CTU Clean Technology Universe AGYour Partner for responsible waste treatment
Company Presentation
CTU Clean Technology Universe AG
CTU Clean Technology Universe AG - Your Partner for responsible waste treatment
Products
• Energy from waste– Incineration
• Hazardous waste• Solids, fluids, gases, sludges
– Gas cleaning• Flue gas cleaning – wet, dry and semi dry scrubbing, SCR DeNOx, Dedioxin
• Gas Scrubbing– Gas scrubbing for
• Flue gases from process industries incl. wet, semi dry, dry scrubbing, SCR DeNOx, Dedioxin
• cleaning of other off gases – pyrolysis gas, synthesis gas etc.
• Energy from biomass– BioSNG – Methane from Wood
CTU Clean Technology Universe AG - Your Partner for responsible waste treatment
Services• Project management• Basic engineering• Detail engineering• Procurement• Erection• Commissioning• Operator training• Comprehensive safety analysis
• Extended services: Studies, Laboratory analysis, Licensing
• Owner’s Engineer– Conceptual Design– FEED– Project Management
CTU Clean Technology Universe AG - Your Partner for responsible waste treatment
Organisation
• Public limited company: Shanghai Mechanical & Electrical Industry Co. Ltd, 100% shareholder
• Equity: CHF 750’000
• Chairmen of the board: Wang Xiao Di
• Managing Director / CEO: Martin Schaub
• Employees: ~ 20
• General Liability Insurance: Swiss Franks 20 Million (Helvetia Ins. Company)
• Relationship Bank: UBS and Zurcher Kantonalbank
• ISO 9001 – 2015
• Winner of the Watt d’Or Award 2009
CTU Clean Technology Universe AG - Your Partner for responsible waste treatment
Selected Projects: Flue Gas Treatment for Municipal Waste Incineration
Municipal Waste Incineration Plant in Bern, Switzerland
Flue gas treatment system provided by CTU Clean Technology Universe AG as a turn key supplier of:
Basic and detailed engineering Raw gas low dust SCR-DeNOx Heat exchanger 3-stage wet scrubbing system Polishing filter including adsorbents handling Draft fan
Commissioning
Approx. value of the contract: 18.2 Mio €
Duration of assignment: 36 months; commissioned 02/2013
Plant capacity: 100'000 Nm3/h flue gas, or 110'000 t/a of waste.
Plant features: low operational costs, highest removal of flue gaspollutants efficiency (far lower than Swiss or European legislation.
CTU Clean Technology Universe AG - Your Partner for responsible waste treatment
Selected Projects: SNCR for CFB Boiler firing Coal, Waste Wood and Meat Flour
Power Plant in Grenoble, France
Revamp of a flue gas treatment system provided by CTU Clean Technology Universe AG as a turn key supplier of:
Basic and detailed engineeringSNCR for CFB boiler run with coal, wood and meat flourUREA systemIntegration in existing process control system
Commissioning
Operator Training
Approx. value of the contract: 0.7 Mio €
Duration of assignment: 12 months; commissioned 10/2012
Plant capacity: 100'000 Nm3/h flue gas
Plant features: low operational costs, very low SNCR temperatureoperation (<940°C), for a district heat and power plant.
CTU Clean Technology Universe AG - Your Partner for responsible waste treatment
Selected Projects: Hazardous Waste Incineration
Hazardous Waste Incineration Plant in Dushanzi, PRC
Hazardous Waste Treatment System consisting of rotary kiln, boiler and flue gas cleaning provided by CTU Clean Technology Universe AG as the key technology provider:
Conceptual and Basic Engineering Detailed Engineering Supply of Key Equipment Procurement supervision Erection Supervision
Commissioning
Operator Training
Approx. value of the contract: 4.5 Mio € (CTU’s portion)
Duration of assignment: 36 months; commissioned 12/2012
Plant capacity: 21'000 Nm3/h flue gas, or 15'000 t/a of waste.
CTU Clean Technology Universe AG - Your Partner for responsible waste treatment
Selected Projects: Hazardous Waste Incineration
Hazardous Waste Incineration Plant in Kazincbarcika , Hungary
Hazardous Waste Treatment System consisting of boiler, ESP, SCR DeNOx/DeDioxin, scrubber system provided by CTU Clean Technology Universe AG as turn key provider:
Conceptual and Basic Engineering
Detailed Engineering
Supply of Equipment
Erection Supervision
Commissioning
Operator Training
Approx. value of the contract: 4.5 Mio € (CTU’s portion)
Duration of assignment: 36 months; commissioned 12/2011
Plant capacity: 18‘500 t/a of waste, 10 MW thermal
CTU Clean Technology Universe AG - Your Partner for responsible waste treatment
Selected Projects: Hazardous Waste Incineration
Hazardous Waste Incineration Plant in n.n., Middle East
Hazardous Waste Treatment System consisting of a combustion chamber with multi-stage flue gas cleaning provided by CTU Clean Technology Universe AG as turn key provider:
Conceptual and Basic Engineering
Detailed Engineering
Supply of Equipment
Procurement Supervision
Erection Supervision
Commissioning
Operator Training
Approx. value of the contract: 5 Mio € (CTU’s portion)
Duration of assignment: 36 months; under commissioning
Plant capacity: 12’000t/a liquid waste, 5t/hr steam production
CTU Clean Technology Universe AG - Your Partner for responsible waste treatment
Selected Projects: BFB for Paper Sludge and Rejects
Paper Sludge and Rejects Incinerator, Hansol Paper Ltd. Daejeong, Korea Bubbling Fluidized Bed Incinerator incl. Boiler and Flue gas Treatment originally built by by local company CTU Clean Technology Universe AG provided engineering and selected equipment for upgrade from 420 tpd to 640 tpd by modification of • Feeding System • Air Distribution System • BFB operating conditions • Boiler and Economizer Modification • Specific Adaptation of Flue Gas Treatment System • Sand recycling System
Modification done by client with CTU for • Assistance for Mechanical Acceptance • Commissioning Supervision
Duration of Engineering work: 2.5 months Delivery of Supplies: 4.5 months Modification work: 1 month (3 shift) Commissioning: 2 weeks
CTU Clean Technology Universe AG - Your Partner for responsible waste treatment
Selected Projects: BioSNG from Wood
Demonstration Plant at PSI in Villigen, Switzerland
Fluidized bed methanisation for a wood gasification plant provided by CTU Clean Technology Universe AG as turn key provider:
Conceptual and Basic Engineering
Detailed Engineering
Supply of Key Equipment
Procurement supervision
Erection
Commissioning
Operator Training
Approx. value of the contract: 1.1 Mio CHF
Duration of assignment: 24months; under construction
Plant capacity: 350 KWsng
CTU Clean Technology Universe AG - Your Partner for responsible waste treatment
Thank you for your attention!