Connor Creek Bridge
Design and construct emergency vehicle/pedestrian bridge across
Connor Creek. Parks Development
Southwest Production Team
Connor Creek BridgeInitial Concept
Connor Creek BridgePhoto taken at high
tide on 12/29/05
Connor Creek BridgeDesign Concept
Connor Creek BridgeMed-Tracker
Connor Creek BridgeAmphibious All-Terrain Vehicles
Max IV
Argo Bigfoot
Connor Creek Bridge
Land Tamer
Amphibious All-Terrain Vehicles
Connor Creek Bridge
Permitting Process $5,000.00
Topographical Survey (Consultant) $2,400.00
Site Planning & Review $8,000.00
Geotechnical & Engineering (Consultant) $25,329.47
Construction Supervision $4,000.00
Emergency Vehicle (Vender) $20,000.00
Construction (Contractor) $180,000.00
Administration $1,000.00
TOTAL PROJECT COST $245,729.47
Budget of $250,000.00
Connor Creek BridgeSchedule
FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Project Description
Connor Creek Bridge
Environmental Review & Permits
Design
Bid & Award
Construction
Color Code
Environmental Review & Permits
Design
Bid & Award
Construction
Connor Creek Bridge
Southwest Region Capital Team
The bridge will carry pedestrians and a small emergency vehicle, with a maximum gross vehicle weight of 6000 pounds. The bridge will use timber planks, a timber rail system, and pressure treated glue laminated beams to span between timber pile caps over driven galvanized steel pipe piles. The length of the bridge is approximately 250' long. There will be four spans of 50' and two removable beach side spans of 25' each.