Transcript of Con Kehely BA, BAI, MUBC Chartered Engineer, National Transport Authority Design Section Sutton 2...
Con Kehely BA, BAI, MUBC Chartered Engineer,
National Transport Authority Design Section
Sutton 2 Sandycove Cycle RouteInterim Solution at Clontarf / Dollymount
(Wooden Bridge to Causeway Road)
S2S:- WOODEN BRIDGE TO CAUSEWAY ROAD
Roads• Traffic• Condition
Sea Defences• Erosion• Flooding
Ecology• SPA• SCA• pNHA
S2S:- WOODEN BRIDGE TO CAUSEWAY ROAD
S2S:- WOODEN BRIDGE TO CAUSEWAY ROAD
S2S:- WOODEN BRIDGE TO CAUSEWAY ROAD
S2S:- WOODEN BRIDGE TO CAUSEWAY ROAD
S2S:- WOODEN BRIDGE TO CAUSEWAY ROAD
S2S:- WOODEN BRIDGE TO CAUSEWAY ROAD
NEXT STEPS
•Planning Application / Public Display
•Cost
•Construction mid 2013
CONCLUSION
• Interim Solution
• Deliverable in Short Term
• Cycling
• Walking
• Additional flood defence
• Coastal erosion
• Trunk Water Main