Comprehensive Environmental Assessment of Engineered ... · Development Commitment to Rapid...

29
US Army Corps of Engineers BUILDING STRONG ® Comprehensive Environmental Assessment of Engineered Aluminum Nanoparticles in DoD Materiel: Evaluation before Acquisition Chris Griggs -ERDC -EL Environmental Engineering Branch Dr. David Johnson-ERDC-EL Chief, Risk Assessment Branch Dr. Jeff Steevens-ERDC-EL Project Lead/Senior Scientist

Transcript of Comprehensive Environmental Assessment of Engineered ... · Development Commitment to Rapid...

Page 1: Comprehensive Environmental Assessment of Engineered ... · Development Commitment to Rapid Acquisition Technology development and acquisitions process. ... I Analytical methods development

US Army Corps of EngineersBUILDING STRONG®

Comprehensive Environmental Assessment of Engineered Aluminum Nanoparticles in DoD Materiel: Evaluation before Acquisition

Chris Griggs -ERDC -ELEnvironmental Engineering Branch

Dr. David Johnson-ERDC-ELChief, Risk Assessment Branch

Dr. Jeff Steevens-ERDC-ELProject Lead/Senior Scientist

Page 2: Comprehensive Environmental Assessment of Engineered ... · Development Commitment to Rapid Acquisition Technology development and acquisitions process. ... I Analytical methods development

Report Documentation Page Form ApprovedOMB No. 0704-0188

Public reporting burden for the collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering andmaintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, ArlingtonVA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to a penalty for failing to comply with a collection of information if itdoes not display a currently valid OMB control number.

1. REPORT DATE 28 MAR 2011 2. REPORT TYPE

3. DATES COVERED 00-00-2011 to 00-00-2011

4. TITLE AND SUBTITLE Comprehensive Environmental Assessment of Engineered AluminumNanoparticles in DoD Materiel: Evaluation before Acquisition

5a. CONTRACT NUMBER

5b. GRANT NUMBER

5c. PROGRAM ELEMENT NUMBER

6. AUTHOR(S) 5d. PROJECT NUMBER

5e. TASK NUMBER

5f. WORK UNIT NUMBER

7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) U.S. Army Engineer Research and Development Center,EnvironmentalLaboratory,3909 Halls Ferry Road,Vicksburg,MS,39180-6199

8. PERFORMING ORGANIZATIONREPORT NUMBER

9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM(S)

11. SPONSOR/MONITOR’S REPORT NUMBER(S)

12. DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release; distribution unlimited

13. SUPPLEMENTARY NOTES Presented at the 2011 DoD Environmental Monitoring & Data Quality Workshop (EMDQ 2011), 28 Mar ?1 Apr, Arlington, VA.

14. ABSTRACT

15. SUBJECT TERMS

16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF ABSTRACT Same as

Report (SAR)

18. NUMBEROF PAGES

28

19a. NAME OFRESPONSIBLE PERSON

a. REPORT unclassified

b. ABSTRACT unclassified

c. THIS PAGE unclassified

Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18

Page 3: Comprehensive Environmental Assessment of Engineered ... · Development Commitment to Rapid Acquisition Technology development and acquisitions process. ... I Analytical methods development

BUILDING STRONG®

Stages of Acquisition Process Benefiting from Environmental Hazard Assessment

A CB

ConceptDecision

SystemIntegration

SystemDemonstration

Full‐RateProduction& Deployment

Sustainment Disposal

CONCEPTREFINEMENT

TECHNOLOGYDEVELOPMENT

SYSTEM DEVELOPMENT& DEMONSTRATION

PRODUCTION& DEPLOYMENT

OPERATIONS& SUPPORT

Pre‐SystemsAcquisition

SystemsAcquisition

Sustainment& Maintenance

DesignReadinessReview

FRPDecisionReview

MilestonesAnalyzeConcept

BeginDevelopment

Commitment to Rapid Acquisition

Technologydevelopmentandacquisitionsprocess.AdaptedfromMikeMcDevitt,InstallationsManagementCommand

2

Page 4: Comprehensive Environmental Assessment of Engineered ... · Development Commitment to Rapid Acquisition Technology development and acquisitions process. ... I Analytical methods development

BUILDING STRONG®

DoD Materiel Development and Costs

It is estimated that over 85% of the costs of technology occur after systems acquisition

3

Page 5: Comprehensive Environmental Assessment of Engineered ... · Development Commitment to Rapid Acquisition Technology development and acquisitions process. ... I Analytical methods development

BUILDING STRONG®

Comprehensive Environmental Assessment (CEA)

Adapted from Davis, 2007

4

Page 6: Comprehensive Environmental Assessment of Engineered ... · Development Commitment to Rapid Acquisition Technology development and acquisitions process. ... I Analytical methods development

BUILDING STRONG®

CEA Process Identify the question(s)

► Sources► Life cycle stages, fate & transport, matrices, exposure, effects► Developed methods and standardized protocols

Obtain diverse perspectives► ODUSD Chemical & Material Risk Management ► NNCO National Nanotechnology Coordination Office ► ARMY - ARDEC , Army Institute of Public Health, ERDC► Navy - NSWC-IHD► Air Force - Air Force Laboratory Human Effectiveness Directorate

Use collective judgment method

Adapted from Davis, 2007

5

Page 7: Comprehensive Environmental Assessment of Engineered ... · Development Commitment to Rapid Acquisition Technology development and acquisitions process. ... I Analytical methods development

BUILDING STRONG®

ERDC CEA Case Study:Engineered Aluminum Nanoparticles

6

Page 8: Comprehensive Environmental Assessment of Engineered ... · Development Commitment to Rapid Acquisition Technology development and acquisitions process. ... I Analytical methods development

BUILDING STRONG®

•Lack of mature industries

•Data lacking or evolving

•Characterization of materials

•Uncertainty is high

•Identify and prioritize knowledge gaps

Applying CEA approach to nanotechnology in the R&D Phase

7

Page 9: Comprehensive Environmental Assessment of Engineered ... · Development Commitment to Rapid Acquisition Technology development and acquisitions process. ... I Analytical methods development

BUILDING STRONG®

CEA: Life Cycle Stages of nano-Al

8

J Comprehensive Environmental Assessment~

Life Cycle Environmental Fate & Exposure-Effects

Stages Pathways Transport Dose

Feedstocks "'

Manufacture Air ~ Primary Biota

Distribution contaminants Ecosystems Water >-

Storage j Secondary Human

Human Health populations

Soil contaminants Use

Disposal

l 1 1 1 1 I Analytical methods development and application I

rf.iiiffll ~®

Page 10: Comprehensive Environmental Assessment of Engineered ... · Development Commitment to Rapid Acquisition Technology development and acquisitions process. ... I Analytical methods development

BUILDING STRONG®

Site Visit: ARDEC Picatinny Arsenal Nanotechnology Research Center

Operates North America’s largest Radiofrequency (RF) Induction Plasma reactor (Tekna Plasma Systems) pilot plant for nano-Al and high performance nonmaterial:►Plasma Synthesis►10 micron aluminum powder feedstock►Use of nano-aluminum still in the R&D phase►Characterization FE-SEM ,XRD, XRF, XRD, BET,

Thermal analysis

9

Page 11: Comprehensive Environmental Assessment of Engineered ... · Development Commitment to Rapid Acquisition Technology development and acquisitions process. ... I Analytical methods development

BUILDING STRONG®

CEA: Life Cycle Stages – Feedstocks Powder feeder system introduces10

micron aluminum powder Plasma system combines “top down”

and “bottom up” process, solid precursor vaporized and quenched enabling synthesis of nano-Al

Feedstock is aluminum oxide passivated in situ with an approximately 5 nm oxide coating

Nano-scale powder collected in stainless steel canister inside glove box

10

Page 12: Comprehensive Environmental Assessment of Engineered ... · Development Commitment to Rapid Acquisition Technology development and acquisitions process. ... I Analytical methods development

BUILDING STRONG®

CEA: Life Cycle Stages – manufacture

Picatinny Arsenal Nanotechnology Research Center maintains two 300kiloWatt RF Tekna Plasma Systems:

•Metals and metal oxides

•Ceramics

Cyclone classifier separates product by size, nano-scale powder is collected in a collection chamber under argon

Synthesis efficiency is 10:1 nanopowder to aggregates, aggregates are stored for research purposes

11

Page 13: Comprehensive Environmental Assessment of Engineered ... · Development Commitment to Rapid Acquisition Technology development and acquisitions process. ... I Analytical methods development

BUILDING STRONG®

CEA: Life Cycle Stages – manufacture

HEPA filtered fan with 100 cfm exhaust hood, hydrogen sensors in enclosure to detect leaks

Reactor process capacity of 4hrs per day with 4 hours remaining to rapidly characterize product FE-SEM ,XRD, XRF, XRD, BET, Thermal Analysis, etc.

12

Page 14: Comprehensive Environmental Assessment of Engineered ... · Development Commitment to Rapid Acquisition Technology development and acquisitions process. ... I Analytical methods development

BUILDING STRONG®

CEA: Life Cycle Stages – distribution and storage

Use of nano-aluminum still in the R&D phase

Stored under inert atmosphere Aggregates are stored at the facility (still

have research value), Current synthesis of 200g batches for rapid

characterization Stability studies indicate no loss in surface

area, however a 20% loss in reactivity due to oxygen diffusion

13

Page 15: Comprehensive Environmental Assessment of Engineered ... · Development Commitment to Rapid Acquisition Technology development and acquisitions process. ... I Analytical methods development

BUILDING STRONG®

CEA: Environmental Pathways of nano-Al

14

J Comprehensive Environmental Assessment~

Life Cycle Environ mental ate & Exposure-Effects

Stages Pathways ransport Dose

Feedstocks "'

Manufacture

I Air Primary Biota

Distribution contaminants Ecosystems Water

j Human Storage Secondary

populations Human Health

Soil contaminants Use

Disposal

1 l 1 1 1 I Analytical methods development and application I

rf.iiiffll ~®

Page 16: Comprehensive Environmental Assessment of Engineered ... · Development Commitment to Rapid Acquisition Technology development and acquisitions process. ... I Analytical methods development

BUILDING STRONG®

CEA: Environmental Pathways of nano-Al

Material Feedstock

•Al powder•Al solutions

Production•Material•Byproducts•Waste/emissions

Distribution•Storage•Spills•Shipping

Deployment•Ignition•Propellants•Additives

End of Use•Demilitarization•Recycling•Disposal

Human•Soldier•Worker•Public

Eco‐Terrestrial•Wildlife•Birds•Plants

Eco‐Aquatic•Wildlife•Fish•Plants

Air•Inhalation•Deposition

Water•Ingestion•Contact

Soil•Ingestion•Contact

Research and Development

Pathways

Receptors

Technology development and use for nanoaluminum

15

Page 17: Comprehensive Environmental Assessment of Engineered ... · Development Commitment to Rapid Acquisition Technology development and acquisitions process. ... I Analytical methods development

BUILDING STRONG®

CEA: Fate and Transport of nano-Al

16

,-----i Comprehensive Environmental Assessment t-----.

Life Cycle Stages

Feedstocks "'

Manufacture

Distribution

Storage

Use

Disposal

1

Environmenta Fate & Pathways Transport

Air .....,

Primary contaminants

Water

Exposure­Dose

Biota

Soil

Human Secondary populations

__, contaminant~

1 l 1

Effects

Ecosystems

Human Health

1 Analytical methods development and application

rf.iiiffll ~®

Page 18: Comprehensive Environmental Assessment of Engineered ... · Development Commitment to Rapid Acquisition Technology development and acquisitions process. ... I Analytical methods development

BUILDING STRONG®

CEA: Fate and Transport of nano-Al

Particle size dictates oxidation potential Nano-Al/ Al2O3 interacts with soil, water, and strongly with

humic acids Highly agglomerates affects mobility in soil Surface charge changes with leachate alters mobility Micron-sized Al2O3 has greater sorption than nano-Al2O3

17

Page 19: Comprehensive Environmental Assessment of Engineered ... · Development Commitment to Rapid Acquisition Technology development and acquisitions process. ... I Analytical methods development

BUILDING STRONG®

CEA: Exposure-Dose of nano-Al

18

,-----i Comprehensive Environmental Assessment t-----.

Life Cycle Stages

Feedstocks "'

Manufacture

Distribution

Storage

Use

Disposal

1

Environmental Fate & Exposure­Dose Pathways Transport

Air

Water

Soil

1

I Primary Bi t [ contaminants

0 a >- >-

j Human Secondary contaminant~ populations

1 !

Effects

Ecosystems !>-

Human Health

1 Analytical methods development and application

rf.iiiffll ~®

Page 20: Comprehensive Environmental Assessment of Engineered ... · Development Commitment to Rapid Acquisition Technology development and acquisitions process. ... I Analytical methods development

BUILDING STRONG®

CEA: Exposure-Dose% content of nano-Al

75%50%

10%

Plot of extinction values for Al triangular prisms (Faber et al. 2008)

19

Page 21: Comprehensive Environmental Assessment of Engineered ... · Development Commitment to Rapid Acquisition Technology development and acquisitions process. ... I Analytical methods development

BUILDING STRONG®

CEA: Exposure-Dose of nano-Al

•ARDEC-NIOSH collaborative framework “Nano-powder Synthesis & Associated Safety Precautions at ARDEC”

TWA and other occupational exposure values?

R&D laboratory evaluations of occupational exposures?

Most likely routes of nano-Al/Al2O3exposure: Inhalation > Dermal > Internal (oral, ip, iv)

20

Page 22: Comprehensive Environmental Assessment of Engineered ... · Development Commitment to Rapid Acquisition Technology development and acquisitions process. ... I Analytical methods development

BUILDING STRONG®

CEA: Effects of nano-Al

21

J Comprehensive Environmental Assessment~

Life Cycle Environmental Fate & Exposure-Effects

Stages Pathways Transport Dose

Feedstocks "'

Manufacture Air ~ Primary Biota

Distribution contaminants Ecosystems Water >- 1>-

Storage j Secondary Human

Human Health populations

Soil contaminants Use

Disposal

1 1 1 1 l I Analytical methods development and application I

rf.iiiffll ~®

Page 23: Comprehensive Environmental Assessment of Engineered ... · Development Commitment to Rapid Acquisition Technology development and acquisitions process. ... I Analytical methods development

BUILDING STRONG®

CEA: Problems with Effects of nano-Al• Nano-Al/Al2O3 is highly agglomerated• Is aged nano-Al the same as nano-Al2O3?

Nano-Al

Nano-Al2O3

Nano-Al

Increased Oxidation

22

Page 24: Comprehensive Environmental Assessment of Engineered ... · Development Commitment to Rapid Acquisition Technology development and acquisitions process. ... I Analytical methods development

BUILDING STRONG®

CEA: Effects of nano-Al

Ecosystems: Less toxic to daphnids and algae than other NPs More toxic to juvenile zebrafish than adults Causes atherothrombotic events in zebrafish Produces differential effects on benthic organisms Mildly toxic to bacteria Mildly phytotoxic (root growth inhibition) due to ROS Soil nematodes and earthworm reproduction negatively

affected

23

Page 25: Comprehensive Environmental Assessment of Engineered ... · Development Commitment to Rapid Acquisition Technology development and acquisitions process. ... I Analytical methods development

BUILDING STRONG®

CEA: Effects of nano-Al

Human Health:

1. Inhalation –Negatively affects alveolar macrophages function

2. Dermal –Dermal contact may increase proinflammation, dermatitis

3. Internal –Neurotoxicity (blood brain barrier disruption) and

Increased genotoxicity

24

Page 26: Comprehensive Environmental Assessment of Engineered ... · Development Commitment to Rapid Acquisition Technology development and acquisitions process. ... I Analytical methods development

BUILDING STRONG®

Preliminary Conclusions

Potential sources and releases of nano-Al to the environment that will likely occur through air, water, or soil exposures through the production, use, and disposal of nano-Al propellants, igniters, and additives.

However, these preliminary findings are the result of an assessment from the R&D community.

Data collection is still required to gain a better understanding of the future deployment and handling of nano-Al as a military technology.

25

Page 27: Comprehensive Environmental Assessment of Engineered ... · Development Commitment to Rapid Acquisition Technology development and acquisitions process. ... I Analytical methods development

BUILDING STRONG®

Data Gaps / Moving Forward

Life Cycle: Further collaboration required within the R&D community such ARDEC, NSWC-IHD, and AFRL to discuss life cycle phases.

Environmental Pathways: This is a potential laboratory and field research project (modeling and hyperspectral imaging analysis for nano-Al/energetic combustion analyses)

Exposure: Exposure to biota and humans is perhaps the biggest area of uncertainty in this entire nano-Al CEA.

Environmental Fate: Once nano-Al has moved beyond the R&D phase, field testing will be imperative to study nano-Al/Al2O3 propellants and energetics in the field.

Effects: Data needs to reflect of actual particle sizes, i.e,. nanoparticle agglomerates vs. monodispersed nanoparticles.

26

Page 28: Comprehensive Environmental Assessment of Engineered ... · Development Commitment to Rapid Acquisition Technology development and acquisitions process. ... I Analytical methods development

BUILDING STRONG®

Questions?

27

Page 29: Comprehensive Environmental Assessment of Engineered ... · Development Commitment to Rapid Acquisition Technology development and acquisitions process. ... I Analytical methods development

BUILDING STRONG®

ReferencesColeman, J.G., Johnson, D.R., Stanley, J.K., Bednar, A.J., Weiss, Boyd, R.E., Steevens, J.A. (2010) Assessing the fate and effects of nano aluminum oxide in the terrestrial earthworm, Eisenia fetida. Environ. Toxicol. Chem. 29(7): 1575-1580.Darlington, T.K., Neigh, A.M., Spencer, M.T., Nguyen, O.T., Oldenburg, S.J. (2009) Nanoparticlecharacteristics affecting environmental fate and transport through soil. Environ. Toxicol. Chem. 28(6): 1191-1199.Davis, J.M. (2007) How to assess the risks of nanotechnology: learning from past experience. Nanosci. Nanotech. 7: 402-409.Davis, J.M. (2007) How to assess the risks of nanotechnology: learning from past experience. Nanosci. Nanotech. 7: 402-409.Doshi, R., Braida, W., Christodoulatos, C., Wazne, M., O’Connor, G. (2008) Nano-aluminum: transport through sand columns and environmental effects on plants and soil communities. Environ. Res. 106: 296-303.Faber, Benjamin J., Schatz, George C., and Camden, Jon P. Electrodynamics Calculations of SMSERS Active Junctions and New UV Active Subtrates. Nanoscape Vol. 5: 41-51Johnson, D.R., Methner, M.M., Kennedy, A.J., Steevens, J.A. (2010) Potential for occupational exposure to engineered carbon-based nanomaterials in environmental laboratory studies. Environ. Health Perspect. 118(1): 49-54.Stanley, J.K., Coleman, J.G., Weiss, C.A., Steevens, J.A. (2010) Sediment toxicity and bioaccumulation of nano and micron-sized aluminum oxide. Environ. Toxicol. Chem. 29(2): 422-429.Critical review and advising from Dr. Mike Davis, Senior Science Advisor, U.S. EPA and Dr. Thomas Seager, Professor, University of Arizona

28