Confluence Hub
Transcript of Confluence Hub
Confluence Hub:Collaboration | Coffee | Connectivity
Founded in 1994, 26 years of expertise.
More than 99% positive customer feedbacks.
Pan-India Presence with 8 branch offices.
Manufacturing Facility in Sanjan, Gujarat.
Recognized for transforming over 90 million sq. ft. of workspaces with 15,000+ Globally satisfied customers.
The only raised access floor company in India withmore than 450+ members on board.
Annual production capacity of 120 lakh sq. ft..
INDIA’SNO. 1RAISED ACCESSFLOOR BRAND
………………………………….
..………………………………….
…..……………………………...
……………………………………..….
……….………………………………….
…………….……………………………...
…………….…………………………......
Certifications
WorldClass
Quality
Certified byBureau Veritas,France
Excellenceguaranteed with
third partytested at
TÜV SÜD PSB, Singapore
Environmental Conscientiousness
Health And Safety
Measures
SingaporeGreen
BuildingCouncil(SGBC)
What is a Raised Floor?Raised access floors is a platform built several inches above the structural floor, creating a cavity/void between the existing floor/slab and the top surface of raised access floor system.
Introductionto Raised AccessFloor System
PURPOSE OF CAVITY
Passing Electrical Data / Voice Power cables
Air conditioning piping and cable in equipment room.
Plumbing pipes
Why use a Raised Floor?
The system responds to organizational & technological
changes quickly and easily.
Provides a tremendous amount of flexibility &
capacity in minimal time.
An access floor system reduces the facilities
life cycle costs.
Designed to meet the most demanding needs of new or
refurbished buildings.
A long term cost-effective investment.
Advanced Technology Platform
01. Non-powered workstations.
02. Unitile Grommets allow cables to pass securely.
03. Enhanced ceiling design freedom with services underfloor.
04. Unitile understructure with typical FFH from 75 mm to 200 mm.
05. Underfloor service pathway to manage and protect any type of voice and data system.
06. Carpet tile to fit on the panel with the help of tacky adhesive.
1
2
3
45
6
How raised access floorshelp your co-working space?
WORK HAS CHANGED,MOST OFFICES HAVEN’T.
The freedom ofFlexibility
High SpeedConstruction
Aesthetics & low maintenance
Return onInvestment
GreenProduct
Realities ofCo-working Dynamics
NEED FOR SPEED
Short project timelines.
Delay in construction due to the curing process of screed works.
Delayed project timelines leading to loss of revenue.
Raised floors eliminates the need for wet works like screeding and tiling.
Early occupation in a facility results in enormous savings on skyrocketing rents & early revenue generation.
Drastically reduces the fit out program schedule in a pre-occupied, speculated tenant building.
Access floor installation can be carried out simultaneously with others services.
The modularity of the system & the plenum beneath the floor lets you modify layouts at any stage of the project.
CHALLENGES SOLUTIONS
FLOORED BY HIGH SPEED
MUMBAI BENGALURU
PROJECTS
Vikhroli
Goregaon
Marol
Thane
Worli
QTY (SQ. FT.)
42,217
60,203
1,24,454
45,822
20,990
DAYS
13
15
16
13
9
PROJECTS
RMZ Latitude
Embassy Tech Village
Symbiosis Salarpuria
Magnificia Salarpuria
QTY (SQ. FT.)
39,849
80,461
72,625
35,770
DAYS
11
14
13
9
BRINGING PERSONALITY TO PLACES
Level differences, undulations and rough conditions of the mother slab
Raised floors eliminates the need for wet works like screeding and tiling.
Guarantees a water leveled floor.
CHALLENGES SOLUTIONS
CASE IN POINTWATER LEVELED FLOORS
Project: GIA - Mumbai
Area: 45,000 Sq. ft.
Problem: The client wanted a water leveled floor due to the nature of their business which involves diamonds.
The floor level undulations was derived using a laser leveling machine and the heights of the pedestals were pre-planned. Hence with the use of Raised Access Floors the client achieved a water leveled floor with dry construction, modularity and fast installation.
SOLUTION
CASE IN POINTOVERCOME LEVEL UNDULATIONS
Location: MumbaiArea: 70,000 Sq. ft.
Floor plate: 12,000 Sq. ft.Undulation: 75 – 100 mm
CASE IN POINTOVERCOME LEVEL UNDULATIONS
Location: MumbaiArea: 98,000 Sq. ft.
Undulation: 80 – 120 mm
FLEXIBILITY ON THE UPSWING
Loss of opportunity and downtime during layout modifications in a live office.
Inability to adapt to evolving technology- “A Future-ready Facility.’
Freedom of configuring your workspace based on functional requirements.
Electrical, mechanical, communication, voice and data services are conveniently accessible to adapt to organizational change.
Future technology changes to be accomplished without extensive demolition or disruption.
Sustainable solution for space changes, renovations and reuse.
Facilitates quick access to Under Floor Service Distribution (UFSD).
CHALLENGES SOLUTIONS
CASE IN POINTREFURBISHMENT & FLEXIBILITY
Location: MumbaiArea: 80,000 Sq. ft.
Existing seats
Added seats
FUNCTIONALITY MEETS BEAUTY
Cable management interfering with the aesthetics of the workplace
Costs and rigidity of cable tray systems
Grommets on the raised floor allow cables to pass securely.
Conceals data cables, cable tray wiring and other unsightly equipment.
A raised floor eliminates the need for cable trays.
Optimize your wire lengths as you now have the flexibility of taking the shortest route.
CHALLENGES SOLUTIONS
CASE IN POINTOPTIMIZING UNDERFLOOR CABLE MANAGEMENT
Location: Gurgaon, Bengaluru, KolkataArea: 65,660 Sq. ft.
Power voice and data services rooted beneath the raised floor without cable trays.
DESIGNING FOR THE MOBILE WORKFORCE
Disruptions to existing tenants in case oflayout modifications.
Low noise, low downtime and minimal dust & dirt during refurbishment of the premise.
No loss of opportunity during restack/re-densification program.
Maximizes productivity and improves the working environments.
CHALLENGES SOLUTIONS
HACKING AGILITY
Height restraints Freedom of configuring your workspace based on functional requirements
Electrical, mechanical, communication, voice and data services are conveniently accessible to adapt to organizational change.
Future technology changes to be accomplished without extensive demolition or disruption.
Sustainable solution for space changes, renovations and reuse.
Facilitates quick access to Under Floor Service Distribution (UFSD).
CHALLENGES SOLUTIONS
CASE IN POINTHEIGHT CONSTRAINTS
Cannot be installed dueto height constraints.
A raised floor can be installed with a finished floor height a low as 75 mm.
FACTMYTH
Relocation Panels can be easily re-used when moving to another facility.
Easily dismantle & relocate the flooring.
Save on additional costs.
Achieve quick installation in your new facility.
CHALLENGES SOLUTIONS
HOOK AND LOOP
CASE IN POINTRELOCATION
HongkongMumbai
Bengaluru
Pune
Chennai
Hongkong – 2004
Mumbai – 2010
Life of the raised floor - 6 yrs
Area – 80,000 sq. ft.
Mumbai – 2006
Bengaluru – 2014
Life of the raised floor - 8 yrs
Area – 25,000 sq. ft.
Pune – 2007
Chennai – 2016
Life of the raised floor - 9 yrs
Area – 27,000 sq. ft.
FLOORS FOR THE ENVIRONMENT
Materials and Resources
Unitile is specifically created from recycled components and materials that meet Singapore Green Building Standards (SGBC) for safety and low emission.
The panel infill is made up of recyclable contents such as non combustible cement.
Drastically reduces the deadload on the base building
The dead load of 3” of raised flooring system is only 35 to 42 Kg/ Sq. m. v/s 3” of IPS (concrete) is 150 - 170 Kg / Sq. m.
Repeated reconfiguration involves breaking works thus results in the weakening of the base building.
Lifespan exceeding 25 yrs
Owning a raised flooring systemis a permanent asset for the tenant. On the completion of the lease period in a facility, the complete system can be dismantled and relocated to the customer’s new facility.
We have the honor of being the only companyin India to achieve the green certification from
Singapore Green Building Council (SGBC) with a two-tick remark.
Our Clients
CO-WORKING CLIENTS
Bengaluru, Delhi, Gurgaon, Hyderabad, Mumbai, Navi Mumbai, Thane, Uttar
Pradesh
14,46,617 Sq. Ft.Hyderabad, Mumbai, Kolkata, Noida, Pune, Chennai, Bengaluru, Gurgaon
11,23,460 Sq. Ft.
Gurgaon
2,39,251 Sq. Ft.
Bengaluru, Hyderabad, Pune, Mumbai
1,61,604 Sq. Ft.Pune, Hyderabad, Mumbai, Gurgaon,
Chennai, Bengaluru
1,45,841 Sq. Ft.
Chennai
1,25,002 Sq. Ft.
CO-WORKING CLIENTS
Mumbai
33,907 Sq. Ft.
Mumbai
11,657 Sq. Ft.
Chennai
10,689 Sq. Ft.
KEY CLIENTS
KEY CLIENTS
KEY CLIENTS
Client Speaks
“Good product! Had a great experience throughout the project.”
07-03-2020
“Project team very cooperative & dedicated.”
24-12-2019
“Site team has given full-time support with timely project completion. Overall team has supported & suggested whenever required.”
21-12-2019
“Material delivery on time and execution also excellent. Superb supervision during work.”
31-05-2019
“Allianz Very good experience working with entire site team with utmost quality, co-operation, and timely delivery.”
04-04-2019
“Blackrock The superstition, quality control and service is absolutely high-level, would always recommend.”
28-03-2019
“Highly satisfied with great teamco-ordination. The entire team is fully trained and expert.”
16-03-2019
“Completed supply and installation as per site requirement and committed time line 1 week for 30,000 sq.ft area.”
“Very satisfied with the product, good workmanship by the coordinator.”
28-05-2017 28-05-2017
“Good Projects Team. Project was executed seamless without any escalation.”
21-03-2017
“Team has done a great job which has increased the bar of satisfaction of the client. The team manager has managed the critical job very efficiently and moved the project to closure very smoothly.”
25-03-2017
“Workmanship is very good. Quality of Product is good. Vendor support is excellent.”
03-12-2016
“Good experience and timely delivery, fast execution.”
11-05-2016
“We are very pleased with the overall performance of your product. The structure and surface finish resulted in a highly stable and almost noise neutral floor. The pedestals, tools and on-site cutting process made installations simple and quick. We are already seeing its advantages in quick work stations layout adjustments. In short, Unitile is performing as promised.”
02-08-2016
PHILIPPINES
“Product is very good and fulfills all requirement.“
12-10-2015
“Timely delivery, good execution, people were cooperative.”
31-12-2014
“I am extremely happy with the service provided which helped complete the project on time.”
07-10-2014
“Dedicated Team!! Terrific Product!! Excellent Overall Experience!! Looking forward to working with you in future.”
31-05-2014
“The execution was flawless and commitment level is highly satisfactory.”
“Delivery on time as committed and supported for installation works to meet the project timelines. Good work done by Ajit and Team.”
27-06-201420-01-2014
“Happy with on-site team’spro-activeness.”
05-08-2013
“Completed installation work as per committed timelines, i.e. 15 days for 1.5 lakh sq.ft area.”
02-12-2013
INDIAAhmedabad | Ankleshwar | Aurangabad | Bareilly | Bengaluru |
Chandigarh | Chennai | Cuttack | Goa | Gurgaon | Guwahati |
Hyderabad | Indore | Jaipur | Kanpur | Kolkata | Lucknow |
Mumbai | Nagpur | New Delhi | Pune | Raipur | Thane | Vadodara
INTERNATIONALAzerbaijan | Bahrain | Bangladesh | Egypt | Hong Kong | Indonesia | Kenya |
Nepal | Oman | Philippines | Qatar | Saudi Arabia | Singapore | Sri Lanka |
Tanzania | Turkey | UAE | Vietnam I Maldives I Nigeria I Bhutan
OURPRESENCE