Company Profile PT. Palmas Project Engineering
-
Upload
pt-palmas-project-engineering -
Category
Business
-
view
83 -
download
2
Transcript of Company Profile PT. Palmas Project Engineering
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile Contents
Company Services
Company Management System & HSE
Company Resources
Client List
1
2
3
4
5
Company Introduction
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile - Introduction
About UsPT. PALMAS PROJECT ENGINEERING, an engineering based palm oil upstream and downstream refinery turnkey contractor, established in 2006. With great emphasis on strong engineering research developments and technologies enhancements theme, and an undisputed reputation of quality works and delivery commitment , we have established ourselves as of one the local palm oil industry favoured tender participants.
We are the pioneers in Indexer, CMC and Undertow system design developments, our engineering team in Jakarta office is coordinating the in house production developments and on site implementations. This coordination includes a constant feedback and reviews from implementation process for further improvement.
Our Jakarta workshop operation provides national support of equipment fabrications, pre-engineering assembly. Our regional workshops and warehouses set up to provide immediate and effective local supports.
We have a strong logistic team and facilities to ensure precise timed delivery and effective material handling methods.
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile - Introduction
About Us - ContinuedOur Jakarta operation has the main office located in West Jakarta Green Garden area, providing all the administrative, purchasing, project and customer support engineering facilities.
Our workshops and warehouse located in various West Jakarta Industrial parks like Tangerang Jatake Park, Union Paper Industrial park, Kapuk areas. Total land area 9,000 square M, with a workforce around 150.
Kalimantan Tengah, Sampit 1500m2 workshop located 8km from town centre, has a workshop and warehouse operation as a localized supports.
Kalimantan Barat, Pangkalanbun,and Ketapang Kelampai , both location are having our logistic and warehouse facilities for localized supports. We are fleet of heavy machineries to support our effective erections and assemblies at site.
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile Contents
Company Introduction
Company Services
Company Resources
Client List
1
2
3
4
5
Company Management System & HSE
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
We undertake all mechanical, civil site fabrications and installation works.
We are capable of renting equipments to contractors such as mobile crane, diesel welding set, generators, metal sheet roll machine, in addition we also have this own heavy equipment.
We are providing competitiveness and effective supporting for major contractors to build mill in Kalimantan Tengah and Selatan in terms of mobilizations, logistic supports and project management.
We always keep the basic principles of safety and and continue to encourage use safety equipment for our manpower.
Company Management System
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
Company Organisation StructureVice President
Danang Indra Wicaksono
General ManagerJasper Lim
Hydraulics & Electrical Services
TeamJoni S. Ginting
Project ManagerSuparman
Site Electrical EngineerIrawadi
Site Mechanical EngineerDarsono
Site Civil EngineerDarmadi
Estimator & Budgeting Manager
Rendra Kusuma
Finance & Admin Manager
Weisy
Warehouse Manager
Pipik Aryanto
Logistic ManagerRifan Khalimi
Commercial & Business DevelopmentChye Min How
ControllerLiy Link
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
2010 2011 2012 2013 2014 20150
1,000
2,000
3,000
4,000
5,000
6,000
7,000
00.0050.010.0150.020.0250.030.0350.040.045
3,6004,320 4,320
4,680
5,760 5,825
0.01
0.02 0.02
0.030.035
0.04
Man Hours LTI Frequency Rate
Man
Hou
rs
Frequency Rate
Man Hours Worked in Relation to Lost Time Incident Frequency Rate
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
2009 2010 2011 2012 2013 20140
1
2
3
4
5
6
7
8
9
3
2 2
8
2
4
1
2
4 4
1
6
0 0 0
1
2
3
0 0 0 0 0 00 0 0 0 0 0
Medical Treatment Cases First Aid Cases Near Misses LTI Fatality
Company Incident Report Analysis
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile Contents
Company Introduction
Company Management System & HSE
Company Resources
Client List
1
2
3
4
5
Company Services
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
Earth Works & Civil Works
Company Services
Mechanical Works
Hydraulics and Electrical Works
Logistic Services
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
Effecttive logistic handling
Strength of fleet (own heavy equipment)
Bulk shipment concept
Pre Fabricated concept (minimum site fabrications)
Strict work quality control
Earth Works & Civil Works
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
Earth Works & Civil Works - Picture
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
Pre Assembly concept (Main process equipment) Pre Fabricated concept Strength of equipment handling (painting by manlift) Strength of team works Standard of QA inspections
Mechanical Works
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
Mechanical Works - Picture
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
Hydraulics and Electrical Works
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
Strenght material handling equipments Strenght hydraulic and automations site implementations Effective site supervisions
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
Hydraulics and Electrical Works - Picture
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
Hydraulics and Electrical Works - Picture
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
Hydraulics and Electrical Works - Picture
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
Time frame
Vessel availabilities
Trucking facilities
Local supervisions
Local liaison accessibilites
Logistic Services
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
Logistic Services - Picture
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
300 feet jumbo barge unloading
process at temporarry jetty kalimantan barat
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
Our Full TurnkeySampoerna Agro
30 TPH FFBExtendable to 45 TPH FFB
ManismataKalimantan Barat
THE CONSTRUCTION OF USAHA AGRO INDONESIA
PALM OIL MILL
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
Ground Breaking Ceremonyon 12th June 2013
Our Full Turnkey
30 TPH FFBExtendable to 45 TPH FFB
ManismataKalimantan Barat
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
Front Preview
Back Preview
Project Progress achievement Up to Mid of June 2014
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
Vertical Sterilizer
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
Press Station Oil Storage Tank
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
EFB Conveyor WTP Area
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
Threshing & Clarification Station Kernel Recovery Station
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
PROGRESS OF WORK
ACHIEVED
91,40%
12 June 2013 Mid June 2014
PROJECTKICK OFF
0%
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
Our ProjectWithout Turnkey
Systems
Kalimantan Tengah
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
Our ProjectWithout Turnkey
Systems
Kalimantan Tengah
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
Our ProjectWithout Turnkey
Systems
Kalimantan Tengah
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
Our Project Without Turnkey Systems - Kalimantan Tengah
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
Our Project Without Turnkey Systems - Kalimantan Tengah
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
Our Project Without Turnkey Systems - Kalimantan Tengah
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
Site OfficeDaily Safety Briefing
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
Our Latest Project PT Andes Agro Investama – Ketapang, KalbarCARGILL INDONESIA
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
Our Latest Project PT Andes Agro Investama – Ketapang, Kalbar
Piling Safety Inspection
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
Our Latest Project PT Andes Agro Investama – Ketapang, KalbarPDA Test
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
Our Latest Project PT Andes Agro Investama – Ketapang, KalbarCBRTest
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
Our Latest Project PT Andes Agro Investama – Ketapang, Kalbar
Loading Ramp Area
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
Our Latest Project PT Andes Agro Investama – Ketapang, Kalbar
Loading Ramp Area
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
Our Latest Project PT Andes Agro Investama – Ketapang, Kalbar
Loading Ramp Area
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
Our Latest Project PT Andes Agro Investama – Ketapang, Kalbar
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
Our Latest Project PT Andes Agro Investama – Ketapang, Kalbar
Loading Ramp Area
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
Our Latest Project PT Andes Agro Investama – Ketapang, Kalbar
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
Our Latest Project PT Andes Agro Investama – Ketapang, Kalbar
Main Building Area
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
Our Latest Project PT Andes Agro Investama – Ketapang, Kalbar
Road Works - Hardcore
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
Our Latest Project PT Andes Agro Investama – Ketapang, Kalbar
Road Works - Hardcore
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
Our Latest Project PT Andes Agro Investama – Ketapang, KalbarRoad Works - Concrete
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
Our Latest Project PT Andes Agro Investama – Ketapang, Kalbar
Pabrikasi Batako
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
Our Latest Project PT Andes Agro Investama – Ketapang, Kalbar
Pabrikasi Reinforce Building
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
Our Latest Project PT Andes Agro Investama – Ketapang, Kalbar
Workshop Building Foundation
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
Our Latest Project PT Andes Agro Investama – Ketapang, Kalbar
Workshop Building Foundation
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
Our Latest Project PT Andes Agro Investama – Ketapang, Kalbar
Workshop Building Foundation
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
Our Latest Project PT Andes Agro Investama – Ketapang, Kalbar
Sterilizer Foundation
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
Our Latest Project PT Andes Agro Investama – Ketapang, KalbarSterilizer Foundation & Pit
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
Our Latest Project PT Andes Agro Investama – Ketapang, Kalbar
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
Our Latest Project PT Andes Agro Investama – Ketapang, Kalbar
Extention Building Erection Press StructureErection
Water Clarifier Tank Erection Nut Hopper Structure Erection
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
Our Latest Project PT Andes Agro Investama – Ketapang, Kalbar
Fiber Cyclone Structure Erection Workshop
Roofing & Cladding Erection Tipper 1 Put On Foundation
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
Our Latest Project PT Andes Agro Investama – Ketapang, KalbarOil Storage Tank
OST NO. 1, 2,3 OST NO. 4 Pilling
OST NO. 1, 2,3 OST NO. 1, 2,3
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
Our Latest Project PT Andes Agro Investama – Ketapang, Kalbar
Shipment Process
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
Our Latest Project PT Andes Agro Investama – Ketapang, Kalbar
Shipment Process
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
Our Latest Project PT Andes Agro Investama – Ketapang, Kalbar
Shipment Process
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
Our Latest Project PT Andes Agro Investama – Ketapang, Kalbar
Shipment Process
Gunung Garuda Steel Structure Jumbo Bag Cement
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile Contents
Company Introduction
Company Management System & HSE
Company Services
Client List
1
2
3
4
5
Company Resources
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
2 Toyota New Hilux 2013 2 Nissan Selfloader 2005 3 Isuzu D-Max 2012 3 Isuzu Panther 2010 5 Dump Truk UD
• 5 Unit Exca Komatsu -7• 2 Unit Vibro Compactor• 2 Unit Dozer • 5 Unit Mobile Crane 25 T• 2 Unit Manlift
Project Manager Drafter and Estimator Proffessional workers at
site Certified Welder, Etc.
Manpower, Vehicle, and Heavy Equipment Operation
Vehicle Heavy EquipmentMan Power
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
Piling 1.5 Ton Hammer Head 2 Unit
Genset Mitshubishi Above 100Kva: 8 Un Below 100Kva: 6 Un
Mini Exca 1 Unit Baby Roller 2 Unit
Mobile Ready Mixer 5 m³ : 2 Unit 8 m³ : 2 Unit
Heavy Equipment Operation - Continued
Piling Equipment Power & Other Equip.
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
Supplier List
Supplier
Krakatu Steel (Besi Baja-Cilegon Factory) Gunung Garuda (Besi Baja-Cibitung) Indonesia Putra Pratama (Batu Split-Cilegon) Indonesia Bulk Carrier (Transport-Jakarta) Bina Cipta Pondasi (Pile Supply-Tangerang)
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
In deep water , we did not hesitate to use larger vessels. And we chose Tug and Barge with a variety of sizes up to 300 feet jumbo. This vessel usually loading at Bojonagara, Cilegon – Banten.
In Associate with PT Kapuas Armada Sarana As Glory 9 LCT, with cargo tank capacity 8,000 MT we can bring
the material down the river in the region of Borneo, with limitation draft we can still reach that area.
Marine Sevices – LCT / Tug and Barge
Tug and Barge Services
LCT Services
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile Contents
Company Introduction
Company Management System & HSE
Company Services
Company Resources
1
2
3
4
5 Client List
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
Below illustrates a number of the clients which PPE (PT Palmas Project Engineering) has undertaken projects for over the last five years:
Client Listing
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
CCC (Underwater Engineering) S.A.L.A Member of the Consolidated Contractors Group of Companies
Company Profile
Build 9 Fertilizer Store Minamas Plantation in Kalimantan Tengah and Kalimantan Selatan Build Cargill - PT. Indo Sawit Kekal 50/100 TPH Mechanical Project Palm Oil Mill at
Manismata, Kalimantan Barat. Upgrade Siriham Palm Oil Mill – Poliplant Group 30 / 45 TPH at Sengkuang, Air Upas –
Kalimantan Barat. Build Palm Oil Mill PT. Maya Agro Investama 45 TPH – Poliplant Group at Desa Air
Dekakah, Manismata – Kalimantan Barat. Rehabilitation 45 TPH Lembiru Palm Oil Mill – Sime Darby – Minamas Group at
Kalimantan Barat. Build indexer turnkey sterilisation station for Rea Kaltim – PT. Sasana Yudha Bhakti new
60 Tph mill Kutai, Kalimantan Timur. Build The Construction 30-45 TPH Palm Oil Mill UAI Oil Mill – Sampoerna Agro,
Manismata – Kalimantan Barat Build The Construction 90 TPH PT AAI Sei Kerandi Oil Mill – Poliplant Group,
Kendawangan – Kalimantan Barat And others
Client Listing Last 5 Years
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services
PT PPETurnkey and Services Palm Oil Mill Companies
Rukan Green Garden Blok Z 2 / No. 78-79Kedoya Utara, Kebon Jeruk, Jakarta Barat – Indoesia 11520
Tel.: +6221 5814165, Fax: +6221 5815306Email: [email protected]
www.palmas-ppe.co.id
End of Presentation
PT PALMAS PROJECT ENGINEERINGTurnkey Contractor and Services