCT PROPOSED CONCEPT Special Bridges - Crossing of existing

DETAILS OF EXISTING WATER PIPE LINESDETAILS OF EXISTING WATER PIPE LINESCHURCHGATE TO MAHALAXMICHURCHGATE TO MAHALAXMI

S No. From Chainage

To Chainage

Affected Length in (m)

Dia/ Size Position w.r.t. Alignment Remark

1 -5 2600 2605 150mm, 250mm, 600mm,750mm & 800mm

Both side East & West abovealignment along the track

B750mm & 800mm alignment along the track

2 147 150mm Across B3 240 150mm Across B4 327 150mm Across B5 415 150mm Across B5 415 150mm Across B6 700 840 140 3000mm Across at depth of 50mtrs B7 1465 2081 616 3000mm Across at depth of 50mtrs B8 1998 750mm Across B9 2008 2035 27 600mm Across B

10 2635 2900 265 80mm, 750mm & 250mm

Across B

11 2978 2993 15 150mm & 250mm Across B12 3167 3268 101 80mm, 100mm, 150mm &

250mm Along & Across B

250mm 13 3528 3664 136 800mm & 900mm Along & Across B14 4161 4782 621 2X1450mm, 600mm &

450mmAlong & Across B

15 5663 5675 12 600mm Across B

“A” Sewer lines running parallel/across the alignment are proposed to be diverted away from the alignment or supportedproperly before work is taken in hand at each location.

B” Sewer lines running parallel/across the alignment is not proposed for diversion, but due care will be required to avoidany damage to above linesany damage to above lines.

Page 24: CONSTRUCTION METHODS - VIADUCTindianrailways.gov.in/railwayboard/uploads/directorate/infra/... · CONSTRUCTION METHODS - VIADUCT PROPOSED CONCEPT Special Bridges - Crossing of existing

DETAILS OF EXISTING STORM WATER DRAINSDETAILS OF EXISTING STORM WATER DRAINSMAHALAXMIMAHALAXMI –– BORIVALI BORIVALI -- VIRARVIRAR

S No. From Chainage

To Chainage

Affected Length in

(m)

Dia/ Size Position w.r.t. Alignment Remark

1 6216 7200 984 2 44m wide along 15m away from centre B1 6216 7200 984 2.44m wide along,15m away from centreline - no infringement andmoves parallel at as max41m away & min 23m

B

2 7802 22 0.60m wide away 8.5m from CL ofproposed alignment, noinfringement Across

B

3 9005 9015 22 5m wide Across B

4 9065 9070 222x1m wide 2Nos. Across B

5 9075 9080 22 0.75 m wide Across B6 9800 9810 22 5m wide Across B7 11900 11975 75 3m wide Across B

“A” Sewer lines running parallel/across the alignment are proposed to be diverted away from the alignment or supportedproperly before work is taken in hand at each location.

B” Sewer lines running parallel/across the alignment is not proposed for diversion, but due care will be required to avoidany damage to above linesany damage to above lines.

Page 25: CONSTRUCTION METHODS - VIADUCTindianrailways.gov.in/railwayboard/uploads/directorate/infra/... · CONSTRUCTION METHODS - VIADUCT PROPOSED CONCEPT Special Bridges - Crossing of existing

DETAILS OF EXISTING SEWER LINESDETAILS OF EXISTING SEWER LINESMAHALAXMI MAHALAXMI –– BORIVALI BORIVALI -- VIRARVIRAR

S No. From Chainage.

To Chainage.

Affected Length in

(m)

Dia/ Size Position w.r.t. Alignment

Remark

(m)

1 7980 7985 22 600mm Across B1 18710 18715 22 400mm Across B1 22160 22170 22 400mm Across B2 22465 22475 22 750mm Across B

B3 24507 24530 23 900mm Along & Across4 26018 26022 22 700mm Across B5 27433 27437 22 900mm Across B6 29340 29345 22 1000mm Across B7 34470 34475 22 700mm Across B

“A” Sewer lines running parallel/across the alignment are proposed to be diverted away from thealignment or supported properly before work is taken in hand at each location.

B” Sewer lines running parallel/across the alignment is not proposed for diversion, but due carewill be required to avoid any damage to above lines.q y g

Page 26: CONSTRUCTION METHODS - VIADUCTindianrailways.gov.in/railwayboard/uploads/directorate/infra/... · CONSTRUCTION METHODS - VIADUCT PROPOSED CONCEPT Special Bridges - Crossing of existing

DETAILS OF EXISTING WATER PIPE LINEDETAILS OF EXISTING WATER PIPE LINEMAHALAXMIMAHALAXMI –– BORIVALI BORIVALI -- VIRARVIRAR

S No. From Chainage To Chainage Affected Dia/ Size Position w.r.t. Remarkg gLength in (m) Alignment

1 5680 5705 25 600mm Across B2 14316 14376 60 600mm Across (Proposed) B3 14410 14415 22 600mm Across B4 14543 14610 67 600mm Across B5 15180 15185 22 600mm Across B6 17015 17020 22 150mm Across B7 17140 17155 22 600 A B7 17140 17155 22 600mm Across B8 17222 17234 22 600mm Across B9 17300 17310 22 600mm Across B

10 17610 17835 225 600mm Across B11 19355 19480 125 600mm Along /Across B11 19355 19480 125 600mm Along /Across B12 20060 20065 22 600mm Across B13 21540 21545 22 1200mm &

1350mm Across B

14 23720 23925 205 900mm Across B14 23720 23925 205 900mm Across B15 24510 24515 22 900mm B16 24526 24566 40 1200mm Discarded main B17 30080 30260 180 600mm 250mm Tentative boundary of

micro tunnelB

18 32500 32510 22 1200mm Along (2 Main lines) B

19 32562 32567 22 1200mm Across (2 Main lines) B

“A” Sewer lines running parallel/across the alignment are proposed to be diverted away from the alignment or supportedA Sewer lines running parallel/across the alignment are proposed to be diverted away from the alignment or supportedproperly before work is taken in hand at each location.

B” Sewer lines running parallel/across the alignment is not proposed for diversion, but due care will be required to avoidany damage to above lines.

Page 27: CONSTRUCTION METHODS - VIADUCTindianrailways.gov.in/railwayboard/uploads/directorate/infra/... · CONSTRUCTION METHODS - VIADUCT PROPOSED CONCEPT Special Bridges - Crossing of existing

DETAILS OF EXISTING MGL PIPE LINESDETAILS OF EXISTING MGL PIPE LINESMAHALAXMI MAHALAXMI –– BORIVALI BORIVALI -- VIRARVIRAR

S No. From Chainage

To Chainage

Affected Length in (m)

Dia / Size Position w.r.t. Alignment

Remark

1 14400 14405 22 12mm steel gas pipe line

Across B

2 22500 22880 380 12mm steel gas along & Bpipe line across

3 26370 26385 22 12mm steel gas pipe line

along & across

B

4 28375 28380 22 12mm steel gas pipe line

across -proposed

B

5 29141 29146 22 12mm steel gas across - Bpipe line

6 34740 34745 22 12mm steel gas pipe line

across - A

“A” Sewer lines running parallel/across the alignment are proposed to be diverted away from the alignment orsupported properly before work is taken in hand at each location.

B” Sewer lines running parallel/across the alignment is not proposed for diversion, but due care will be requiredto avoid any damage to above lines.to avoid any damage to above lines.

Page 28: CONSTRUCTION METHODS - VIADUCTindianrailways.gov.in/railwayboard/uploads/directorate/infra/... · CONSTRUCTION METHODS - VIADUCT PROPOSED CONCEPT Special Bridges - Crossing of existing

TRAFFIC INTEGRATIONTRAFFIC INTEGRATION ANDAND

DIVERSIONDIVERSION

Page 29: CONSTRUCTION METHODS - VIADUCTindianrailways.gov.in/railwayboard/uploads/directorate/infra/... · CONSTRUCTION METHODS - VIADUCT PROPOSED CONCEPT Special Bridges - Crossing of existing

Total traffic on the Corridor will remain sameTotal traffic on the Corridor will remain same-- ‘with’ or‘with’ orRIDERSHIP ASSESSMENT

Total traffic on the Corridor will remain sameTotal traffic on the Corridor will remain same-- with or with or ‘without’ elevated Corridor. New facility will only ‘without’ elevated Corridor. New facility will only provide redistribution of traffic on available mass provide redistribution of traffic on available mass transit systemstransit systemstransit systemstransit systems

Existing suburban system is unable handle the Existing suburban system is unable handle the g yg ypassenger volumes. Proposed Corridor will cater for passenger volumes. Proposed Corridor will cater for the capacity shortfall with better service the capacity shortfall with better service

Proposed Elevated Corridor will offload a part of Proposed Elevated Corridor will offload a part of passenger traffic from existing suburban system as passenger traffic from existing suburban system as

ll d tll d twell as road systemwell as road system

Main factors that will effect the shiftMain factors that will effect the shift Main factors that will effect the shift Main factors that will effect the shift Parallel metro corridors being planned by MMRDAParallel metro corridors being planned by MMRDA Fare structure on elevated corridor Fare structure on elevated corridor

Page 30: CONSTRUCTION METHODS - VIADUCTindianrailways.gov.in/railwayboard/uploads/directorate/infra/... · CONSTRUCTION METHODS - VIADUCT PROPOSED CONCEPT Special Bridges - Crossing of existing

MASS TRANSIT SYSTEMS IN MUMBAI

DAHISAR

CHARKOPMULUND

ANDHERI

KANJURMARG

VERSOVASEEPZ

BANDRA

GHATKOPAR

BKC

ANDHERI

Chembur Railway Station

MANKHURD

PRABHADEVI Wadala Bridge

SEWRI

Metro Phase IMetro Phase II

Gadge Maharaj Chowk

COLABA

Metro Phase IIMetro Phase III

Existing Western railway track

HUTATMA CHAWK Monorail Phase I

Page 31: CONSTRUCTION METHODS - VIADUCTindianrailways.gov.in/railwayboard/uploads/directorate/infra/... · CONSTRUCTION METHODS - VIADUCT PROPOSED CONCEPT Special Bridges - Crossing of existing

BasedBased onon thethe ComprehensiveComprehensive TransportationTransportation StudyStudy MMRDA’sMMRDA’s

RIDERSHIP ASSESSMENT BasedBased onon thethe ComprehensiveComprehensive TransportationTransportation Study,Study, MMRDA sMMRDA s

population/population/ employmentemployment projections,projections, MRVCMRVC StudyStudy forfor feasibilityfeasibility ofofACAC servicesservices onon MumbaiMumbai subsub--urbanurban system,system, WesternWestern RailwayRailway DataDataonon traffictraffic andand limitedlimited primaryprimary passengerpassenger traffictraffic surveyssurveysyy gg yy

ItIt isis estimatedestimated thatthat aboutabout 5050 %% ofof firstfirst classclass andand 2020%% ofof secondsecondclassclass suburbansuburban railrail passengerspassengers willwill shiftshift toto ElevatedElevated CorridorCorridor

AboutAbout 1010 %% ofof roadroad passengerspassengers areare expectedexpected toto shiftshift

AA growthgrowth raterate ofof 22%% pp..aa.. forfor ChurchChurch GateGate –– BorivaliBorivali sectionsection andand 44%%pp..aa.. uptoupto VirarVirar isis takentaken basedbased onon MMRDAMMRDA PlansPlans

ThisThis providesprovides aa ridershipridership figurefigure ofof aboutabout 4545,,000000 PHPDTPHPDT forfor ChurchChurchGateGate –– BorivaliBorivali andand 3333,,000000 PHPDTPHPDT forfor BorivaliBorivali –– VirarVirar sectionsection inin 20392039

TheThe systemsystem hashas beenbeen plannedplanned withwith thethe designdesign traffictraffic loadload ofof 9090,,000000PHPDTPHPDT

Page 32: CONSTRUCTION METHODS - VIADUCTindianrailways.gov.in/railwayboard/uploads/directorate/infra/... · CONSTRUCTION METHODS - VIADUCT PROPOSED CONCEPT Special Bridges - Crossing of existing

INTERMODAL INTEGRATION & DISPERSAL

OBJECTIVES

To facilitate efficient transfer and dispersal of passengers

To provide for effective inter-modal interchange ofTo provide for effective inter modal interchange of the passengers

To integrate proposed system’s entry/ exits with those of existing suburban system and upcomingthose of existing suburban system and upcoming transport infrastructure

Page 33: CONSTRUCTION METHODS - VIADUCTindianrailways.gov.in/railwayboard/uploads/directorate/infra/... · CONSTRUCTION METHODS - VIADUCT PROPOSED CONCEPT Special Bridges - Crossing of existing

INTERMODAL INTEGRATION & DISPERSAL

PROPOSED MEASURES

Traffic Circulation Planning Up-gradation/ widening of roads and walkways Pedestrian cross-over facilities New/ augmented bus/ IPT stands

Pl d i k / d ff Planned pick-up/ drop-off areas Parking facilities

Additional measures such as integrated ticketing, dedicated feeder services, introduction of modern low floor ‘urban’ buses, etc. can also h lhelp

Page 34: CONSTRUCTION METHODS - VIADUCTindianrailways.gov.in/railwayboard/uploads/directorate/infra/... · CONSTRUCTION METHODS - VIADUCT PROPOSED CONCEPT Special Bridges - Crossing of existing

INTERMODAL INTEGRATION & DISPERSAL

Entry/ Exits of Proposed System are integrated with y p y gthose of existing Suburban, Metro and Skywalks

Details worked out for Typical stations : Dadar Andheri Goregaon and Mira RoadDadar, Andheri, Goregaon and Mira Road

MCGM and Traffic Police agree that the schemes are doable

Page 35: CONSTRUCTION METHODS - VIADUCTindianrailways.gov.in/railwayboard/uploads/directorate/infra/... · CONSTRUCTION METHODS - VIADUCT PROPOSED CONCEPT Special Bridges - Crossing of existing

CONCEPT

ROAD TRAFFIC DIVERSIONS CONCEPT

The Corridor is planned to be constructed largely within the Railway p g y yBoundary

Preliminary traffic analysis has been done and conceptual traffic Preliminary traffic analysis has been done and conceptual traffic diversion plans have been proposed – to give confidence that the proposal is doable

Traffic flow, Road Width, Pedestrian Flow, Traffic Management measures may be different at the time of implementation and the detailing will need to be done at the time of Detailed Project Report/detailing will need to be done at the time of Detailed Project Report/ Implementation

P d C id li t d t ti th d l / Proposed Corridor alignment and construction methodology/ sequence has been planned with a view to minimize affecting existing structures and disrupting the traffic flow in the vicinity.

Page 36: CONSTRUCTION METHODS - VIADUCTindianrailways.gov.in/railwayboard/uploads/directorate/infra/... · CONSTRUCTION METHODS - VIADUCT PROPOSED CONCEPT Special Bridges - Crossing of existing

ROAD TRAFFIC DIVERSIONSCONCEPT

At t i l ti l d / ti ti t R il At certain locations, lands/ properties contiguous to Railway Land are proposed to be acquired for the Project. With this, the need for traffic diversion will not arise

However, at several locations the construction of the proposed Corridor will involve the partial or complete closure of existing roads for varying amounts of time

Capacity of the alternative road networks has been assessed for possible spare capacity to carry the diverted trafficpossible spare capacity to carry the diverted traffic.

Suitable Traffic Circulation Schemes have been suggested so as not to exceed V/C Ratio of 1 on any road with the diverted traffic. y

The bus stops/ IPT stands, if affected by the diversion, have been suitably planned at alternate locations

Page 37: CONSTRUCTION METHODS - VIADUCTindianrailways.gov.in/railwayboard/uploads/directorate/infra/... · CONSTRUCTION METHODS - VIADUCT PROPOSED CONCEPT Special Bridges - Crossing of existing

TYPICAL CONSTRUCTION SEQUENCE AND TRAFFIC MOVEMENT

ROAD TRAFFIC DIVERSIONSTYPICAL CONSTRUCTION SEQUENCE AND TRAFFIC MOVEMENT

ELEVATED SECTIONS

It is proposed to construct the elevated sections on a combination of monopile and multiple pile foundations. Thi ill i l bl k f i i 5 id t i i f This will involve blockage of a minimum 5 m wide strip in case of monopile and 8 m in case of multiple pile foundations

An extra barricading width of 1.75 m on either side would be desirable gduring night time for movement of equipments within the construction zone, and the same shall be withdrawn during day time to maximize available road widthavailable road width

At station, the total width to be blocked for construction would be about 26 m, to be blocked in one go. However, most of these would be over Railway Land and only block part of the adjacent roads in some casesRailway Land, and only block part of the adjacent roads in some cases.

Page 38: CONSTRUCTION METHODS - VIADUCTindianrailways.gov.in/railwayboard/uploads/directorate/infra/... · CONSTRUCTION METHODS - VIADUCT PROPOSED CONCEPT Special Bridges - Crossing of existing

ELEVATED SECTIONSROAD TRAFFIC DIVERSIONS

ELEVATED SECTIONS

PROPOSED 9 M WIDTH OF ELEVATED DECK TO BE BLOCKED ON SURFACE ALONG

SAMPLE TRAFFIC DIVERSION FOR CONSTRUCTION OF ELEVATED DECK AT

ELEVATED SECTIONS BANDRA MAIN ROAD

Page 39: CONSTRUCTION METHODS - VIADUCTindianrailways.gov.in/railwayboard/uploads/directorate/infra/... · CONSTRUCTION METHODS - VIADUCT PROPOSED CONCEPT Special Bridges - Crossing of existing

Capital Expenditure

&&

Financial AnalysisFinancial Analysis

Page 40: CONSTRUCTION METHODS - VIADUCTindianrailways.gov.in/railwayboard/uploads/directorate/infra/... · CONSTRUCTION METHODS - VIADUCT PROPOSED CONCEPT Special Bridges - Crossing of existing

CAPITAL COST ESTIMATECAPITAL COST ESTIMATE

S. No. ItemAmount in

Rs.Cr.Rs.Cr.

1 Land and Structures 886.25

2 Civil Construction 6804.40

3 P-Way 542.26

4 Signal & Telecommunication 1129.98g

5 Traction & Power supply 684.43

5 Depot 329.22p

6 Rolling Stock 4485.00

7 Others misc. works 658.11

8 Traffic integration & dispersal facilities 607.20

9 Design, General Charges etc. 860.45g g

Gross Total(incl 5% contingency) 17836.66

Page 41: CONSTRUCTION METHODS - VIADUCTindianrailways.gov.in/railwayboard/uploads/directorate/infra/... · CONSTRUCTION METHODS - VIADUCT PROPOSED CONCEPT Special Bridges - Crossing of existing

COST STREAM

Complete Project Cost - Rs. 20,654 Crores..p j ,Includes – Inflation during Construction.Excludes – Interest during Construction.

Investment accounted for in FIRR calculation: -• Additional Investment in Rolling stock in 2029-30 & 2039-40.• 50% Replacement of S&T and 25% of Electrical assets (in

2037 38)2037 – 38).

O & M Cost (as on 2019-20) :- Rs 461 04 Crores O & M Cost (as on 2019-20) :- Rs. 461.04 Crores.

Page 42: CONSTRUCTION METHODS - VIADUCTindianrailways.gov.in/railwayboard/uploads/directorate/infra/... · CONSTRUCTION METHODS - VIADUCT PROPOSED CONCEPT Special Bridges - Crossing of existing

REVENUE STREAM

Fare box revenue : Rs. 1392 Crores (as on 2019-20)

Advt. & Others(5% of fare box revenue): 69.60 crores.

Project FIRR without VGF & commercial development-3.26%

(b d DA f )(based on MMRDA fare structure)

S f f di i FIRRSources of funding to improve FIRR

VGF

C i l D l f i & bl l d Commercial Development of airspace & spareble land parcels .

Page 43: CONSTRUCTION METHODS - VIADUCTindianrailways.gov.in/railwayboard/uploads/directorate/infra/... · CONSTRUCTION METHODS - VIADUCT PROPOSED CONCEPT Special Bridges - Crossing of existing

COMMERCIAL DEVELOPMENT

A Above Existing Stations A Above Existing Stations.

B Ab El t d St ti n B Above Elevated Stations.

C S bl d l C Sparable Land Parcels

Page 44: CONSTRUCTION METHODS - VIADUCTindianrailways.gov.in/railwayboard/uploads/directorate/infra/... · CONSTRUCTION METHODS - VIADUCT PROPOSED CONCEPT Special Bridges - Crossing of existing

COMMERCIAL DEVELOPMENT

Adequate land parcels and air spacesAdequate land parcels and air spaceswill be made available for commercialdevelopment to make the projectbankablebankable.

Page 45: CONSTRUCTION METHODS - VIADUCTindianrailways.gov.in/railwayboard/uploads/directorate/infra/... · CONSTRUCTION METHODS - VIADUCT PROPOSED CONCEPT Special Bridges - Crossing of existing

THANKSTHANKS