ConocoPhillips ConocoPhillips Systematic PCB Source Characterization: Achieving A Major PMP Goal John Jengo, PG MWH Americas, Inc. Paul McDonald ConocoPhillips Trainer Refinery Systematic PCB Source Characterization: Achieving A Major PMP Goal John Jengo, PG MWH Americas, Inc. Paul McDonald ConocoPhillips Trainer Refinery

Transcript of ConocoPhillips - State

Page 1: ConocoPhillips - State

ConocoPhillipsConocoPhillipsSystematic PCB Source Characterization:

Achieving A Major PMP Goal

John Jengo, PGMWH Americas, Inc.

Paul McDonaldConocoPhillips Trainer Refinery

Systematic PCB Source Characterization: Achieving A Major PMP Goal

John Jengo, PGMWH Americas, Inc.

Paul McDonaldConocoPhillips Trainer Refinery

Page 2: ConocoPhillips - State

22

Page 3: ConocoPhillips - State

33

Page 4: ConocoPhillips - State

44

PMP Characterization RequirementsPMP Characterization Requirements• Identify Facility Known or Probable PCB

Sources

• Identification of Unknown PCB Sources

• Quantify Extent and Magnitude of Impact

Page 5: ConocoPhillips - State

55

A 5-Step Technical ApproachA 5-Step Technical Approach

1. Locate All Existing and Former Transformers

2. Map the NPDES Outfall Watersheds

3. Determine Most Likely Areas of Impact in Each Watershed

4. Decide on the Most Appropriate Analytical Suite

5. Conduct Characterization Sampling

Page 6: ConocoPhillips - State

66

1. Locate All Existing and Former Transformers1. Locate All Existing and Former Transformers• Reviewed Available Facility Maps (1890-

Present)

• Conducted Intensive Site Walkover to Locate Existing Equipment

• Interviewed Electrical Engineers

• Reviewed Prior PCB Oil Sampling Reports

Page 7: ConocoPhillips - State

77

Page 8: ConocoPhillips - State

88

2. Map the Watersheds2. Map the Watersheds

• Utilized Aerial Survey Topographic Map (0.1 foot Vertical Resolution)

• Observed Surface Water Flows During Storm Events

• Excluded WWTP/Process Sewer Drainage Areas

Page 9: ConocoPhillips - State

99

Page 10: ConocoPhillips - State

1010

3. Determine Most Likely Areas of Impact3. Determine Most Likely Areas of Impact• Assessed the Locations of all Transformers

within Each Watershed

• Most Transformers Posed No Risk to Surface Water

• Identified Sediment in Ditches as Primary Source of PCBs

• Identified a Few Transformers in Close Proximity to Drainage Ditches

Page 11: ConocoPhillips - State

1111

Page 12: ConocoPhillips - State

1212

Analytical Suite Option:1668A CongenersAnalytical Suite Option:1668A Congeners• 1668A: 209 Congeners w/ Coelutions

– PRO: Congener-specific

– CON: ~$1,000-$1,100/sample

Page 13: ConocoPhillips - State

1313

Analytical Suite Option:8082 AroclorsAnalytical Suite Option:8082 Aroclors• 8082: Aroclors

– PRO: Inexpensive (~$60/sample)

– CONS: High Detection Limits (6-13 ug/kg) & Not Congener-specific

Page 14: ConocoPhillips - State

1414

Analytical Suite Option:8082 CongenersAnalytical Suite Option:8082 Congeners• 8082: 56-65 Congeners

– PRO: Relatively Inexpensive (~$300/sample)

– CON: Higher Detection Limits than 1668A (0.09 -3 ug/kg)

Page 15: ConocoPhillips - State

1515

4. Select Analytical Suite:8082 Congeners4. Select Analytical Suite:8082 Congeners• 8082: 56-65 Congeners

– Relatively Inexpensive Congener Screening

– Sufficient to Characterize Substantial PCB Impacts

– Useful for Determining the Presence and General Range of Congeners

Page 16: ConocoPhillips - State

1616

5. Conduct Characterization Sampling5. Conduct Characterization Sampling• Targeted Confluence Points in Drainage Ditch

• Targeted Locations Downslope of Adjacent Transformers

• Sampled Sediment Along Entire Length of Ditch

Page 17: ConocoPhillips - State

1717

Page 18: ConocoPhillips - State

1818

Characterization ResultsCharacterization Results

• Presence of Congeners in Ditch Sediments

• General Increasing Trend of Number of Congeners Toward Outfall

• No Discernable Trend of Increasing Concentrations Further Downstream

Page 19: ConocoPhillips - State

1919

The Next Step: MinimizationThe Next Step: Minimization

• The Unknowns are Now Known – Spatial Distribution of Congeners

– Approximate Volume of Impacted Sediment

– Confirmed Pathways of Migration

• Now Able to Focus Potential Minimization Actions