Consolidated Rental Car Facility (CONRAC) y ( )

14
Consolidated Rental Car Facility (CONRAC) Nashville International Airport www.flynashville.com

Transcript of Consolidated Rental Car Facility (CONRAC) y ( )

Page 1: Consolidated Rental Car Facility (CONRAC) y ( )

Consolidated Rental Car Facility (CONRAC)y ( )

Nashville International Airport

www.flynashville.com

Page 2: Consolidated Rental Car Facility (CONRAC) y ( )

CONRAC – HistoryCONRAC – History

DECEMBER 2004INTERSTATE 40INTERSTATE 40

DECEMBER 2004

•Remote Location

•90 acre Site; 150 ft of relief

•2 Level R/R Facility with a CSB

on top and individual Service Center Sites

•$88 million Project Costs

AUGUST 2006

•Conducted a studyy

•Multiple Locations

On Short Term Garage

Adjacent to Short Term GarageAdjacent to Short Term Garage

In Long Term Lot

Employee Lot

www.flynashville.com

Overflow Lot

Page 3: Consolidated Rental Car Facility (CONRAC) y ( )

CONRAC – History

NOVEMBER 2007

•Started Schematic Design

MAY 2008MAY 2008

•Brought on CM at Risk for

Pre-construction Services

OCTOBER 2008

•Project bid at $89

•Project Put on Hold

October 2009

•Project bid at $58,000,000

March 2010

•Began Construction

NOVEMBER 1 2011

www.flynashville.com

NOVEMBER 1, 2011

•Successfully Opened for Operation

Page 4: Consolidated Rental Car Facility (CONRAC) y ( )

CONRAC – Site Plan

Existing Long TermParking Lot

CUSTOMER ENTRY

READY/RETURN

TARI PHASE I

QTA

SERVICE

RETURN

CUSTOMER EXIT

EXISTINGGARAGE

TO SERVICE SITES

TERMINAL

RAC COUNTERSTO SERVICE SITES

www.flynashville.com

Page 5: Consolidated Rental Car Facility (CONRAC) y ( )

CONRAC – Project Statistics

•1.2 million-square-foot facility

•3 Level Ready/Return Facility

•2400 Ready/Return Stalls2400 Ready/Return Stalls

•9 Rental Car Brands with space for 10

•900 lf of moving walkways

C d E t Pl f Sh t T•Covered Entry Plaza from Short Term Garage

•On-Grade Quick Turn Around (QTA) FacilityFacility

•3-20,000 gallon Underground Storage Tanks

•54 Fueling Stations5 ue g S a o s

•10 Car Wash Bays

•Public Art Piece incorporated in facility

www.flynashville.com

Page 6: Consolidated Rental Car Facility (CONRAC) y ( )

CONRAC – Construction Photos

www.flynashville.com

Page 7: Consolidated Rental Car Facility (CONRAC) y ( )

CONRAC – Construction Photos

www.flynashville.com

Page 8: Consolidated Rental Car Facility (CONRAC) y ( )

CONRAC – Construction Photos

www.flynashville.com

Page 9: Consolidated Rental Car Facility (CONRAC) y ( )

CONRAC – Construction Photos

www.flynashville.com

Page 10: Consolidated Rental Car Facility (CONRAC) y ( )

CONRAC – Construction Photos

www.flynashville.com

Page 11: Consolidated Rental Car Facility (CONRAC) y ( )

CONRAC – Construction Photos

www.flynashville.com

Page 12: Consolidated Rental Car Facility (CONRAC) y ( )

CONRAC – Summary

Funding Source: 100% CFC @ $4.50/day

Total Design Cost: $4,929,507

Total Construction Cost: $58,000,000 GMP

Total Project Cost: $68,000,000

Design Team: Demattei Wong ArchitectureMoody Nolan (local)

General Contractor/Construction Manager: Austin CommericalDF Chase (local)

www.flynashville.com

Page 13: Consolidated Rental Car Facility (CONRAC) y ( )

CONRAC – Airport Contacts

Traci Cooper, P.E.Manager, Design

(615) 275 4139 t i @ hi tl(615) 275-4139 [email protected]

Robert Ramsey, P.E.Assistant Vice President PDC

Planning and Design

(615) 275 1461 robert ramsey@nashintl com(615) 275-1461 [email protected]

Christine Vitt, P.E.Assistant Vice President PDC

Construction and Environmental

(615-) 275-1783 christine vitt@nashintl com

www.flynashville.com

(615 ) 275 1783 [email protected]

Page 14: Consolidated Rental Car Facility (CONRAC) y ( )

www.flynashville.comA Six Sigma OrganizationA Six Sigma Organization