Configuration ManagementT3 Webinar Feb 21, 2008
Chuck Larsen
ITS Program Coordinator
Oregon Department of Transportation
![Page 2: Configuration Management T3 Webinar Feb 21, 2008 Chuck Larsen ITS Program Coordinator Oregon Department of Transportation.](https://reader030.fdocuments.net/reader030/viewer/2022032707/56649e395503460f94b2a78d/html5/thumbnails/2.jpg)
Outline
• CM at ODOT– Our repositories– Configuration Identification (more formal)– Change Management– Accounting– Audits (less formal)
• Support for CM
• Benefits & Lessons learned
![Page 3: Configuration Management T3 Webinar Feb 21, 2008 Chuck Larsen ITS Program Coordinator Oregon Department of Transportation.](https://reader030.fdocuments.net/reader030/viewer/2022032707/56649e395503460f94b2a78d/html5/thumbnails/3.jpg)
Configuration Management at ODOT
• CM is very integrated into what we do
• It is hard to discuss it as a sole context
• It is a key process set in our system development, project management, and maintenance methodology
![Page 4: Configuration Management T3 Webinar Feb 21, 2008 Chuck Larsen ITS Program Coordinator Oregon Department of Transportation.](https://reader030.fdocuments.net/reader030/viewer/2022032707/56649e395503460f94b2a78d/html5/thumbnails/4.jpg)
CM Repositories at ODOT
• Project document– Project Statements, Designs, Test Plans, Specs, etc...
• Source code• Requirements Repository• Application deployment and versioning• Hardware deployment• Field equipment
![Page 5: Configuration Management T3 Webinar Feb 21, 2008 Chuck Larsen ITS Program Coordinator Oregon Department of Transportation.](https://reader030.fdocuments.net/reader030/viewer/2022032707/56649e395503460f94b2a78d/html5/thumbnails/5.jpg)
Project Documents
Project documentation is stored in directories, the directory structure is controlled by the project office. It is organized by system by project. They are also organized by projects in development vs. in production.
![Page 6: Configuration Management T3 Webinar Feb 21, 2008 Chuck Larsen ITS Program Coordinator Oregon Department of Transportation.](https://reader030.fdocuments.net/reader030/viewer/2022032707/56649e395503460f94b2a78d/html5/thumbnails/6.jpg)
Project Documents Include
• Project Management
• Development Methodology– Architecture– Development strategy– Requirements reports– Design– Specs– Test plans
![Page 7: Configuration Management T3 Webinar Feb 21, 2008 Chuck Larsen ITS Program Coordinator Oregon Department of Transportation.](https://reader030.fdocuments.net/reader030/viewer/2022032707/56649e395503460f94b2a78d/html5/thumbnails/7.jpg)
Source Code Management
Source code is stored in directories, the directory structure is controlled by the project office. It is organized by system and by version. Old versions are stored in history. Current development code vs. what is in production.
![Page 8: Configuration Management T3 Webinar Feb 21, 2008 Chuck Larsen ITS Program Coordinator Oregon Department of Transportation.](https://reader030.fdocuments.net/reader030/viewer/2022032707/56649e395503460f94b2a78d/html5/thumbnails/8.jpg)
Requirements Repository (Doors)158
6194
The TOCS’s shall support an automatic interface to the Remedy application. Automatic notification may be based upon thresholds
2 700
156
5239
The TOCS system shall be capable of generating alarms from all ODOT field devices within an ODOT designated zone.
2 700
76 4249
The TOCS will use Traffic Monitoring Stations to determine traffic conditions
2 700
309
6320
The scheduler shall support at least # TBD simultaneous active, scheduled events at any given time.
2 700
310
6321
The scheduler shall be able to integrate other subsystems, such that additional devices and actions may be scheduled (i.e., set camera views for time of day, schedule ramp metering, etc.).
2 700
406
3379
The TOCS shall provide an integrated VSL (Variable Speed Limit) program using all of ODOT’s roadway field devices.
2 700
ODOT maintains a master requirements list of all systems. The list gets updated through the system development and maintenance process.
This is not true for all legacy systems.
![Page 9: Configuration Management T3 Webinar Feb 21, 2008 Chuck Larsen ITS Program Coordinator Oregon Department of Transportation.](https://reader030.fdocuments.net/reader030/viewer/2022032707/56649e395503460f94b2a78d/html5/thumbnails/9.jpg)
Hardware/Software
IT System Menu
IT System Name Acronym Program Area
Top of FormAdvanced Traffic Management
ATM ITS (Intelligent Transportation Systems)
Automatic Vehicle Location AVL ITS (Intelligent Transportation Systems)
AVTEC Radio System AVT ITS (Intelligent Transportation Systems)
Cable TV CTV ITS (Intelligent Transportation Systems)
Camera Services ITS-CSS ITS (Intelligent Transportation Systems)
Closed Circuit TV Region 1 CCT1 ITS (Intelligent Transportation Systems)
Closed Circuit TV Region 2-5 CCT2-5 ITS (Intelligent Transportation Systems)
Computer Aided Dispatch CAD ITS (Intelligent Transportation Systems) Bottom of Form
And the list goes on …
![Page 10: Configuration Management T3 Webinar Feb 21, 2008 Chuck Larsen ITS Program Coordinator Oregon Department of Transportation.](https://reader030.fdocuments.net/reader030/viewer/2022032707/56649e395503460f94b2a78d/html5/thumbnails/10.jpg)
System Repository
System information
![Page 11: Configuration Management T3 Webinar Feb 21, 2008 Chuck Larsen ITS Program Coordinator Oregon Department of Transportation.](https://reader030.fdocuments.net/reader030/viewer/2022032707/56649e395503460f94b2a78d/html5/thumbnails/11.jpg)
System Repository
Contact information
![Page 12: Configuration Management T3 Webinar Feb 21, 2008 Chuck Larsen ITS Program Coordinator Oregon Department of Transportation.](https://reader030.fdocuments.net/reader030/viewer/2022032707/56649e395503460f94b2a78d/html5/thumbnails/12.jpg)
System Repository
Interfaces
![Page 13: Configuration Management T3 Webinar Feb 21, 2008 Chuck Larsen ITS Program Coordinator Oregon Department of Transportation.](https://reader030.fdocuments.net/reader030/viewer/2022032707/56649e395503460f94b2a78d/html5/thumbnails/13.jpg)
System Repository
System components List
![Page 14: Configuration Management T3 Webinar Feb 21, 2008 Chuck Larsen ITS Program Coordinator Oregon Department of Transportation.](https://reader030.fdocuments.net/reader030/viewer/2022032707/56649e395503460f94b2a78d/html5/thumbnails/14.jpg)
System Repository
System component information
Note: Production, test and development environments or tracked.
![Page 15: Configuration Management T3 Webinar Feb 21, 2008 Chuck Larsen ITS Program Coordinator Oregon Department of Transportation.](https://reader030.fdocuments.net/reader030/viewer/2022032707/56649e395503460f94b2a78d/html5/thumbnails/15.jpg)
Hardware ViewServers by Application
![Page 16: Configuration Management T3 Webinar Feb 21, 2008 Chuck Larsen ITS Program Coordinator Oregon Department of Transportation.](https://reader030.fdocuments.net/reader030/viewer/2022032707/56649e395503460f94b2a78d/html5/thumbnails/16.jpg)
Hardware ViewComponents Loaded on a Server
![Page 17: Configuration Management T3 Webinar Feb 21, 2008 Chuck Larsen ITS Program Coordinator Oregon Department of Transportation.](https://reader030.fdocuments.net/reader030/viewer/2022032707/56649e395503460f94b2a78d/html5/thumbnails/17.jpg)
Change Management
The Process
![Page 18: Configuration Management T3 Webinar Feb 21, 2008 Chuck Larsen ITS Program Coordinator Oregon Department of Transportation.](https://reader030.fdocuments.net/reader030/viewer/2022032707/56649e395503460f94b2a78d/html5/thumbnails/18.jpg)
Configuration Establishment/Identification
Theoretical “CM” process describes this as following:• To establish the CM infrastructure in order to ensure integrity and
consistency in the various versions of the configuration items delivered.
• To formalize a CM plan.
In practice ODOT:• Establishes what elements go to which repository though policy and
procedure.• Does not commonly create CM plans on a project level. • Creation of the elements are established in the development and
maintenance processes.• Each component type has naming conventions. Not all elements
have formal naming conventions.
![Page 19: Configuration Management T3 Webinar Feb 21, 2008 Chuck Larsen ITS Program Coordinator Oregon Department of Transportation.](https://reader030.fdocuments.net/reader030/viewer/2022032707/56649e395503460f94b2a78d/html5/thumbnails/19.jpg)
Accounting & Change Management
The Theoretical “CM” process describes this as:• Implementing changes • Tracking the changes to the system
In practice ODOT uses:• SCM requests to track and control source code and
project documentation
• Change requests to document implementation changes to the production/test environment
![Page 20: Configuration Management T3 Webinar Feb 21, 2008 Chuck Larsen ITS Program Coordinator Oregon Department of Transportation.](https://reader030.fdocuments.net/reader030/viewer/2022032707/56649e395503460f94b2a78d/html5/thumbnails/20.jpg)
ODOT SCM
What– Source code– Project documentation
Processes– SCM requests
Controls– Program coordinator oversight– Project office oversight
![Page 21: Configuration Management T3 Webinar Feb 21, 2008 Chuck Larsen ITS Program Coordinator Oregon Department of Transportation.](https://reader030.fdocuments.net/reader030/viewer/2022032707/56649e395503460f94b2a78d/html5/thumbnails/21.jpg)
ODOT Change Management
What– All changes to the IT environment must go through
ODOT’s change management process.
Processes– Change Request
• Repository Updates• Logs
Controls– All changes are managed and coordinated by
ODOT’s ITS maintenance coordinator. Verifies all standards and practices are met.
![Page 22: Configuration Management T3 Webinar Feb 21, 2008 Chuck Larsen ITS Program Coordinator Oregon Department of Transportation.](https://reader030.fdocuments.net/reader030/viewer/2022032707/56649e395503460f94b2a78d/html5/thumbnails/22.jpg)
Configuration Audits
The Theoretical “CM” process describes this as:• To ensure that developers have followed the CM process with
respect to all external obligations.• To verify that the software items match the configuration item
descriptions in the specification documentation, and that the package being reviewed is complete.
In practice ODOT uses:• High level testing of each requirement as part of the project. • Auditing by the project office that the required documentation is
complete.• Review by the Program Coordinator of results.
![Page 23: Configuration Management T3 Webinar Feb 21, 2008 Chuck Larsen ITS Program Coordinator Oregon Department of Transportation.](https://reader030.fdocuments.net/reader030/viewer/2022032707/56649e395503460f94b2a78d/html5/thumbnails/23.jpg)
Configuration Management
Support at ODOT
![Page 24: Configuration Management T3 Webinar Feb 21, 2008 Chuck Larsen ITS Program Coordinator Oregon Department of Transportation.](https://reader030.fdocuments.net/reader030/viewer/2022032707/56649e395503460f94b2a78d/html5/thumbnails/24.jpg)
CM is required by policy at ODOT– Policy IS-002, established in 1999 in
response to Y2K– ADM 04-05 System engineering
Primarily an IT policy
![Page 25: Configuration Management T3 Webinar Feb 21, 2008 Chuck Larsen ITS Program Coordinator Oregon Department of Transportation.](https://reader030.fdocuments.net/reader030/viewer/2022032707/56649e395503460f94b2a78d/html5/thumbnails/25.jpg)
ODOT Policy IS-002 Established 1999
IT Configuration Management
PURPOSE: To ensure that the integrity of ODOT’s software and hardware
assets, and their related components, is protected and effectively managed throughout the product’s life cycle.
BACKGROUND: In 1991, the Legislature passed Senate Bill 1210. This legislation
states, "Information is a strategic asset of the state which must be managed as a valuable state resource." ODOT has an enormous investment in hardware, and created and purchased information software to support the organization’s business processes. The integrity of these components is vital to the organization.
![Page 26: Configuration Management T3 Webinar Feb 21, 2008 Chuck Larsen ITS Program Coordinator Oregon Department of Transportation.](https://reader030.fdocuments.net/reader030/viewer/2022032707/56649e395503460f94b2a78d/html5/thumbnails/26.jpg)
CM Policy Goals
• GOALS:• CM activities are planned for each project• Configuration components are identified,
maintained in a controlled repository, and made available as needed
• Changes to established configuration components are controlled
• Affected groups and individuals are aware of baseline content, the status of configuration data, proposed changes, and how to access this information
![Page 27: Configuration Management T3 Webinar Feb 21, 2008 Chuck Larsen ITS Program Coordinator Oregon Department of Transportation.](https://reader030.fdocuments.net/reader030/viewer/2022032707/56649e395503460f94b2a78d/html5/thumbnails/27.jpg)
Policy Guidelines
• Establish and maintain CM processes and procedures to ensure software and hardware assets, and their related components, are protected and effectively managed throughout their life cycle
• Assign responsibility for CM for each project or product
• Ensure CM is implemented and utilized throughout the product’s life cycle
• Ensure configuration component baselines and CM activities are audited on a periodic basis
![Page 28: Configuration Management T3 Webinar Feb 21, 2008 Chuck Larsen ITS Program Coordinator Oregon Department of Transportation.](https://reader030.fdocuments.net/reader030/viewer/2022032707/56649e395503460f94b2a78d/html5/thumbnails/28.jpg)
Key Factor:
Strong partnership between ITS and IS.• IS leadership realized ITS was coming and
planned accordingly.• IS staffs positions specifically for ITS
– Development– Field Maintenance– Project Management
• System Methodology
![Page 29: Configuration Management T3 Webinar Feb 21, 2008 Chuck Larsen ITS Program Coordinator Oregon Department of Transportation.](https://reader030.fdocuments.net/reader030/viewer/2022032707/56649e395503460f94b2a78d/html5/thumbnails/29.jpg)
Benefits of CM
You control the system. Not the other way around.
You can make changes affordably.Reduced costs for future projects
Reduced costs for maintenance
![Page 30: Configuration Management T3 Webinar Feb 21, 2008 Chuck Larsen ITS Program Coordinator Oregon Department of Transportation.](https://reader030.fdocuments.net/reader030/viewer/2022032707/56649e395503460f94b2a78d/html5/thumbnails/30.jpg)
Benefits of CM
How else can you…Keep track of
• Dozens of applications• Over 50 servers• Several 100 field devices
While• Working on 3-6 major software development projects• Process dozens of maintenance requests• Dealing with standard IT infrastructure maintenance• Adding several new devices every month• Maintaining and updating the field equipment
![Page 31: Configuration Management T3 Webinar Feb 21, 2008 Chuck Larsen ITS Program Coordinator Oregon Department of Transportation.](https://reader030.fdocuments.net/reader030/viewer/2022032707/56649e395503460f94b2a78d/html5/thumbnails/31.jpg)
Lessons learned
• Partnership with IS is important
• Keep it as simple as you can
• Certain things must be very formal– Change management into production.
• The people who use the data must be responsible for maintaining the data.
![Page 32: Configuration Management T3 Webinar Feb 21, 2008 Chuck Larsen ITS Program Coordinator Oregon Department of Transportation.](https://reader030.fdocuments.net/reader030/viewer/2022032707/56649e395503460f94b2a78d/html5/thumbnails/32.jpg)
You know your CM is working if
• You know what applications are installed where?• You know what components and versions make up your
applications.• When a system has problems maintenance staff don’t
waste time looking for documentation.• When you start an enhancement project to an existing
system you have the document you need.– Existing requirements– Existing test plans– Etc…
• Staff doesn’t struggle with implementation of systems.• Field Staff know the what equipment is installed in what
cabinets, so they can take the appropriate spare parts.
![Page 33: Configuration Management T3 Webinar Feb 21, 2008 Chuck Larsen ITS Program Coordinator Oregon Department of Transportation.](https://reader030.fdocuments.net/reader030/viewer/2022032707/56649e395503460f94b2a78d/html5/thumbnails/33.jpg)
Contact Info
Chuck LarsenOregon Department TransportationIntelligent Transportation System Program CoordinatorPhone: 503 986 3676Email: [email protected]