Recovery Boiler Inspections
Jim GrahamBuckman Laboratories
TAPPI Engineering ConferenceOctober 2007
![Page 2: Confined Space Recovery Boiler](https://reader030.fdocuments.net/reader030/viewer/2022011722/577ccd371a28ab9e788bcf14/html5/thumbnails/2.jpg)
If you are going to spend three hours cutting wood, spend two hours sharpening your saw.
![Page 3: Confined Space Recovery Boiler](https://reader030.fdocuments.net/reader030/viewer/2022011722/577ccd371a28ab9e788bcf14/html5/thumbnails/3.jpg)
Inspection Discussion
SafetyEquipmentReviewing materialInspectionReporting
![Page 4: Confined Space Recovery Boiler](https://reader030.fdocuments.net/reader030/viewer/2022011722/577ccd371a28ab9e788bcf14/html5/thumbnails/4.jpg)
Safety
Follow established mill proceduresLock out / tag outConfined space entryCommunication
Never inspect a boiler without a watchContingency plan in case of emergency
Monitor conditions within the boilerAir qualityPotential for other hazards
![Page 5: Confined Space Recovery Boiler](https://reader030.fdocuments.net/reader030/viewer/2022011722/577ccd371a28ab9e788bcf14/html5/thumbnails/5.jpg)
Safety
Be aware of potential risksLeaking feedwaterBlowdown flash tank crossoverShock hazardsInter-drum hazards
Report unsafe working conditionsLearn about the equipment that will be inspected
![Page 6: Confined Space Recovery Boiler](https://reader030.fdocuments.net/reader030/viewer/2022011722/577ccd371a28ab9e788bcf14/html5/thumbnails/6.jpg)
Equipment Preparation
Inspection cameras (boroscope and still)4 gas monitorRescue HarnessScraper, magnet, sample bags (Whirlpak)Parafilm and transparent tapeDeposit test kit (qualitative)Necessary clothing, gloves and respiratorVentilation
![Page 7: Confined Space Recovery Boiler](https://reader030.fdocuments.net/reader030/viewer/2022011722/577ccd371a28ab9e788bcf14/html5/thumbnails/7.jpg)
Equipment Examples
![Page 8: Confined Space Recovery Boiler](https://reader030.fdocuments.net/reader030/viewer/2022011722/577ccd371a28ab9e788bcf14/html5/thumbnails/8.jpg)
Understand the Boiler Specifics
Review drawings and elevation diagramIdentify inspection areasNote any mechanical changes to system
Review tube inspection recordsPast inspection reportsPhotos and video records
Be aware of past chemical excursionsDate, severity, contaminant
![Page 9: Confined Space Recovery Boiler](https://reader030.fdocuments.net/reader030/viewer/2022011722/577ccd371a28ab9e788bcf14/html5/thumbnails/9.jpg)
Understand the Boiler Specifics
Know what will be accessibleWork with contractors and millTake advantage of any opportunity
Review any mechanical, operational or chemical changes since last inspection
Baffles, treatment program, controlChanges in treatment can contribute to redistribution of deposits in the boiler
![Page 10: Confined Space Recovery Boiler](https://reader030.fdocuments.net/reader030/viewer/2022011722/577ccd371a28ab9e788bcf14/html5/thumbnails/10.jpg)
Tube Inspection Map - History
Tube 1
Row 1
![Page 11: Confined Space Recovery Boiler](https://reader030.fdocuments.net/reader030/viewer/2022011722/577ccd371a28ab9e788bcf14/html5/thumbnails/11.jpg)
Inspection Areas
Upper and lower wall headersLook for debris, pluggage, Inspect accessible wall tubes
Penthouse and lower vestibuleSteam and mud drums
Waterline (loose equipment can cause steam purity issues)Check integrity of cyclones, demisters, chevrons, and all separating equipment
![Page 12: Confined Space Recovery Boiler](https://reader030.fdocuments.net/reader030/viewer/2022011722/577ccd371a28ab9e788bcf14/html5/thumbnails/12.jpg)
Inspection Areas
Generating bank and downcomersNote deposition pattern if presentIdentify signs of steam blanketingLook for corrosion at tube ends
Side wallsRun boroscope in all accessible tubesMake note of elevation and tube specifics
Floor and roof tubesRun scope as far as possible
![Page 13: Confined Space Recovery Boiler](https://reader030.fdocuments.net/reader030/viewer/2022011722/577ccd371a28ab9e788bcf14/html5/thumbnails/13.jpg)
Inspection Areas
Screen tubesMay indicate area-specific issuesFocus on slopes and bends
Superheaters and headersCarryover
FiresideBlisters and bulges indicate heat transfer issues. Changing fuels can alter the heat flux to the tube
Auxiliary equipment
![Page 14: Confined Space Recovery Boiler](https://reader030.fdocuments.net/reader030/viewer/2022011722/577ccd371a28ab9e788bcf14/html5/thumbnails/14.jpg)
General Photos
![Page 15: Confined Space Recovery Boiler](https://reader030.fdocuments.net/reader030/viewer/2022011722/577ccd371a28ab9e788bcf14/html5/thumbnails/15.jpg)
Boroscoping
Provides a convenient record of changesTubes can be tracked year after year
Newer technology makes data access easyDVD and flash drive recording media
Inspection results can be inserted into reportVirtually all areas of boiler can be accessedResults are portable
Questionable areas can be shared via email
![Page 16: Confined Space Recovery Boiler](https://reader030.fdocuments.net/reader030/viewer/2022011722/577ccd371a28ab9e788bcf14/html5/thumbnails/16.jpg)
Boroscoping MapRecovery BoilerGenerating Bank
(top view)
co lds ide
Fu rnaceho ts ide
row01
t ub e01
row10
tube01
row20
tube01
ro w30
tube01
ro w40
tube01
row50
tube01
row60
tube01
row70
tube01
row80
tube01
row84
tube01
row
01tu
be27
row
10tu
be27
row
20tu
b e2 7
row
30t u
be2 7
row
40t u
be2 7
row
50t u
be2 7
row
60t u
be27
row
70tu
b e27
row
80tu
b e27
row
84t u
be27
tube 10
tube 15
tube 20
tube 10
tube 15
tube 20
.
![Page 17: Confined Space Recovery Boiler](https://reader030.fdocuments.net/reader030/viewer/2022011722/577ccd371a28ab9e788bcf14/html5/thumbnails/17.jpg)
General Reporting
Provide as much information as possibleExecutive summaryAnalytical resultsBoroscope map / tube historyFollow-up planPhotos, video clips
Keep the report format consistentMake the data easy to access and share
![Page 18: Confined Space Recovery Boiler](https://reader030.fdocuments.net/reader030/viewer/2022011722/577ccd371a28ab9e788bcf14/html5/thumbnails/18.jpg)
Report Components
Probable Combination for Deposit
Percent of Compound
46%
27%
8%
8%4% 3% 2% 1%1%
CALCIUM CARBONATE (CALCITE)
IRON OXIDES
MAGNESIUM PHOSPHATE (MUNSONITE)SILICA / QUARTZ / CRISTOBALITE
MAGNESIUM SILICATE (SERPENTINE)
SODIUM CARBONATE
CALCIUM SULFATE (ANHYDRITE)
COPPER OXIDES
ALUMINUM, MANGANESE AND / OR ZINC OXIDES
Row 1
Tube 1
![Page 19: Confined Space Recovery Boiler](https://reader030.fdocuments.net/reader030/viewer/2022011722/577ccd371a28ab9e788bcf14/html5/thumbnails/19.jpg)
Summary
Plan well to be safeReview information from past inspectionsMake sure equipment is fully functionalYou can’t collect too much informationMake the results easily accessibleKeep good recordsAsk questions