Transcript of Complete Streets Design Examples - GSMSummit 2014,Tom Errico
![Page 1: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/1.jpg)
Complete Streets Design Examples
GrowSmart Maine October 21, 2014
1
![Page 2: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/2.jpg)
Road Diets/Road Retrofits
![Page 3: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/3.jpg)
3
There’s room; it needs to be recaptured
![Page 4: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/4.jpg)
4
City of Belfast
![Page 5: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/5.jpg)
5
City of Belfast
![Page 6: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/6.jpg)
6
City of Belfast
![Page 7: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/7.jpg)
Narrower Travel Lanes
• AASHTO Green Book allows narrower lanes:
– 9’ on local residential streets
– 10’ on low speed arterials & collectors
– 11’ for streets with trucks
7
![Page 8: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/8.jpg)
Lane Width Adjustment
![Page 9: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/9.jpg)
Lane Width Adjustment
![Page 10: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/10.jpg)
Facility Selection
• Bicycle Lanes
OK to reduce travel lane
10 and 11-foot lanes are just as safe as 12-foot lanes on urban arterials with posted speeds less than 45 mph
![Page 11: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/11.jpg)
18 – 49% crash reduction (ITE)
Convert 4-Lane Road to 3-Lane including Center Turn Lane
How to Make Room: Road Diets
![Page 12: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/12.jpg)
State Street– Augusta, Maine
![Page 13: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/13.jpg)
State Street– Augusta, Maine
![Page 14: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/14.jpg)
Park Avenue– Portland, Maine
![Page 15: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/15.jpg)
Park Avenue– Portland, Maine
![Page 16: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/16.jpg)
Beth Condon Path- Yarmouth, Maine
![Page 17: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/17.jpg)
Beth Condon Path- Yarmouth, Maine
![Page 18: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/18.jpg)
Congress Street - Portland
![Page 19: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/19.jpg)
Congress Street - Portland
![Page 20: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/20.jpg)
Congress Street - Portland
![Page 21: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/21.jpg)
Roadway Classification vs.
Context-Based
![Page 22: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/22.jpg)
22
Should street width be based on classification?
Functional classification doesn’t
adequately describe the street’s role
in a community
These 3 streets are “arterials” yet
look, feel and perform very
differently:
![Page 23: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/23.jpg)
North Windham, Maine
![Page 24: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/24.jpg)
Bath Road Master Plan (Route 1) Wiscasset, Maine
![Page 25: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/25.jpg)
Route 1-Wiscasset, Maine
![Page 26: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/26.jpg)
Route 1-Wiscasset, Maine
![Page 27: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/27.jpg)
Speed Matters
• Drivers’ field of vision & ability to see pedestrians
• Drivers’ ability to react and avoid a crash
• Crash severity
Speed affects:
27
![Page 28: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/28.jpg)
Speed Affects Crash Severity
High speeds lead to greater chance of serious injury & death
Doubling the speed from 20 mph to 40 mph reduces the survivability from 95% to just 15%
28
![Page 29: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/29.jpg)
Speed Affects Crash Severity
29
![Page 30: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/30.jpg)
Route 9 – Biddeford, Maine
![Page 31: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/31.jpg)
Route 9 – Biddeford, Maine
![Page 32: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/32.jpg)
Intersection Design
![Page 33: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/33.jpg)
They drive fast,
Effect of large radius on drivers
ignoring pedestrians
![Page 34: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/34.jpg)
• Large corner radii:
Allow high-speed
turns by cars
-Less likely to yield
-Injury severity
Tighten Corner Curb Radii
![Page 35: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/35.jpg)
• Large corner radii:
– Increase crossing
distance
– Require longer
signal time
Tighten Corner Curb Radii
![Page 36: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/36.jpg)
Eliminate free flow turns across
crosswalks/bikeways Designing Streets for Pedestrian Safety – Interchanges & roundabouts 7-10
… they are difficult for pedestrians to cross… they are difficult for pedestrians to cross
Avoid freeAvoid free--flow movements…flow movements…
Asheville NC
Free Flow Right Turn Lanes
![Page 37: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/37.jpg)
Franklin St. – Radius Adjustment
![Page 38: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/38.jpg)
Franklin St. – Radius Adjustment
![Page 39: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/39.jpg)
Park and St. John – Radius Adjustment
![Page 40: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/40.jpg)
Park and St. John – Radius
Adjustment
![Page 41: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/41.jpg)
Washington/Chapman – Portland, ME
![Page 42: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/42.jpg)
Pedestrian Facilities
![Page 43: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/43.jpg)
Rectangular Rapid Flash LED Beacon
►Beacon is yellow, rectangular, and has a rapid “stutter” flash
►Beacon located between the warning sign and the arrow plaque
►Must be pedestrian activated (pushbutton or passive)
►Studies indicate motorist yielding rates increased from 18.2% to 81.2% for 2 beacons and to 87.8% for 4 beacons
►Interim approval from FHWA in July 2008
43
![Page 44: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/44.jpg)
Marginal Way – Portland, Maine
![Page 45: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/45.jpg)
Curb Extensions
![Page 46: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/46.jpg)
Curb Extensions
•Reduces Pedestrian Crossing Distance
•Increases pedestrian visibility
•Prevents vehicle enchroachment on crosswalk
•Encourages slower speeds by tightening corner
radii
•Provides improved opportunity for ADA Ramps
![Page 47: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/47.jpg)
Anderson St. Neighborhood By-Way
![Page 48: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/48.jpg)
Maine Street - Brunswick
![Page 49: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/49.jpg)
Mid-Block Crossing
![Page 50: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/50.jpg)
Mid-Block Crossing
![Page 51: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/51.jpg)
Congress Street - Portland
![Page 52: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/52.jpg)
Falmouth Sidewalk/Crosswalk
![Page 53: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/53.jpg)
Falmouth Sidewalk/Crosswalk
![Page 54: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/54.jpg)
Traffic Signals
![Page 55: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/55.jpg)
Pedestrian count-down signal tells pedestrians
how much crossing time is left
Countdown Clocks
55
![Page 56: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/56.jpg)
Results from San Francisco:
25% Crash Reduction Factor after countdown signals installed
Countdown Clocks
56
![Page 57: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/57.jpg)
Route 1 - Wiscasset
![Page 58: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/58.jpg)
Shorten Cycle Lengths
Reduces Overall
Pedestrian Wait
Times
![Page 59: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/59.jpg)
Lead Pedestrian Interval
![Page 60: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/60.jpg)
Lead Pedestrian Interval
![Page 61: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/61.jpg)
Lead Pedestrian Interval
LPIs increase the visibility of crossing pedestrians and give
them priority within the intersection.
LPIs have been shown to reduce pedestrian-vehicle
collisions as much as 60% at treated intersections.
LPIs typically require adjustments to existing signal timing
that are relatively low cost compared to other
countermeasures.
![Page 62: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/62.jpg)
Other Traffic Signal Considerations
Prioritize Walking, Bicycling, and Transit
Keep the Number of Signal Phases to a Minimum
Time Signals to the Speed you Intend Traffic to Go
Adjust Timing for Peak and Off-Peak Volumes
Use FixedTime Signals as Opposed to Actuated
Signals
![Page 63: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/63.jpg)
Thank you!
![Page 64: Complete Streets Design Examples - GSMSummit 2014,Tom Errico](https://reader036.fdocuments.net/reader036/viewer/2022062514/558a2fefd8b42ae75d8b4739/html5/thumbnails/64.jpg)
QUESTIONS?
64
Tom Errico, PE Senior Associate
T.Y. Lin International Falmouth, ME