COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ...

62
DECEMBER 2017 PEG HEADQUA RT ERS Piazza Stia 8 00138 – Rome – Italy Phone +39 06 881741 Fax +39 06 88174210 E-mail: [email protected] PEG Engineering & Contracting DMCC Unit 1009, Jumeirah Bay Tower X3, Cluster X, Jumeirah Lakes Towers P.O. Box 634338, Dubai – UAE Phone: +971 4 4205321 Fax: +971 4 4204249 E-mail: [email protected] PEG Iraq Basrah, Al Khaliliyah Iraq Phone: +964 780 210 2000 +964 780 1623113 E-mail: [email protected] Web Site: www.pegint.com

Transcript of COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ...

Page 1: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

DECEMBER 2017

PEG HEADQUARTERSPiazza Stia 800138 – Rome – Italy

Phone +39 06 881741Fax +39 06 88174210E-mail: [email protected]

PEG Engineering & Contracting DMCCUnit 1009, Jumeirah Bay Tower X3,Cluster X, Jumeirah Lakes TowersP.O. Box 634338, Dubai – UAE

Phone: +971 4 4205321Fax: +971 4 4204249E-mail: [email protected]

PEG IraqBasrah, Al KhaliliyahIraq

Phone: +964 780 210 2000+964 780 1623113

E-mail: [email protected]

Web Site: www.pegint.com

Page 2: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

2

INDEX

�OUR COMPANY 3

�OUR SKILLS 10

�CRUDE OIL TREATMENT & GAS SEPARATION 11

�CRUDE OIL TREATMENT & GAS SEPARATION MAIN REFERENCE S 12

�OIL AND GAS TRANSPORTATION AND STORAGE FACILITIES M AIN REFERENCES 17

� UPGRADING AND REVAMPING OF EXISTING FACILITIES MAIN REFERENCES 20

�GAS METERING & REDUCING SYSTEMS - LIQUID METERING & FILTERING SYSTEMS 21

�GAS METERING & REDUCING SYSTEMS MAIN REFERENCES 23

�LIQUID METERING & FILTERING SYSTEMS MAIN REFERENCES 2 8

�OUR WORK 32

Page 3: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

3

PEG is a flexible and experienced multi-sector Supplier, that operates on behalf of Private and Public Companies in the design and implementation of Oil & Gas plants and Infrastructure since 1970, both in Italy and abroad.

OUR COMPANY

� TURNOVER IN THE LAST THREE YEARS (2014 2016) 193 M €

� EXPECTED TURNOVER FOR THE YEAR 2017: 70 M €

PEG GROUP CONSOLIDATED FIGURES

OIL & GAS

INFRASTRUCTURE

Page 4: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

4

PEG experience in the “Oil & Gas Sector” has beenconsolidated over more than forty years of experience in thesame field.

OUR COMPANY

BOARD OF DIRECTORS:

� MR. PAOLO TROCCA CHAIRMAN

� MR. GUIDO BALBO DI VINADIO BOARD DIRECTOR

� MRS. FRANCESCA TROCCA BOARD DIRECTOR

Progetti Europa & Global S.p.A. – Rome - Italy

PEG Engineering & Contracting DMCC – Dubai - UAE

MR. FABRIZIO POCCI MANAGING DIRECTOR

MR. PAOLO TROCCA CHAIRMAN

MR. MAURIZIO MELANI VICE-CHAIRMAN

Page 5: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

OUR COMPANY

ORGANIZATION CHART

PEG - ROME

5

Page 6: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

ORGANIZATION CHART

PEG - DUBAI

OUR COMPANY

6

Page 7: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

7

CERTIFICATIONS

Progetti Europa & Global S.p.A. and PEG Engineering and Contracting DMCC are certified in compliance with the standards ISO 9001:2008 , ISO 14001:2004 and OHSAS 18001:2007

OUR COMPANY

Page 8: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

8

MAJOR CLIENTS

Among PEG’s major Clients it is worth mentioning:

OUR COMPANY

� ABB S.p.A.

� AGENZIA TORINO 2006 – ITALY

� ALENIA AERONAUTICA

� ANAS - ITALY

� ANESRIF – ALGERIA

� ARAMCO

� BP IRAQ NV / ROO

� DALEEL PETROLEUM LLC - OMAN

� ENI

� EXXON

� EDISON – ITALY

� ENEL – ITALY

� GASCO – EGYPT

� GTCL – BANGLADESH

� INTERPORTO CAMPANO – ITALY

� ITALFERR – ITALY

� IRAQI MINISTRY OF TRANSPORTATION

� MOTOR OIL HELLAS – GREECE

� MOC – Missan Oil Company – IRAQ

� MdOC – Midland Oil Company – IRAQ

� OGC – Oman Gas Company S.A.O.C.

� PDO – Petroleum Development Oman L.L.C.

� PETROJET – EGYPT

� RASCO – LYBIA

� RAS EJDYER -EMSSAD EXPRESSWAY MONITORING

PROJECT MANAGEMENT COMMITTEE - LYBIA

� SAIPEM – ITALY

� SATORP - SAUDI ARABIA

� SHELL

� SCOP - IRAQ

� SOC – IRAQ

� SONATRACH – ALGERIA

� TITAS – BANGLADESH

� TECHNIP

� UNIVERSITY OF NAPLES – ITALY

� WEATHERFORD

� ZUETINA OIL COMPANY – LIBYA

Page 9: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

9

CLIENT QUALIFICATION

PEG has obtained a suitable qualification from the following worldwide Companies:

OUR COMPANY

� SAUDI ARAMCO - KSA 10042498

� ENI - ITALY 393095

� SAIPEM - ITALY 50780

� SATORP - KSA 10540

� PDO – Petroleum Development Oman L.L.C. - OMAN 100594

� ADGAS – Abu Dhabi Gas Liquefaction Company Ltd. - UAE 1 01895

� GASCO – Abu Dhabi Gas Industries – UAE 027610

� TAKREER - Abu Dhabi Oil Refining Company – UAE 027610

� ADCO – Abu Dhabi Company – UAE 9874

� DOLPHIN ENERGY – QATAR 102903

� KURDISTAN MNR – Ministry of Natural Resources 001068

� SOC – South Oil Company - IRAQ 131

� OGC – Oman Gas Company S.A.O.C. - OMAN

� SULTANATE OF OMAN – Ministry of Oil & Gas

� KUWAIT OIL COMPANY – KUWAIT

� SONATRACH – ALGAERIA

� EGAS – Egyptian Natural Gas Holding Company – EGYPT 240 30

CLIENT QUALIFICATION NUMBER

Page 10: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

10

OUR SKILLS

MAIN AREAS OF SPECIALIZATION

PEG has a high level of experience and capability in the implementation of:

� Process Units for upstream and downstream plants � Utilities & Offsite Facilities� Transportation facilities as Pumping and Compression Stations, Tank Farms, Metering Systems

for Gas & Liquids, Pressure Reducing Stations, etc.

PEG also has a wide experience in designing and building pre-assembled skid-mounted units.

PRODUCTS AND SERVICES PROVIDED

PEG is active in the national and international market as an Engineering & Contracting Company for EPC contracts

in the field of oil & gas facilities, petrochemical and energy production plants.

� Pre – investments studies� Basic and detailed engineering services� Services for procurement� Project & Construction management� Works supervision� Start - up services� Pre-assembled units on skids

OIL & GAS

Page 11: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

11

OIL & GAS

PROCESS UNITS FOR UPSTREAM AND DOWNSTREAM PLANTS

� For Upstream Plants PEG has more than 20 years worldwide experience makingcomplete Gas & Oil Separation Plants (G.O.S.P.) starting from the Manifolds andincluding Dehydration and Desalting .

� For Downstream Plants PEG experience includes Crude Distillation Units(Topping) , Hydrodesulphurization , Reforming Units and others.

UTILITIES AND OFFSITE FACILITIES

� PEG experience includes Steam Generation , Compressed Air , Water Treatment , HotOil , Truck Loading , Pumping Stations , Gas Compression Units and complete TankFarms .

CRUDE OIL TREATMENT & GAS SEPARATION

Page 12: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

CONTRACT TYPE

E Engineering S Supervis ion

P Procurement C Const ruct ion

12

CLIENT LOCATION DESCRIPTIONCONTRACT

TYPEVALUE €000

VALUE $000

PERIOD START- END

CRUDE OIL TREATMENT & GAS SEPARATION MAIN REFERENCE S

MdOC-Midland Oil Company

IRAQ Gas Oil Separation Plant EPC 63.850 2013 - 2016

ENI Iraq BV IRAQ Supply of Well Manifolds EP 9.900 2013 - 2015

SOC IRAQDehydration and Desalting Unit for

Nassiryia Degassing StationEP 12.150 2014 - u.w .

B.P. IRAQ NV / ROO IRAQ FEED work for Free Water Knoc k Out E 476 2015 – 2015

B.P. IRAQ NV / ROO IRAQ Free Water Knock Out EPC 98.700 2015 – u.w .

SHELL IRAQ N 1 Manifold Skid for Crude Oil EP 2.197 2015-2016

SHELL IRAQ N°1 Manifold Skid for Crude Oil EP 2.256 2015-2016

Page 13: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

CONTRACT TYPE

E Engineering S Supervis ion

P Procurement C Const ruct ion

13

CLIENT LOCATION DESCRIPTIONCONTRACT

TYPEVALUE €000

VALUE $000

PERIOD START- END

EXXON MOBIL IRAQ Manifolds EP 4.087 2013- 2014

CRUDE OIL TREATMENT & GAS SEPARATION MAIN REFERENCE S

WEATHERFORD IRAQCrude Oil Processing Trains

Zubair Project (6X50.000 BOPD) EPSC 82.000 2012 – 2014

BP Iraq N.V / ROO(Rumaila Operating

Organization)IRAQ

FEED for Separation Train 200 K BPD (2X100 KBODP)

E 468 2012 – 2012

BP Iraq N.V / ROO(Rumaila Operating

Organization)IRAQ

Provision of Design and Fabrication of Crude Oil Manifolds

EP 14.500 2012 – 2013

SHELL IRAQ Supply of Flare Systems EPSC 586 2011 – 2012

TECHNIP ITALY IRAQ

West Qurna 2 – Early Production Facilities Oil Train Package

Front End Engineering for Oil Train Package

E 660 2011 – 2011

Page 14: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

CONTRACT TYPE

E Engineering S Supervis ion

P Procurement C Const ruct ion

14

CRUDE OIL TREATMENT & GAS SEPARATION MAIN REFERENCE S

SHELL IRAQHP Manifold (Skid Mounted)

EPC 1.735 2011 – 2012

BP IRAQ NV IRAQDS4 Production Crude Oil Manifold for

North RumaliaEPC 4.925 2009 – 2012

CLIENT LOCATION DESCRIPTIONCONTRACT

TYPEVALUE €000

VALUE $000

PERIOD START- END

PETROFAC IRAQCrude Oil Process Plants (DS1 and DS2)

Re-Habilitation of Majnoon Oil FieldE 1.256 2010 –2011

SOC SOUTH OIL CO.

IRAQNorth Rumalia & West Qurna Oil Field

Manifolds (Skid Mounted) EP 11.535 2008 - 2009

(SOC)EES - Energy

Engineering & ServicesIRAQ

Test Banks in South Rumalia Field(Skid Mounted)

EP 6.000 2008 – 2010

SOC SOUTH OIL CO.

IRAQPackage n°1-Crude Oil Process Plant

Development of Naher Ben Umar Oil Field Yamana Formation (Skid Mounted)

EP 63.240 2008 – 2010

Page 15: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

CONTRACT TYPE

E Engineering S Supervis ion

P Procurement C Const ruct ion

15

SOC SOUTH OIL CO.

IRAQ

Crude Oil Process Plant Package for Shamya Mushrif Qurainat Mushrif &

Tuba Degassing Station (50.000 BOPD)

EP 16.470 2007 – 2009

SOC SOUTH OIL CO.

IRAQN° 4 Water Injection Manifolds

for Zubair Field EP 3.980 2006 – 2007

SOC SOUTH OIL CO.

IRAQ Crude Oil Manifold 600# EPC 5.120 2007 – 2008

CRUDE OIL TREATMENT & GAS SEPARATION MAIN REFERENCE S

SOC SOUTH OIL CO.

IRAQWest Qurna Crude Oil Manifolds

(Skid Mounted) EP 8.550 2007 – 2009

SOC SOUTH OIL CO.

IRAQWest Qurna Production Manifolds 900#

(Skid Mounted)EP 9.920 2007 - 2009

CLIENT LOCATION DESCRIPTIONCONTRACT

TYPEVALUE €000

VALUE $000

PERIOD START- END

Page 16: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

CONTRACT TYPE

E Engineering S Supervis ion

P Procurement C Const ruct ion

16

SOC SOUTH OIL CO.

IRAQN. 3 Hydrocarbon Manifolds

(Skid Mounted) EP 1.254 2005 - 2006

SCOPState Company for Oil

ProjectsIRAQ

N. 7 Oil Manifolds for West Qurna(Skid Mounted) EPC 1.837 2005 – 2006

SOC SOUTH OIL CO.

IRAQCrude Oil Processing Plant

at Majnoon FieldEP 18.800 2001 – 2004

SOC SOUTH OIL CO.

IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 20 01 – 2002

SCOPState Company for Oil

ProjectsIRAQ

N. 5 Water Injection Manifolds (Skid Mounted) EP 2.487 2006- 2006

CLIENT LOCATION DESCRIPTIONCONTRACT

TYPEVALUE €000

VALUE $000

PERIOD START- END

CRUDE OIL TREATMENT & GAS SEPARATION MAIN REFERENCE S

Page 17: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

CONTRACT TYPE

E Engineering S Supervis ion

P Procurement C Const ruct ion

17

SCOPState Company for Oil

ProjectsIRAQ

Fuel Oil P/L from 1st June Depot to new Dibbs Power Station

EPSC 20.419 2012 – 2014

BIN LADIN GROUP / AL ASWAD ELECTRO

MECHANICALSAUDI ARABIA

New Jeddah Airport Tank FarmConsultancy and Assistance Services

E 1.500 2012 – 2015

OIL & GAS TRANSPORTATION AND STORAGE FACILITIES MA IN REFERENCES

SCOP/RUHRPUMPEN IRAQ10 Gas Turbine Pumps for

FAO Depot Pumping Station EP 25.000 2013 - u.w .

SCOP/RUHRPUMPEN IRAQ 4 Additional Gas Turbine Pumps for FAO Depot Pumping Station

EPC 108.398 2014 - u.w .

CLIENT LOCATION DESCRIPTIONCONTRACT

TYPEVALUE €000

VALUE $000

PERIOD START- END

Page 18: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

CONTRACT TYPE

E Engineering S Supervis ion

P Procurement C Const ruct ion

18

OIL & GAS TRANSPORTATION AND STORAGE FACILITIES MA IN REFERENCES

MOC Missan Oil Company

IRAQ Pumps at Noor Field EPSC 3.520 2011 – 2013

SCOPState Company for Oil

ProjectsIRAQ Expansion of LPG Loading/Unloading and

Storage Facilities at SumawaEP 5.250 2011– 2014

SCOPState Company for Oil

ProjectsIRAQ

Line Pipes, Pipe Fittings & Valves, Wrapping Materials & Crossing

Materials for Karbala Oil Products Storage Depot

EP 6.443 2008 – 2009

SCOPState Company for

Oil ProjectsIRAQ

Engineering, Procurement and Construction for the New Pumping

Station PS4 at Al HabaneyaEPC 71.907 2011 – u.w .

CLIENT LOCATION DESCRIPTIONCONTRACT

TYPEVALUE €000

VALUE $000

PERIOD START- END

Page 19: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

CONTRACT TYPE

E Engineering S Supervis ion

P Procurement C Const ruct ion

19

OIL & GAS TRANSPORTATION AND STORAGE FACILITIES MA IN REFERENCES

SCOPState Company for Oil

ProjectsIRAQ

Valve Stations, Pig Launchers & Receivers EP 14.530 2006 - 2007

SCOPState Company for Oil

ProjectsIRAQ

Supply of Scraper Trap Skid Mounted and Valves for Shuaiba - Khor Al Zubair

Product PipelineEP 1.360 2008 – 2009

CLIENT LOCATION DESCRIPTIONCONTRACT

TYPEVALUE €000

VALUE $000

PERIOD START- END

Page 20: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

CONTRACT TYPE

E Engineering S Supervis ion

P Procurement C Const ruct ion

20

UPGRADING AND REVAMPING OF EXISTING FACILITIES - MAI N REFERENCES

MOTOR OIL HELLAS GREECETopping Column C1101, Radiant Section of Furnace Revamping and Transfer Line

Replac.EPC 1.295 2005 - 2006

HELLENIC PETROLEUM GREECEEngineering Studies for Partial Shell

Replacement of Atmospheric Pipestill Column T-101

E 95 2011 – 2011

SHELL IRAQDesign and Supply of New Flare System

for CPF and DS02EP 1.215 2014 - 2015

CORAF REFINERY CONGOStudy for the climatization of three

electrical sub-stations E 24 2015 - 2015

CLIENT LOCATION DESCRIPTIONCONTRACT

TYPEVALUE €000

VALUE $000

PERIOD START- END

Page 21: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

21

OIL & GAS

� In the field of Gas Metering and Reducing Systems PEG has more than forty years ofworldwide experience, making measurements through the use of well-knownmethods: orifice fittings , turbines and ultrasonic, in accordance with widelyrecognized measurement codes such as AGA 3 , AGA 7, AGA 9 , ISO 5167 and5168, applied to all pertinent fields, including custody transfer.

� In this sector PEG does act not only as a system integrator but has developed its ownSupervisory Control System that can be integrated with Kelton validation software forcustody application.A simulator is available in our offices to give clients the opportunity to test and feelconfident about the capability of our Supervisory Control System, in a comfortableplace.

GAS METERING & REDUCING SYSTEMSLIQUID METERING & FILTERING SYSTEMS

Page 22: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

22

OIL & GAS

� PEG has developed a fully equipped , wired and tested sheltered control room thatcan be delivered as a single container ready for field installation anywhere in the world.

� PEG is among the few companies able to produce bidirectional or unidirectionalMeter Provers , giving clients the possibility to count on a single-source supplier forMetering and Test Prover Systems.

� For all components and services not included in its production activity, PEG hasacquired a wide experience making it possible to get first class components at the bestpossible prices, which means that clients are offered top quality metering andreducing stations at excellent commercial conditions .

GAS METERING & REDUCING SYSTEMSLIQUID METERING & FILTERING SYSTEMS

Page 23: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

CONTRACT TYPE

E Engineering S Supervis ion

P Procurement C Const ruct ion

23

SOCSOUTH OIL CO.

IRAQNo 6 Custody Transfer Fuel

Gas Metering Systems EP 1.050 2012 – 2014

GAS METERING & REDUCING SYSTEMS MAIN REFERENCES

SCOPState Company for Oil

ProjectsIRAQ No 2 Dry Gas Metering Skids for Taza and

Haydareia Power PlantsEP 2.587 2012 – 2014

PETROLEUM DEVELOPM ENT OMAN -

PDOOMAN

Fiscal Gas Flow Metering Systems Spurline & GSS for IPP at Sur EP 2.085 2011 – 2013

SAUDI ARAMCO SAUDI ARABIA

Sales Gas & Ethane Gas Custody Metering Systems with Gas

Chromatograph Analyzer and Associated Appurtenances

EP 2.410 2011 – 2012

SCOPState Company for Oil

ProjectsIRAQ No 1 Dry Gas Metering Skid for

Dewanyia Power PlantEP 2.070 2013 – 2014

CLIENT LOCATION DESCRIPTION CONTRACTTYPE

VALUE €000

VALUE $000

PERIOD START- END

ENI S.p.A.ITALY

Provision of Materials and/or services for renewal of Fiscal Gas Metering system

certificationEP+S 3.000* 2017 – u.w .

*estimated value: this contract is a 3 years framewo rk agreement with no minimum/maximum amount granted

Page 24: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

CONTRACT TYPE

E Engineering S Supervis ion

P Procurement C Const ruct ion

24

GAS METERING & REDUCING SYSTEMS MAIN REFERENCES

TECHINT EGYPT Gas Filtering and Metering Station EP 1.160 2008 - 2009

SONATRACH ALGERIA Natural Gas, Metering System and Analyzers

EPC 1.050 2008 - 2009

SNAMPROGETTI S.p.A. ALGERIA Ultrasonic Metering Skid System - Arzew EP 2.084 2008 - 2009

CLIENT LOCATION DESCRIPTIONCONTRACT

TYPEVALUE €000

VALUE $000

PERIOD START- END

ENEL ITALYNatural Gas & Hydrogen Reducing and

Metering System EP 572 2008 - 2009

GASCO EGYPTSupply of Metering Skid for Alkyl Benzene

ELAB EP 247 2008 - 2009

GULF PETROCHEMICAL SERVICES &TRADING

LLCOMAN

Fiscal Gas Flow Metering System for Spurline & Gss for IWPP At Salalah

(Taqa) & Salalah GSS for Methanol FacilityEP 506 2009 - 2009

KTI EGYPT Revamping of n 2 Gas Metering Stations P 1.785 2 009 – 2010

Page 25: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

CONTRACT TYPE

E Engineering S Supervis ion

P Procurement C Const ruct ion

25

GAS METERING & REDUCING SYSTEMS MAIN REFERENCES

SNAMPROGETTI ENI S.E.F. ITALY N 1 Gas Reducing and Metering Station EPC 620 2005 - 2006

SCOPState Company for Oil

ProjectsIRAQ

Trans Iraq Dry Gas Network N. 5 Metering Stations EP 2006 - 2007

ERG Nuove Centrali S.p.A. SNAMPROGETTI ITALY

N 1 Gas Reducing and Metering Station

Priolo Gargallo (SR)EPC 796 10.764 2006 - 2007

GASCO EGYPTN 3 Control Rooms & Meter Runs for Gas

StationsEPC 1.000 2006- 2006

MOPCO EGYPTDamietta Gas Reducing and

Metering StationEP 2.012 2006 - 2007

TECHNIP / KTI EGYPT N 2 Gas Custody Metering Stations E P 1.700 2006 – 2007

CLIENT LOCATION DESCRIPTIONCONTRACT

TYPEVALUE €000

VALUE $000

PERIOD START- END

OMAN GAS COMPANY (OGC) OMAN

Supply of Fiscal Metering Skid for RusaylPower Plant PRT EPC 931 2008 - 2009

GASCO EGYPTSupply of Control Room and Meter Run

EP 390 2008 - 2009

Page 26: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

CONTRACT TYPE

E Engineering S Supervis ion

P Procurement C Const ruct ion

26

GAS METERING & REDUCING SYSTEMS MAIN REFERENCES

GASCO EGYPTRevamping of n ° 71 Gas Pipeline

Sectionalisinig Valves SitesEPC 1.197 2000- 2003

PETROJET EGYPTN° 2 Gas Metering and Reducing Stations

at El Sharkaw ia and North Cairo P.S. EPC 1.650 2003 - 2005

TRANSGAS EGYPTGas Filtering and Metering Station at Kafr

el SheikhEPC 412 2003 - 2005

State Company for Oil Projects

SCOPIRAQ

N° 3 Gas Metering and Reducing Stations at Doura P.S., Yousifiya P.S.

and Al Bader PlantEP 3.600 2001 – 2002

GASCO EGYPTN° 1 new Gas Metering and Reducing

Station at Kafr el Dawar P.S. and Revamping of N ° 6 existing RMS

EPC 2.187 2000 - 2003

CLIENT LOCATION DESCRIPTIONCONTRACT

TYPEVALUE €000

VALUE $000

PERIOD START- END

GASCO EGYPTN 4 Sheltered Control Rooms & and

N. 12 Meter Runs for Gas StationsEP 725 2005 - 2005

DANIEL/ENI. LYBIA Gas Metering Station EPC 88 2005 - 2006

Page 27: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

CONTRACT TYPE

E Engineering S Supervis ion

P Procurement C Const ruct ion

27

GAS TRANSMISSION & DISTRIBUTION Co. Ltd BANGLADESH

N° 1 Gas Metering and Reducing Station at Baghabari Power Station. EPC 600 1998 - 2000

ENEL ITALYN° 1 Gas Metering and Reducing Station

at Termini Imerese P.S.EPC 1.450 1993 - 1997

GAS METERING & REDUCING SYSTEMS MAIN REFERENCES

CLIENT LOCATION DESCRIPTIONCONTRACT

TYPEVALUE €000

VALUE $000

PERIOD START- END

GASCO EGYPT

Revamping of Metering Runs, Control Rooms and Field Instrumentation of N ° 8

Gas Metering StationsEP 1.100 2000 - 2001

TITAS GAS TRANSMISSION &

DISTRIBUTION Co. Ltd.BANGLADESH

N° 1 Gas Metering and Reducing Station at Haripur P.S. EPC 1.650 2000 - 2001

Page 28: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

CONTRACT TYPE

E Engineering S Supervis ion

P Procurement C Const ruct ion

28

LIQUID METERING & FILTERING SYSTEMS MAIN REFERENCES

DLPS- Diversified LinesPetroleum Services Est

SAUDI ARABIA Metering System Revamping EP 450 2013-2013

PETROJET EGYPTSupply of n°2 Metering Systems for the

new Multi-Product Storage and Transportation Project

EP 282 2011- 2013

ABB S.P.A / PETROLEUM DEVELOPM ENT OMAN

(PDO)OMAN

Design and supply of n°1 Condensate Metering and provers for SNCP: Saih

Nihayda Condensate Stabilization Plant EP 1.282 2013- 2015

DALEEL PETROLEUM LLC OMAN

Daleel LACT Unit – Crude OilMetering Upgrade EPSC 1.353 2013 – 2015

SATORP SAUDI ARABIASpare Parts-Custody Metering

System and Provers EP 23 2013-2014

SOCSOUTH OIL CO.

IRAQ Spare Parts for ZR-1, PS-1 and

Al-Omaya Custody

EP 840 2014-2016

CLIENT LOCATION DESCRIPTIONCONTRACT

TYPEVALUE €000

VALUE $000

PERIOD START- END

Page 29: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

CONTRACT TYPE

E Engineering S Supervis ion

P Procurement C Const ruct ion

29

LIQUID METERING & FILTERING SYSTEMS MAIN REFERENCES

SAUDI ARAMCO SAUDI ARABIA

Custody Crude Metering Station, Bi-directional Proving Skid, Densitometer Skid, Redundant Flow Computers and

Redundant Metering Supervisory Computers

EP 1.215 2011- 2012

DALEEL PETROLEUM LLC OMAN Upgrade of existing LACT Unit up to the

capacity of 45,000 BPDEP 42 2011 – 2012

PETROJET EGYPT N 2 Metering Skids EP 972 2010 – 2013

DAYIM PUNJ LLOYD SAUDI ARABIA Custody Metering Skids and Prover’s EP 7.740 2010-2013

ZUETINA OIL COMPANY LIBYA Metering System Upgrade at Hakim Plant EPC 418 2010-2011

CLIENT LOCATION DESCRIPTIONCONTRACT

TYPEVALUE €000

VALUE $000

PERIOD START- END

Page 30: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

CONTRACT TYPE

E Engineering S Supervis ion

P Procurement C Const ruct ion

30

SONATRACH EMERSON

ALGERIA Supply of 24" 600# Meter Run EPC 7,5 2008 – 2009

LIQUID METERING & FILTERING SYSTEMS MAIN REFERENCES

SOCSouth Oil Company IRAQ Crude Oil Custody Transfer Metering

System for PS1 & ZR1 DepotsEP 4.885 2007 - 2008

SOC South Oil Company

IRAQMetering System and Control Room for

Off-Shore Al-Amaya Terminal EP 5.050 2007 - 2008

AGIBA EGYPT Crude Oil Metering System & Prover EP 778 20 08 – 2009

Arabian Engineering Services

Petroleum Development Oman

OMANSupply of Ultrasonic Metering System for Sahma additional Pump Station, Upgrade

ProjectEPC 612 2008 – 2009

PPC- PETROLEUM PIPELINE Co.

EGYPT Flow Metering System EPC 1.420 2008 - 2009

CLIENT LOCATION DESCRIPTIONCONTRACT

TYPEVALUE €000

VALUE $000

PERIOD START- END

Page 31: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

CONTRACT TYPE

E Engineering S Supervis ion

P Procurement C Const ruct ion

31

P.P.C. EGYPTRevamping of n 18 Hydrocarbon

Metering Stations EPC 1.082 2005 – 2006

LIQUID METERING & FILTERING SYSTEMS MAIN REFERENCES

DISMA S.R.L. ITALY Oil Metering Systems and Meter Proverfor the Oil Depot at Malpensa Airport

EPC 6.700 1997- 1998

N.G.C. NORTH GAS CO.

IRAQSkid Mounted LPG Metering System and

Meter Prover EP 480 2002 - 2004

SOC SOUTH OIL CO. IRAQ N° 3 Crude Oil Manifold Skid Mounted EP 1.800 2001 - 2002

NAFTAL / BENTINI ALGERIAN° 3 Skid Mounted Custody Metering

Systems and Meter ProversEP 534 2004 – 2005

DANIELAGIP LYBIA LYBIA

N° 3 Skid Mounted Custody Metering Systems and N ° 2 Bi-Di Meter Provers EP 970 2005 - 2006

BONATTI / SONATRACH ALGERIA N° 2 Skid Mounted Custody Metering Systems

EP 820 2006 - 2007

DALEEL OMAN N °1 LACT Unit and Shelter Control Room EPC 768 2006 - 200 7

CLIENT LOCATION DESCRIPTIONCONTRACT

TYPEVALUE €000

VALUE $000

PERIOD START- END

Page 32: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

OUR WORK

OIL & GAS

Page 33: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

PE15002D – FREE WATER KNOCK OUT SEPARATION TRAINS

2015 – u.w. CRUDE OIL TREATMENT & GAS SEPARATION

PE15002D – CLIENT: BP IRAQ NV – RUMAILA OIL FIELD - IR AQ

FREE WATER KNOCK OUT PROCESSING TRAINS

CONTRACT VALUE: 98.700.000 USD

CONTRACT TYPE: ENGINEERING, PROCUREMENT, CONSTRUCTION

33

Page 34: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

PE11070R – GAS OIL SEPARATION PLANT - 30.000 BOPD

2013 - 2016 CRUDE OIL TREATMENT & GAS SEPARATION

PE11070R – CLIENT: MDOC – MIDLAND OIL COMPANY - IRAQ

Gas Oil Separation Plant - 30.000 BOPD

CONTRACT VALUE: 63.850.000 USD

CONTRACT TYPE: ENGINEERING, PROCUREM ENT, CONSTRUCTION

33

Page 35: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

35

PE12015R – CRUDE OIL PROCESSING TRAINS- ZUBAIR PROJE CT

2012- 2014 CRUDE OIL TREATMENT & GAS SEPARATION

PE12015R –CLIENT – WEATHERFORD - IRAQCrude Oil Processing Trains

CONTRACT VALUE: 82.000.000 USD

CONTRACT TYPE: Engineering, Procurement, Supervision, Construction

Page 36: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

36

PE11054R – NEW PUMPING STATION PS4 AT AL HABANEYA

2013- u.w CRUDE OIL TREATMENT & GAS SEPARATION

PE11054R –CLIENT – SOC - IRAQNew Pumping Station PS4 at Al Habaneya

CONTRACT VALUE: 71.907.000 Euros

CONTRACT TYPE: Engineering, Procurement, Construction

Page 37: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

37

PE6093R – CRUDE OIL PROCESS PLANT

2008- 2010 CRUDE OIL TREATMENT & GAS SEPARATION

PE6093R –SOUTH OIL COMPANY – SOC - IRAQPackage n° 1 Crude Oil Process Plant (50.000BOPD) Development of Naher Ben Ummar Oil Field – Yamana Formation

CONTRACT VALUE: 63.240.000 Euros

CONTRACT TYPE: Engineering, Procurement This image shows the first stage separator unit, the dehydration and desalter unit and the crude stabilizer column.

Page 38: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

38

PE7087R – NORTH RUMALIA & WEST QURNA OIL FIELD MANI FOLDS

2008- 2009 CRUDE OIL TREATMENT & GAS SEPARATION

PE7087R –SOUTH OIL COMPANY – SOC - IRAQNorth Rumaila & West Qurna Oil Field Manifolds

CONTRACT VALUE: 11.535.000 Euros

CONTRACT TYPE: Engineering, Procurement

Page 39: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

39

PE7030R – WEST QURNA PRODUCTION MANIFOLDS 900#

2007- 2009 CRUDE OIL TREATMENT & GAS SEPARATION

PE7030R –SOUTH OIL COMPANY – SOC - IRAQWest Qurna Production Manifolds 900#

CONTRACT VALUE: 6.740.000 Euros

CONTRACT TYPE: Engineering, Procurement

Page 40: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

40

PE7029R – WEST QURNA CRUDE OIL PRODUCTION MANIFOLDS

2007- 2009 CRUDE OIL TREATMENT & GAS SEPARATION

PE7029R – SOUTH OIL COMPANY – SOC - IRAQWest Qurna Crude Oil Manifolds

CONTRACT VALUE: 8.550.000 Euros

CONTRACT TYPE: Engineering, Procurement

Page 41: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

41

PE6092R – SHAMYA MUSHRIF, QURAINAT MUSHRIF & TUBA DEGASSING S TATION

2007- 2009 CRUDE OIL TREATMENT & GAS SEPARATION

PE6092R –SOUTH OIL COMPANY – SOC - IRAQCrude Oil Process Plant Package for Shamya Mushrif, Qurainat Mushrif & Tuba Degassing Station

CONTRACT VALUE: 12.000.000 Euros

CONTRACT TYPE: Engineering, Procurement

Page 42: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

42

PE5026R – WATER INJECTION MANIFOLDS FOR ZUBAIR FIEL D

2006- 2007 CRUDE OIL TREATMENT & GAS SEPARATION

PE5026R –SOUTH OIL COMPANY – SOC - IRAQN° 4 Water Injection Manifolds for Zubair Field

CONTRACT VALUE: 3.980.000 Euros

CONTRACT TYPE: Engineering, Procurement

Page 43: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

43

PE4046R – SKID MOUNTED OIL MANIFOLDS FOR WEST QURNA

2005 - 2006 CRUDE OIL TREATMENT & GAS SEPARATION

PE4046R – STATE COMPANY FOR OIL PROJECT – SCOP - IRAQN° 7 Skid Mounted Oil Manifolds for West Qurna

CONTRACT VALUE: 1.837.000 Euros

CONTRACT TYPE: Engineering, Procurement, Constructio n

Page 44: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

44

PE1058R – CRUDE OIL PROCESS PLANT AT MAJNOON FIELD

2001 - 2004 CRUDE OIL TREATMENT & GAS SEPARATION

PE1058R –SOUTH OIL COMPANY – SOC - IRAQCrude Oil Process Plant at Majnoon Field

CONTRACT VALUE: 18.800.000 Euros

CONTRACT TYPE: Engineering, Procurement

Page 45: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

45

GAS METERING & REDUCING SYSTEMS

PE11046R – No. 1 Dry Gas Metering Skid dor Dewanyia Power Plant

2013 – 2014

PE11046R – SCOP – State Company for Oil Projects - IRAQ

NO. 1 DRY GAS METERING SKID DOR DEWANYIA POWER PLANT

CONTRACT VALUE: 2.070.000 Euro

CONTRACT TYPE: Engineering, Procurement

Page 46: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

46

GAS METERING & REDUCING SYSTEMS

PE11066R – No. 2 Gas Metering Skids for Taza and Ha ydareia Power Plants

2012 – 2014

PE11066R – SCOP - State Company for Oil Projects - Iraq

NO. 2 GAS METERING SKIDS FOR TAZA AND HAYDAREIA POWERPLANTS

CONTRACT VALUE: 2.587.000 EuroCONTRACT TYPE: Engineering, Procurement

Page 47: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

47

GAS METERING & REDUCING SYSTEMS

PE11055R – No. 6 Custody Transfer Fuel Gas Metering System

2012 – 2014

PE11055R – SOC – South Oil Company - Iraq

NO. 6 CUSTODY TRANSFER FUEL GAS METERING SYSTEM

CONTRACT VALUE: 1.050.000 Euro

CONTRACT TYPE: Engineering, Procurement

Page 48: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

48

GAS METERING & REDUCING SYSTEMS

PE11027R – Fiscal Gas Flow Metering Systems Spurline & GSS for IPP at Sur

2012 – 2014

PE11027R – PDO – Petroleum Development Oman

FISCAL GAS FLOW METERING SYSTEMS SPURLINE & GSS FOR I PP ATSUR - OMAN

CONTRACT VALUE: 2.587.000 Euro

CONTRACT TYPE: Engineering, Procurement

Page 49: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

49

PE9049R – REVAMPING OF N 2 GAS METERING STATIONS

2009-u.w. GAS METERING & REDUCING SYSTEMS

PE9049R – KTI – EGYPTREVAMPING OF N° 2 GAS METERING STATIONS

CONTRACT VALUE: 1.700.000 Euro

CONTRACT TYPE: Engineering, Procurement

Page 50: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

50

PE8013R – ULTRASONIC METERING SKID SYSTEM

2008-2009

PE8013R – SNAMPROGETTI S.p.A. - ALGERIEULTRASONIC METERING SKID SYSTEMOléoduc LZ2 24” GPL Hassi R’Mel – Arzew

CONTRACT VALUE: 1.970.000 Euros

CONTRACT TYPE: Engineering, Procurement

GAS METERING & REDUCING SYSTEMS

Page 51: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

51

PE7092R – NATURAL GAS & HYDROGEN REDUCING AND METER ING SYSTEM

PE7092R – ENEL S.p.A. - ITALYNATURAL GAS & HYDROGEN REDUCING AND METERING SYSTEM

CONTRACT VALUE: 572.000 Euros

CONTRACT TYPE: Engineering, Procurement

2008-2009 GAS METERING & REDUCING SYSTEMS

Page 52: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

52

PE7091R – NATURAL GAS, METERING SYSTEM AND ANALYZER S

PE7091R – SONATRACH - ALGERIENATURAL GAS, METERING SYSTEM & ANALYZERS

CONTRACT VALUE: 1.050.000 Euros

CONTRACT TYPE: Engineering, Procurement, Constructio n

2008-2009 GAS METERING & REDUCING SYSTEMS

Page 53: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

53

PE6056R – DAMIETTA GAS REDUCING AND METERING STATIO N

PE6056R – MOPCO - Misr Oil Processing Company - EGYPTN°1 GAS, REDUCING & METERING STATION

CONTRACT VALUE: 1.700.000 Euros

CONTRACT TYPE: Engineering, Procurement

SENIOR ORIFICE METERING SYSTEM SKID

2006-2007 GAS METERING & REDUCING SYSTEMS

Page 54: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

54

NATURAL GAS REDUCING AND METERING PLANT

ENEL - TERMINI IMERESE - ITALYNATURAL GAS REDUCING & METERING PLANT

CONTRACT VALUE: 1.450.000 Euros

CONTRACT TYPE: Engineering, Procurement, Construction

PRESSURE REGULATOR AND ORIFICE METERING SKID

GAS METERING & REDUCING SYSTEMS1993-1997

Page 55: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

55

LIQUID METERING & FILTERING SYSTEMS

PE12049R – No. 1 Condensate Metering and Provers

2013 – u.w.

PE12049R – ABB S.p.A. for PDO – Petroleum Development Oman

DESIGN AND SUPPLY OF N° 1 CONDENSATE METERING AND PR OVERSFOR SNCP- SAIH NIHAYDA CONDENSATE STABILIZATION PLANT

CONTRACT VALUE: 1.070.000 EuroCONTRACT TYPE: Engineering, Procurement

Page 56: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

56

LIQUID METERING & FILTERING SYSTEMS

PE11066R – Custody Metering Systems and Provers

2010 – 2013

PE10006R – Dayim Punj Lloyd – End User Satorp – Saudi Arab ia

CUSTODY METERING SYSTEMS AND PROVERS

CONTRACT VALUE: 5.600.000 Euro

CONTRACT TYPE: Engineering, Procurement

Page 57: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

57

PE7034R – SUPPLY OF 24” 600# METER RUN

2008-2009 LIQUID METERING & FILTERING SYSTEMS

PE7034R – SONATRACH/EMERSON - ALGERIESUPPLY OF 24” 600# METER RUN

CONTRACT VALUE: 74.500 Euros

CONTRACT TYPE: Engineering, Procurement, Constructio n

Page 58: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

58

PE7106R – CRUDE OIL METERING SYSTEM & PROVER

2008-2009 LIQUID METERING & FILTERING SYSTEMS

PE7106R – AGIBA - EGYPTCRUDE OIL METERING SYSTEM & PROVER

CONTRACT VALUE: 778.000 Euros

CONTRACT TYPE: Engineering, Procurement

Page 59: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

59

PE7054R – SUPPLY OF ULTRASONIC FLOW METERING SYSTEM

2008-2009 LIQUID METERING & FILTERING SYSTEMS

PE7054R – ARABIAN ENGINEERING CO / PDO - OMANSUPPLY OF ULTRASONIC FLOW METERING SYSTEM FOR SAHMA ADDITIONAL PUMP STATION – UPGRADE PROJECT

CONTRACT VALUE: 474.000 Euros

CONTRACT TYPE: Engineering, Procurement, Constructio n

Page 60: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

60

PE6072R – METERING SYSTEM AND CONTROL ROOM

2007-2008 LIQUID METERING & FILTERING SYSTEMS

PE6072R – SOUTH OIL COMPANY (SOC) - IRAQMETERING SYSTEM AND CONTROL ROOM FOR OFF-SHORE AL-AMAYA TERMINAL

CONTRACT VALUE: 3.173.000 Euros

CONTRACT TYPE: Engineering, Procurement

Page 61: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

61

PE6077R – CRUDE OIL CUSTODY TRANSFER METERING SYSTEM

2007-2008 LIQUID METERING & FILTERING SYSTEMS

PE6077R – SOUTH OIL COMPANY (SOC) - IRAQCRUDE OIL CUSTODY TRANSFER METERING SYSTEM FOR PS1 & ZR1 DEPOTS

CONTRACT VALUE: 3.600.000 Euros

CONTRACT TYPE: Engineering, Procurement

Page 62: COMPANY PROFILE OIL&GAS DECEMBER · PDF fileSAIPEM - ITALY 50780 SATORP - KSA 10540 ... IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002 SCOP State Company for Oil

62

PE4058R – SKID MOUNTED CUSTODY METERING SYSTEMS AND BI-DI ME TER PROVERS

2005-2006 LIQUID METERING & FILTERING SYSTEMS

PE4058R – DANIEL/AGIP LYBIA - MELLITAH LYBIAN° 3 Skid Mounted Custody Metering Systems and N° 2 Bi-Di Meter Provers

CONTRACT VALUE: 970.000 Euros

CONTRACT TYPE: Engineering, Procurement

BI-DIRECTIONAL METER PROVER SKID

TURBINE METERING SKID