Comprehensive Traffic Study and Concept Plans for ... · Comprehensive Traffic Study and Concept...

29
Comprehensive Traffic Study and Concept Plans for Intersection Improvements at County Route 13A (Sycamore Avenue) and County Route 51 (Hance Avenue), and County Route 13A (Sycamore Avenue) and Hope Road in the Borough of Tinton Falls

Transcript of Comprehensive Traffic Study and Concept Plans for ... · Comprehensive Traffic Study and Concept...

Page 1: Comprehensive Traffic Study and Concept Plans for ... · Comprehensive Traffic Study and Concept Plans for Intersection Improvements at County Route 13A (Sycamore Avenue) and ...

Comprehensive Traffic Study and Concept Plans for Intersection Improvements at County Route 13A (Sycamore Avenue) and County Route 51 (HanceAvenue), and County Route 13A (Sycamore Avenue) and Hope Road in the Borough of Tinton Falls

Page 2: Comprehensive Traffic Study and Concept Plans for ... · Comprehensive Traffic Study and Concept Plans for Intersection Improvements at County Route 13A (Sycamore Avenue) and ...

Agenda1. Existing Conditions2. Future Conditions3. Infeasible Concepts4. Feasible Concepts

Page 3: Comprehensive Traffic Study and Concept Plans for ... · Comprehensive Traffic Study and Concept Plans for Intersection Improvements at County Route 13A (Sycamore Avenue) and ...

Existing Conditions

Page 4: Comprehensive Traffic Study and Concept Plans for ... · Comprehensive Traffic Study and Concept Plans for Intersection Improvements at County Route 13A (Sycamore Avenue) and ...

Tinton FallsEXIT 105

Red Bank

Tinton Falls

Middletown

Shrewsbury

Hope Rd

HanceAve

Page 5: Comprehensive Traffic Study and Concept Plans for ... · Comprehensive Traffic Study and Concept Plans for Intersection Improvements at County Route 13A (Sycamore Avenue) and ...

Study AreaHance

Ave

3

3

21

1

2

Page 6: Comprehensive Traffic Study and Concept Plans for ... · Comprehensive Traffic Study and Concept Plans for Intersection Improvements at County Route 13A (Sycamore Avenue) and ...

Data Collection• Turning Movement Counts

• Hance/Hope & Sycamore• Tuesday and Thursday in October 2017

• Road Tubes• Between Intersections• October 2017 – One Full Week

• Origin-Destination Counts• Vehicles Diverting Away from Hance• Over 100 Vehicles During Peak Hours

• Peak Hours• 7:30 AM to 8:30 AM• 5:00 PM to 6:00 PM

Page 7: Comprehensive Traffic Study and Concept Plans for ... · Comprehensive Traffic Study and Concept Plans for Intersection Improvements at County Route 13A (Sycamore Avenue) and ...

CR 51 (Hance Avenue)

CR 13A (Sycamore Avenue)615468

154380

235545

406 177

418139

358165

Hop

e R

oad

PM Peak Volumes

Traffic Volumes – Existing Conditions

AM Peak Volumes

222 100

417409

408343

42981

471327

424267

Page 8: Comprehensive Traffic Study and Concept Plans for ... · Comprehensive Traffic Study and Concept Plans for Intersection Improvements at County Route 13A (Sycamore Avenue) and ...

Existing Congestion – AM Peak HourVideo Recording

Hance Avenue Facing South, Towards Sycamore

SimTraffic ModelHance Avenue at Sycamore Avenue

Page 9: Comprehensive Traffic Study and Concept Plans for ... · Comprehensive Traffic Study and Concept Plans for Intersection Improvements at County Route 13A (Sycamore Avenue) and ...

Existing Conditions AM - Video of Close Call #1

Page 10: Comprehensive Traffic Study and Concept Plans for ... · Comprehensive Traffic Study and Concept Plans for Intersection Improvements at County Route 13A (Sycamore Avenue) and ...

Existing Conditions AM - Video of Close Call #2

Page 11: Comprehensive Traffic Study and Concept Plans for ... · Comprehensive Traffic Study and Concept Plans for Intersection Improvements at County Route 13A (Sycamore Avenue) and ...

0

5

10

15

20

2520

01

2002

2003

2004

2005

2006

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

Cra

shes

Per

Yea

rSycamore & Hance 4-Year Crash History• More Than 20 Injuries• Failure to Yield• Right Angle Collisions

• Crash Rate Over Twice State Avg.• Injury Rate Over 3x State Avg.

Crash History

DATANOT

AVAILABLE

Page 12: Comprehensive Traffic Study and Concept Plans for ... · Comprehensive Traffic Study and Concept Plans for Intersection Improvements at County Route 13A (Sycamore Avenue) and ...

Future Conditions

Page 13: Comprehensive Traffic Study and Concept Plans for ... · Comprehensive Traffic Study and Concept Plans for Intersection Improvements at County Route 13A (Sycamore Avenue) and ...

Future Conditions – 2037• Forecasting Data for Population/Emp.• 0.6% Per Year; 20 Years• Fort Monmouth Redevelopment• Apple Street Traffic Back to Hance• More Than 15% Growth

Page 14: Comprehensive Traffic Study and Concept Plans for ... · Comprehensive Traffic Study and Concept Plans for Intersection Improvements at County Route 13A (Sycamore Avenue) and ...

Need for Improvement• Cost of Crashes to Society Over 20 Years - $12 Million

• $600,000 Per Year $100,000 Per Injury Crash & $10,000 Per PDO• Calculated According to Highway Safety Manual

• MUTCD Warrants Signalization• Four-Hour Volume• Eight-Hour Volume• Exceeds Five Correctable Crashes Per Year Threshold

• 2037 Intersection Delay to Increase 25% at Hance

Page 15: Comprehensive Traffic Study and Concept Plans for ... · Comprehensive Traffic Study and Concept Plans for Intersection Improvements at County Route 13A (Sycamore Avenue) and ...

Infeasible Concepts

Page 16: Comprehensive Traffic Study and Concept Plans for ... · Comprehensive Traffic Study and Concept Plans for Intersection Improvements at County Route 13A (Sycamore Avenue) and ...

Concept 3 – Single-Lane Roundabout• Failing Operations• 1000’ Queuing• Backup Extends Off Page

Page 17: Comprehensive Traffic Study and Concept Plans for ... · Comprehensive Traffic Study and Concept Plans for Intersection Improvements at County Route 13A (Sycamore Avenue) and ...

Concept 4 – Multi-Lane Roundabout• Huge Property Impacts• Driver Confusion• Sideswipe Collisions

Page 18: Comprehensive Traffic Study and Concept Plans for ... · Comprehensive Traffic Study and Concept Plans for Intersection Improvements at County Route 13A (Sycamore Avenue) and ...

Concept 5 – Right-In/Right-Out• Enforcement Needed• Safety Issue• Traffic Diversions

• Riverdale Avenue• Knollwood Drive• Apple Street• Linda Lane• Shrewsbury Avenue

Page 19: Comprehensive Traffic Study and Concept Plans for ... · Comprehensive Traffic Study and Concept Plans for Intersection Improvements at County Route 13A (Sycamore Avenue) and ...

Concept 6 – All-Way Stop Control• Failing Operations• Over ½ Mile Queuing• Queuing Off Page• For Low Volume Roads

Page 20: Comprehensive Traffic Study and Concept Plans for ... · Comprehensive Traffic Study and Concept Plans for Intersection Improvements at County Route 13A (Sycamore Avenue) and ...

Feasible Concepts

Page 21: Comprehensive Traffic Study and Concept Plans for ... · Comprehensive Traffic Study and Concept Plans for Intersection Improvements at County Route 13A (Sycamore Avenue) and ...

Concept 1 – Hope Road Extension

Page 22: Comprehensive Traffic Study and Concept Plans for ... · Comprehensive Traffic Study and Concept Plans for Intersection Improvements at County Route 13A (Sycamore Avenue) and ...

Concept 1 – Hope Road Extension

Page 23: Comprehensive Traffic Study and Concept Plans for ... · Comprehensive Traffic Study and Concept Plans for Intersection Improvements at County Route 13A (Sycamore Avenue) and ...

Concept 1 – Video of 2037 Conditions

Page 24: Comprehensive Traffic Study and Concept Plans for ... · Comprehensive Traffic Study and Concept Plans for Intersection Improvements at County Route 13A (Sycamore Avenue) and ...

Concept 2 – Signal at Hance

Page 25: Comprehensive Traffic Study and Concept Plans for ... · Comprehensive Traffic Study and Concept Plans for Intersection Improvements at County Route 13A (Sycamore Avenue) and ...

Concept 2 – Signal at Hance

Page 26: Comprehensive Traffic Study and Concept Plans for ... · Comprehensive Traffic Study and Concept Plans for Intersection Improvements at County Route 13A (Sycamore Avenue) and ...

Concept 2 – Video of 2037 Conditions

Page 27: Comprehensive Traffic Study and Concept Plans for ... · Comprehensive Traffic Study and Concept Plans for Intersection Improvements at County Route 13A (Sycamore Avenue) and ...

Matrix of Feasible Concepts

Feasible Concept

Traffic Operations

Maximum Distance of

Widening Along Sycamore

Right-of-Way to be Acquired

Mature Landscaping Impact Along

Sycamore

Concept 1Hope Road Extension

LOS D or BetterQueues Under

400’

Roughly 10’ 3.1 Acres

Maple, Oak, Evergreen

4 Trees

Concept 2 Signal at Hance

LOS D or BetterQueues Under

500’(Traffic May Wait at Two Signals)

Roughly 15’ 0.1 Acres

Maple, Oak, Evergreen

15 Trees

Page 28: Comprehensive Traffic Study and Concept Plans for ... · Comprehensive Traffic Study and Concept Plans for Intersection Improvements at County Route 13A (Sycamore Avenue) and ...

Matrix of Feasible Concepts (continued)

Feasible Concept Cost by Conceptual Alternative Pros Cons

Concept 1Hope Road Extension

Construction – $1.5 MMROW – $0.7 MM

Total – $2.2 MM

Consolidates Traffic Operations,

Addresses Safety Need

Property Takings Required, Property

Access Issues

Concept 2 Signal at Hance

Construction – $1.5 MMROW – $0.1 MM

Total – $1.6 MM

Minimizes Property Impacts,

Addresses Safety Need

O&M of Two Signals

Page 29: Comprehensive Traffic Study and Concept Plans for ... · Comprehensive Traffic Study and Concept Plans for Intersection Improvements at County Route 13A (Sycamore Avenue) and ...