CONFERENCE OF BEE EMPANNELLED CFL INVESTORS / MANUFACTURERS FOR IMPLEMENTATION OF

17
CONFERENCE OF BEE EMPANNELLED CFL INVESTORS / MANUFACTURERS FOR IMPLEMENTATION OF

description

CONFERENCE OF BEE EMPANNELLED CFL INVESTORS / MANUFACTURERS FOR IMPLEMENTATION OF. A. CLEAN DEVELOPMENT MECHANISM CDM. SSC- PoA Registered under Kyoto Protocol with UNFCCC by. BUREAU OF ENERGY EFFICIENCY. MINISTRY OF POWER, GOI. - PowerPoint PPT Presentation

Transcript of CONFERENCE OF BEE EMPANNELLED CFL INVESTORS / MANUFACTURERS FOR IMPLEMENTATION OF

Page 1: CONFERENCE OF  BEE EMPANNELLED CFL INVESTORS / MANUFACTURERS FOR IMPLEMENTATION OF

CONFERENCE OF BEE EMPANNELLED CFL INVESTORS /

MANUFACTURERS FOR IMPLEMENTATION OF

Page 2: CONFERENCE OF  BEE EMPANNELLED CFL INVESTORS / MANUFACTURERS FOR IMPLEMENTATION OF

A

CLEAN DEVELOPMENT MECHANISM

CDM SSC-PoA

Registered under Kyoto Protocol with UNFCCC by

BUREAU OF ENERGY EFFICIENCY MINISTRY OF POWER, GOI

Page 3: CONFERENCE OF  BEE EMPANNELLED CFL INVESTORS / MANUFACTURERS FOR IMPLEMENTATION OF

Under the BLY scheme quality long-life CFLs would be distributed by SSC-CPA implementer(s) to grid-connected residential households in exchange of an incandescent lamp (ICL) @ INR 15.

Once the CFLs have reached their end of life or any CFLs which have failed prematurely during the project period, the SSC-CPA implementer(s) would arrange for the collection and disposal of CFLs as per applicable environmental norms.

To bridge the cost differential between the market price of the CFLs and the price at which they are distributed to households, the Clean Development Mechanism (CDM) is harnessed. The SSC-CPA implementer(s) would cover the project cost through sale of GHG emission reductions (CERs) achieved in their respective CPA areas.

Page 4: CONFERENCE OF  BEE EMPANNELLED CFL INVESTORS / MANUFACTURERS FOR IMPLEMENTATION OF

BEE will co-ordinate the Small-Scale Programme of Activities (SSC-PoA) with UNFCCC.

BEE will support the project implementer(s) in implementing the CDM Programme Activities (CPAs) in India through Electricity Distribution Companies (DISCOMs)

ROLE OF BUREAU OF ENERGY EFFICIENCY

Page 5: CONFERENCE OF  BEE EMPANNELLED CFL INVESTORS / MANUFACTURERS FOR IMPLEMENTATION OF

• DISCOM identifies BEE empanelled Investor for implementation of BLY in their territory

• Enters into Bi-partite Agreement with Investor

• Enters into Tri-partite Agreement with Investor and BEE

• Provides all the necessary support including the database of the targeted consumers

ROLE OF DISCOM

Page 6: CONFERENCE OF  BEE EMPANNELLED CFL INVESTORS / MANUFACTURERS FOR IMPLEMENTATION OF

ROLE OF INVESTOR

•Investor identifies long-life IS 15111 certified CFL Supplier

• Develops project as per BLY scheme templates

•Generate CFL use awareness amongst the households

• Distributes the CFLs to the targeted consumers in the project area

Page 7: CONFERENCE OF  BEE EMPANNELLED CFL INVESTORS / MANUFACTURERS FOR IMPLEMENTATION OF

Role ofUttar Pradesh Power Corporation Ltd.

Uttar Pradesh Power Corporation Ltd. through its DISCOMs intends to promote Energy Efficiency in lighting system of residential households consumers based on the scheme parameters laid down by the Bureau of Energy Efficiency under the CDM based CFL Lighting Scheme Bachat Lamp Yojana.

Model Bid Documents have been prepared based on EOI Templete of BEE for selection of investors / project developers .

Page 8: CONFERENCE OF  BEE EMPANNELLED CFL INVESTORS / MANUFACTURERS FOR IMPLEMENTATION OF

DISCOMs PARTICIPATING IN

Page 9: CONFERENCE OF  BEE EMPANNELLED CFL INVESTORS / MANUFACTURERS FOR IMPLEMENTATION OF

DAKSHINANCHAL VIDYUT VITRAN NIGAM LTD.

Number of consumers

Zones

Agra Aligarh Kanpur Jhansi Banda

18 Lakh

DVVNL TENDER NOTICE

Page 10: CONFERENCE OF  BEE EMPANNELLED CFL INVESTORS / MANUFACTURERS FOR IMPLEMENTATION OF

PASCHIMANCHAL VIDYUT VITRAN NIGAM LTD.

Number of consumers

Zones

2O Lakh

PVVNL TENDER NOTICE

Meeru

t

Saharanpu

r

Moradab

ad

Noida Ghaziaba

d

Page 11: CONFERENCE OF  BEE EMPANNELLED CFL INVESTORS / MANUFACTURERS FOR IMPLEMENTATION OF

SCOPE OF BLY OPPORTUNITY

•The number of CPA documents to be developed in DISCOM is to be decided by the CPA-implementer at the time of document development.

• The Investor will provide new CFLs to household, in case CFLs become non functional during the Warrantee Period. Warrantee Period is one year from the completion date of CFL distribution to households as accepted by BEE for start date of CER crediting for a CPA under PoA.

Page 12: CONFERENCE OF  BEE EMPANNELLED CFL INVESTORS / MANUFACTURERS FOR IMPLEMENTATION OF

SCOPE OF BLY OPPORTUNITY

ICL CFL

40W 8-10 Watt

60W 11-15 Watt

100W 18-20 Watt

• The range of CFL Watt should be as given in the table :-

•The CFLs should be capable of with standing very wide Voltage swings i.e. 110 volts to 280 volts. •The CFLs to be distributed should carry the manufacturer’s logo, BLY logo and logo of DISCOM.

Page 13: CONFERENCE OF  BEE EMPANNELLED CFL INVESTORS / MANUFACTURERS FOR IMPLEMENTATION OF

SCOPE OF BLY OPPORTUNITYThe project completion period shall be

CER crediting Period which will be calculated as follows :-

1 Rated life of lamps in hours (Minimum) as per IS 15111

6000 hr.

2 Uses of CFL per day as per CDM small scale methodology AMS-II. J

3.5 hr.

3 CER crediting period =6000/(3.5*365)

4.7 years.

Page 14: CONFERENCE OF  BEE EMPANNELLED CFL INVESTORS / MANUFACTURERS FOR IMPLEMENTATION OF

EVALUATION CRITERION FOR SELECTION OF PROJECT

DEVELOPER

The bid shall be awarded to the firm which will share the maximum percentage of CERs with DISCOM.

Page 15: CONFERENCE OF  BEE EMPANNELLED CFL INVESTORS / MANUFACTURERS FOR IMPLEMENTATION OF

EXPECTED TIMELINES

Deliverable Planned Date(s)Submit bi-lateral agreement with DISCOM

Within one month of winning the bid

Submit bank guarantee of requisite Within one month of winning the bidSign Tri-partite agreement with DISCOM and BEE

Within two month of winning the bid

Secure finance Within four months of winning the bid

Secure supply agreement of CFLs with manufacturer

Within four months of winning the bid

CPA submission for inclusion to BEE Within six months of winning the bidDelivery of CFLs (beginning date) Within eight months of winning the

bidDistribution of CFLs (beginning date) Within ten months of winning the

bidDistribution of CFLs (end date) Within Twelve months of bid date

Page 16: CONFERENCE OF  BEE EMPANNELLED CFL INVESTORS / MANUFACTURERS FOR IMPLEMENTATION OF

NON-PERFORMANCE PENALTY

“The CPA implementer is required to submit a Performance Bank Guarantee (from a nationalized / scheduled commercial bank of Rs. 50 Lacs (INR) on winning the bid•Either within one month of registration of PoA with the CDM executive board

OR•Within one month of winning the bid ( whichever is earlier )”

This Bank Guarantee shall be invoked by the DISCOM in the event the CPA implementers withdraw or are unable to implement the CPA as agreed to the timelines after following due procedure given in the relevant agreements. The Bank Guarantee is returnable as per the following. •50% after the expiry of warrantee period. •50% after the Project Completion.

Page 17: CONFERENCE OF  BEE EMPANNELLED CFL INVESTORS / MANUFACTURERS FOR IMPLEMENTATION OF