CONSTRUCTION BIDDING PHASE CONSTRUCTION DOCUMENTS ...
Transcript of CONSTRUCTION BIDDING PHASE CONSTRUCTION DOCUMENTS ...
JSYJ
CONCEPT DESIGN
DESIGN DEVELOPMENT
CONSTRUCTION DOCUMENTS
CONSTRUCTION ADMINISTRATION
ACTIVE DESIGN PHASE
CONSTRUCTION BIDDING PHASE
DRAWING INFORMATION
AS SHOWN
7-17-17
TJK
JBL
THIS DRAWING IS THE PROPERTY OF "APPALACHIADESIGN SERVICES, IS AN INSTRUMENT OF DESIGN,& IS TO BE USED ONLY WITH RESPECT TO THEPROJECT INDICATED ON THIS DRAWING.
"APPALACHIA DESIGN SERVICES" SHALL RETAINALL RIGHTS TO THE USE OF THIS DRAWING & ITSHALL NOT BE USED, COPIED, OR RETAINEDWITHOUT THE SPECIFIC WRITTEN PERMISSION OF"APPALACHIA DESIGN SERVICES". ANY VIOLATIONSHALL BE PROSECUTED TO THE MAXIMUMPOSSIBLE EXTENT WITHIN THE LAW.
REVISIONS
NO. DATE DESCRIPTION
PPALACHIA
S
D
A
ESIGN
ERVICES
42OF
-
PROJECT:
Abingdon, Virginia 24202
ADS PROJ. NO.:
GREEN SPRING RD.REALIGNMENT
VDOTBonham Road
7-17-17
COMMON
WEALT
H OF VIRGINIA
PROFESS I ONAL E
NG
INEER
1DEMOLITION PLAN
EXISTINGCONDITIONS ANDDEMOLITION PLAN
2
\\Fs\projects\AD
S\AD
S- TH
E M
EAD
OW
S\Project D
raw
ings\Current\VD
OT 60%
REALIG
NM
EN
T 21.dw
g, D
EM
O-C2 (2), 7/17/2017 3:58:06 PM
, Com
puter 2, 1:1
JSYJ
CONCEPT DESIGN
DESIGN DEVELOPMENT
CONSTRUCTION DOCUMENTS
CONSTRUCTION ADMINISTRATION
ACTIVE DESIGN PHASE
CONSTRUCTION BIDDING PHASE
DRAWING INFORMATION
AS SHOWN
7-17-17
TJK
JBL
THIS DRAWING IS THE PROPERTY OF "APPALACHIADESIGN SERVICES, IS AN INSTRUMENT OF DESIGN,& IS TO BE USED ONLY WITH RESPECT TO THEPROJECT INDICATED ON THIS DRAWING.
"APPALACHIA DESIGN SERVICES" SHALL RETAINALL RIGHTS TO THE USE OF THIS DRAWING & ITSHALL NOT BE USED, COPIED, OR RETAINEDWITHOUT THE SPECIFIC WRITTEN PERMISSION OF"APPALACHIA DESIGN SERVICES". ANY VIOLATIONSHALL BE PROSECUTED TO THE MAXIMUMPOSSIBLE EXTENT WITHIN THE LAW.
REVISIONS
NO. DATE DESCRIPTION
PPALACHIA
S
D
A
ESIGN
ERVICES
37OF
-
PROJECT:
Abingdon, Virginia 24210
ADS PROJ. NO.:
THE MEADOWSABINGDON, VA
owner
1 Food City Circle
Marathon Reality Corporation
7-17-17
COMMON
WEALT
H OF VIRGINIA
PROFESS I ONAL E
NG
INEER
2
EXISTINGCONDITIONS ANDDEMOLITION PLAN
2
\\Fs\projects\AD
S\AD
S- TH
E M
EAD
OW
S\Project D
raw
ings\Current\TH
E M
EAD
OW
S (JBL N
ew
Pond)_R6.dw
g, EX (2), 7/17/2017 3:58:38 PM
, Com
puter 2, 1:1