Completing Industrial Waste Surveys (IWS) Completing IWS.pdf · Authority to control industrial and...

13
Completing Industrial Waste Surveys (IWS) By Brian Allen

Transcript of Completing Industrial Waste Surveys (IWS) Completing IWS.pdf · Authority to control industrial and...

Page 1: Completing Industrial Waste Surveys (IWS) Completing IWS.pdf · Authority to control industrial and commercial discharges to the sewer collection and treatment system, thereby reducing

Completing Industrial Waste

Surveys (IWS)By Brian Allen

Page 2: Completing Industrial Waste Surveys (IWS) Completing IWS.pdf · Authority to control industrial and commercial discharges to the sewer collection and treatment system, thereby reducing

A pretreatment program is an EPA-mandated program that requires the Control

Authority to control industrial and commercial discharges to the sewer

collection and treatment system, thereby reducing the amount of pollutants

released to the environment from the wastewater treatment plant.

The Industrial Waste Survey (IWS) is a required part of the pretreatment

program. The IWS is conducted primarily to identify the nature and quantity of

pollutants entering the Publicly Owned Treatment Works.

40 CFR 403.8 (f) (2) (i) Identify and locate all possible IUs

(ii) Identify the character and volume of pollutants(iii) Notify IUs of applicable PT standards

PURPOSE

Page 3: Completing Industrial Waste Surveys (IWS) Completing IWS.pdf · Authority to control industrial and commercial discharges to the sewer collection and treatment system, thereby reducing

Investigating your Collection SystemTo protect your POTW

Page 4: Completing Industrial Waste Surveys (IWS) Completing IWS.pdf · Authority to control industrial and commercial discharges to the sewer collection and treatment system, thereby reducing

The Industrial Waste Survey (IWS) or may be referred as permit application is

the effort made to ensure that the POTW's list of Industrial Users and the

pollutants in their wastestream are current, and to determine which, if any, of

the Users have the potential to adversely affect the WWTP and its receiving

environments and should become Significant Industrial Users (SIU), or

otherwise might need regulation as a non-SIU.

Industrial Waste Survey (IWS)

Page 5: Completing Industrial Waste Surveys (IWS) Completing IWS.pdf · Authority to control industrial and commercial discharges to the sewer collection and treatment system, thereby reducing

The Significant Industrial User criteria are found in EPA 40 CFR 403 Pretreatment Standards and are listed below.An Industrial User is a SIU if the facility:• Discharges an average of 25,000 gallons or more per day of process wastewater

to the POTW (excluding sanitary, noncontact cooling and boiler blowdown wastewaters) or;

• Contributes more than 5 percent of the NPDES or non-discharge permitted flow limit or organic capacity of the POTW treatment plant (In this context, organic capacity refers to BOD, TSS and ammonia), or;

• Is subject to categorical standards under 40 CFR Part 403.6 and 40 CFR Parts 405-471, or;

• Is, regardless of Parts (1), (2), and (3) above, otherwise determined by the control authority to have a reasonable potential for adversely affecting the POTW's operation or for violating any pretreatment standard or requirement or POTW's receiving stream standard, or to limit the POTW's sludge disposal options.

Significant Industrial User (SIU)

Page 6: Completing Industrial Waste Surveys (IWS) Completing IWS.pdf · Authority to control industrial and commercial discharges to the sewer collection and treatment system, thereby reducing

Filling out the IWS

https://www.ncsd.sc.gov/archived-pages/industrial-

pretreatment

https://www.ncsd.sc.gov/download_file/view/350/242

NORTH CHARLESTON SEWER DISTRICT

INDUSTRIAL WASTEWATER

DISCHARGE PERMIT APPLICATION

SECTION A - GENERAL INFORMATION

A.1. Company name, mailing address, and telephone number:

Zip Code Telephone No.

A.2. Address of production or manufacturing facility. (If same as above, check .)

Zip Code Telephone No.

Note to Signing Official: In accordance with Title 40 of the Code of Federal Regulations Part 403

Section 403.14, information and data provided in this questionnaire which identifies the nature and

frequency of discharge shall be available to the public without restriction. Requests for confidential

treatment of other information shall be governed by procedures specified in 40 CFR Part 2. Should a

discharge permit be required for your facility, the information in this questionnaire will be used to

issue the permit.

This is to be signed by an authorized official of your firm after adequate completion of this form and

review of the information by the signing official.

I certify under penalty of law that this document and all attachments were prepared

under my direction or supervision in accordance with a system designed to assure that

qualified personnel properly gathered and evaluated the information submitted. Based on my

inquiry of the persons who manage the system, or those persons directly responsible for

gathering the information, the information submitted is, to the best of my knowledge and

belief, true, accurate and complete. I am aware that there are significant penalties for

submitting false information including the possibility of fines and imprisonment for knowing

violations.

Authorized Representative:

Type or Print Name Title

Signature Date

Page 7: Completing Industrial Waste Surveys (IWS) Completing IWS.pdf · Authority to control industrial and commercial discharges to the sewer collection and treatment system, thereby reducing

Providing False Information

Western Massachusetts Power Plant Owner and Management Companies Sentenced

for Tampering and False Reporting.

Settlement requires companies to pay fines and payments totaling over $7 million .

BOSTON – Berkshire Power Company (BPC) and Power Plant Management Services, Inc.

(PPMS) were sentenced in U.S. District Court in Springfield for tampering with air

pollution emissions equipment, and PPMS was also sentenced for submitting false

information to both environmental and energy regulators relating to the

Berkshire Power Plant (“the Plant”) in Agawam, Mass.

During the course of the tampering investigation, criminal investigators also learned that

PPMS made and caused staff at the Plant to make false statements to the ISO-New

England, about the Plant’s availability to produce power for the New England grid. They

also caused staff at the Plant to falsely claim to the ISO that the Plant was available to

produce power when it was not. PPMS did this to maximize the Plant’s revenues and to

minimize repair expenditures.

Page 8: Completing Industrial Waste Surveys (IWS) Completing IWS.pdf · Authority to control industrial and commercial discharges to the sewer collection and treatment system, thereby reducing

https://siccode.com/page/what-is-a-naics-code

Finding your NAICS & SIC Code

Page 9: Completing Industrial Waste Surveys (IWS) Completing IWS.pdf · Authority to control industrial and commercial discharges to the sewer collection and treatment system, thereby reducing

Finding your EPA Pretreatment Categorical

Standard

https://www.epa.gov/eg/industrial-effluent-guidelines

https://www.epa.gov/npdes/national-pretreatment-program

North Charleston Customers

Page 10: Completing Industrial Waste Surveys (IWS) Completing IWS.pdf · Authority to control industrial and commercial discharges to the sewer collection and treatment system, thereby reducing

List of Helpful References✓ Utility bill

✓ NAICS & SIC websites

✓ Process flow diagrams

✓ Plumbing diagrams or flow schematics

✓ Environment permits

✓ Safety & Pretreatment file

✓ Raw material list & waste disposal manifest

✓ EPA 40 CFR 403. Pretreatment website & Control Authority website

✓ Applicable effluent limits (local limits, categorical standards, BMPs, production

levels, flow data...)

✓ Analytical information

Page 11: Completing Industrial Waste Surveys (IWS) Completing IWS.pdf · Authority to control industrial and commercial discharges to the sewer collection and treatment system, thereby reducing

Friendly Reminders

• Take you time to provide accurate information

• Authorized Representative is responsible

• Confirm correct Pretreatment standards apply (Categorical standards)

• Update information (don’t copy and paste)

• Report the TRUTH If you don’t know or have the

answer, let them know

Page 12: Completing Industrial Waste Surveys (IWS) Completing IWS.pdf · Authority to control industrial and commercial discharges to the sewer collection and treatment system, thereby reducing
Page 13: Completing Industrial Waste Surveys (IWS) Completing IWS.pdf · Authority to control industrial and commercial discharges to the sewer collection and treatment system, thereby reducing

Questions? More Information?

Contact Brian AllenCell (803) 317-4811

[email protected]