Amendments to the Accelerated Filer and Large Accelerated ...
COMMUNITY-LED ACCELERATED WASH (COWASH) PROJECT
Transcript of COMMUNITY-LED ACCELERATED WASH (COWASH) PROJECT
COMMUNITY-LED ACCELERATED WASH (COWASH)
PROJECT
ANNUAL PERFORMANCE REPORT
2007 EFY (07/07/2014-06/07/2015)
OCTOBER 2015
i
Table of contents
1 EXECUTIVE SUMMARY ........................................................................................................................................ 1
2 OVERALL OBJECTIVE ACHIEVEMENT.................................................................................................................... 8
3 PROJECT PURPOSE ACHIEVEMENT .....................................................................................................................16
4 COMPONENT 1: STRENGTHENING THE FEDERAL CAPACITY TO IMPLEMENT COMMUNITY MANAGED PROJECTS
ALONGSIDE WITH A SUPPORT TO THE ESTABLISHMENT OF THE ONE WASH NATIONAL PROGRAM .................20
4.1 RESULT 1 OF COMPONENT 1: COMMUNITY MANAGED PROJECT APPROACH SCALED-UP AT NATIONAL LEVEL ..... 20
4.1.1 Output 1: Manuals and Guidelines Reviewed and Developed for Standardizing the CMP Implementation
within the WaSH Implementation Framework ............................................................................................ 20
4.1.2 Output 2: Tools and Mechanisms Reviewed and Developed for Standardizing the Planning,
Implementation and Monitoring of CMPs ................................................................................................... 22
4.1.3 Output 3: CMP Approach within the Rural WaSH Scientifically Researched ............................................... 23
4.1.4 Output 4: Information, Education and Communication (IEC) on CMP Implementation Modality Enhanced
..................................................................................................................................................................... 25
4.2 RESULT 2 OF COMPONENT 1: CMP IMPLEMENTATION CAPACITY AT THE FEDERAL AND REGIONAL LEVELS
DEVELOPED ....................................................................................................................................................... 27
4.2.1 Output 1: Capacity Building Instruments Reviewed and Developed ........................................................... 27
4.2.2 Output 2: Capable and Adequate Personnel in place for CMP Implementation at National and Regional
Levels ........................................................................................................................................................... 27
4.3 RESULT 3 OF COMPONENT 1: DEVELOPMENT AND IMPLEMENTATION OF ONE WASH NATIONAL PROGRAM
SUPPORTED ...................................................................................................................................................... 29
4.3.1 Output 1: COWASH Support Provided in Preparing One WaSH National Program ..................................... 29
4.3.2 Output 2: COWASH Support Provided in Implementation of One WaSH National Program ....................... 30
5 COMPONENT 2: ESTABLISHING AND STRENGTHENING THE CAPACITY IN REGIONS TO SCALE-UP
IMPLEMENTATION OF CMP ...............................................................................................................................31
5.1 RESULT 1 OF COMPONENT 2: TARGET REGIONS, ZONES AND WOREDAS CAPABLE TO PLAN, MANAGE, MONITOR
AND IMPLEMENT RURAL WASH INTERVENTIONS USING CMP APPROACH ....................................................... 31
5.1.1 Output 1: Regional Support Units (RSU) Established and Functional .......................................................... 31
5.1.2 Output 2: Regions, Zones and Woredas Capacitated to Implement Rural WaSH through CMP ................. 32
5.2 RESULT 2 OF COMPONENT 2: FINANCIAL AND PROCUREMENT SERVICES DELIVERED FOR CMP INTERVENTION AT
ALL LEVELS IN THE SELECTED REGIONS .............................................................................................................. 42
5.2.1 Output 1: Flow of Funds for CMPs Functional ............................................................................................. 42
5.2.2 Output 2: Linkages Created with Private Sector in the Supply of Materials, Equipment, Tools and Services
..................................................................................................................................................................... 46
5.3 RESULT 3 OF COMPONENT 2: SUSTAINABLE COMMUNITY AND INSTITUTIONAL ACCESS TO SAFE WATER,
SANITATION AND HYGIENE IN THE TARGET WOREDAS INCREASED.................................................................. 46
5.3.1 Output 1: Access to Improved Water Sources for Communities and Institutions Increased ....................... 46
5.3.2 Output 2: Access to Sanitation for Household and Institutions Increased and Hygiene Behavior Improved
..................................................................................................................................................................... 57
5.3.3 Output 3: Sustainability of Communal and Institutional Water Schemes in the Targeted Woredas
Strengthened ............................................................................................................................................... 59
5.3.4 Output 4: Potable Water Quality Ensured in Targeted Woredas ................................................................ 62
6 FINANCIAL PERFORMANCE ................................................................................................................................64
6.1 FINANCIAL PERFORMANCE OF COMPONENT 1 ............................................................................................................. 64
6.1.1 Cumulative expenditures of Phase I and II .................................................................................................. 64
6.2 FINANCIAL PERFORMANCE OF COMPONENT 2 ............................................................................................................. 65
ii
6.2.1 Financial Performance of Amhara region.................................................................................................... 65
6.2.2 Financial Performance of Tigray Region ...................................................................................................... 67
6.2.3 Financial Performance of SNNP Region ....................................................................................................... 68
6.2.4 Financial Performance of Oromia region .................................................................................................... 70
6.2.5 Benishangul Gumuz region .......................................................................................................................... 71
7 PROJECT COORDINATION WITH KEY STAKEHOLDERS .........................................................................................73
8 CHALLENGES ......................................................................................................................................................77
iii
Abbreviation Interpretation
ACSI
Amhara Credit and Saving Institution
AfDB African Development Bank
AWP Annual Work Plan
BoE Bureau of Education
BoFED Bureau of Finance and Economic Development
BoH Bureau of Health
CARE Cooperative for Assistance and Relief Everywhere
CBN Community Based Nutrition
CDF Community Development Fund
CFT Community Facilitation Team
CIDA Canadian International Development Agency
CLTSH Community-Led Total Sanitation and Hygiene
CMP Community Managed Project
COWASH Community Led Accelerated WASH in Ethiopia
CRS Catholic Relief Services
CTA Chief Technical Advisor
CWA Consolidated WaSH Account
DCSI Dedebit Credit & Saving Institution
DFID Department for International Development (UK)
EFY Ethiopian Fiscal Year
EIRR Economic Internal Rate of Return
ETB Ethiopian Birr
EU European Union
EUR Euro
EUWI European Union Water Initiative
EWA Ethiopian Water Alliance
FI Financial Intermediary
FinnWASH-BG Rural Water Supply, Sanitation and Hygiene Programme in
Benishangul-Gumuz Region
FTAT Federal Technical Assistance Team
GoE Government of Ethiopia
GoF Government of Finland
GTP Growth and Transformation Plan
HEW Health Extension Worker
HIV/AIDS Human Immunodeficiency Virus/ Acquired Immunodeficiency Syn-
drome
HQ Head Quarter
HRD Human Resource Development
HSDP Health Sector Development Plan
IDC Italian Development Cooperation
IEC Information, Education and Communication
JFA Joint Financing Agreement
JICA Japan International Cooperation Agency
JMP Joint Monitoring Program
JTR Joint Monitoring Review
KWT Kebele WaSH Team
LWI Living Water International
MDG Millennium Development Goal
iv
Abbreviation Interpretation
M&E Monitoring and Evaluation
METB Million Birr
MEUR Million Euros
MFA Ministry for Foreign Affairs (of Finland)
MFI Microfinance Institution
MIS Management Information System
MMS Mass Mobilization Strategy
MoE Ministry of Education
MoFED Ministry of Finance and Economic Development
MoH Ministry of Health
MoU Memorandum of Understanding
MoWE Ministry of Water & Energy
MSF Multi-Stakeholder Forum
MUS Multiple Use of Services (Water)
MUSD Million United States Dollars
MWA Millennium Water Alliance
NGO Non-Governmental Organization
NPV Net Present Value
NUWI Netherlands-UNICEF WaSH Initiative
NWCO National WaSH Coordination Office
NWI National WaSH Inventory
NWMU National WaSH Management Unit
NWSC National WaSH Steering Committee
NWTT National WaSH Technical Team
OCSSCO Oromia Credit and Saving Shareholder Company
ODF Open Defecation Free
O&M Operation and Maintenance
OMA Office Management Assistant
OMFI OMO Micro-Finance Institution
OMSU Operation and Maintenance Support Unit
ORDA Organization for Rehabilitation and Development in Amhara
PASDEP Plan for Accelerated and Sustainable Development to End Poverty
REST Relief Society of Tigray
RiPPLE Research Inspired Policy and Practice Learning in Ethiopia and the
Nile Region
RSU Regional Support Unit
RWCO Regional WaSH Coordination Office
RWSC Regional WaSH Steering Committee
RWSEP Rural Water Supply and Environment Programme
RWTT Regional WaSH Technical Team
SAP National Hygiene and Sanitation Strategic Action Plan
SNNPR Southern Nations & Nationalities Peoples Region
SNV Netherlands Development Organization
SvB Supervisory Board
SWAp Sector Wide Approach
TA Technical Assistance
TVETC Technical Vocational & Educational Training College
UAP Universal Access Plan
UK United Kingdom
v
Abbreviation Interpretation
UNESCO United Nations Educational, Scientific and Cultural Organization
UNICEF United Nations Children’s Fund
WaSH Water Supply, Sanitation and Hygiene
WASHCO Water Supply, Sanitation and Hygiene Committee
WB The World Bank
WEW Water Extension Worker
WIF WaSH Implementation Framework
WMP Woreda Managed Project
WMU WaSH Management Unit
WRDB Water Resources Development Bureau
WSA Woreda Support Agent
WSG Woreda Support Group
WSP Water Safety Plan
WSP-AF Water and Sanitation Program-Africa
WSS Water Supply and Sanitation
WSSD Water Supply and Sanitation Directorate
WSSP Water Supply and Sanitation Program
WWT Woreda WaSH Team
WYCB Women, Youth and Children Bureau
1
1 EXECUTIVE SUMMARY
Readers should note that four baseline and target figures are presented for an indicator
as woredas were entered in the project at different years. Unless otherwise indicated
all dates in the report are in Ethiopian Calendar. The CMP approach is being implemented in
five regions of the country. The number of woredas of these regions implementing CMP approach
has increased from 5.5% in 2003 EFY to 13.0 % in 2007 EFY. COWASH has constructed 8,161
community and institutional water points in four years. This accounts 122.7% of the 6,649 water
points target set to be constructed until end of 2007. The achievement surpassed the target
mainly due to the increase in community contribution, allocating extra investment funds in some
implementation years and experience gained over the years in the implementation of the CMP
approach.
Contribution in Improving Rural Water Supply Access:
The rural water supply access coverage of the first year woredas has increased to 93.37% in
2007 from 40.68% in 2003 EFY. COWASH contributed some 28.7% of the current rural water
supply access coverage of these woredas.
The second, third and fourth year woredas’ water supply access coverage has shown increment.
In second year woredas, the water supply access coverage grew to 73.48% in 2007 from 46.66%
in 2004. About 26.9% of the achievement is due to the project.
Similarly, COWASH contributed 10.7% of the average rural water supply access coverage of the
third year woredas, which has improved from 51.07% in 2005 to 72.54% in 2007 EFY. The least
contribution was reported from the fourth year woredas. About 1.0% of the current rural water
supply coverage achievement of the fourth year woredas is attributed to COWASH.
Overall, as a result of the construction of 7,712 community water points in the four years, the
project contributed 0.9% to 28.7% to the achievement of the current water supply access cover-
age of the project woredas (Table 1). However, the rural water supply access coverage of the
project woredas is below the 98.0% target set in GTP I.
Table 1: Contribution of COWASH in Rural Water Supply Access Coverage
1 2 3 4 5 6 =(4) / (3)*100 7 8=(6) / (7)*100
Region
No. of
CMP
Woredas
Total Rural
Population of
the Woredas,
end of 2007
EFY
Total no. of
Rural people
having accesss
from CMP WPs,
end of 2007 EFY
Average Rural
WS Access
Coverage of the
woredas in the
base year (%)*
Average Rural
WS Access
Coverage of the
Woredas by
CMP, end of 2007
EFY (%)
Average Rural
WS Access
Coverage,
end of 2007
EFY
Contribution
of COWASH
/CMP (%)
First Year
Woredas31 5,069,700 1,359,813
40.6826.82 93.37 28.7
Second Year
Woredas9 1,016,680 200,732
46.6619.74 73.48 26.9
Third Year
Woredas23 2,839,048 220,082
51.077.75 72.54 10.7
Fourth Year
Woredas8 481,997 3,152
75.270.65 70.85 0.9
The share of COWASH in the current rural water supply coverage of SNNPR, Tigray, Amhara and
Oromia woredas was about 33.7%, 25.0%, 16.5% and 13.0%, respectively. The project didn’t do
much in BSG as the project started late and implementation of project activities in the woredas
have been delayed.
2
Table 2: Contribution of COWASH in Rural Water Supply Access Coverage
Region
No. of
COWASH
Project
Woredas
Average Rural
WS Access
Coverage of the
Project Woredas
in 2007 EFY (%)
Average Rural WS
Access Coverage
of the Project
Woredas due to
CMP in 2007 EFY
(%)
% Contribution of
COWASH to Rural
Water Supply
Access Coverage of
the Woreda
Amhara 40 92.4 23.1 25.0
Tigray 7 74.1 12.2 16.5
SNNPR 8 41.2 13.9 33.7
Oromia 12 83.2 10.8 13.0
BSG 4 62.3 0.0 0.0
Contribution in Improving the School Water Supply Access:
A total of 374 schools (74.8 % of the target) have got access to CMP water points. The construc-
tion of these school water points and the capacity building activities undertaken over the years
has improved the school water supply situation of the project woredas. Overall, COWASH contrib-
uted 27.0%, 25.7%, 11.9% and 3.2% of the school water supply access coverage of the first
year, second year, third year and fourth year woredas of COWASH (Table 3). This is believed to
improve the teaching-learning situation in the project kebeles. The project didn’t contribute in the
improvement of the school water supply accss in BSG woredas due to late implementation of the
project and delay in preparatory activities needed for the construction of water supplies.
Table 3: Contribution of COWASH in School Water Supply Access Coverage
1 2 3 4 5 =(4) / (3)*100 6 7=(5) / (6)*100
Region
No. of
CMP
Woredas
Total No. of
Schools in
Woredas, end
of 2007 EFY
Total no. of
Schools
accessing
CMP WPs,
end of 2007
EFY
School Water
Supply Acces
Coverage by
COWASH, end
of 2007 EFY(%)
Average School
WS Access
Coverage, end
of 2007 EFY
Contribution of
COWASH/CMP(%)
First Year
Woredas31 2,278 293 12.86 47.69 27.0
Second Year
Woredas9 427 40 9.37 36.43 25.7
Third Year
Woredas23 1,228 39 3.18 26.65 11.9
Fourth Year
Woredas8 269 2 0.74 23.52 3.2
Contribution in Improving Health Facility Water Supply Access:
The construction of health water supply facilities is very low compared to schools. Anyhow, as a
result of the construction of 75 health facility water supply schemes (35.5% of the target) and
capacity building activities, COWASH contributed 20.8% to 77.7% of the health facility water
supply access coverage of the project woredas (Table 4). The disaggregation by woreda shows
that 27.5%, 54.3%, 20.8% and 77.7% of the current health facilities water supply access cover-
age of the first year, second year, third year and fourth year woredas, respectively is attributed to
COWASH. The fourth year woredas in Oromia performed well in improving the health facilities
water supply access coverage due to the experience they learnt from the previous year woredas
and attention given to institutional WASH.
3
Table 4: Contribution of COWASH in Health Facilities Water Supply Access Coverage
1 2 3 4 5 =(4) / (3)*100 6 7=(5) / (6)*100
Region
No. of
CMP
Woredas
Total No. of
Health
Facilities in
Woredas, end
of 2007 EFY
Total no. of
Health
Facilities
accessing
CMP WPs,
end of 2007
EFY
Health Facilities
Water Supply
Access
Coverage by
COWASH, end
of 2007 EFY(%)
Average Health
Facilities WS
Access
Coverage, end
of 2007 EFY
Contribution of
COWASH/CMP (%)
First Year
Woredas 31 1175 59 5.02 18.23 27.5
Second Year
Woredas9 244 26 10.66 19.64 54.3
Third Year
Woredas23 715 19 2.66 12.79 20.8
Fourth Year
Woredas 8 204 29 14.22 18.29 77.7
Contribution in Improving Institutions Latrine Access:
COWASH has also improved sanitation and hygiene situation of institutions through construction of
latrines and raising the implementation capacity of woredas and beneficiaries. The project has
achieved 67.9 % of the institutional latrine target (221) set for end of 2007. This reveals that the
contribution of the project in school and health facility improved latrine access was very low
mainly due to the priority given to construction of community water supplies thereby increase
water supply access coverage target of GTP 1.
As indicated in Table 5 below, nearly 1.9% to 7.0% of the current school latrine access coverage
of the first three years project woredas was achieved by COWASH. No contribution in the fourth
year woredas as they entered late into the project and delay in preparatory activities.
Table 5: Contribution of COWASH in School Latrine Access Coverage
1 2 3 4 5 =(4) / (3)*100 6 7=(5) / (6)*100
Region
No. of
CMP
Woredas
Total No. of
Schools in
Woredas, end
of 2007 EFY
Total no. of
Schools
accessing
Improved CMP
Latrines, end of
2007 EFY
School Latrine
Access
Coverage by
COWASH, end
of 2007 EFY (%)
Average School
Latrine Access
Coverage, end
of 2007 EFY
Contribution of
COWASH/CMP (%)
First Year
Woredas31 2,278 55 2.41 46.09 5.2
Second Year
Woredas9 427 13 3.04 43.24 7.0
Third Year
Woredas23 1,228 7 0.57 30.57 1.9
Fourth Year
Woredas8 269 0 0.00 28.21 0.0
COWASH has tried to contribute in the improvement of the sanitation and hygiene situation of the
health facilities. The effort exerted by COWASH in the four years of implementation has enabled
to contribute to the current health facilities latrine access coverage achievement by 7.5%, 7.9%
and 10.9% in the first, second and third year woredas (Table 6). The project has not contributed
much in improving the sanitation and hygiene situation of the fourth year woredas due to delay in
implementation of construction activities.
4
Table 6: Contribution of COWASH in Health Facilities Latrine Access Coverage
1 2 3 4 5 =(4) / (3)*100 6 7=(5) / (6)*100
Region
No. of
CMP
Woredas
Total No. of
Health
Facilities in
Woredas, end
of 2007 EFY
Total no. of
Health Facilities
accessing
Improved CMP
Latrines, end of
2007 EFY
Health Facilities
Latrine Access
Coverage due
to
COWASH/CMP
trines, end of
2007EFY(%)
Average Health
Facilities Latrine
Access Coverage,
end of 2007 EFY
Contribution of
COWASH/CMP (%)
First Year
Woredas 31 1,175 44 3.74 49.98 7.5
Second Year
Woredas9 244 10 4.10 51.88 7.9
Third Year
Woredas23 715 8 1.12 10.25 10.9
Fourth Year
Woredas8 204 0 0.00 61.39 0.0
Non-Functionality rate of rural water supplies:
As a result of efforts exerted by all WASH actors (including COWASH) in the project woredas, the
rural water supply non-functionality rate has declined. The average water supply non-functionality
rate of 1st year woredas has reduced from 26.14% in 2003 EFY to 8.1% in 2007 EFY. The
non-functionality rate of the 2nd and 3rd year woredas declined from 19.6% in 2004 EFY to 6.2 %
in 2007 EFY and 18.6% in 2005 EFY to 7.1 % in 2007 EFY, respectively. The average rate of non-
functionality in the 4th year woredas dropped from about 11.4% to 8.3 % by all WASH actors
working in the project woredas. This achievement is very high compared to the other project
woredas.
With regards to COWASH CMP water points, on the average 3.8% of the project water points
were not functioning in Amhara. The maximum rate of non-functionality in the project woredas of
Amhara was about 7.6%. In the other regions, all of the project water points were functional.
22,53
32,08
23,8 26,14
5,12 2,75
16,5
8,12
0,00
5,00
10,00
15,00
20,00
25,00
30,00
35,00
Amhara 1st Year Woredas (27)
Tigray 1st Year Woredas (2)
SNNPR 1st Year Woredas (2)
Average Non-Functionality
Rate First Year Woredas
Fig. 1 Water Points Non-Functionality Rate of First Year Woredas
Average Non-functionality Rate in 2003EFY
Average Non-functionality Rate in 2007 EFY
14,50
35,75
8,54
19,59
1,25
14,50
2,80 6,18
0,00
5,00
10,00
15,00
20,00
25,00
30,00
35,00
40,00
Tigray 2nd Year Woredas (2)
SNNPR 2nd Year Woredas (2)
Oromia 2nd Year Woredas (5)
Average Non-Functionality
Rate
Second Year Woredas
Fig.2 Water Points Non-Functionality Rate of Second Year Woredas
Average Non-functionality Rate in 2004EFY
Average Non-functionality Rate in 2007 EFY
5
COWASH’s contribution for the decrement of non-functionality of water points was through reha-
bilitation of 449 community and institutional water points and building the capacity of implement-
ers and beneficiaries of the facilities.
Manuals/guidelines Development:
The project has produced a number of important manuals and guidelines. Until end of 2007 EFY,
COWASH planned to develop 17 manuals/guidelines (2 generic CMP implementation manuals and
1 training manual, 1 in use of CMP in higher technologies and 13 O&MM, climate risk screening
training maual , climate resilient water safety plan (CR-WSP) and social accountability guidelines
and training manuals) and 14 of them were produced (83.4%).
Human Capacity Building:
At the federal level, from 2004-2007 EFY, COWASH technical assistance team (COWASH FTAT)
provided 22 types of trainings (100.0% of planned types of trainings) and 1,248 woreda, regional
and national level people (9.4 % female) participated (70.6 % of those planned to be trained) in
these trainings given by COWASH FTAT or in collaboration with other WASH actors.
The project has been trying to fulfill the physical and human capacity building needs of the pro-
ject regions, zones and woredas. Between 2004 EFY and 2007 EFY, a total of 135,754 people
(97.6% of the planned) have received trainings on CMP promotion, management, appraisal, re-
porting and other related issues in the five COWASH project regions. Of these trainees, 6,570
(39.0%) are female. The regional disaggregation of the number of people trained shows that a
total of 98,221 (123.4%), 10,528 (72.9%), and 9,877 (47.7%) people were trained in CMP man-
agement and related issues over the last four years of implementation of the project in Amhara,
Tigray and SNNPR, respectively. In Oromia region, some 16,091(71.6%) people were trained in
2005-2007 EFY. Similarly, more than 1,037 (55.3%) people have received CMP management and
related trainings in Benishangul Gumuz region in 2007 EFY only. Among the people trained in the
regions, 37.9% in Amhara, 44.3% in Tigray, 41.5% in SNNPR, 40.8% in Oromia and 35.7% in
BSG are female.
Research on CMP Approach:
Over the four years of implementation, the project planned to conduct 5 MSc, 1 BSc and 1 PhD
level researches on WASH implementation through the CMP approach. Consequently, four of the
12,12
17,73
30,63
13,93
18,60
7,97
1,01
14,00
5,54 7,13
0,00
5,00
10,00
15,00
20,00
25,00
30,00
35,00
Amhara 3rd Year Woredas (13)
Tigray 3rd Year Woredas (3)
SNNPR 3rd Year Woredas (4)
Oromia 3rd Year Woredas (3)
Average Non-Functionality
Rate
Third Year Woredas
Fig.3 Water Points Non-Functionality Rate of Third Year Woredas
Average Non-functionality Rate in 2005EFY
Average Non-functionality Rate in 2007 EFY
7,29
15,45
11,37
2,59
13,93
8,26
0
2
4
6
8
10
12
14
16
18
Oromia 4th Year Woredas (4)
BSG 4th Year Woredas (4)
Average Non-Functionality Rate
Fourth Year Woredas
Fig. 4 Water Points Non-Functionality Rate of Fourth Year Woredas
Average Non-functionality Rate in 2006EFY
Average Non-functionality Rate in 2007 EFY
6
MSc and BSc level researches were completed (83.3%) and the PhD level research has continued
with the financial and technical support of COWASH. One of the MSc level researches is being
completed. Also, the PhD level researcher published 1 article in a reputable journal (50.0%) and
1 research result presentation was made at international conferences (50.0%).
Fund Allocation and Utilization:
A total of EUR 3,730,392 was allocated for Component 1 for five years. The total Component 1
usage at the end of June 2007 EFY (June 2015) was EUR 2,821,008, representing 75.6 % of
budget utilization from the total 5-year budget. In 2007 EFY, a total of EUR 850,000 was allocat-
ed and EUR 816,342 was utilized (96.0 %) for activities planned under Component 1.
Under Component 2, the five project regions have received EUR 13,580,516.94 (74.3 % of EUR
18,269,590 allocated) from Government of Finland (GoF) and Birr 327,397,112 (65.1 % of Birr
502,827,227 committed) from GoE in the last four fiscal years (2004 EFY- 2007 EFY). So far,
80.6% of the GoF and 88.0 % of the GoE funds received have been utilized until end of July 7,
2015 (Fig. 17). The fund utilization of the regions varies greatly (Fig. 18). The highest GoF fund
utilization was reported from Amhara (98.1%of the transferred) while BSG stood the least in GoF
fund utilization (49.6% of the transferred). The GoE fund utilization was better in Tigray (93.0%)
and the least GoE fund utilization was reported from SNNPR (75.0%).
332,61 323,55
298,72 319,72
268,14 287,98
0,00
50,00
100,00
150,00
200,00
250,00
300,00
350,00
GoF GoE
Fund Sources
Fig. 5 GoF & GoE Funds Received, Transferred & Utilized (in Million Birr) until July 7, 2015
Received from Source
to date
Transferred to
Beneficiaries to date
Utilized by
Beneficiaries to date
7
Fig. 6 Component 2 Funds (GoF & GoE) Received, Transferred & Utilized to date (in Million Birr)
by Fund Source and Region
GoF GoE GoF GoE GoF GoE GoF GoE GoF GoE
Amhara Tigray SNNPR Oromia BSG
Received to date 226,58 223,36 28,73 31,22 25,74 35,12 28,02 33,71 23,54 0,15
Transferred to date 210,68 223,36 28,10 31,22 23,78 32,92 27,82 32,07 8,33 0,15
Utilized to date 206,74 206,19 18,61 29,04 21,24 24,82 17,42 27,78 4,13 0,15
-20,00
30,00
80,00
130,00
180,00
230,00
Received to date Transferred to date Utilized to date
8
2 OVERALL OBJECTIVE ACHIEVEMENT
The overall objective of COWASH is ‘to achieve universal access to WaSH in the rural areas
of Ethiopia’. The project tries to attain this objective through implementing Component 1 at the
federal level and Component 2 in the regions through the adoption and application of Community
Managed Project (CMP) approach. The contribution of the project in improving the water supply,
sanitation and hygiene situation of the project woredas is presented hereunder.
The key indicators for the verification of the achievement of the overall objective are the WASH
GTP I indicators: i) Access to safe rural water fulfilling the UAP II criteria in the targeted woredas;
ii) Percentage of institutions (schools and health facilities) accessing water supply; iii) Percentage
of institutions (schools and health facilities) accessing sanitation facilities; iv) Rate of functionality
of rural water supplies in the targeted woredas; v) Percentage of rural ODF kebeles in the target-
ed woredas; vi) Proportion of rural households with access to sanitation facilities.
The contributions of COWASH in improving the WASH situation of the woredas are indicated be-
low. The baseline figures of the woredas could not be reported as the NWI results and the ones
reported by woredas were found to be contradictory and some of these data do not seem reliable.
Contribution in improving water supply access coverage:
COWASH has been instrumental in improving the water supply situation of communities and insti-
tutions (schools and health facilities) thereby attaining the GTP targets of the project woredas.
Between 2004 and 2007 EFY, more than 1.78 million rural people got access from and 1.82 mil-
lion rural people are using the CMP water points. The completion of the community water points
has improved the rural water supply access coverage of the project woredas (Table 7).
The rural water supply access coverage of the first year woredas has increased to 93.37% in
2007 from 40.68% in 2003 EFY. COWASH contributed some 28.7% of the current rural water
supply access coverage of these woredas.
The second, third and fourth year woredas’ water supply access coverage has shown increment.
In second year woredas, the water supply access coverage grew to 73.48% in 2007 from 46.66%
in 2004. About 26.9% of the achievement is due to the project.
Similarly, COWASH contributed 10.7% of the average rural water supply access coverage of the
third year woredas, which has improved from 51.07% in 2005 to 72.54% in 2007 EFY. The least
contribution was reported from the fourth year woredas. About 1.0% of the current rural water
supply coverage achievement of the fourth year woredas is attributed to COWASH.
Overall, as a result of the construction of 7,712 community water points in the four years, the
project contributed 28.7%, 26.9%, 10.7% and 0.9% of the current water supply access coverage
achievement of the 1st, 2nd, 3rd and 4th year woredas (Table 1 above). However, the rural water
supply access coverage of the project woredas is below the 98.0% target set in GTP I. The con-
tribution by region is presented below.
In Amhara region, more than 1.78 million rural people have got access to water supply in four
years. Consequently, 10.8% and 29.0% of the water supply access coverage achievement of the
first and third year woredas, respectively is contributed by COWASH.
The project has also improved the water supply situation of the rural people of Tigray regional
state by constructing 371 water points, benefiting more than 0.16 million rural people, in the sev-
en project woredas. Due to these water supply facilities, more than 19.9%, 23.9% and 10.1% of
the rural water supply access coverage in Tigray first, second and third year woredas, respective-
ly is attributed to COWASH.
9
The contribution of the project in improving the water supply situation of the rural community in
SNNPR was higher than the other regions. Over 32.5%, 61.5% and 14.4% of the rural water sup-
ply access coverage of the first, second and third year wored, respectively at the end of 2007 EFY
is due to COWASH/CMP.
Though COWASH was started after one year in Oromia, good progress has been recorded in the
three years of implementation. As a result of construction of 750 community water points and
tremendous human and physical capacity building activities the project managed to contribute
21.8%, 9.1% and 1.3% of the existing water supply access rate achievement of the second, third
and fourth year woredas, respectively.
The project started late in BSG and there was no contribution in the improvement of the rural
water supply access coverage of the four project woredas.
Table 7: Contribution of COWASH in Rural Water Supply Access Coverage Improvement
1 2 3 4 5 6 =(4) / (3)*100 7 8=(6) / (7)*100
Region
No. of
CMP
Woredas
Total Rural
Population of
the Woredas,
end of 2007
EFY
Total no. of
Rural people
having accesss
from CMP WPs,
end of 2007 EFY
Average Rural
WS Access
Coverage of the
woredas in the
base year (%)*
Average Rural
WS Access
Coverage of the
Woredas by
CMP, end of 2007
EFY (%)
Average Rural
WS Access
Coverage,
end of 2007
EFY
Contribution
of COWASH
/CMP (%)
1. Amhara 40 6,024,881 1,388,945
1st Year 27
Woredas27 4,484,611 1,248,023 40.04 27.83 96.03 29.0
3rd
Year 13
Woredas13 1,540,270 140,922 58.78 9.15 84.84 10.8
2. Tigray 7 883,828 107,589
1st Year 2
Woredas2 248,388 43,939 51.21 17.69 88.80 19.9
2nd
Year 2
Woredas2 225,669 33,750 52.50 14.96 62.50 23.9
3rd
Year 3
Woredas3 409,771 29,900 66.42 7.30 72.00 10.1
3. SNNPR 8 1,139,998 158,029
1st Year 2
Woredas2 336,701 67,851 38.82 20.15 62.00 32.5
2nd
Year 2
Woredas2 290,074 65,868 20.39 22.71 36.93 61.5
3rd
Year 4
Woredas4 513,223 24,310 20.83 4.74 32.84 14.4
4. Oromia 12 1,194,139 129,216
2nd
Year 5
Woredas5 500,937 101,114 54.84 20.18 92.50 21.8
3rd
Year 3
Woredas3 375,784 24,950 42.60 6.64 72.70 9.1
4th
Year 4
Woredas4 317,418 3,152 74.46 0.99 79.40 1.3
5. BSG 4 164,579 0
4th
Year 4
Woredas 4 164,579 0 76.08 0.00 62.30 0.0
Contribution in improving school water supply access coverage:
COWASH has been also improving the water supply situation of schools thereby improving the
teaching-learning situation in the project kebeles. A total of 374 schools in the project woredas of
the four regions (Amhara, Tigray, SNNPR and Oromia) have got access to water supply between
2004 EFY and 2007 EFY through the support of COWASH (Table 8).
Accordingly, on average COWASH’s water points contributed about 27.0%, 25.7%, 11.9% and
3.2% of the 2007 EFY school water supply access coverage of the first, second, third and fourth
year woredas(Table 3 above). The baseline figures are not presented as many woredas didn’t
10
accept the NWI results and some unreliable data were reported by some project woredas. Details
are indicated hereunder.
On average, about 16.3% to 43.4% of the existing school water supply access coverage of the
first year woredas at the end of 2007 EFY is attributed to COWASH. The project’s school water
points constructed contributed about 21.5% to 38.5% of the current school water supply access
coverage achievement of the 2nd year woredas.
The contribution of the project in improving the school water supply access coverage of the 3rd
year woredas is between 6.2% and 15.2% of the average coverage at the end of 2007 EFY. The
project didn’t contribute much in SNNPR 3rd year and BSG woredas due to delay in implementa-
tion of the project activities in the woredas.
Table 8: Contribution of COWASH in School Water Supply Access Coverage Improvement
1 2 3 4 5 =(4) / (3)*100 6 7=(5) / (6)*100
Region
No. of
CMP
Woredas
Total No. of
Schools in
Woredas, end
of 2007 EFY
Total no. of
Schools
accessing
CMP WPs,
end of 2007
EFY
School Water
Supply Access
Coverage due to
COWASH/CMP,
end of 2007 EFY
(%)
Average School
WS Access
Coverage, end
of 2007 EFY
Contribution of
COWASH/CMP (%)
1. Amhara 40 2,797 303
1st Year 27
Woredas27 2,013 271 13.46 50.60 26.6
3rd
Year 13
Woredas13 784 32 4.08 30.10 13.6
2. Tigray 7 399 21
1st Year 2
Woredas2 119 6 5.04 30.84 16.3
2nd
Year 2
Woredas2 105 12 11.43 29.71 38.5
3rd
Year 3
Woredas3 175 3 1.71 27.50 6.2
3. SNNPR 8 384 19
1st Year 2
Woredas2 146 16 10.96 25.23 43.4
2nd
Year 2
Woredas2 85 3 3.53 11.74 30.1
3rd
Year 4
Woredas4 153 0 0.00 17.81 0.0
4. Oromia 12 516 31
2nd
Year 5
Woredas5 237 25 10.55 48.99 21.5
3rd
Year 3
Woredas3 116 4 3.45 22.67 15.2
4th
Year 4
Woredas4 163 2 1.23 34.57 3.5
5. BSG 4 106 0
4th
Year 4
Woredas4 106 0 0.00 12.47 0.0
Contribution in improving health facilities water supply access coverage:
COWASH has been also contributing in improving the water supply situation of health facilities
thereby improving the health situation of health staff and clients of the institutions. In the period
between 2004 and 2007 EFY, COWASH assisted in the construction of 75 water supply schemes
for health facilities in the project woredas of four regions (Amhara, Tigray, SNNPR and Oromia).
The contribution of the project in improving the health facilities water supply access coverage was
better than the schools’ water supply access coverage. The water point constructed for health
facilities contributed, on average, 27.5%, 54.3%, 20.8% and 77.7% of the 2007 EFY school water
supply access coverage of the first, second, third and fourth year woredas(Table 4 above). The
baseline figures are not presented as many woredas didn’t accept the NWI results and some un-
reliable data were reported by some project woredas. Details are indicated hereunder.
11
Regional reports show that 26.7% to 34.0% of the current health facilities water supply access
coverage of the first woredas is due to COWASH water points (Table 9). The percentage share of
the project in improving the health facilities water supply access coverage of the second year
woredas is very low except the Oromia woredas where close to 95.0% of the coverage is due to
COWASH.
The contribution of the project in improving the health facilities water supply access coverage of
the 3rd year Amhara, Tigray and Oromia woredas is 9.4%, 491% and 99.3%, respectively of their
coverage at the end of 2007 EFY. While the contribution in Oromia 4th year woredas was remark-
able (90.1% of the current coverage), the project have not done much in SNNPR 3rd year and
BSG woredas mainly due to late implementation of construction activities and priority given to
community water supplies.
Table 9: Contribution of COWASH in Health Facilities Water Supply Access Coverage Improvement
1 2 3 4 5 =(4) / (3)*100 6 7=(5) / (6)*100
Region
No. of
CMP
Woredas
Total No. of
Health
Facilities in
Woredas, end
of 2007 EFY
Total no. of
Health
Facilities
accessing
CMP WPs,
end of 2007
EFY
Health Facilities
Water Supply
Access Coverage
due to
COWASH/CMP,
end of 2007 EFY
(%)
Average Health
Facilities WS
Access
Coverage, end
of 2007 EFY
Contribution of
COWASH/CMP (%)
1. Amhara 40 1,434 59
1st Year 27
Woredas27 1,028 53 5.16 19.30 26.7
3rd
Year 13
Woredas13 406 6 1.48 15.80 9.4
2. Tigray 7 164 4
1st Year 2
Woredas2 47 1 2.13 7.28 29.2
2nd
Year 2
Woredas2 46 0 0.00 15.52 0.0
3rd
Year 3
Woredas3 71 3 4.23 8.61 49.1
3. SNNPR 8 323 5
1st Year 2
Woredas2 100 5 5.00 14.69 34.0
2nd
Year 2
Woredas2 78 0 0.00 15.67 0.0
3rd
Year 4
Woredas4 145 0 0.00 7.63 0.0
4. Oromia 12 323 65
2nd
Year 5
Woredas5 120 26 21.67 22.87 94.7
3rd
Year 3
Woredas3 93 10 10.75 10.83 99.3
4th
Year 4
Woredas4 110 29 26.36 29.26 90.1
5. BSG 4 94 0
4th
Year 4
Woredas 4 94 0 0.00 7.32 0.0
Contribution in improving school sanitation access coverage:
COWASH has also contributed in improving the sanitation situation of schools in the project
woredas of the four regions by constructing a total of 75 school latrines (58 in Amhara, 5 in
Tigray, 4 in SNNPR and 8 in Oromia) over the period of 2004 EFY to 2007 EFY (Table 10).
On the average, the percentage share of the project in the current school latrine access coverage
achievement of the first, second, and third year woredas is about 5.2%, 7.0%, and 1.9%, respec-
tively (Table 5 above). The fourth year woredas have not completed school latrine constructions.
Details are presented below.
About 6.0% and 2.1% of the school latrine access coverage of Amhara and Tigray first year
woredas is due to COWASH’s school latrines. Tigray first year woredas constructed one to two
blocks latrines for some schools already included in the school latrine access coverage of the
woredas. However, this is not included in the contribution to the coverage. The share of the pro-
12
ject in improving the school latrine coverage of the second year Tigray, SNNPR and Oromia
woredas is about 2.6%, 6.2% and 8.4%, respectively.
COWASH accounts close to 1.6% and 2.8% of the present school latrine access coverage of
Amhara and Tigray third year woredas, respectively. There is no contribution in the SNNPR third
year and all the fourth year woredas as they have not completed construction of school latrines
through the CMP approach.
Table 10: Contribution of COWASH in School Latrine Access Coverage Improvement
1 2 3 4 5 =(4) / (3)*100 6 7=(5) / (6)*100
Region
No. of
CMP
Woredas
Total No. of
Schools in
Woredas, end
of 2007 EFY
Total no. of
Schools
accessing
Improved CMP
Latrines, end of
2007 EFY
School Latrine
Access Coverage
due to
COWASH/CMP,
end of 2007 FY(%)
Average School
Latrine Access
Coverage, end
of 2007 EFY
Contribution of
COWASH/CMP (%)
1. Amhara 40 2,797 58
1st Year 27
Woredas27 2,013 54 2.68 44.56 6.0
3rd
Year 13
Woredas13 784 4 0.51 31.45 1.6
2. Tigray 7 399 5
1st Year 2
Woredas2 119 0 0.00 80.05 0.0
2nd
Year 2
Woredas2 105 2 1.90 74.60 2.6
3rd
Year 3
Woredas3 175 3 1.71 60.28 2.8
3. SNNPR 8 384 4
1st Year 2
Woredas2 146 1 0.68 32.83 2.1
2nd
Year 2
Woredas2 85 3 3.53 57.14 6.2
3rd
Year 4
Woredas4 153 0 0.00 12.83 0.0
4. Oromia 12 516 5
2nd
Year 5
Woredas5 237 5 2.11 25.13 8.4
3rd
Year 3
Woredas3 116 0 0.00 20.71 0.0
4th
Year 4
Woredas4 163 0 0.00 30.46 0.0
5. BSG 4 106 0
4th
Year 4
Woredas 4 106 0 0.00 25.96 0.0
Contribution in improving health facilities sanitation access coverage:
As indicated in Table 11 below, the sanitation situation of the health facilities is better than
schools. COWASH has been also assisting in improving the sanitation coverage of health facilities
thereby improving the health situation of rural people in the project kebeles. This has been possi-
ble by constructing standard latrines (1 block with 2 seats for health posts) and building the phys-
ical and human capacity of implementers and beneficiaries. Though the performance of the
woredas in health facilities’ latrines is much below the plan, 62 standard latrines (47 in Amhara,
10 in Tigray and 5 in Oromia) were constructed in health facilities in the project woredas
(Table 11).
The effort exerted by stakeholders of COWASH in the four years has enabled to contribute to the
current health facilities latrine access coverage achievement of the first, second and third year
woredas by 7.5%, 7.9%, and 10.9%, respectively (Table 6 above).
The contribution of the project is better in Tigray and Oromia woredas. More than 4.3%, 14.2%
and 4.3% of the 2007 EFY health facilities latrine access coverage of Tigray first, second and third
year woredas is attributed to COWASH. In Amhara region, 8.6% and 2.8% of the health facility
latrine access coverage of the first and third year woredas, respectively is COWASH’s contribu-
tion. The percentage share of COWASH in the 2007 EFY health facilities latrine access coverage
of Oromia second year and third year woredas is about 10.6% and 4.6%, respectively. There is
no contribution in all the SNNPR woredas, fourth year Oromia and BSG woredas as there are no
health facility latrines constructed in the woredas.
13
Table 11: Contribution of COWASH in Health Facilities Latrine Access Coverage Improvement
1 2 3 4 5 =(4) / (3)*100 6 7=(5) / (6)*100
Region
No. of
CMP
Woredas
Total No. of
Health
Facilities in
Woredas, end
of 2007 EFY
Total no. of
Health Facilities
accessing
Improved CMP
Latrines, end of
2007 EFY
Health Facilities
Latrine Access
Coverage due to
COWASH/CMP, end
of 2007 EFY(%)
Average Health
Facilities Latrine
Access Coverage,
end of 2007 EFY
Contribution of
COWASH/CMP (%)
1. Amhara 40 1,434 47
1st Year 27
Woredas27 1,028 42 4.09 47.65 8.6
3rd
Year 13
Woredas13 406 5 1.23 44.03 2.8
2. Tigray 7 164 10
1st Year 2
Woredas2 47 2 4.26 100.00 4.3
2nd
Year 2
Woredas2 46 6 13.04 92.00 14.2
3rd
Year 3
Woredas3 71 2 2.82 65.45 4.3
3. SNNPR 8 323 0
1st Year 2
Woredas2 100 0 0.00 31.49 0.0
2nd
Year 2
Woredas2 78 0 0.00 62.70 0.0
3rd
Year 4
Woredas4 145 0 0.00 23.03 0.0
4. Oromia 12 323 5
2nd
Year 5
Woredas5 120 4 3.33 31.51 10.6
3rd
Year 3
Woredas3 93 1 1.08 23.62 4.6
4th
Year 4
Woredas4 110 0 0.00 76.29 0.0
5. BSG 4 94 0
4th
Year 4
Woredas 4 94 0 0.00 46.49 0.0
Contribution in lowering non-functionality rate of water points:
The rate of functionality of rural water supplies in the project woredas has shown improvement
from 2003 to 2007 EFY. COWASH has contributed by rehabilitating water points (449 water points
– 385 in Amhara, 23 in Tigray, 32 in SNNPR and 9 in Oromia woredas) and building the imple-
mentation capacity of the project woredas through filling the gap in physical and human capacity
(Table 12). All of the project woredas except the SNNPR woredas have met the GTP 1 target of
lowering the water supply non-functionality rate to about 10.0% due to all WASH actors in the
woredas.
Though there is ambiguity in the definition (especially in the time of visit and clarity in the factors
to be considered for recording a water point as functional), regional reports reveal that significant
improvement has been registered in improving the functionality of rural water supplies. The aver-
age rate of functionality of rural water supplies of the first year woredas increased fom 76.77% in
2003 EFY to 91.69% in 2007 EFY. Similarly, the functionality rate of the second year woredas
increased to 94.63% in 2007 from 84.09% in the base year (2004 EFY). The third year’s woredas
functionality rate rose to 93.18% in the reporting period from 83.69% in 2005. Fourth year
woredas have also registered good performance. The average functionality rate of rural water
supplies grew to 95.25% in 2007 from 90.67% in 2006.
In a nut shell, some 6.54 %, 1.67 %, 15.0 %, and 3.64 % of the rural water supplies in the pro-
ject woredas of Amhara, Tigray, SNNPR, Oromia and BSG were non-functional in 2007 EFY. The
detailed changes in the rural water supplies functionality rate of groups of project woredas is indi-
cated in Table 12 below.
14
Table 12: Improvement in Functionality of Rural Water Supply Schemes (by all WASH actors)
RegionNo. of CMP
Woredas
Average Functionality
Rate of Rural WS
Schemes (%), end of
Base Year*
Average Functionality
Rate of Rural WS
Schemes (%), end of
2007 EFY
1. Amhara 40 93.46
1st Year 27
Woredas27 77.47 94.88
3rd
Year 13
Woredas13 87.88 92.03
2. Tigray 7 98.33
1st Year 2
Woredas2 67.92 97.25
2nd
Year 2
Woredas2 85.50 98.75
3rd
Year 3
Woredas3 82.25 98.99
3. SNNPR 8 85.00
1st Year 2
Woredas2 76.20 83.50
2nd
Year 2
Woredas2 64.25 85.50
3rd
Year 4
Woredas4 69.37 86.00
4. Oromia 12 96.36
2nd
Year 5
Woredas5 91.46 97.20
3rd
Year 3
Woredas 3 86.07 94.46
4ተሀ Year 4
Woredas 4 92.71 97.41
5. BSG 4 93.00
4th
Year 4
Woredas 4 88.63 93.00
* - The base years for woredas encompassed by COWASH are different- the base year for 1st, 2nd, 3rd & 4th Year woredas is 2003 EFY, 2004 EFY, 2005 EFY, and 2006 EFY, respectively.
Contribution in Increasing ODF Kebeles and Improving the Household Latrine Access:
Many of the project regions, zones and woredas have not given due emphasis for verification and
re-verification of kebeles. Supportive supervisions reveal that there has not been clear under-
standing and awareness in ODF definition across the project woredas. As a result, much of the
data reported on ODF kebeles by woredas are not considered as reliable. Anyhow, the ODF situa-
tion of Kebeles in the project woredas, as reported by regions, is presented in Table 13 below.
Regional reports show that the number of Open Defecation Free (ODF) environment Kebeles of
first year woredas increased from 1.2% in 2003 EFY to 64.3% in 2007. The percentage of ODF
kebeles in the second year woredas has increased to 63.8% in 2004 from 29.1%. The effort ex-
erted by all WASH actors in the third year woredas increased the percentage of ODF kebeles from
9.2% to 45.7%. According to the regional reports, the ODF kebeles in the fourth year woredas
are very small. Only 8.5% of the total rural kebeles in the fourth year proejct woredas were re-
ported to be ODF. Details of ODF kebeles in the regions are indicated in Table 13 below.
Altogether, 627 (58.7 %), 112 (83.0 %), 157 (60.4 %), 48 (27.7 %) and 15 (17.2%) of the rural
kebeles of 40 Amhara, 7 Tigray, 8 SNNPR, 12 Oromia and 4 BSG woredas were reported to be
ODF at the end of 2007 EFY. Of these ODF kebeles, 84.7 %, 43.8 %, 45.2 %, 56.3 % and 0.0 %
in Amhara, Tigray, SNNPR, Oromia and BSG woredas are ODF CMP kebeles.
The contribution of COWASH in improving the ODF situation of the woredas was through capaci-
tating the stakeholders (beneficiaries and woreda staff) through trainings and workshops and
building latrines for institutions (schools and health facilities) in the project kebeles.
15
Table 13: Improvement in ODF Status of Kebeles in Project Woredas (by all WASH actors)
RegionNo. of CMP
Woredas
Total No. of
Rural
Kebeles
Total No. of
ODF Kebeles in
the Base Year*
% of ODF
Kebeles in the
Base Year
Total No. of
ODF Kebeles,
end of 2007
EFY
% of ODF
Kebeles end
of 2007 EFY
1. Amhara 40 1,069 627 58.7
1st Year 27
Woredas27 752 0 0.0 466 62.0
3rd
Year 13
Woredas13 317 10 3.2 161 50.8
2. Tigray 7 135 112 83.0
1st Year 2
Woredas2 34 0 0.0 34 100.0
2nd
Year 2
Woredas2 39 1 2.6 27 69.2
3rd
Year 3
Woredas3 62 15 24.2 51 82.3
3. SNNPR 8 260 157 60.4
1st Year 2
Woredas2 74 10 13.5 53 71.6
2nd
Year 2
Woredas2 64 36 56.25 58 90.6
3rd
Year 4
Woredas4 122 28 22.95 46 37.7
4. Oromia 8 173 48 27.7
2nd
Year 5
Woredas5 96 21 21.88 42 43.8
3rd
Year 3
Woredas3 77 0 0.00 6 7.8
4th Year 4
Woredas4 89 0 0.00 0 0.0
5. BSG 4 87 15 17.2
4th
Year 4
Woredas 4 87 10 11.49 15 17.2
* - The base years for woredas encompassed by COWASH are different- the base year for 1st, 2nd, 3rd and 4th Year woredas is 2003 EFY, 2004 EFY, 2005 EFY, and 2006 EFY, respectively.
Improvement in Household Latrine Access Coverage:
Attempt has been made to collect data on household access to latrine and use of improved la-
trine. However, the data on household access to and use of latrines in many of the woredas were
reported to be high and some woreda health staff are in doubt about the reliability of the sanita-
tion data. Moreover, data on household improved latrine could not be reported as the definition
of improved latrine has been understood differently in different woredas and this resulted in un-
reliable figures. Anyhow, the rural household latrine access coverage of the woredas as reported
by regions is presented in Table 14.
As reported by regions, the average rural household latrine (improved +traditional) access cover-
age of the first year woredas increased to 92.1% in 2007 from 81.6% in the base year
(2003).Similar improvement was reported for the second year woredas. The household latrine
access coverage of the third year woredas improved to 89.2% from 76.7% in 2005. The im-
provement in the fourth year woredas was very small compared with the other project woredas.
Overall, the average household latrine access coverage of the project woredas in Amhara, Tigrya,
SNNPR, Oromia and BSG, at the end of 2007 EFY, was reported to be 93.9%, 92.0%, 91.9%,
79.2% and 56.3%, respectively.
16
Table 14: Improvement in Rural Households Access to Latrines in Project Woredas
RegionNo. of CMP
Woredas
Average Rural
Households Latrine
Access coverage
(%), end of Base
Year*
Average Rural
Households Latrine
Access coverage (%),
end of 2007 EFY
1. Amhara 40 93.85
1st Year 27
Woredas27 81.24 93.80
3rd
Year 13
Woredas13 84.90 93.90
2. Tigray 7 92.03
1st Year 2
Woredas2 90.80 91.00
2nd
Year 2
Woredas2 89.50 92.10
3rd
Year 3
Woredas3 82.70 93.00
3. SNNPR 8 91.93
1st Year 2
Woredas2 77.50 91.50
2nd
Year 2
Woredas2 92.00 95.50
3rd
Year 4
Woredas4 79.00 88.80
4. Oromia 12 79.23
2nd
Year 5
Woredas5 73.20 90.20
3rd
Year 3
Woredas 3 32.30 72.70
4th
Year 4
Woredas 4 69.00 74.80
5. BSG 4 56.30
4th
Year 4
Woredas 4 61.6 56.3
3 PROJECT PURPOSE ACHIEVEMENT
Within the framework of the overall objective described above, the project purpose is to “Sup-
port the acceleration of UAP-rural water and sanitation targets attainment through the
establishment of an enabling environment and the implementation of CMP interventions
in selected rural areas of Ethiopia”. Thus, COWASH strives to provide support for developing
the enabling environment at the federal level and in the project regions where hydro-geological
conditions are suitable for its replication.
The key indicators for the verification of the achievement of the Project purpose are:
i) Percentage of Regions implementing CMP approach; ii) Number and Percentage of Woredas of
targeted regions implementing CMP approach; iii) Number and Percentage of Kebeles of targeted
woredas implementing CMP approach; iv) Number and Percentage of rural people that has access
to potable water through COWASH; and v) Amount of regional budget allocated for COWASH.
The number of regions implementing CMP has increased from two regions (22.2% of the 9 admin-
istrative regions of Ethiopia, excluding the city administrations of Addis Ababa and Dire Dawa) in
2003 EFY to five regions (55.6%) in 2007 EFY. In 2003 EFY, Amhara and Benishangul-Gumuz
were the only regions implementing CMP approach in the name of Community Development Fund
(CDF). In 2004 EFY, the approach was scaled-up to the national level and as a result of under-
standing created on the procedures and usefulness of the approach and discussions made be-
tween the regional governments, two more regions (Tigray and SNNPR) were encompassed by
the project. Due to the delay in preparatory activities, Oromia started CMP implementation in
2005 EFY in 5 woredas of two zones (Jimma and North Shoa). In 2006 and 2007 EFY, there was
no change in the number of regions implementing CMP. That is, same regions in 2005 EFY were
implementing the CMP approach. The exception is that COWASH intervened in Benishangul Gu-
muz region in 2006 EFY based on COWASH revised project document though implementation was
started in the reporting period.
17
Table 15: Number of Regions, Woredas and Kebeles Implementing CMP Approach
COWASH UNICEFFinnWA
SH-BGTotal COWASH UNICEF
FinnW
ASH-
BG
Total %
Amhara 153 19 8 27 120 40 40 26.1 775
Tigray 36 0 0 0 7 7 19.4 62
SNNPR 125 0 0 0 8 8 6.4 105
Oromia 249 0 0 0 12 12 4.8 101
BSGR 20 5 5 76 4 5 9 45.0 104
Total 583 19 8 5 32 196 71 0 5 76 13.0 1 , 147
Region
Total No.
of Rural
Woredas
No. of CMP Woredas & Kebeles
CMP Woredas in 2007 EFYNo. of CMP
Kebeles in
2007 EFY
(COWASH
+FinnWaSH-
BG)
CMP Woredas in 2003 EFYNo. of CMP
Kebeles in
2003 EFY
Note: UNICEF has informed that they do not use MFIs anymore in finance channelling as it violates UNICEF internal regulations. Therefore, the UNICEF figures of the CMP implementation are not anymore valid after 2006 EFY.
The number of woredas implementing CMP approach rose from 5.5% (32 of the 583 woredas) in
2003 EFY to 13.0 % (76 of the 583 woredas) in 2007 EFY.
In 2003 EFY, only 27 woredas in Amhara (19 by RWSEP and 8 by UNICEF) and 5 woredas in
Benishangul-Gumuz have been implementing CMP. This accounts for 17.6 % of the 153 rural
woredas in Amhara Region and 25 % of the 20 rural woredas in Benishangul-Gumuz region, re-
spectively. In 2004 EFY, the approach has been implemented in 44 woredas in Amhara, Tigray,
SNNPR and BSGR, which is 13.2 % of the woredas in the four regions. In 2005 EFY, the share of
CMP woredas in the 5 regions was 9.1 % including the 8 UNICEF CMP woredas in Amhara region.
According to the revised COWASH project document, CMP was expanded to 23 new woredas (13
in Amhara, 3 in Tigray, 4 in SNNPR and 3 in Oromia) in 2006 EFY. In 2006 EFY, the approach has
been implemented in 68 (11.7%) woredas, excluding the 8 UNICEF CMP woredas, of the five re-
gions. In the reporting period, 8 woredas (4 each in Oromia and BSG regions) were encompassed
by the project and the total number of CMP woredas increased to 76 (13.0% of the 583 rural
woredas) of the five project regions.
Between 2003 EFY and 2007 EFY, the number of kebeles implementing CMP approach increased
from 360 (18.2 %) of the 1,973 rural kebeles in COWASH, FinnWASH-BG and UNICEF woredas to
1,147 (61.7 %) of the 1,859 rural kebeles in COWASH and FINNWASH-BG woredas, excluding the
rural kebeles of UNICEF CMP woredas.
In the base year (2003 EFY), 360 (18.2 %) of the 1,973 rural kebeles in COWASH, FinnWASH-BG
and UNICEF woredas have been implementing the CMP approach. In 2004 EFY, the figure in-
creased to 637 kebeles (58.9% of the 1,081 rural kebeles of 44 COWASH, UNICEF and Finn-
WASH-BG woredas) of Amhara, Tigray, SNNP, BSG regional states. In 2005 EFY, 703 kebeles
(54.9 % of 1,280 rural kebeles) of 53 COWASH, UNICEF and FinnWASH-BG woredas in five re-
gions (Amhara, Tigray, SNNPR, Oromia and BSG) have been implementing the approach. A total
of 916 kebeles (662 in Amhara, 47 in Tigray, 70 in SNNPR, 61 in Oromia, and 76 in BGR) in
COWASH and FinnWaSH-BG woredas (53.6 % of the 1,709 kebeles including FinnWaSH-BG ke-
beles) have been implementing the CMP approach in 2006 EFY. In the reporting period, the CMP
approach is being implemented in 1,147 kebeles (61.7% of the rural kebeles) in 76 woredas of
five regions of the country. Since 2006 EFY, UNICEF has stopped using the CMP approach in the
country and hence UNICEF’s CMP woredas and kebeles are not included in the COWASH reports.
A large number of rural people are benefiting from the water points built with the support of
COWASH through the CMP approach. The regional disaggregation is described as follows.
In Amhara region, a total of 1.4 million rural people in 40 woredas have benefited from the 6,095
water points constructed, with COWASH support, since the launching of COWASH in the region in
2004 EFY. A total of 303 schools and 59 health facilities have got access to improved water sup-
ply. Over 0.12 million students and teachers and 9 thousands staff of health institutions and their
clients are benefiting from the institutional water points constructed with COWASH’s support.
18
In Tigray region, some 0.11 million rural people have benefited from the 371 CMP water points
constructed by communities with the support of COWASH until end of July 7, 2015. Moreover, 21
schools and 4 health institutions have got access to improved water supply in the same period of
the project. These institutional water points are benefiting over 8 thousands students and teach-
ers and 125 health staff and beneficiaries of the health facilities.
Similarly in SNNPR, 496 community water points were constructed and more than 0.18 million
rural people have benefitted over the four years of implementation of COWASH in the region.
Also, 19 schools and 4 health facilities have become beneficiaries of improved water supply. The
institutional water points are benefiting more than 9 thousands students and teachers and 5 hun-
dred staff and clients of the health facilities.
In Oromia region, more than 0.14 million rural people of the 12 project woredas are benefitting
from the 750 COWASH water points constructed over the three years of implementation of the
project in the region - 2005 -2007 EFY. Thirty one schools and 8 health facilities have got access
to improved water supply. More than 16 thousands students and teachers and 4 thousands staff
of health facilities and clients of the facilities are benefiting from the water supplies constructed
with the support of COWASH.
In BSG region, water points construction were not completed in 2007 EFY and COWASH could not
contribute to the attainment of the GTP I targets of the woredas of the region.
Overall, since COWASH was launched in the regions, some 1.83 rural people in the project wore-
das of Amhara, Tigray, SNNPR and Oromia have benefited from the 7,712 CMP water points con-
structed by communities with the support of the project.
GoE funds allocated by COWASH project regions grew from about Birr 25.52 million in 2004 EFY,
by three regions, to Birr 327.4 million in 2007 EFY, by five regions. So far, some 65.1 % of the
total budget committed has been allocated for the four years of implementation of the project.
As indicated in the revised Project Document, the five COWASH regions have committed to allo-
cate more than half a billion birr (Birr 502,827,227) for the implementation of the project activi-
ties, mainly for investment, until end of 2008 EFY (July 7, 2016). Disaggregation by region
shows that about Birr 239.6 million, 92.8 million, 77.4 million, 72.2 million and 20.8 million have
been committed by Amhara, Tigray, SNNP, Oromia and Benishangul-Gumuz regions, respectively.
In 2004 EFY, a total of about Birr 25.5 million was allocated by three regional states (Amhara,
Tigray and SNNPR). In the four years of implementation of the project (2004-2007 EFY), the pro-
ject regions allocated about Birr 327.4 million. This accounts about 65.1 % of the funds commit-
ted for the five years. The overall GoE fund utilization rate of the regions in the four years stood
at 88.0 % of the transferred – 92.3 % in Amhara, 93.0 % in Tigray, 70.7 % in SNNPR, 82.4 % in
Oromia and 3.8 % in BSG (Table 16).
19
Table 16: Budget (GoE) Committed, Allocated and Utilized for COWASH by Project Regions
2004 EFY
Total Allocated
(2004-
2007EFY)
Amhara 239,634,780 20,537,000 223,357,072 93.2 206,192,384.4 92.3
Tigray 92,838,635 2,427,352 31,217,328 33.6 29,042,690.7 93.0
SNNPR 77,400,262 2,559,304 35,116,139 45.4 24,822,937.9 70.7
Oromia 72,153,550 33,706,574 46.7 27,776,572.0 82.4
BSG 20,800,000 4,000,000 19.2 150,000.0 3.8
Total 502,827,227 25,523,656 327,397,112 65.1 287,984,585 88.0
%
Utilization
Amount
Utilized until
end of 2007
EFY
Region
Budget Allocated (in Birr)Amount
Commited to
be Allocated
by Regions
(in Birr)
%
Allocated
from
Committed
The project regions have been receiving funds (Euro) from the Ministry for Foreign Affairs of Fin-
land (MFA) as per their funding agreements signed with Embassy of Finland. Euro 18,269,590
was allocated by the Government of Finland for the five years’ implementation of the project in
five regions. Of this amount, Euro 13,580,516.94 (74.3% of the Euro allocated), or about Birr
332.61 million has been transferred to the project regions until end of the reporting period
(Table 17). Financial performance reports of the project regions reveal that over 80.6 % of the
funds transferred from MFA have been utilized for the project activities in the five regions until 7th
July 2015. Amhara, Tigray, SNNPR, Oromia and BSG regions have utilized about 91.2 %, 64.8 %,
82.5 %, 62.2 % and 17.6 % of the funds transferred from MFA.
Table 17: Amount of Funds (in Euro) transferred from MFA to Project Regions (in Euro & Birr)
until 7th July 2015
COWASH
Project
Region
Amount of
Euro Agreed
for 5 Years
Amount of Euro
Transferred
from MFA until
7th July 2015
%
Transferred
Amount (in Birr)
Transferred
from MFA until
7th July 2015*
Amount utilized
(in Birr) until 7th
July 2015
%
Utilized
Amhara*10,310,578 9,173,016.71 89.0 226,580,502.43 206,738,885.38 91.2
Tigray2,184,299 1,200,462.77 55.0 28,734,412.85 18,612,348.10 64.8
SNNPR1,746,084 1,074,410.00 61.5 25,743,063.86 21,235,310.14 82.5
Oromia1,766,000 1,158,347.00 65.6 28,016,347.24 17,424,409.49 62.2
BSG2,262,629 974,280.46 43.1 23,540,525.94 4,131,530.73 17.6
Total18,269,590 13,580,516.94 74.3 332,614,852.32 268,142,483.84 80.6
Note: * The ‘Amount Transferred from MFA until 7th July 2015’ to Amhara region includes Birr 4,291,860.92 transferred
from RWSEP savings.
Under Component 2, the five project regions received Euro 13,580,516.94 (74.3 % of Euro
18,269,590 allocated) from Government of Finland (GoF) and Birr 327,397,112 (65.1% of Birr
502,827,227 committed) from GoE in the last four fiscal years (2004 EFY- 2007 EFY). So far, 80.6
% of the GoF and 88.0 % of the GoE funds received have been utilized until end of July 7, 2015.
The fund utilization of the regions vary greatly.
20
4 COMPONENT 1: STRENGTHENING THE FEDERAL CAPACITY TO IMPLEMENT
COMMUNITY MANAGED PROJECTS ALONGSIDE WITH A SUPPORT TO THE ES-
TABLISHMENT OF THE ONE WASH NATIONAL PROGRAM
Component 1 of the COWASH project strives to strengthen the federal level capacity for imple-
mentation of the CMP approach and to support the overall WaSH sector development process. It
also strives to support the establishment and implementation of One WaSH National Program. In
order to scale-up the CMP approach, tools and planning, implementation and monitoring mecha-
nisms were developed for a wider application of the CMP approach. Networking and coordination
activities have been performed to promote CMP and generate more funds for CMP implementa-
tions thereby accelerate the WaSH interventions in water supply access, sanitation and hygiene.
With the support of the federal technical staff, the project has performed quite a lot of WaSH ac-
tivities over the four years of implementation of COWASH. At the federal level, the project has
been assisting MoWIE, specifically the NWCO, in strategically thinking and moving forward in im-
plementing WaSH activities in a coordinated and harmonized manner. In the project regions, ut-
most effort has been exerted to assist in preparing annual plans, performance reports (both
physical and financial) for the quarterly fund transfer requests to the Embassy of Finland. Suppor-
tive supervisions have been made in all regions and on-the-job technical assistances provided by
federal technical staff. The supports provided from the federal technical assistance team helped in
the implementation of the CMP approach in the regions and the Government of Ethiopia to further
develop the WaSH sector.
In 2007 EFY, the project planned to widen and deepen its support in achieving the GTP targets of
WaSH by providing technical and financial support to NWCO and other stakeholders of the pro-
ject. The Component 1 major activities performed during the reporting period are presented un-
der the outputs indicated below (Component 1 detailed activities performed in the fiscal year are
attached in Annex 1). Also, the four years’ achievements of the project are indicated with the an-
nual performances. It should be noted that all the activities performed by the federal COWASH
team do not automatically belong to Component 1 but support directly Component 2 (the project
regions).
4.1 RESULT 1 OF COMPONENT 1: COMMUNITY MANAGED PROJECT APPROACH
SCALED-UP AT NATIONAL LEVEL
4.1.1 Output 1: Manuals and Guidelines Reviewed and Developed for Standardizing the
CMP Implementation within the WaSH Implementation Framework
The achievement of the output is measured by the three indicators: i) number of generic CMP
implementation guidelines harmonized with WIF and incorporating crosscutting issues developed
and implemented, ii) number of tested higher technology options reviewed (with women and vul-
nerable groups opinions included) and incorporated into CMP manuals and guidelines and iii)
number of generic operation and maintenance manuals/guidelines for rural water supply devel-
oped.
In the last four years of implementation of COWASH, it was planned to develop 17 manu-
als/guidelines (2 generic CMP implementation manuals and 1 training manual, 1 in use of CMP in
higher technologies and 13 O&MM, Climate Risk Screening, Water Safety Plan and Social Ac-
countability guidelines and training manuals) and 14 of them (83.4%) were produced. The rest of
the manuals or guidelines are under preparation.
21
Some main activities were planned to be executed in the reporting period. Some main activities
planned were: i) Participate as a member of the Task Force in the development of Generic RPS
and Pastoralist areas Water Supply O&MM Manual and Strategic Framework; ii) Provision of tech-
nical assistance in the development of GLOWS/Water Safety Planning Guideline for CMP point wa-
ter schemes; iii) Assist in the approval of the CMP Implementation Manual by the MoFED; and iv)
Develop new CMP financial management manual training materials using Public Financial Man-
agement System (PFMS) in CMP Implementation.
The analysis of the status of the above and some other documents and manuals are presented
below.
4.1.1.1 Participation in the Task Force in the Development of Generic Rural Water Supply O&MM RPS and Point Water Schemes and Generic O&MM Strategic Framework
The guideline and strategic framework have been under preparation in the last fiscal year based
on the table of content prepared based on comments and suggestions of a half-day meeting of
the taskforce established to lead the assignment. All the 18 parts and one strategic framework
have been completed (95.0%) and all have been commented by the task force members. The
manuals and strategic framework have been also commented in a workshop held on April 28-
30/2015 with the participation of all regional water bureaus and other WASH stakeholders’ repre-
sentatives. Comments forwarded by stakeholders are now being incorporated and the final ver-
sion of the manual and strategic framework will be out in the first quarter of the upcoming fiscal
year. Afterwards, training manuals will be prepared and intensive training will be conducted at all
levels.
4.1.1.2 Translation of GLOWS/WSP Guideline into Amharic
COWASH planned to promote and implement Guided Learning on Water and Sanitation (GLOWS)
and Water Safety Planning (WSP) in its project woredas. For this purpose, the English version of
the GLOWS/WSP guideline prepared by MetaMeta should be translated into regional working lan-
guages: Amharic, Oromifa and Tigrigna. The training guideline has been translated into Amharic
by a private consultant experienced in GLOWS and commented by COWASH FTAT and some ex-
perienced Amhara RSU. The Amharic version will be translated into Oromifa and Tigrigna so that
it can be used in the trainings in Tigray and Oromia woredas.
4.1.1.3 Developing GIS based mapping trainers manual
It was planned to prepare a manual for GIS training of regional, zonal and woreda staff of project
regions. Accordingly, the GIS Expert has prepared a training manual and distributed to trainees in
digital and hardcopy during the GIS trainings in the regions (100.0%). The manual will be im-
proved through comments from the trainees in the regions and incorporating self-learning exer-
cises.
4.1.1.4 Editing of the Point Source O&M Manual for rural water supply
It was planned to edit the Point Source O&M Manual completed last fiscal year to make it suitable
for training at the grassroots level. The activity has not been started as it was found important to
make the editing together with the RPS O&MM manual being finalized.
4.1.1.5 Preparation and Approval of the CMP Implementation Manual based on Public Financial Man-
agement System (PFMS)
The CMP Implementation Manual as per the Public Financial Management System has been final-
ized by private consultants and it was submitted to MoFED for approval. The manual was com-
mented by MoWIE staff and participants of a half-day workshop organized for the purpose. Once
22
it is approved, the manual will be part of POM. However, so far, there is no response from MoFED
and a number of important federal and regional level activities planned are awaiting the approval
of the manual by MoFED.
4.1.1.6 Preparation of other guidelines and manuals
COWASH has also started to prepare some other guidelines and manuals: Climate Risk Screen-
ing guideline Trainer’s manual, Social Accountability guideline and Model Business Plan for RPS.
The RPS business plan has been commented by COWASH FTAT and comments are incorporated
together with the other O&MM manuals. In all, nearly 80.0% of the manuals and guidelines have
been completed.
4.1.2 Output 2: Tools and Mechanisms Reviewed and Developed for Standardizing the
Planning, Implementation and Monitoring of CMPs
Four indicators were set to measure the achievement of the output, namely, i) number of annual
plans prepared; ii) number of quarterly reports prepared and disseminated to partners; iii) M&E
framework developed; and iv) number of federal level steering committee meetings conducted.
Thus far, the project targeted to produce 4 annual plans, 1 M&E framework, 15 reports and facili-
tate 8 National WASH Steering Committee on COWASH (NWSC) meetings. Accordingly, all the
annual plans (one for each implementation year), revision of the M&E framework, 15 quarterly
and annual reports were produced and 4 NWSC meetings facilitated and held until end of 2007
EFY. In the reporting period, 1 annual plan (100.0 %), 4 annual and quarterly reports (100.0 %)
were produced and 2 NWSC meetings on COWASH (100.0 %) were facilitated and conducted.
As in the previous implementation years, as indicated in Annex 1, a series of activities that are
believed to contribute for the achievement of the output were planned to be carried out in the
reporting period. The status of some of the main activities are presented as follows:
4.1.2.1 Preparation of Annual Plans
The 2007 EFY COWASH Component 1 (C-1) annual plan has been prepared and approved by the
NWSC early in the first quarter of the fiscal year. Moreover, COWASH FTAT has been assisting in
the preparation of regional plans. Planning templates (physical and financial) and unit costs were
prepared and distributed to RSUs to modify them to be suitable to their situation and employ
them in their planning exercises. Consequently, all of the project regions have finalized their an-
nual plans and approved by the respective RWSCs in the second quarter.
4.1.2.2 Participation in Federal WaSH Steering Committee Meetings
National and Regional WaSH Steering Committee meetings are expected to be made twice a year.
COWASH facilitates the meetings and provides technical assistance for undertaking these meet-
ings. Usually, quite a lot of issues and challenges hindering the implementation of the project are
raised and deliberated and important decisions are being made during these meetings. In the
reporting period, two National Wash Steering Committee (NWSC) meetings were held. During this
meeting, Component 1 performance reports of 2006 EFY, 2007 EFY annual plan and the 2007 EFY
semi-annual report have been discussed and endorsed. Issues related to the CMP Implementation
Manual based on the Public Financial Management System (PFMS) were discussed during the 2nd
NWSC meeting in 2007 EFY.
4.1.2.3 COWASH Quarterly Report Preparation
Every fiscal year, COWASH is expected to prepare four progress reports – one annual report and
three quarterly reports. In the reporting period, the 2006 EFY annual, the 2007 EFY first quarter
23
report, the 2007 EFY semi-annual performance report and the Nine months performance report
have been prepared (100.0%). All of these reports were distributed to stakeholders. Moreover, a
summarized version of the first phase of the project’s Results-Based Report was prepared and
distributed to stakeholders. On top of these, separate quarterly performance reports of the Com-
ponent 1 including some construction achievements of regions have been submitted to MoWIE.
4.1.2.4 Indicator Monitoring Plan Preparation
COWASH planned to complete the indicator monitoring plan preparation of four regions. Accord-
ingly, the indicator monitoring plans (plans and achievements) of the four regions have been pre-
pared based on the baseline data and performances collected from the regions and project
woredas. The indicator monitoring plan of BSG region will be prepared in the 1st quarter of 2008
EFY based on the baseline data collected from the project woredas.
4.1.2.5 Production of WASH facility maps for each COWASH woreda
COWASH planned to produce 67 maps (one for each project woreda) in the fiscal year. According-
ly, the GIS expert produced 57 woreda maps (85.1%). The maps of the 10 woredas could not be
produced as the GIS expert has been engaged in FINNWASH-BG project data collection and map-
ping and training of the woreda staff on GIS and basic computer skills.
4.1.3 Output 3: CMP Approach within the Rural WaSH Scientifically Researched
Three indicators are set for measuring the achievement of this output. These are: i) number of
CMP researches (disaggregated by Doctoral, Masters and Bachelor levels) completed;
ii) number of published articles on CMP research results; and iii) number of CMP research result
presentations given in international conferences.
This output is supported by the Finnish "Society of Soil and Water Technology" ("Maa- ja
Vesitekniikan Tuki ry”).
Over the four years of implementation, the project planned to conduct 5 MSc, 1 BSc and 1 PhD
level researches on WASH implementation through the CMP approach. Consequently, 4 of the
MSc and 1 BSc level researches were completed (83.3 %) and the PhD level research has contin-
ued (100.0%) with the financial and technical support of COWASH. Also, one article on CMP was
published on international journal (50.0%) and one research result presentation was made at an
international conference (66.7%) in the 3 years of implementation of the project. All the complet-
ed researches are uploaded in the website www.cmpethiopia.org.
24
Some activities have been carried out in the reporting period. The main ones are indicated below:
4.1.3.1 Continuation of the PhD level research
This fiscal year, the PhD level research has continued. In the reporting year, four articles have
been prepared and two of them were submitted for publication in reputable journals. The status
of the four articles is indicated below.
Article I: ‘Evolution of Community Managed Water Supply Projects (CMP) from 1994 to the
2010s in Ethiopia’ was reviewed by different reviewers and is now published at Public
Works Management and Policy Journal. The article can be found via the link
http://pwm.sagepub.com/cgi/reprint/1087724X15593955v1.pdf?ijkey=NEQXaqPwbEv
UVjR&keytype=finite
Article II: ‘Community Managed Projects and other Implementation Approaches in Rural Water
Supply of Ethiopia’ submitted for the Journal (Waterlines) was reviewed and send for
publication.
Article III: ‘Service Failures of Rural Water Supply Systems in Ethiopia and Their Policy
Implications’ submitted to Journal of Natural Resources Forum is under review
Article IV: ‘Lessons from indigenous practices of water system management: Case of Borana and
Konso, Ethiopia’ is targeted for the Journal of Developmental Studies was reviewed.
Moreover, write up of the Dissertation is underway.
4.1.3.2 New MSc level research
A new MSc level CMP research entitled “Assessment of Potable Water Access & Users’ service sat-
isfaction in Gonji Kolella woreda rural communities during CMP implementation” was started in
Gonji Kolela woreda of Amhara region with the financial support of COWASH. The draft thesis of
the MSc level research was prepared and commented by COWASH FTAT and sent to the research-
er for corrections. However, so far, though the researcher mailed the remaining settlements of his
advance to the project office, the final version of the thesis is not submitted to COWASH.
4.1.3.3 Case study on the Impact of CMP Water Supply in Gonji Kolela Woreda
COWASH has conducted a case study on the impact of CMP water supplies on the life of rural
community in Gonji Kolela woreda of West Gojjam Zone of Amhara region. It was found out that
the implementation of rural water supply schemes using CMP funding mechanism created sense
of ownership and motivation to rural communities in Abunebla and Besanit village. Since the in-
troduction of this approach in the area, rural communities have understood the value and owner-
ship of water resources. Farmers are looking to improve their livelihood using the excess water
from the improved sources and rope pumps. All households visited stopped open defecation and
practice hand washing at critical moments.
4.1.3.4 Case study on Women Empowerment through CMP
The study intends to assess how women can be empowered through active (leadership) roles in
community managed projects. COWASH FTAT collected primary data from members of WASHCOs,
beneficiary target groups and Woreda water offices in Fogera and Farta woredas of Amhara re-
gion. The data collected has been encoded into computer and analysis is being started. To have
good picture of the case study in the whole COWASH implementing regions, it is planned to in-
clude WASHCOs and beneficiaries from the other regions except BGR. This will be done and com-
pleted in second quarter of the upcoming year. The write up of the case study will also be com-
pleted in the same quarter of the upcoming fiscal year.
25
4.1.4 Output 4: Information, Education and Communication (IEC) on CMP Implementa-
tion Modality Enhanced
The major indicators for measuring the achievement of the output are: i) Communication strategy
developed; ii) Number of major international and national events (workshops, seminars, confer-
ences, symposiums) where CMP awareness is raised through COWASH participation; and iii)
Number of CMP related information and education materials prepared and published (disaggre-
gated by types).
Over the three years of implementation, 1 Communication Strategy was developed (100.0%), 25
major international and national events where CMP awareness was raised through COWASH par-
ticipation were participated (100.0%) and 9 types of IEC materials on CMP were produced and
disseminated to users (100.0%).
As indicated in Annex 1, a number of communication-related activities were planned for the fiscal
year under reporting. The major ones and their status are indicated hereunder:
4.1.4.1 Production and distribution of table calendars with CMP incorporated
COWASH produced its own table calendars in the first month of the fiscal year. A total of 6,500
CMP table calendars (100.0%) were produced and disseminated to all 5 project regions, zones,
woredas and also to the stakeholders at federal level. These calendars are believed to promote
CMP in the COWASH woredas and beyond.
4.1.4.2 Participation in selected International conferences, networking and forums
COWASH has been supporting participation in international conferences, networking meetings and
forums so as to promote CMP at the international and national levels. This reporting period, it was
planned to participate 3 MoWIE staff in Stockholm Water Week 2014. Accordingly, three MoWIE
staff (Abiy Girma, head of NWCO, Nuredin Muhammed, director of WSSD and Lakech Haile, direc-
tor of WCYD) participated in the conference with the sponsorship of COWASH. The project has
also sponsored the stand of MoWIE exhibition, which was successfully carried out.
At the end of the reporting period a briefing paper on CMP was accepted to 38th International
WEDC Conference on Water, Sanitation and Hygiene Services Beyond 2015 to be organised in the
end of July 2015. At the end of the reporting period COWASH was also requested to provide a
presentation for the MFA Finland event and for the Water Integrity Network event at the Stock-
holm Water Week 2015 to be held in the end of August 2015.
4.1.4.3 Participation in selected national events (WWD & March 8)
COWASH planned to assist the MoWIE in celebrating international events in the country. Financial
and technical support has been provided in organizing the World Water Day (WWD) and World
Women’s Day (March 8) celebrations. Moreover, a two pages article that focused on introducing
the readers with CMP and COWASH achievements was prepared and published in WWD publica-
tion. One workshop, where COWASH participated, was held on March 20 focused on self-supply
and another workshop on March 21 focused on WWD objective and themes. On March 22 the
WWD was colorfully celebrated in MoWIE. In addition, there was also an exhibition at MoWIE
compound on “WASH as a business” where private sector and NGOs presented their products.
Besides funding the event, COWASH assisted in preparing ToR, selection of an entertainment en-
terprise, preparing magazine and banner, and following-up drama performance and facilitation of
the March 8 celebration.
26
4.1.4.4 Water Credit Market Assessment Report Dissemination Workshop
The water credit market assessment was carried out by M2i consultants from India with the sup-
port of Water.Org and co-operation of COWASH. On July 23, 2014, a workshop was organized
jointly with Water.org, WaterAid and COWASH with the participation of 73 people (7 female). In
this workshop facilitated and sponsored by COWASH, findings and experience of the WASH/MFI
workshop held on October 2012 was presented by COWASH CTA and experiences from Kenya,
Uganda and India were also presented at the workshop. COWASH also assisted in commenting
the data collection instruments and draft report.
4.1.4.5 Updating CMP WEB page
The official CMP website (www.cmpethiopia.org) was developed in collaboration with IRC to dis-
seminate basic information on CMP and attract more funding for the country. In the reporting
period, the website was redesigned and updated regularly and a number of WASH and related
documents have been uploaded. This website is also assisting in providing information on Ethio-
pian WASH sector through uploading major WASH related documents. COWASH has been receiv-
ing appreciations from many international and national organizations for availing important WASH
related documents at the CMP web page. The CMP website is now being updated for content.
However, no feedback from IRC in incorporating the last comments from COWASH FTAT.
4.1.4.6 Incorporating COWASH as a Case study into the Water Integrity Network (WIN) Flagship Publica-
tion
The Water Integrity Network (WIN) and other international partners are working on a flagship
publication on water integrity to be released at Stockholm World Water Week 2015. WIN
proposed to include COWASH as a case study in the section of 'WRM and Access to Water and
Sanitation in Rural Areas' of the flagship publication. Accordingly, COWASH team drafted the case
study and submitted to the organizers. The draft of the case study has been published in
http://www.cmpethiopia.org/page/184.
4.1.4.7 Organizing Exhibition on Finnish Financed Projects in Ethiopia
The Minister of Development Cooperation of Finland (Ms Sirpa Paatero) paid a visit to Ethiopia
specifically to Amhara region on Jan 8-10, 2015. COWASH, together with the other five Govern-
ment of Finland financed development cooperation projects, organized an exhibition on Jan.9,
2015 in Bahir Dar as part of the visit of the Minister. The Minister visited a COWASH-funded water
point in Yeloma Kebele of Bahir Dar Zuria woreda and including a visit to a beneficiary household
in the same kebele. COWASH has prepared a set of fact sheets of the project both in English and
Finnish languages and a case study of one Steward of the water point selected for the visit and
disseminated to the participants of the Exhibition. The responsibility of the practical arrangements
of the visit was carried by AGRO-BIG project in collaboration with Amhara RSU staff.
Besides, COWASH facilitated visits and provided information about the project performance to
independent reviewers of the effectiveness/results of Finland’s development cooperation in its
current form. The objective of the review, commissioned by MFA, is to present a general indica-
tion on how effective and impactful Finland's development cooperation can be considered and
why. The reviewers (Mrs Ritva Reinikka and Mr. Jim Adams) visited Abichu-gena woreda, a
COWASH woreda in Oromia, on 8th of March 2015. The project has also facilitated the meeting of
the reviewers with the State Minister and Directors of MoWIE held on March 6, 2015.
The project facilitated the visit of a team of 16 journalists from Finland to Fogera woreda of
Amhara region. The team visited two water points (one community and one school) and paid visit
to a household in Maksegnit kebele of the same woreda.
27
4.1.4.8 Preparation of Comprehensive Information Package of COWASH and CMP approach
The project planned to prepare information package on COWASH and CMP approach so as to
promote the approach and through disseminating working systems and achievements. According-
ly, information pack on CMP approach and achievements of COWASH project was prepared and
disseminated to visitors and journalists coming from Finland to visit the project. This package
includes fact sheets on COWASH at the federal level, in Amhara region, information on selected
water points, a case story on a beneficiary and a brochure on CMP project cycle.
4.2 RESULT 2 OF COMPONENT 1: CMP IMPLEMENTATION CAPACITY AT THE FED-
ERAL AND REGIONAL LEVELS DEVELOPED
4.2.1 Output 1: Capacity Building Instruments Reviewed and Developed
The achievement of the output is to be measured by three indicators: i) Generic CMP capacity
building strategy developed; ii) Generic woreda level capacity building package developed; and
iii) number of impact assessments made on CMP related trainings (one in each project region).
Until end of 2007EFY, generic CMP capacity building strategy and generic woreda level capacity
building package were developed (100.0%) and three training impact assessments and re-
searches on CMP related trainings conducted were carried out (100.0%).
Some of the main activities planned for the reporting period were the completion of the training
impact research and the transfer of the impact research findings into the capacity building strat-
egy, conducting another training impact assessment in SNNP and Oromia regions. Accordingly,
the research report was completed by the consultant by including all the comments and sugges-
tions forwarded by stakeholders: development partners, MoWIE representatives and COWASH
federal and regional unit staff. The report is uploaded to the CMP website
http://www.cmpethiopia.org/page/184. The project has hired a Human Resource Development
(HRD) Specialist and the review of the impact assessment research was completed.
Furthermore, the second training impact assessment conducted in Oromia and SNNPR was com-
pleted. Comments of COWASH FTAT were included and the findings were deliberated on a half-day meeting
with the participation of COWASH FTAT and two invited guests. The report was finalized by incorporating all
the comments and submitted to COWASH.
4.2.2 Output 2: Capable and Adequate Personnel in place for CMP Implementation at
National and Regional Levels
Number of people hired at federal level (disaggregated by sex), number of trainings given by the
federal COWASH team and number of people participated in trainings (disaggregated by sex) are
the indicators set to measure the achievement of the output.
Between 2004 and 2007 EFY, COWASH hired 12 people for Component 1 (100.0%), FTAT team
provided 22 types of trainings (100.0%) and 1,248 woreda, regional and national level people
(9.4 % female) participated (70.6 % of those planned to be trained) in these trainings given by
FTAT or in collaboration with other WASHC actors.
In the reporting period, COWASH planned to carry out a number of capacity building activities.
The activities were planned to be conducted at the federal and regional levels. The major activi-
ties and their achievements in the reporting period are the following.
28
4.2.2.1 Hiring of Staff for Phase II of COWASH
Ramboll and Niras hired all the 12 staff needed for COWASH Phase II, including the HRDS, as per
the revised project document (100%). All of the COWASH Phase I national staff and the GIS Spe-
cialist continued to Phase II and the 4 additional national and international staff (Crosscutting
Specialist, Communication Specialist, HRD Specialist and Junior Professional Officer) were includ-
ed. All of them have assumed their post.
Moreover, it was planned to provide technical assistance to Water Bureau of BSG region in the
hiring of 4 RSU staff. The ToRs were prepared and sent and technical assistance in recruitment
process was given to the bureau. Accordingly, though it was delayed for some time due to com-
peting activities in the region, 4 RSU staff (Team Leader and Capacity Building, M&E and Financial
Specialists) have been hired and assumed their post in BSG region. All the RSU staff hired, in-
cluding the CMP Coordinator assigned from the regional water bureau, have received training on
CMP management, promotion, appraisal and M&E by COWASH FTAT. Moreover, COWASH has as-
signed the Cross Cutting Specialist to oversee and assist the region in the implementation of the
COWASH activities in Benishangul Gumuz region.
4.2.2.2 GIS/M&E Training
COWASH planned to map out its project woredas including all the facilities (community and insti-
tutional water points and institutional latrine) constructed over the years. For this purpose, train-
ing of regional and woreda staff in Quantum GIS, Data Management and Basic Computer skills
were planned and executed. In the reporting period, it was planned to train Tigray, Oromia and
Amhara woreda staff. Accordingly, a total of 145 woreda, zone and regional staff (20 females) in
Tigray, Oromia and Amhara region have been trained in GIS, Water Points and Institutional La-
trines data management and basic computer skill for 3- 5 days. This accounts 82.9% of the
planned (175 people). Disaggregation of the trainees is shown as follows.
In Tigray and Oromia regions, 24(5 females) and 17 (1 female) woreda, zone and regional staff
participated in this training. In Amhara, 104 (14 females), including those trained for ToT from
region and MoWIE, were trained for 5 days in five sessions.
Besides, the training materials and data collection tools have been updated based on the findings
in the trainings conducted in each region.
4.2.2.3 GLOWS/WSP Training
COWASH is promoting and implementing GLOWS/WSP in view of sustaining facilities it has been
supporting in the project woredas. To attain this objective, the project has started training staff at
the federal and regional levels to cascade the capacity building down the administrative ladder of
the project regions. In the first quarter, 3 COWASH FTAT were trained by MetaMeta for 3 days on
few of the GLOWS/WSP modules together with other trainees constituted from different organiza-
tions based in Addis Ababa. Moreover, COWASH in co-operation with MetaMeta conducted ToT
training in GLOWS-Rural Water Safety Planning (GLOWS/WSP) for 5 days. A total of 29 staff (2
female, one each from MetaMeta and COWASH) of COWASH FTAT, RSU and Regional Water Bu-
reaux received the training sponsored by COWASH.
Trainees of GLOWS/WSP learnt how to facilitate rural water assessments and action plans prepa-
ration in water safety planning. GLOWS modules 1-10 and Kebele Water Safety Plan Guideline
provided the main resources for the training. The participants learned kebele water safety plan
preparation and its concept from resource protection to the point of use of water. They also
learned to understand the participatory approach, how to facilitate the woreda staff trainings to
become more participative and how to develop support materials to be used in participatory train-
ing. During the training, the Amharic version of the training manual was reviewed and made
29
ready for training in the woredas and kebeles. The English and Amharic versions of GLOWS man-
ual and Kebele WSP Guideline were uploaded to the CMP web page
http://www.cmpethiopia.org/page/401. The plan is to publish these Amharic documents in a book
so that they can be adequately used at woreda level.
4.2.2.1 CMP Management Training to Regions
COWASH FTAT planned to carry out CMP management, promotion, appraisal and M&E and
WASHCO CMP management ToT training to BSG and Oromia new woreda and zonal staff. Conse-
quently, a total of 200 woreda, zone and regional staff (20 female) have been provided different
CMP related trainings BY COWASH FTAT, in collaboration with RSU staff, for 3 days. This accounts
87.0% of the plan for the reporting period. The disaggregation by type of training and region is
presented below.
In BSG region, 114 (16 females) staff have been trained in the reporting period – 76(11 females)
in CMP management, promotion and appraisal and 38(5 females) in WASHCO CMP management
ToT- for 3 days. A total of 86 staff (12 females) were trained in Oromia region – 60 in CMP man-
agement, promotion, appraisal and reporting and 26 (4 females) in WASHCO CMP management
ToT- for 3 days. Among these, 34 (2 females) in BSG and 57(7 females) were trained on CMP
appraisal and & M&E for 3 additional days.
Moreover, in SNNPR, 22 woreda and zone and regional staff (1 female) have been trained in
O&MM for 3 days at Hawassa.
4.3 RESULT 3 OF COMPONENT 1: DEVELOPMENT AND IMPLEMENTATION OF ONE
WaSH NATIONAL PROGRAM SUPPORTED
In the One WaSH National Program development, COWASH is accountable for the provision of
technical assistance and financial support as per the mutually agreed terms of references.
COWASH is not, however, responsible in the development and implementation of One WaSH
National Program.
4.3.1 Output 1: COWASH Support Provided in Preparing One WaSH National Program
Number of short term consultancy days provided by COWASH for the development and imple-
mentation of One WaSH National Program, and amount of finance provided for the development
and implementation of One WaSH National Program are the indicators set to measure the
achievement of this output.
COWASH has been active in the development of OWNP Phase I and it will continue its support
(technical and financial) to NWCO in the preparation of the OWNP Phase II document and review
of Phase I through participation in the task force. Last fiscal year, COWASH FTAT contributed for
the successful development of the OWNP document.
This fiscal year COWASH has been focusing providing support to preparation of the OWNP docu-
ment and participate in the task force meetings for Phase I review and preparation of Phase II of
the program. However, much support could not be provided as request has not been presented to
COWASH. Anyhow, 10 consultancy days have been provided for the finalization of the CMP im-
plementation manual for CWA and POM.
30
4.3.2 Output 2: COWASH Support Provided in Implementation of One WaSH National
Program
Number of people trained in CMP implementation in non-COWASH regions by federal COWASH
and number of federal level advisers assigned in the One WaSH National Program management
are the two indicators set for measuring the achievement of the output.
The indicators were set with the view that OWNP will be implemented and CMP will be scaled-up
in the rest of the regions of the country. However, reporting as per these indicators has not been
started as the CMP approach is not yet implemented in the non-COWASH regions.
COWASH was ready to train regional, zonal and woreda staff in non-COWASH regions on CMP
promotion, management, appraisal and reporting and to assign advisors at the federal level.
However, all these could not be materialized as OWNP did not start at full scale.
In the period under reporting, COWASH planned to participate and provide technical and financial
support in the first Joint Technical Review of the fiscal year (JTR 9 &10), organizing MSF7, devel-
opment of the national Water Safety Plan (WSP) Guideline, and strengthening the regional, zone
and woreda WASH structures. It was also planned to provide technical assistance in the develop-
ment of planning and reporting formats of OWNP upon request of the NWCO. The technical assis-
tance provided are indicated hereunder.
CR-WSP Guideline Development: a ToR was prepared by the MoWIE on Climate Resilient Wa-
ter Safety Plan implementation and on establishment of Task Force. Revision of the ToR was
made based on the comments of COWASH CTA. COWASH has also provided its feedback on the
questionnaires prepared by WHO on the experience of COWASH in WSP in Amhara region. Na-
tional CR-WSP Strategic Framework, and CR-WSP implementation guidelines were prepared both
for the rural and urban water supply and COWASH provided 10 TA days technical support through
commenting and participation in Task Force meeting to review the documents.
Joint Technical Review (JTR 9 &10) and MSF 7: The first draft ToR for JTR 9 and MSF 7 was
drafted by COWASH CTA. CWA partners conducted CWA-Project review in Dec. 2014 according to
POM. However, due to the busy schedule of the regions and federal ministries in massive train-
ings for staff, preparations for JTR and MSF have been postponed indefinitely and COWASH could
not provide its planned technical support in the fiscal year.
Strengthening of the WASH structure: COWASH has been strengthening the WASH structure
through trainings, awareness raising workshops and meetings. In 2007 EFY, Regional WASH
Steering Committee (RWSC) on COWASH meetings of all the project regions (50.0%) have been
held and many of the members attended the meetings and decisions have been passed. Moreo-
ver, zone and woreda WASH Team members have attended the CMP management, promotion
and M&E trainings for BSG and Oromia woredas. In these trainings, awareness on the WASH
M&E-MIS and Guidance and Governance of WASH have been given. In all project regions, the
ZWT and WWT members participated in the COWASH 2006 EFY annual performance review and
2007 EFY planning workshop, which provides awareness on CMP implementation and need for
coordination in attaining GTP/WASH targets.
Support in the development of Planning and Reporting Tools: COWASH FTAT provided
technical support in commenting reporting formats prepared for CWA and assessment report on
WASH M&E prepared by the M&E team hired by DFID. Other supports could not be provided as
there was no specific request presented to COWASH.
31
5 COMPONENT 2: ESTABLISHING AND STRENGTHENING THE CAPACITY IN RE-
GIONS TO SCALE-UP IMPLEMENTATION OF CMP
The original COWASH project document had three components-Component 1, Component 2 and
Component 3. Component 2 dealt with strengthening of the regional capacity and systems for
implementation of Window Two financing mechanism in ’new’ Regions where applicable and feasi-
ble while Component 3 aimed at scaling-up of community-led WaSH and implementation of Win-
dow Two financing mechanism in Amhara Region.
In the revised project document, the two components (Component 2 and 3) are merged into one
Component. This new component (named Component 2) aims at building the capacity of target
Regions, Zones and Woredas to plan, manage, monitor and implement WaSH interventions
through the CMP approach; deliver financial and procurement services for CMP interventions at all
levels; and to increase the sustainable community and institutional access to safe water, sanita-
tion and hygiene in the target areas.
Like in the previous fiscal years, much had not been done in the regions in the first half of the
fiscal year primarily due to one or more of the the following reasons: i) rainy season in most parts
of the project regions; ii) delay in the preparation and approval of 2007 EFY plans; and
iii) competing activities in the woredas. Soon after the approval of regional plans, good progress-
es have been recorded; the major achievements of the fiscal year and the four years of imple-
mentation (2004-2007EFY) of the project in the regions are indicated under the output levels be-
low.
5.1 RESULT 1 OF COMPONENT 2: TARGET REGIONS, ZONES AND WOREDAS CA-
PABLE TO PLAN, MANAGE, MONITOR AND IMPLEMENT RURAL WaSH INTER-
VENTIONS USING CMP APPROACH
The major achievements of the regions in the reporting period and over the four years of the pro-
ject in planning, managing, monitoring and implementing WaSH interventions through CMP ap-
proach are presented in the following output levels.
5.1.1 Output 1: Regional Support Units (RSU) Established and Functional
Number of Regional Support Unit (RSU) staff hired (disaggregated by region and sex), number of
annual COWASH work plans produced and number of COWASH quarterly and annual reports pro-
duced as per the annual plan are set to measure the achievement of this output.
Adequate staff has been hired in the regions in the four implementation years (2004-2007 EFY) of
the project. Over the last four years of implementation, 31 (96.9%) RSU technical staffs of four
project regions, including the Woreda CMP Advisors in SNNPR, were hired in the regions. In addi-
tion, 16 work plans (100.0%), 1 per year per region, and 59 quarterly and annual reports
(100.0%) were produced by the four project regions of COWASH.
This fiscal year, BSG region has hired four Specialists (RSU team leader, Capacity Building, M&E
and Financial) in the 2nd quarter. Moreover, Oromia region filled the Financial Specialist position
which was vacant due to the resignation of the previous financial specialist.
All project regions were expected to prepare and approve their 2007 EFY annual plans of the pro-
ject. Accordingly, regions have prepared the 2007 EFY plans of the project, with the participation
of woreda, zonal and regional stakeholders, and approved by the respective Regional WASH
Steering Committees. The preparation and approval of the regional plans were extended to the
2nd quarter due to one or more of the following reasons: i) delay in the announcement of shares
32
of the annual budget of the woredas and zones from the regional governments and other compet-
ing activities (soil and water conservation, irrigation, etc.) in the regions.
Regions were also expected to prepare and submit four performance reports (3 quarterly and one
annual) to Embassy of Finland. In the reporting period, RSUs of the four COWASH regions have
prepared and submitted the 2006 EFY annual (physical and financial) reports and the 2007 EFY
three quarters performance reports (100.0%). The first quarter performance reports of the re-
gions were not formal as their plans have not been approved and there were no many activities
performed in the quarter.
Besides, RWSC meetings were held in the regions (50.0%) though it was expected to make these
meetings twice in the fiscal year. The RWSC meetings have endorsed the 2007 EFY annual plans
and made decisions on a range of issues of the project which speed up the implementation of the
project. The meeting in SNNPR has resulted in a monitoring plan to speed up the procurement in
the region and other pending issues. The strong decisions of the meeting brought about good
performances at the regional and woreda levels.
5.1.2 Output 2: Regions, Zones and Woredas Capacitated to Implement Rural WaSH
through CMP
Number of people (disaggregated by sex and type of training) participated in trainings given by
regions, zones and woredas and amount of capacity building funds allocated are the indicators set
to measure the achievement of the output.
According to the revised COWASH Project document, a total of Birr 283.51 million (Birr 280.1 mil-
lion from GoF and Birr 3.44 million from GoE) was allocated for capacity building activities for five
years. Of this amount Birr 203.18 million was allocated for capacity building for four years.
Consequently, more than Birr 270.73 million (133.2%) has been approved by RWSCs for capacity
building activities for the four years of implementation. The approved exceeded the allocated in
the document due to different use of exchange rates and change of plans.
The scaling-up of the CMP approach requires extensive human capacity building activities at the
regional, zonal and woreda levels. A number of trainings have been planned and carried out in the
four implementation years of the project. Between 2004 EFY and 2007 EFY, a total of 135,754
people (97.6% of the planned) have received trainings on CMP promotion, management, apprais-
al, reporting and other related issues in the five COWASH project regions. Of these trainees,
nearly 39.0% were female.
The regional disaggregation shows that 98,221(123.4%), 10,528(72.9%), 9,877(47.7%),
16,091(71.6%) and 1,037(55.3%) people were trained on CMP implementation and related issues
in Amhara, Tigray, SNNP, Oromia and BSG regions, respectively since the project started in the
respective regions. Among the people trained in the regions, 37.9% in Amhara, 44.3% in Tigray,
41.5% in SNNPR, 40.8% in Oromia and 35.7% in BSG were female.
The human capacity building activities performed in the five project regions in 2007 EFY are pre-
sented hereunder.
5.1.2.1 Trainings Conducted in 2007 EFY in SNNPR
In SNNPR, a total of 20 types of trainings were planned to be conducted in 2007 EFY. Among the-
se, 15 types of trainings (75.0 %) were conducted partially or fully in the reporting period.
Among the 10,417 planned to be trained in the fiscal year, 6,040 (24.8%) kebele, woreda, zone
and regional level people were trained in different training topics related to CMP at a cost of about
Birr 3.6 million. Of these people trained 44.4 % were female. Among the total people trained in
33
the region, 170 (18.2%) were newly trained and refreshed artisans for the construction of water
points and institutional latrines. Details of the different trainings are indicated in Table 18 below.
Table 18: Trainings held in SNNPR in 2007 EFY
M F T M F T
1CMP Management Training for ZWT, WWT & appraisal
teamCOWASH FTAT & RSU 135 0 0 0 0 0 0
2CMP Promotion, Application, Appraisal & M&E Training
for CMP appraisal teamCOWASH FTAT & RSU 52 0 0 0 0 0 0 0 0
3 WaSHCO ToT in CMP Management COWASH FTAT & RSU 48 0 0 0 0 0 0 0
4 O & M ToT trainig for zonal &Woreda technical staffs COWASH FTAT & RSU 26 0 27 1 28 27 1 28 3 64,208
4 ToT Training in Water Safety Planning/GLOWS RSU 52 0 0 0 0 0 0 0
5Financial management & Utilization training for Zonal &
Woreda technical staff.BoFED 50 0 35 10 45 35 10 45 3 123,467
8 CLTSH ToT Training (for Woreda & Zone staff) BoH 86 0 0 0 0 0 0 0 0
6 WASHCO Training in Scheme Management WWO 1,460 0 327 312 639 512 436 948 3 to 4 502,824
7 Pump attendants & care takers Refreshment Training WWO 380 0 62 2 64 62 2 64 3 59,500
9 CLTSH Training for Kebele Level Experts W HO 785 0 231 226 457 439 345 784 3 452,069
10KWT CM P Promotion & Appraisal Training WWO 429 0 24 11 35 283 161 444 3 to 4 376,095
11 WASHCO CMP Management Training WWO 2,692 841 230 174 404 773 749 1522 4 to 5 745,413
12 WASHCO CMP Management refreshment Training WWO 1,095 0 290 220 510 290 220 510 3 to5 80,295
14 WASHCOs training in O & M for old WPS-referesher WWO 800 402 233 182 415 233 182 415 5 267,482
14 New artisans Training WWO 114 0 43 7 50 95 23 118 28 to45 397,199
15 Refreshment training for old artisans WWO 49 0 33 4 37 44 8 52 7 29,159
16Pump Attendants & Caretakers Training WWO 858 145 92 63 155 179 120 299 4 to 5 176,340
17 Kebele strategic plan in 5 kebeles per Woreda WWO 0 0 0 0 0 15 10 25 4 15,000
18 WASHCOs GLOWS/WSP Training WWO 435 435
19KWT gender awareness & mainstreaming Training WWAO 605 310 204 247 451 318 365 683 4 227,440
20 Training of WASHCOs in Water Quality WWO 266 103 0 0 0 53 50 103 4 84,964
Total 1 0,41 7 2 ,236 1 ,831 1 ,459 3 ,290 3 ,358 2 ,682 6 ,040 3 ,601 ,456
S/
NType of Training Responsible body/Trainer
No. of Trainees Planned Number Trained Estimated cost of
training
(in Birr)
4th Quarter AnnualAnnual 4th Quarter
No. of
Days
Trained
5.1.2.2 Trainings Conducted in 2007 EFY in Tigray Region
In Tigray region, 20 types of trainings were planned to be given at the regional and woreda levels
in the fiscal year. A total of 6,399 regional, zonal and woreda level people were planned to attend
these trainings. Among the planned types of trainings, 13 (65.0 %) of the trainings were given by
regional and woreda sector offices’ staff and 6,250 (98.6 %) people have attended the trainings
held at regional, woreda and kebele levels. More than 44.8% of the people trained were female.
According to the regional performance report, about Birr 3.41 million was spent for the different
trainings.
34
Table 19: Trainings held in Tigray Region in 2007 EFY
M F T M F T
1 WWT CMP Management Training FTAT & RSU 15 - 0
2
CMP Promotion, Application,
Appraisal & M&E Training for
CMP appraisal teamFTAT & RSU 20 - 0
3 WASHCO CMP Mgt ToT training WWO 15 - 0
4WWT CMP Management
Refreshment TrainingRSU 15 19 4 23 1 28,414
5
CMP Promotion, Application,
Appraisal & M&E Refreshment
Training for CMP appraisal team
RSU 20 19 4 23 1
6Financial Management training
for Finance PersonnelBoFP 30 34 11 45 34 11 45 4 40,902
7Refreshment ToT in O&MM of
Water Schemes RSU 20 - - - 6 2 8 3 25,380
8Pump Attendant and Care
Takers TrainingWWO 738 485 243 728 541 396 937 3 677,697
9 CLTSH ToT Training BoH 28 - -
10 CLTSH Training for Kebele level
ExpertsWHO 315 78 92 170 548 526 1074 5 388,886
11KWT CMP promotion & appraisal
trainingWWO 175 - 190 122 312 3 157,503
12 WASCHO CMP Mgt Training WWO 2040 490 310 800 943 709 1652 5 995,244
13 Artisan training WWO 105 - - - - - -
14 GLOWS/WSP ToT training RSU 20 - - - 12 3 15 4 59,100
15KWT gender awareness &
mainstreaming trainingWWAO 280 19 138 157 71 258 329 2 14,173
16 WASHCO GLOWS/WSP Training WWO 35 35 15 5 20 15 5 20 2 11,265
17 O&M Training for WASHCO members WWO 2190 825 606 1,431 825 606 1431 3 875,636
18 School Club WASH training WWO 280 112 93 205 228 153 381 3 132,515
19Gender awareness training for
woreda experts BWAO 24 0
20Training for school girls' clubs
and teachers BoW 34 - - - - - -
6,399 35 2,058 1,498 3,556 3,451 2,799 6,250 3,406,713 Total
S/
NType of Training
Responsible
body/Trainer
Number Trained Cost of
training (in
Birr)4th Quarter Annual
Annual4th
Quarter
No. of
Days
Trained
No. of Trainees
Planned
5.1.2.3 Trainings Conducted in 2007 EFY in Amhara Region
A total of 15 types of trainings were planned in 2007 EFY in Amhara region and all of them have
been conducted in the reporting period. A total of 39,760 people (38.4 % female) have received
CMP related trainings. Among those trained, 666(230 females) were artisans who have been
trained for some 45 days (Table 20). More number of people than planned were trained by taking
the trainings closer to the trainees. The amount of funds spent for the trainings in the reporting
period have not been reported by the region.
35
Table 20: Trainings held in Amhara Region in 2007 EFY
M F T M F T
1 WWT CMP Management Training Zones 320 0 0 235 47 282 2
2CMP Promotion, Application, Appraisal
& M&E TrainingZones 160 0 36 6 42 175 45 220 2
3WaSHCO CMP Management ToT
TrainingZones 160 0 36 6 42 165 43 208 2
4 Financial Training for Finance Personnel BoFED 108 0 0 57 39 96 2
5 Pump attendants and care takers training Woredas 1699 1699 2385 355 2740 2385 355 2740 4
6 CLTSH ToT Training Woredas 80 0 0 43 11 54 4
7CLTSH Training for Kebele Level
ExpertsWoredas 2000 0 1090 1286 2376 2049 2126 4175 4
8 KWT CM P Promotion &Appraisal Training Woredas 1400 0 711 342 1053 3348 958 4306 2
9 WASHCO CMP Management Training Woredas 8,235 0 536 151 687 6457 4358 10815 3
10WASHCOs training in O & M
(refreshment)Woredas 80 0 81 32 113 100 33 133 2
11 New artisans Training Woredas 412 0 114 37 151 436 230 666 45
12 Institutional WASHCO training for latrine building Woredas 120 0 66 34 100 98 43 141 3
13 WASHCO Training in Scheme M anagement Woredas 8335 0 7262 4682 7360 7360 4829 12189 4
14KWT gender awareness &
mainstreaming Training Woredas 2000 0 667 721 1388 1565 2125 3690 2
15 Water Quality Test Training WRDB 1,699 0 0 0 0 27 18 45 5
Total 26,808 1,699 12,984 7,652 16,052 24,500 15,260 39,760
S/
NType of Training
Responsible
body/Trainer
No. of Trainees
Planned Number Trained Estimated
cost of
training
(in Birr)
4th Quarter AnnualAnnual
4th
Quarter
No. of
Days
Trained
5.1.2.4 Trainings Conducted in 2007 EFY in Oromia Region
A total of 20 different types of trainings related to CMP were planned to be conducted at regional
and woreda levels in 2007 EFY. Consequently, 13 of them (65.0%) have been conducted at an
estimated cost of Birr 3.24 million. A total of 6,708 people (66.2% of the planned) have attended
the trainings of whom 2,629 (39.2%) are female (Table 21).
Like the other project regions, many of the the trainings in region have been conducted in a cas-
cading manner. Initially, woreda, zone and regional level staff (109 or 43.4% of planned) were
trained on CMP management, promotion, appraisal and monitoring by RSU staff in collaboration
with COWASH FTAT for about 3 days. Following these ToT trainings, similar trainings were given
at the woreda and kebel levels.
Among the total people trained in the fiscal year, 81(13 females) were artisans who were trained
for more than 26 days, on construction of water points and institutional latrines, with an estimat-
ed cost of Birr 197,023.
36
Table 21: Trainings held in Oromia Region in 2007 EFY
Pre Post
1 WWT CMP Management TrainingRSU & COWASH
FTAT0 127 0 0 0 54 7 61 3 154,600 44.4 70.49
2CMP Promotion, Application, Appraisal
& M&E Training
RSU & COWASH
FTAT0 56 0 0 0 20 2 22 3 61,351 47.6 91.23
3 WASHCO ToT in CMP ManagementRSU & COWASH
FTAT0 68 0 0 0 23 3 26 3 82,000 43.4 72.68
4 Financial Training for Finance Personnel BoFED & RSU 0 32
5Train Woreda/Zonal Staff on CMP
Finance Management & Guideline0 54
6 ToT in O&MM of Water Schemes RSU 0 32 137 1 148 13 1 14 3 70,000
7 CLTSH ToT OHB 0 34 23 5 28 23 5 28 5 110,772
8 School WaSH OEB 0 28
9ToT on Glows/WSP for zonal & Woreda
staffRSU 0 39
10 Institutional Latrine design OWM EB 0 51
11
Train Woreda staff on WPs Design
Preparation, Site selection and
supervision
OWM EB 0 29
12KWT Training in CMP Promotion,
Application, Preparation, Appraisal
WWO, WHO,
WEO0 819 105 42 147 662 247 908 3 366,603
13 Training of New Artisans WWO 0 87 17 2 19 68 13 81 26 197,023
14 Refreshment Training for Old Artisans WWO 0 175 0 0 0 0 0 0
15WaSHCO Training on CMP
Implementation
WWO, WHO,
WEO0 2194 178 131 309 1404 1081 2485 3 910,667
16Training of WaSHCO members in O &
M, Environmental Sanitation & HygieneWWO 1467 4183 617 481 1098 1018 981 1999 5 839,361
17Training of Pump attendants care
takersWWO 370 1262 353 95 448 402 98 500 3 208,398
18Training of Kebelle level Experts in
CLTSHWHO 0 180 161 35 196 178 72 250 5 101,743
19Training on Gender Awareness and
mainstreamingWWO, WYC 0 335 47 28 75 215 119 334 3 133,548
20Training of WASHCO members in
selected kebele in GLWOS/WSPWWO 0 350 0 0 0 0 0 0
Total 1,837 10,135 1,638 820 2 ,468 4 ,080 2 ,629 6 ,708 3 ,236,066
S/
NType of Training Trainer
Planned No. of
TraineesNumber Trained
F T M F T
Pre & Post Test
Result
Total Cost
of Training
(in Birr)4th
QuarterAnnual
4th Quarter Annual
M
No. of
Days
Trained
5.1.2.5 Trainings Conducted in 2007 EFY in BSG Region
For the successful implementation of COWASH in four woredas of BSG, a series of trainings (17
types) were planned to be carried out in 2007 EFY. Much of the trainings were planned in the
woredas as they are the cornerstones of scaling-up the CMP approach and contribute meaningful-
ly to the attainment of the GTP/WASH targets. Of these trainings planned, 11 (64.0%) were con-
ducted at a cost of about Birr 0.83 million from Government of Finland contribution. Three of the
trainings, which are the bases for many of the trainings planned to be given in the region, were
given by COWASH FTAT. These are CMP management, appraisal and approval and WASHCO CMP
management trainings. Following these regional level trainings, a number of other human capaci-
ty building activities have been performed at all levels – region, zone and woreda. A total of
1,051 people (54.6 % of planned) in the region have participated in trainings related to CMP, of
these 374 (35.6 %) were female. Among the people trained, 30 (75.0% of planned) were artisans
in Bambasi woreda, who are constructing the water supply and latrine facilities at the kebele lev-
el.
37
Table 22: Trainings held in BSG Region in 2007 EFY
M F T M F T
1 WWT CMP Management Training FTAT 0 73 0 0 0 76 5 81 3 87,021.60 45.3 61.8
2CMP Promotion, Application, Appraisal & M&E
TrainingFTAT 0 30 0 0 0 31 3 34 3 11,790 64.5 69.1
3 WASHCO ToT in CMP Management FTAT 0 28 0 0 0 49 12 61 3 77,660.30 43.0 67.0
4 Financial Training for Finance Personnel BOFED 0 26 0 0 0 0 0 0 0 0
5 CLTSH ToT Training BOH 0 36 0 0 0 18 0 18 3 95.508
6 CLTSH Training for Kebele Level Experts WHO 0 184 0 0 0 16 53 69 3 43746
7 KWT CMP Promotion & Appraisal Training WOW 0 181 58 24 82 152 70 222 5 125122
8 WASHCO CMP Training WOW 0 559 249 185 434 249 185 434 5 342757
9 Artisans Training/new/ wow 0 40 0 0 0 16 0 16 30 52,738
10 Artisan Refreshment Training /old/ WOW 0 15 9 0 9 9 0 9 7 18353
11 WASHCO Training in Scheme Management WOW 280 280 0 0 0 0 0 0 0 0
12 Pump Attendants & Caretakers Training WOW 144 144 0 0 0 0 0 0 0 0
13Training of Woreda staffs on the design of
institutional latrineRSU 0 21 0 0 0 0 0 0 0 0
14KWT gender awareness & mainstreaming
Training WCYO 0 210 51 42 93 51 42 93 4 59596
15Training of WASHCOs in Water Safety
PlanningWOW 0 60 10 4 14 10 4 14 7 9792
16 GLOWS/WPSTOT training FTAT 0 24 0 0 0 0 0 0 0 0
17Water Points Design, Site Selection &
Supervision TrainingFTAT 0 14 0 0 0 0 0 0 0 0
424 1,925 377 255 632 677 374 1,051 828,671
Pre- & Post-test
Result (%)
Pre- test
Result
P0st- test
Result
Total
S/N Type of Training Trainer
Number Trained
4th
QuarterAnnual
4th Quarter Annual
Planned No. of
Trainees No. of
Days
Trained
Total Cost
of Training
(in Birr)
5.1.2.6 Workshops and Meetings held in the Regions
Workshops and meetings in the project regions, zones and woredas are instrumental in promoting
and deepening the CMP implementation and improving performance of stakeholders. Cognizant of
this fact, COWASH has been implementing and supporting different workshops and meetings at
all levels in the project regions. The performance review and planning workshops held at the re-
gional level help to share experiences in CMP implementation among woredas and zones and pre-
pare doable plan for the upcoming fiscal year. Similarly, though they have been conducted in few
zones, the awareness raising workshops are decisive in promoting CMP and creating linkage be-
tween the private sector (especially construction materials suppliers) and WASHCOs and institu-
tions (schools and health facilities) thereby improving the supply chain in the project woredas.
The zonal level quarterly performance reviews and CMP related briefings to new WWT members
are also helpful in improving the performance of the woredas and zones in CMP implementation in
particular and enhancing of the WASH sector’s performance in general. The project is also sup-
porting sanitation and hygiene interventions in the project woredas. Besides different trainings,
such as CLTSH, WSR workshops have been conducted in the project woredas with the view to
improving the ODF status of the project kebeles.
A total of 22 workshops and meetings were planned to be conducted at all levels – woreda, zone
and region- in the reporting period. The types of workshops and meetings are i) annual perfor-
mance review and planning workshops; ii) awareness raising workshop to the private sector on
the availability of market opportunities; iii) zonal level quarterly review workshop in the presence
of project woredas; iv) Whole System in the Room (WSR) workshop at the woreda levels; and v)
Briefing on CMP management for new WWT members.
Accordingly, majority of the workshops and meetings (91.0%) have been conducted partially or
fully. More than 3,422 people have participated in the different workshops and meetings held in
the reporting period. This accounts below half (48.5%) of the participants invited for the events.
Among the attendants, 791 (23.1%) were female. Many people could not participate the work-
shops and meetings due to competing activities at different areas.
38
Table 23: Workshops and Review Meetings held in the Regions in 2006 EFY
M F T M F T
1Annual Review (EFY 2006) and
Planning Workshop (EFY 2007)BoW 410 - 321 38 359 2
2
Awareness raising workshop to
private sector on the availability
of market opportunities
ZWD 120 60 4 64 75 4 79 1
3Whole System in the Room
(WSR) workshop W oH 200 - - 127 225 1
4
COWASH Zonal Quarterly
Review Meeting with
Woredas(No. of Review
Meetings)
ZWD 10 20 10 14 2
1Annual Review (EFY 2006) and
Planning Workshop (EFY 2007)BoWME 0 124 - 85 1 86 1 175,000
2Zonal Quarterly Review Meeting
with WoredasZWMEO 199 398 79 15 94 79 15 94 3 188,000
3Whole System in the Room
(WSR) workshop W oH 0 787 258 113 371 624 269 893 2 217,623
1Annual Review (EFY 2006) and
Planning Workshop (EFY 2007) BoW 100 0 69 8 77 2 143,732
2Awareness raising workshop to
private sector on the availability
of market opportunities
ZoW 48 0 0
3Zonal Quarterly Review Meeting
with WoredasZoW 72 48 2 50 48 2 50 2 126,368
4Whole System in the Room
(WSR) workshop W oH 796 67 33 100 147 72 219 105,843
1
Three years Perfromance
Review (EFY 2005-7) and 2008
EFY Planning Workshop
BoW 0 117 0 85 7 92 1 203,587
2Annual Review and Planning
Workshop (woreda level)WoW 200 330 76 108 184 153 133 286 3 to 4 87,838
3
Awareness Raising Workshop to
Private Sector on the Availability
of Market OpportunitiesZoW 0 195 0 0 0 12 1 13 5 7,608
4Zonal Quarterly Review Meeting
with Woredas ZoW 60 235 0 0
5Whole System in the Room
(WSR) workshop W OH 0 1371 77 53 130 202 100 302 2 to 5 208,437
6
Briefing to New Woreda Cabinet
Members and Health Staff on
CMP WoW 50 82 13 95 82 13 95 1 15,378
1 2007 EFY Planning Workshop BoW 0 93 0 65 3 68 2 73,078.66
22007 EFY Performance Review
and 2008 EFY annual planning
Workshop
BoW 70 70 75 8 83 75 8 83 382,534.94
3
Awareness Raising Workshop to
Private Sector on the Availability
of Market OpportunitiesZoW 0 60 42 5 47 42 5 47 2 25,267
4Zonal Quarterly Review Meeting
with Woredas ZoW 42 84 26 12 38 26 12 38 2 29,494
5Whole System in the Room
(WSR) workshop W OH 0 1371 77 53 130 202 100 302 2 to 5 208,437
E. BSG Region
A. Amhara Region
B. Oromia Region
C. Tigray Region
D. SNNP Region
Number AttendedNo. of
Workshop
Days
Total Cost
of
Workhop/M
eeting (in
Birr)
S/
NType of Training Organizer
No. of
Participants
Planned 4th Quarter4th
QuarterAnnual
Annual
39
5.1.2.7 Procurements made in the Regions
COWASH aims at building the physical capacity of the implementing institutions so as to imple-
ment the CMP approach in a meaningful and sustainable manner. Much of the procurement was
made by the new woredas as the old woredas have already procured many of the required mate-
rials in the previous implementation years of the project. However, some of the procurements
have been delayed as the preparation and approval of the regional annual plans was delayed.
Anyhow, a number of items (office equipments, construction equipments and transport facilities)
have been procured in the reporting period. Summary of the major procurements made in the
reporting period in the regions, zones and woredas are presented below.
5.1.2.7.1 Procurements made in Oromia Region
Many of the procurements in Oromia region were made in the previous fiscal years. In the report-
ing period, 19 types of items, mainly office equipments, construction equipments and transporta-
tion facilities, were planned to be procured (Table 24). Majority of the items (84.2%) were pro-
cured partially or fully with an estimated cost of about Birr 3.8 million allocated from the GoF con-
tribution. Double cabin pickup, water quality test kits and dewatering pump are the major items
rolled over to the upcoming fiscal year. Evaluation of the bids for the pickup car has been final-
ized and the procurement process of water quality test kits is on process and the items are be-
lieved to be supplied in the first quarter of 2008 EFY.
Table 24: Materials procured in Oromia region in 2007 EFY
5.1.2.7.2 Procurements made in Amhara Region
Much of the procurements in Amhara were undertaken in the first three years of implementation
of COWASH. In 2007 EFY, only 13 types of items (office equipments, construction equipments
and transportation facilities) were planned to be procured. Consequently, 10 of the 13 types of
items planned (76.9%) were procured in the reporting period (Table 25). The procured items in-
clude the procurement of 31 field vehicles and 20 water quality test kits, which have been rolling
over the years. The vehicles were distributed to new zones and woredas, regional sector bureaus
and RSU. Unlike other project regions, the cost of procurement of the planned items has not been
reported by Amhara region.
4th
QuarterAnnual
4th
QuarterAnnual
Artisan Hand Tools Set 0 103 34 86 106,026.95 10 Woreda Water Offices
Spring Equipment Set 0 10 7 10 172,334.60 10 Woreda Water Offices
LCD Projector No. 0 14 3 13 204,991.95 11 Woreda & 2 Zone Water Offices
Water Quality Test Kits No. 0 8 0 0 -
Fax Machine No. 0 3 1 3 30,800.00 3 Woreda Water Offices
Dewatering Pump No. 0 1 0 0 -
File Cabinet No. 0 22 9 18 84,951.25 10 Woreda Water offices & 2 Woreda WoFEDOs
Chain Blocks No. 0 8 4 6 20,529.00 6 Woredas Water Offices
External Hard Disk No. 0 1 0 1 2,500.00 Gumay Woreda water Office
GPS No. 0 14 11 13 75,085.09 7 woreda and 4 zonal water offices
Stabilizer No. 0 50 13 42 40,893.438 Woreda and 2 Zonal WASH sector offices inc
Finance and Womens’ offices
Small Dia. Mold No. 0 21 7 10 100,700.00 3 Woreda Water offices
Desktop Computer No. 0 42 14 41 596,192.657 Woreda and 3 Zonal WASH sector offices inc
Finance and Womens’ offices
Digital Camera No. 0 13 4 12 36,134.00 7 woreda and 3 zonal water offices
Motor Bike No. 0 22 0 22 1,891,816.524 woredas Water, Health and Education offices & 3
woredas Health and Education Offices
Printer No. 0 40 8 40 259,017.807 Woreda and 2 Zonal WASH sector offices inc,
Finance and Womens’ offices
Lap Top Computer No. 0 2 2 4 60,720.00 3 woreda & 1 zonal Water offices
Photocopy Machine No. 0 4 0 3 98,747.00 3 woreda water offices
Double Pick up Car No. 0 1 0 0 -
Total 3,781,440.24
Beneficiary Office(s)Material or Equipment Unit
Quantity Planned Quantity ProcuredTotal Cost
(in Birr)
40
Table 25: Materials procured in Amhara region in 2007 EFY
4th
QuarterAnnual
4th
QuarterAnnual
1 Desktop Computer with UPS No. 0 1 1 1 Finance Off ice
2 Laptop Computer No. 0 40 12 40 WWO
3 Printer No. 0 1 1 1 Finance Off ice
4 File cabinet No. 0 5 0 5 WW0
5 Motorbike No. 0 22 0 22 WWO & WHO
6 Large diameter mold No. 0 4 0 0 WWO
7 Small diameter mold No. 0 17 7 7 WWO
8 Artisan tools Set 0 430 149 251 WWO, ZWD & Region
9 Vehicle No. 0 31 31 31 WWO, ZWD & Region
10 Water quality test kits No. 0 20 0 20 WWO&ZWD
11 Chlorine Drum 0 80 34 43WWO
12 Spring construction tools Set 0 3 1 2 WWO
13 Water quality test reagen No. 0 10 0 0
Total 0
Beeficiary Office/sS/NTotal Cost
(in Birr)
Quantity
Planned
Quantity
ProcuredMaterial or Equipment Unit
5.1.2.7.3 Procurements made in Tigray Region
It was planned to procure 18 types of office equipments, construction equipments and transport
facilities in 2007 EFY. Among these, 8 (44.4%) of the types planned were procured in the report-
ing period at an estimated cost of Birr 0.56 million (Table 26). The region’s report shows that not
all of the quantities in the procured items were procured.
A number of items under procurement (motorbikes, water quality test kits, construction
equipments, etc.) will be re-planned in the upcoming fiscal year.
Table 26: Materials procured in Tigray region in 2007 EFY
Annual4
th
Quarter
4th
QuarterAnnual
1 Desktop Computer with UPS No. 11 4 4 60,169.9
2 Laptop Computer No. 10 13 13 214,549.5
3 Printer No. 8 6 6 51,159.9
5 LCD Projector No. 13 6 126,532.0
6 Digital Camera No. 11 6 18,317.0
7 File cabinet No. 3 28,549.9
8 Motorbike No. 11
9 Chain block No. 3
10 Artisan tools Set 105 1 1 18,150.0
11 Vehicle No. 2
12 GPS No. 6
13 Construction equipments Set 2
14 External hard disk No. 3
15 Office furniture Set 2 31,258.9
16 Water quality test kit Set 7
17 Stabilizer No. 3 4 11,350.0
18 CDMA No. 1 1 1,310.0
561 ,347
Beneficiary
Office(s)
Total
S/N Material or Equipment Unit
Quantity Procured
Total Cost
(in Birr)
Quantity Planned
5.1.2.7.4 Procurements made in SNNP Region
Many of the procurements in SNNPR have been rolling from year to year. In the reporting period
the beneficiaries of COWASH project in the region planned to procure more than 23 types of
items (office equipments, construction equipments and field transportation facilities). As a result
of consultative meetings and frequent follow-ups of the RWSC and COWASH FTAT many of the
items planned have been procured. Until end of the reporting period, 22 of the 23 type of items
(95.7%) were procured (Table 27). Among the procured items are the long-awaited water quality
test kits and RSU field vehicle, which have been rolling for more than three years. The water
quality test kits for 5 woredas were received while the RSU car is to be supplied in the first quar-
ter of the upcoming fiscal year. A total of COWASH funds (GoF & GoE) amounting over Birr 4.72
41
million was expended for the procurement of these items. More than half of the costs (52.3%)
were incurred for the procurement of the field vehicle. Unlike the other zones and woredas of the
region and other project regions, the physical capacity building cost in Sidama and Dawurro zones
and the four woredas under these zones have been covered from GoE.
Table 27: Materials procured in SNNP region in 2007 EFY
4th
QuarterAnnual
4th
QuarterAnnual
1 Desktop Computer with UPS No. 0 10 5 11 96,212Dawuro zone WO &FO; Tocha
WWO & WEO ; Esara WWO &
Duna WWO
2 Laptop Computer No. 0 8 1 9 137,537RSU;Tocha, Gorche & Duna
WWOs; Dawuro Zone
WO;Arbegona WWO
3 Printer No. 0 14 2 16 94144
Dawuro Zone water dep't and
ZFO;Tocha WWO,WEO
&WFEDO,EsaraWWO
4 Photocopy Machine No. 0 5 0 5 141709Tocha, Gorche & Esara
WWOs;Dawuro zone WO;
Arbegona WWO
5 LCD Projector No. 0 8 2 4 58,686 Dawuro zone WO; Duna WWO
6 Scanner No. 0 2 o 0 0
7 Digital Camera No. 0 12 4 8 47,270
M isha , Duna, Gorche &Esara
WWO; Tocha WWO;Dawuro
zone WO;Arbegona WWO
8 File cabinet No. 0 7 1 8 45,947RSU, Arbegona WWO;Gcrche
WWO;Tocha WWO; Esara WWO
9 Motorbike No. 0 7 3 8 379,579Arbegona WWO;Tocha, Gorche
& Esara WWOs
10 Large diameter mold No. 0 4 2 2 36,800 Tocha WWO
11 Small diameter mold No. 0 32 2 16 206,080 Chencha WWO & Tocha WWO
12 Chain block No. 0 12 2 4 27,900 Chencha WWO
13 Artisan tools Set 0 5 0 3 50Gorche WWO;Arbegona
WWO;Tocha Wwo
14 Water quality test kits No. 0 5 0 5 847,665Chencha, A/Zuriya,M isha, Duna &
Esara WWO
15 Stabilizers No. 0 15 0 16 16,245Tocha
WWO,WFO,WHO,WEO;Dawuro
Zone Water and Finance
16 Fax machine No. 0 1 0 2 21,638 M isha WWO
17 GPS No. 0 8 1 5 20,720Tocha WWO;Arbegona
WWO;Chencha nd M isha WWO
18 Spring dev't tools No. 0 6 1 3 44,000 Chencha & Gorche Tocha WWO
18 External hard disk No. 0 2 0 1 1,782 RSU
19 CDMA No. 0 2 0 0 0 RSU
20 Office furniture No. 0 2 0 2 9,900 RSU
21 Vehicel No. 0 1 1 2,470,000 RSU
22 Colour Printer No. 0 1 0 1 17,250 RSU
23 Flash Disk No. 0 3 0 3 552 RSU
Total 4,721,666
Beeficiary Office/sS/NTotal Cost
(in Birr)
Quantity
Planned
Quantity
ProcuredMaterial or Equipment Unit
5.1.2.7.5 Procurements made in BSG Region
In 2007 EFY, BSG region planned to procure 34 types of office equipments, construction
equipments and field vehicles. Accordingly, 22 of the 34 type of items (64.7%) were procured in
the reporting period (Table 28). Advance was paid for the procurement of the vehicles and mo-
torbikes and the suppliers will deliver the vehicles and motorbikes in the first quarter of the up-
coming fiscal year. An estimated GoF funds Birr 1.07 million have been expended for the items
procured for the project in the region.
42
Table 28: Materials procured in BSG region in 2007 EFY
4th
QuarterAnnual
4th
QuarterAnnual
1 Desktop Computer No. 0 30 10 19 240,350
2 Laptop Computer No. 0 15 4 15 233,307
3 Printer No. 0 29 11 25 121,800
4 Photocopy Machine No. 0 8 3 6 160,435
5 LCD Projector No. 0 7 2 2 26,700
6 Scanner No. 0 1 1 1 9,280
7 Digital Camera No. 0 13 4 4 12,190
8 File cabinet No. 0 14 4 4 17,700
9 Motorbike No. 0 16 - - -
10 Large diameter mold No. 0 4 - - -
11 Small diameter mold No. 0 30 - - -
12 Chain block No. 0 18 - - -
13 Artisan tools Set 0 55 - - -
14 Vehicle No. 0 5 - - -
15 Vehicle tyres No. 0 - - 5 40,950
16 EVDOO No. 0 5 - - -
17 Flash disk No. 0 66 8 10 3,200
18 Office furniture 0
18.1 L-shape table No. 0 5 5 5 17,204
18.2 Normal table No. 0 1 1 1 1,958
18.3 Managerial chair No. 0 6 6 6 11,829
18.4 Gust chair with arm No. 0 10 10 10 18,741
18.5 Drawer chair No. - 1 1 1 1,205
18.6 Gust chair without arm No. 0 3 3 3 2,700
19 Laptop bag No. 0 5 - - -
20 Hand held GPS No. 0 12 3 3 18,598
21 Fax machine No. 0 2 1 2 51,000
22 Stabilizer No. 0 26 9 9 6,848
23 Remote sensor No. 0 1 - - -
24 Binding machine No. 0 1 - - -
25 Broadband installation No. 0 1 - - -
26 Construction equipment for springset 0 5 - - -
27 Dewatering pump No. 0 3 1 1 14,950
28 Generator No. 0 6 2 2 60,031
29 Scientific calculator No. 0 0 1 1 1,000
1,071,976Total
Beeficiary Office/sS/NTotal Cost
(in Birr)
Quantity Planned Quantity Procured
Material or Equipment Unit
5.2 RESULT 2 OF COMPONENT 2: FINANCIAL AND PROCUREMENT SERVICES DE-
LIVERED FOR CMP INTERVENTION AT ALL LEVELS IN THE SELECTED RE-
GIONS
5.2.1 Output 1: Flow of Funds for CMPs Functional
Some indicators are set to measure the achievement of the output, viz., 1) number of fund trans-
fer requests done to the financier; 2) number of BoFED audit reports produced (disaggregated by
regions); 3) amount of funds transferred to WASHCOs and 4) amount of funds settled by
WASHCOs.
According to the funding agreements made between the beneficiary regional Finance Bureaus and
Embassy of Finland, a COWASH region is expected to submit three-four fund transfer requests to
the Embassy of Finland per year. A new region can request fund for the first and second quarters
of a fiscal year, at a time, for the first year while an old region can request only for a quarter.
Accordingly, Amhara, Tigray, SNNPR, Oromia and BSG regions submitted 10 (66.7%), 10
(66.7%), 9 (60.0%), 6 (54.5%) and 2 (66.6%) fund transfer requests, respectively, until end of
the reporting period. Until end of the reporting period, a total of 37 (62.7%) fund transfer re-
quests have been submitted to Embassy of Finland by the five project regions. Nearly 37.0% of
the fund transfer requests have not been submitted mainly due to availability of adequate funds
for some of the quarters or delay in the implementation of the project activities in the woredas.
Every implementation year, a COWASH project region is expected to audit the project fund utili-
zation of the preceding fiscal year and submit audit reports prepared in English language to the
43
Embassy of Finland. So far, 11 audit reports of 2004-2006 implementation years were expected
to be submitted to Embassy of Finland, of which 9 (81.8%) were accomplished by the four re-
gions (Amhara, Tigray, SNNPR and Oromia). While Amhara and SNNPR have conducted the audit-
ing of three implementation years (2004-2006 EFY) and submitted the reports, Tigray and
Oromia regions are left with one audit report.
Regions have been transferring investment funds to WASHCOs through MFIs as per the fund
transfer agreements signed between WASH sector bureau(s) and MFIs. Hitherto, investment fund
amounting to Birr 351.91 million was transferred to WASHCOs in the four regions (Table 29). Of
the amount transferred to WASHCOs, Birr 327.14 (93.0 %) was settled by WASHCOs until end of
July 7, 2015. About 94.4 %, 100.0 %, 87.4 %, 78.7 %, and 98.2 % of the amount transferred in
Amhara, Tigray, SNNP, Oromia and BSG regions was settled by WASHCOs, PTAs and Health
Committees.
2007 EFY, plenty of activities related to management of (GoF and GoE) funds were planned in the
project woredas, zones and regional sector offices. Opening of bank accounts in new regions,
zones and woredas was among the major activities to be accomplished during the first quarter of
the reporting period. The new zones (2 in Oromia and 2 in BSGR) and woredas (4 in Oromia and
4 in BSGR) have opened bank accounts with the support of the RSUs staff and BoFED of the re-
spective regions and COWASH funds have been flowing as per the quarterly cash flows of the
beneficiary sector offices.
Fund transfer requests and auditing of the 2006 EFY COWASH fund utilization were the other ma-
jor activities planned for the reporting period. In the reporting period, a total of 12 fund transfer
requests have been submitted (63.2 %) by the five regions- 2 each by Amhara, Oromia and BSG
and by 3 each by Tigray and SNNPR. Many of the regions didn’t request funds for the first two
quarters as they had some leftover funds from 2006 EFY to cover the expenses in the quarters.
Every year, the project regions are expected to audit the project fund utilization of the previous
fiscal year. In the reporting period, all of the project regions except BSG were expected to carry
out and submit the 2006 EFY project fund utilization. Accordingly, Amhara and SNNPR have sub-
mitted their audit reports while Tigray and Oromia didn’t submit their audit reports to the Embas-
sy of Finland. While Amhara has conducted the auditing separately for 2006 EFY, SNNPR conduct-
ed auditing of the four years of implementation together.
MFIs have been transferring to WASHCOs as per the fund transfer agreements signed with one of
the WASH sector bureaus of the project regions. In the period under reporting, Amhara, Tigray,
SNNPR, Oromia and BSG have transferred Birr 92.22 million, Birr 9.41 million, Birr 16.85 million,
Birr 13.15 million and Birr 0.55, respectively. Consequently, 104.7 %, 100.0 %, 84.2 %, 79.2 %
and 98.2 % of the funds transferred in Amhara, Tigray, SNNPR, Oromia and BSG have been set-
tled by WASHCOs, PTAs and Health Committees.
45
Table 29: Number of Fund Transfer Requests made to MFA, COWASH Audit Reports and WASHCO Investment Fund Utilization until end of
2007 EFY (Cumulative)
BSG
2004
EFY
Until end
of 2005
EFY
Until
end of
2006
EFY
Until
end of
2007
EFY
2004
EFY
Until
end of
2005
EFY
Until
end of
2006
EFY
Until
end of
2007
EFY
2004
EFY
Until
end of
2005
EFY
Until
end of
2006
EFY
Until
end of
2007
EFY
2004
EFY
Until
end of
2005
EFY
Until end
of 2006
EFY
Until
end of
2007
EFY
2007
EFY
1Number of Fund Transfer Requests
submitted to Embassy of FinlandNo. 3 6 8 10 1 5 7 10 1 5 6 9 3 4 6 2
1a % of Requests submitted % 100.0 85.7 72.7 66.7 33.3 71.4 63.6 66.7 33.3 71.4 54.5 60.0 100.0 57.1 54.5 66.7
2Number of Audit Reports Produced and
Submitted to Embassy of FinlandNo. - 1 2 3 - 0 2 2 - 0 0 3 - 1 1 -
2a % of Audit Reports Submitted % - 100.0 100.0 100.0 - 0.0 100.0 66.7 - 0.0 0.0 100.0 - 100.0 50.0 -
3Amount of Investment Funds
Transferred to WASHCOs (in Millions)Birr 40.48 104.47 169.98 262.20 2.26 13.66 21.84 31.22 0.69 5.62 8.58 25.44 5.90 19.35 32.50 0.55
4Amount of Investment Funds Utilized
and Settled by WASHCOs (in Millions)Birr 34.69 93.74 151.04 247.55 2.26 13.66 21.84 31.22 0.69 4.60 8.30 22.24 3.76 15.18 25.59 0.54
% Settled fund (from Transferred) % 85.7 89.7 88.9 94.4 100.0 100.0 100.0 100.0 100.0 81.9 96.7 87.4 63.7 78.4 78.7 98.2
SNNPR OromiaAmhara
UnitS/n Indicator/Type of Data Required
Tigray
Note: - The figures indicated in the table are cumulative
46
5.2.2 Output 2: Linkages Created with Private Sector in the Supply of Materials,
Equipment, Tools and Services
Number of new artisans trained by COWASH for WaSH facility construction in the woredas and
number of awareness raising workshops organized for the private sector are set to measure
the achievement of the output.
A COWASH project woreda needs to train or refresh up to 15 artisans to carry out the con-
struction of CMP projects in the kebeles. This means that 1,050 (trained and/or refreshed) ar-
tisans are required for the five regions – 600 for Amhara, 105 for Tigray, 120 each for SNNPR
and Oromia and 60 for BSG. So far, a total of 3,000 (23.1% female) have received training or
refreshed in the project regions. The disaggregation by region shows that 2,311(385.2%),
49(46.7%), 254(211.7%), 361(300.83%) and 25(41.7%) have been trained or refreshed in
water supply scheme and institutional latrines construction in Amhara, Tigray, SNNPR, Oromia
and BSG, respectively.
The other major initiative designed to create linkage with the private sector is the workshop
organized for the private sector on the opportunities created in the CMP kebeles. This has been
planned to be conducted every year in each project zone. However, the workshop was con-
ducted in only 2 zones of 2 project regions – SNNPR and BSG.
Besides, market surveys are expected to be made every quarter in every project woreda of the
five regions. Accordingly, many of the water offices of the project woredas assessed the prices
of construction materials and informed the range of prices of construction materials to
WASHCOs.
5.3 RESULT 3 OF COMPONENT 2: SUSTAINABLE COMMUNITY AND INSTITU-
TIONAL ACCESS TO SAFE WATER, SANITATION AND HYGIENE IN THE
TARGET WOREDAS INCREASED
5.3.1 Output 1: Access to Improved Water Sources for Communities and Institutions
Increased
Three indicators are set to measure the achievement of the output. These are, a) number of
new CMP applications submitted to WWT(disaggregated by communal and institutional);
b) number of new CMP applications approved by WWT (disaggregated by communal and insti-
tutional); and c) number of new water schemes constructed(disaggregated by communal and
institutional).
Over the four years of implementation of COWASH, a total of 11,450 water supply construction
applications (10,719 community, 514 school and 217 health facility), or 197.1 % of those
planned by the five regions in four years, were submitted by WASHCOs and 9,604 of them
(8,975 community, 456 school and 173 health facility), accounting to 83.9 % of those submit-
ted, were approved by WWTs of the respective project woredas. As a result, 8,161 Water
Points (7,712 community, 374 school and 75 health facility), which accounts 122.7 % of the
6,649 WPs planned to be constructed in the 4 years (or 91.5 % of the 8,923 water points
planned to be constructed in the five years of COWASH) have been constructed between 2004
EFY and 2007 EFY.
This fiscal year, like the previous implementation years, the delay in the approval of the annu-
al plans has affected the promotion, approval and construction of water points. Many prepara-
tory activities started late in the fiscal year. Anyhow, some water supply constructions, includ-
ing those started late in the previous fiscal year, were completed in the reporting period.
47
In 2007 EFY, a total of 2,588 new WPs constructions (including those rolled over from 2006
EFY) were planned to be undertaken in the five regions of the project. Among these, 2,269
were for communities and the remaining 319 were for institutions (207 for schools and 112 for
health facilities). Hence, at least 2,588 applications were expected to be submitted to WWTs in
the fiscal year by WASHCOs, PTAs and Health Committees (Table 30). Accordingly, a total of
4,151 applications (160.4 % of the planned) were submitted (170.0% community & 106.3%
school and 68.8% health facility). Among these applications submitted, 87.9% (88.2% com-
munity, 84.1% school and 80.5 % health facility) were approved by WWT of the project
woredas. Of the water supply scheme applications approved, 3,127 were constructed in the
reporting period.
The applications submitted, appraised and approved and constructed in the regions in the re-
porting period are presented hereunder.
48
Table 30: Summary of New Water Points Planned, Applications Submitted, Approved and Constructed in 2007 EFY
Applications
Planned
Applications
Submitted
Applications
Approved
WPs
Constructed
Applications
Planned
Applications
Submitted
Applications
Approved
WPs
Constructed
Applications
Planned
Applications
Submitted
Applications
Approved
WPs
ConstructedPlanned Submitted Approved
WPs
Constructed
Amhara 1,357 2,847 2,484 2,183 153 158 142 112 80 50 41 12 1,590 3,055 2,667 2,307
Tigray 166 197 170 163 22 20 7 7 12 12 12 2 200 229 189 172
SNNPR 434 379 375 327 11 18 18 11 4 3 3 2 449 400 396 340
Oromia 261 398 345 299 9 14 11 9 9 6 4 0 279 418 360 308
BSG 51 33 27 0 12 10 6 0 7 6 5 0 70 49 38 0
Total 2,269 3,854 3,401 2,972 207 220 184 139 112 77 65 16 2,588 4,151 3,650 3,127
Project
Region
Community School
Number of WPs Applications Planned & Submitted in 2007 EFY
TotalHealth Facility
49
5.3.1.1 Water supply schemes constructed in Amhara Region
As indicated in Table 30 above, Amhara woredas planned to construct 1,590 WPs – 1,357 by
communities and 233 by institutions (153 schools and 80 health facilities).
Promotions have been made in the reporting period in the CMP kebeles of Amhara woredas by
woreda staff trained in CMP promotion and appraisal at the zonal and woreda levels. As a result
of the promotions made, 3,055 applications (2,847 for communities and 156 for schools and 50
health facilities) were submitted to WWT for decision. Among these, 2,965 (97.1 %) were desk
appraised and 2,751 of those desk appraised (92.8 %) were appraised at the field level by
trained woreda appraisal team. Many of the field appraised applications, 2,667 (97.0%) were
approved by WWT of the respective project woredas.
Table 31: Number of applications submitted, appraisals made and applications approved in
Amhara Region in 2007 EFY
<50% >50% Total
A. Community Water Points
HDW with RP - 3 3 3 3 - HDW 896 2032 1950 1797 1729 - - - - 121SPD 411 741 741 693 693 - - - - 4SW 48 49 49 49 49 5 - - - 6DW - - - - - - RWH - - - - - -
RPS from SP 2 22 14 10 10 -
RPS from DW - - - - - -
Subtotal 1 ,357 2 ,847 2 ,757 2 ,552 2 ,484 5 - - - 131 -
B. Institutional Water Points
B.1 School Water Points
HDW with RP - - - - - - - - -
HDW 152 146 146 139 133 - - - - 17
SPD 1 12 12 12 9 - - - - 1
SW - - - - - - - - -
DW - - - - - - - - -
RWH - - - - - - - - -
RPS from SP - - - - - - - - -
RPS from DW - - - - - - - - -
Subtotal 153 158 158 151 142 - - - - 18 -
B.2 Health Institutions Water Points
HDW with RP - - - - - - - - -
HDW 80 47 47 45 40 - - - - 5
SPD - 3 3 3 1 - - - -
SW - - - - - - - - -
DW - - - - - - - - -
RWH - - - - - - - - -
RPS from SP - - - - - - - - -
RPS from DW - - - - - - - - -
Subtotal 80 50 50 48 41 - - - - 5 -
Total 1,590 3,055 2 ,965 2 ,751 2 ,667 5 - - - 154 -
Type of Water
Po int(WP)
No . o f
Planned
WPs
No . o f WPs
Applications
made
No . o f WPs
Applications Desk
Apprais ed
No . o f WPs
Application F ield
Apprais ed
No . o f WPs Not
Star ted
Cons truction
No . o f WPs
Abandoned ( could
not be
cons tructed)
No . o f WPs
Applications
Approved by
WWT
No. o f WPs under cons truction No . o f
Tr ials
made
Among the approved applications, 2,307 water points (2,183 community, 112 school and 12
health institutions) were constructed in Amhara woredas in 2007 EFY. Among the community
water points, 29 are machine drilled shallow wells, 2 manual drilled wells and 8 Rural Piped
Schemes (RPS) from Spring Sources. It was reported that 154 water points (143 hand dug wells,
5 On Spot Springs and 6 Shallow Wells) were abandoned during construction. The community
water points have begun benefiting more than 400,365 rural people; the school and health insti-
tutions’ water points are serving over 59,697 students and teachers and 1,268 health extension
workers and some clients of these institutions, respectively.
Community covered more than 15% of the construction costs. On the average, 33.4% (20.0% to
46.8%) of the water points construction cost was contributed from the beneficiary community.
50
Table 31: Number of New Water Points constructed in Amhara Region in 2007 EFY
4th
Quart e r Annua l 4th
Quart e r Annua l
A. Community Water Points
HDW with RP - - 3 3 147 147 HDW 429 896 887 1,504 256,061 256,061 SPD 302 411 293 639 128,408 128,408 SW 32 48 13 29 13,192 13,192 DW - - - - RWH - - - - RPS from SP 2 2 8 8 2,557 2,557 RPS from DW - - -
Subtotal 765 1 ,357 1 ,204 2 , 183 400,365 400,365
B. Institutional Water Points
B.1 School Water PointsHDW with RP - - - - - HDW 152 152 88 104 56,254 SPD 1 1 6 8 3,443 SW - 1 - - DW - - - - RWH - - - - RPS from SP - - - - RPS from DW - - - -
Subtotal 153 154 94 1 12 59,697
B.2 Health Institutions Water Points
HDW with RP - - - - HDW 80 80 10 11 768 SPD - - 1 1 500 SW - - - - DW - - - - RWH - - - - RPS from SP - - - - RPS from DW - - - -
Subtotal 80 80 11 12 1,268
Total 998 1 ,591 1 ,309 2 ,307
Type of Water Point (WP)
No. of WPs Const ruc t ion
Compl e t ed
No. of Peop l e Having
Access t o the
COMPLETED WPs w i th
in 1 .5 km rad ius of the
Ac tua l No of
Peop l e Using the
Compl e t ed WPs
No. of WPs P l anned to be
Const ruc t ed
5.3.1.2 Water supply schemes constructed in Tigray Region
In Tigray region, a total of 200 WPs (166 by communities and 34 by institutions-22 schools and
12 health facilities) were planned to be constructed in the 7 woredas of the region through the
CMP approach with the technical and financial support of COWASH.
Accordingly, promotions have been made in the kebeles and beneficiaries expressed their de-
mand to WWTs. For the planned 200 WPs, 229 (114.5 % of the plan) applications have been
submitted. Of this, 227 (99.1 %) were appraised at the desk level. Among the desk appraised
applications, 189 (83.3 %) were appraised on the field by trained woreda staff. Consequently,
WWTs have approved all of the field appraised applications for funding. Among the approved ap-
plications 170 are for communities and 19 for institutions – 7 for schools and 12 for health facili-
ties.
51
Table 32: Number of applications submitted, appraisals made and applications approved in Tigray
Region in 2007 EFY
<50% >50% Total
A. Community Water Points
HDW with RP - - - - - - - - - HDW 90 95 95 88 88 - - - SPD 45 50 50 40 40 - - - SW 29 50 50 40 40 - - - - DW - - - - - - - - - RWH - - - - - - - - -
RPS from SP - - - - - - - - -
RPS from DW 2 2 2 2 2 - - - -
Subtotal 166 197 197 170 170 - - - - - -
B. Institutional Water Points
B.1 School Water Points
HDW with RP - - - - - - - - -
HDW 9 6 5 3 3 - - - -
SPD - 3 3 2 2 - - - -
SW 7 7 7 1 1 - - - -
DW - - - - - - - - -
RWH 6 4 3 1 1 - - - -
RPS from SP - - - - - - - - -
RPS from DW - - - - - - - - -
Subtotal 22 20 18 7 7 - - - - - -
B.2 Health Institutions Water Points
HDW with RP - - - - - - - - -
HDW - - - - - - - - -
SPD 5 5 5 5 5 5 - - -
SW - - - - - - - - -
DW 4 4 4 4 4 4 - - -
RWH - - - - - - - - -
RPS from SP 3 3 3 3 3 3 - - -
RPS from DW - - - - - - - - -
Subtotal 12 12 12 12 12 12 - - - - -
Total 200 229 227 189 189 12 - - - - -
No. o f WPs Not
Star ted
Cons truction
No . o f WPs
Abandoned ( could
not be
cons tructed)
No . o f WPs
Applications
Approved by
WWT
No. o f WPs under cons truction No . o f
Tr ials
made
Type of Water
Po int(WP)
No . o f
Planned
WPs
No . o f WPs
Applications
made
No . o f WPs
Applications Desk
Apprais ed
No . o f WPs
Application F ield
Apprais ed
In the reporting period, 172 water points (163 community and 9 institutional (7 schools and 2
health facilities)) were constructed. Among these water points, 91 are hand dug wells, 43 on spot
springs, 36 shallow wells and 1 Roof Water Harvesting(RWH). The 163 community water points
completed are benefiting over 48,000 rural people while the 7 school water points and 2 health
facility water points are benefiting more than 4,273 students and teachers and 25 health exten-
sion workers and clients of the health facilities.
Some 20.0% of the construction cost of water supply schemes was contributed from the benefi-
ciary community in the form of labour and materials.
Table 33: Number of New Water Points constructed in Tigray Region in 2007 EFY
4th
Quart e r Annua l 4th
Quart e r Annua l
A. Community Water Points
HDW with RP - - - -
HDW 88 90 88 88 22,000 22,000
SPD 40 45 36 40 12,000 12,000
SW 29 29 35 35 14,000 14,000
DW - - - -
RWH - - - -
RPS from SP - - - -
RPS from DW 2 2 - -
Subtotal 159 166 159 163 48,000 48,000 B. Institutional Water Points
B.1 School Water Points
HDW with RP - - - - -
HDW 7 9 1 3 2,330
SPD - - 2 2 755
SW 7 7 1 1 588
DW - - - -
RWH 6 6 - 1 600
RPS from SP - - - -
RPS from DW - - - -
Subtotal 20 22 4 7 4,273
B.2 Health Institutions Water Points
HDW with RP - - - -
HDW 5 5 1 1 23
SPD - - 1 1 2
SW 4 4 - -
DW - - - -
RWH 3 3 - -
RPS from SP - - - -
RPS from DW - - - -
Subtotal 12 12 2 2 25
Total 191 200 165 172
Type of Water Point (WP)
No. of WPs Const ruc t ion
Compl e t ed
No. of Peop l e Hav ing
Access t o the
COMPLETED WPs w i th
in 1 .5 km rad ius of the
WPs
Ac tua l No of
Peop l e Using the
Compl e t ed WPs
No. of WPs P l anned to be
Const ruc t ed
52
5.3.1.3 Water supply schemes constructed in SNNP Region
With the aim of improving the low water supply access coverage of the project woredas, a total
of 449 WPs – 434 by communities and 15 by institutions (11 schools and 4 health facilities) -
were planned to be constructed, through the CMP approach, in the 8 project woredas of SNNP
region. The plan includes the point water supply schemes on-going in the preceding fiscal year.
Accordingly, 400 new applications were submitted from communities and institutions (schools
and health facilities) in the reporting period. Majority of this (399 or 99.8 %) were desk ap-
praised and 396 (99.2 %) of this were appraised at the field level. All of the field appraised appli-
cations were approved by WWTs.
Table 34: Number of applications submitted, appraisals made and applications approved in SNNP
Region in 2007 EFY
<50% >50% Total
A. Community Water Points
HDW with RP - - - - - 0HDW 23 20 19 16 16 4 0 7 7SPD 406 354 354 354 354 11 11 12 23 SW 5 5 5 5 5 5 - - - DW - - - - - - RWH - - - - - -
RPS from SP - - - - - -
RPS from DW - - - - - -
Subtotal 434 379 378 375 375 20 1 1 19 30 - -
B. Institutional Water Points
B.1 School Water Points
HDW with RP - - - - - - - - -
HDW 10 10 10 10 10 - - - -
SPD - 7 7 7 7 - - - -
SW 1 1 1 1 1 1 - - -
DW - - - - - - - - -
RWH - - - - - - - - -
RPS from SP - - - - - - - - -
RPS from DW - - - - - - - - -
Subtotal 1 1 18 18 18 18 1 - - - - -
B.2 Health Institutions Water Points
HDW with RP - - - - - - - - -
HDW 4 1 1 1 1 - - 1 1
SPD - 2 2 2 2 - - - -
SW - - - - - - - - -
DW - - - - - - - - -
RWH - - - - - - - - -
RPS from SP - - - - - - - - -
RPS from DW - - - - - - - - -
Subtotal 4 3 3 3 3 - - 1 1 - -
Total 449 400 399 396 396 2 1 11 20 31 - -
Type of Water
Po int(WP)
No . o f
Planned
WPs
No . o f WPs
Applications
made
No . o f WPs
Applications Desk
Apprais ed
No . o f WPs
Application F ield
Apprais ed
No . o f WPs Not
Star ted
Cons truction
No . o f WPs
Abandoned ( could
not be
cons tructed)
No . o f WPs
Applications
Approved by
WWT
No. o f WPs under cons truction No . o f
Tr ials
made
The construction of water supply schemes in SNNPR woredas has been improving in the fiscal
year. It was reported that 340 water points (327 for communities and 11 for schools and 2 for
health facilities) were completed in the reporting period. This accounts 75.7 % of the total
planned water points in the region. The community water points constructed constitute 9 hand
dug wells, 329 on spot springs and 2 RPS from spring source. More than 125,759 rural people
have started to benefit from the 327 community water points and 2,462 students and teachers
68 health staff and clients are benefiting from the school and health facility WPs constructed with
the support of COWASH project.
The community contribution in the region was much higher than the 15% threshold. The benefi-
ciary community contributed, on the average, 33.0 % (22.0 % to 37.8 %) of the community wa-
ter supply construction and 22.0 % (12.9 % to 37.1 %) of the institutional water supply schemes
construction cost in the form of labour and materials.
53
Table 35: Number of Water Points constructed in SNNPR in 2007 EFY
4th
Quart e r Annua l 4th
Quart e r Annua l
A. Community Water Points
HDW with RP - - - - HDW 23 2 5 1,651 1,651 SPD 406 203 320 122,823 104,269 SW 5 - - DW - - - RWH - - - RPS from SP - - - RPS from DW - - 2 1,035 995
Subtotal - 434 205 327 125,509 106,915 B. Institutional Water Points
B.1 School Water PointsHDW with RP - - - - - HDW - 10 - 4 1,607 SPD - - 3 7 855 SW - 1 - - DW - - - - RWH - - - - RPS from SP - - - - RPS from DW - - - -
Subtotal - 1 1 3 1 1 2 ,462
B.2 Health Institutions Water Points
HDW with RP - - - - HDW - 4 - - SPD - - - 2 68 SW - - - - DW - - - - RWH - - - - RPS from SP - - - - RPS from DW - - - -
Subtotal - 4 - 2 68
Total - 449 208 340
Type of Water Point (WP)
No. of WPs Const ruc t ion
Compl e t ed
No. of Peop l e Having
Access t o the
COMPLETED WPs w i th
in 1 .5 km rad ius of the
WPs
Ac tua l No of
Peop l e Using the
Compl e t ed WPs
No. of WPs P l anned to be
Const ruc t ed
5.3.1.4 Water supply schemes constructed in Oromia Region
Twelve project woredas of Oromia (8 old and 4 new) planned to construct 279 water points- 261
by communities and 18 by institutions (9 each by schools and health facilities).
As a result of the promotions made in the project kebeles, 418 applications have been submitted
to WWTs in 2007 EFY. Among the applications submitted 407 (97.4 %) were desk appraised and
among these 384 (94.3 %) were appraised at the field level. WWTs of the project woredas ap-
proved 360 (93.8 %) of those field appraised applications. Twenty one of the approved water
supply scheme constructions are under construction at the end of the reporting period.
Table 36: Number of applications submitted, appraisals made and applications approved in
Oromia Region in 2007 EFY
<50% >50% Total
A. Community Water Points
HDW with RP - - - - -
HDW 134 181 178 174 161 13 1 3 4 1 2
SPD 120 207 204 185 177 13 10 1 11
SW 7 10 10 10 7 4 - - -
DW - - - - - -
RWH - - - - - -
RPS from SP - - - - - -
RPS from DW - - - - - -
Subtotal 261 398 392 369 345 30 11 4 15 1 2
B. Institutional Water Points
B.1 School Water Points
HDW with RP - - - - - - - - -
HDW 9 14 11 11 11 2 3 1 4
SPD - - - - - - - - -
SW - - - - - - - - -
DW - - - - - - - - -
RWH - - - - - - - - -
RPS from SP - - - - - - - - -
RPS from DW - - - - - - - - -
Subtotal 9 14 11 11 11 2 3 1 4 - -
B.2 Health Institutions Water Points
HDW with RP - - - - - - - - -
HDW 9 6 4 4 4 2 1 1 2
SPD - - - - - - - - -
SW - - - - - - - - -
DW - - - - - - - - -
RWH - - - - - - - - -
RPS from SP - - - - - - - - -
RPS from DW - - - - - - - - -
Subtotal 9 6 4 4 4 2 1 1 2 - -
Total 279 418 407 384 360 34 15 6 21 1 2
Type of Water
Po int(WP)
No . o f
Planned
WPs
No . o f WPs
Applications
made
No . o f WPs
Applications Desk
Apprais ed
No . o f WPs
Application F ield
Apprais ed
No . o f WPs Not
Star ted
Cons truction
No . o f WPs
Abandoned ( could
not be
cons tructed)
No . o f WPs
Applications
Approved by
WWT
No. o f WPs under cons truction No . o f
Tr ials
made
54
Encouraging results have been observed in Oromia woredas in the fiscal year. A total of 308 wa-
ter points (299 community and 9 school) were constructed in the reporting period. This accounts
10.4% more than the plan of 2007 EFY. The water points constructed constitute 145 hand dug
wells, 158 on spot springs, 3 shallow wells and 2 expansions from spring source. More than
58,751 rural people benefited from the 299 community water points and over 4,650 students and
teachers benefit from the 9 school water points constructed with the support of COWASH project.
Table 37: Number of Water Points constructed in Oromia in 2007 EFY
4th
Quart e r Annua l 4th
Quart e r Annua l
A. Community Water Points
HDW with RP - - - -
HDW 67 134 113 138 20,522 18,829
SPD 60 120 113 158 35,392 34,536
SW 3 7 3 3 2,837 2,837
DW - - -
RWH - - -
RPS from SP - - -
RPS from DW - - - -
Subtotal 130 261 229 299 58,751 56,202
B. Institutional Water Points
B.1 School Water PointsHDW with RP - - - - -
HDW 4 9 7 7 3,704
SPD - - - -
SW - - - -
DW - - - -
RWH - - - -
RPS from SP - - 2 2 946
RPS from DW - - - -
Subtotal 4 9 9 9 4,650
B.2 Health Institutions Water Points
HDW with RP - - - -
HDW 4 9 - -
SPD - - - -
SW - - - -
DW - - - -
RWH - - - -
RPS from SP - - - -
RPS from DW - - - -
Subtotal 4 9 - - -
Total 138 279 238 308
Type of Water Point (WP)
No. of WPs Const ruc t ion
Compl e t ed
No. of Peop l e Having
Access t o the
COMPLETED WPs w i th
in 1 .5 km rad ius of the
WPs
Ac tua l No of
Peop l e Using the
Compl e t ed WPs
No. of WPs P l anned to be
Const ruc t ed
5.3.1.5 Water supply schemes construction in BSG Region
BSG region is the last region joined COWASH this reporting year. The four COWASH woredas of
the region planned to construct 70 water points – 51 by communities, 12 by schools and 7 by
health facilities.
As a result of promotions made in the project kebeles, a total of 49 water supply applications (33
communal, 10 schools and 6 health facilities) have been submitted until end of the reporting pe-
riod. Consequently, 38 of the applications (27 communal, 6 schools and 5 health facilities) have
been appraised at the desk level and all of these desk appraised were appraised on the field.
Consequently, all of the field appraised applications have been approved by WWTs. However,
construction of water points started in only one woreda (Bambasi) of the region. A total of 19
community water points (16 hand dug wells and 3 On Spot Springs) were under construction at
the end of the reporting period. Of these water pints under construction one of them was aban-
doned.
According to the 2007 EFY annual performance reports of the regions, a total of 3,127 water
points (2,972 community, 139 school and 16 health facility), including some WPs rolled over from
the preceding fiscal year, were constructed in the reporting period through the CMP approach
with the financial and technical support of COWASH. This accounts about 20.8% more than the
plan of the fiscal year. More than 624,907 rural people were made beneficiary of the water points
constructed by the communities. The school and health facility water points benefited over
71,082 students and teachers and 1,361 health extension workers and clients of the health facili-
ties, respectively.
55
In the four years of implementation of COWASH (until 7th July 2015), a total of 8,161 water
points (7,712 by communities, 374 by schools and 75 by health facilities) were constructed in 67
of the 71 project woredas with the support of COWASH project, through the CMP approach. This
accounts 120.5 % of the 6,774 target set for end of 2007 EFY in the revised COWASH Project
Document. Majority of these water points (6,457) were constructed in Amhara, 396 in Tigray,
519 in SNNPR and 789 in Oromia woredas. In terms of scheme type, majority of them (67.3 %)
are hand dug wells with Afridev hand pump and Rope Pump, followed by On Spot Springs (30.9
%), shallow wells (1.4%) and RPS from spring and deep well sources (0.2%). The 7, 712 com-
munity water supply schemes have benefitted some 1.83 million and created access (as per UAP
II) to 1.78 million rural people of the project woredas. The institutional water points have bene-
fitted 374 schools (160,969 students and teachers) and 75 health facilities (14,329 health exten-
sion agents and clients of the facilities).
56
Table 38: Number of new (community, school and health institution) water points constructed until end of July 7, 2015
HDW
with
RP
HDW SPD SW DW RWHR P S
fro m
SP
R P S
fro m
D W
TotalPopulatio
n Served
Popn.
having
Access
within
1.5km
HDW
with
RP
HDW SPD SW DW RWHR P S
fro m
SP
R P S
fro m
D W
TotalPopulatio
n Served
Popn.
having
Access
within
1.5km
HDW
with
RP
HDW SPD SW DW RWHR P S
fro m
SP
R P S
fro m
D W
TotalPopulatio
n Served
Popn.
Having
Access
within
1.5Km of
Amhara 15 3,020 864 13 0 0 0 0 3,912 998,578 988,578 3 1,504 639 29 0 0 8 0 2,183 400,365 400,365 18 4,524 1,503 42 0 0 8 0 6,095 1,398,943 1,388,943
Tigray 0 84 91 33 0 0 0 0 208 59,589 59,589 0 88 40 35 0 0 0 0 163 48,000 48,000 0 172 131 68 0 0 0 0 371 107,589 107,589
SNNPR 0 8 161 0 0 0 0 0 169 56,451 51,114 0 5 320 0 0 0 2 0 327 125,759 106,915 0 13 481 0 0 0 2 0 496 182,210 158,029
Oromia 0 252 199 0 0 0 0 0 451 79,776 73,014 0 138 158 3 0 0 0 0 299 58,751 56,202 0 390 357 3 0 0 0 0 750 138,527 129,216
BSG 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Subtotal 15 3,364 1,315 46 0 0 0 0 4,740 1,194,394 1,172,295 3 1,735 1,157 67 0 0 10 0 2,972 632,875 611,482 18 5,099 2,472 113 0 0 10 0 7,712 1,827,269 1,783,777
Amhara 0 181 10 0 0 0 0 0 191 66,686 0 104 8 0 0 0 0 0 112 59,697 0 285 18 0 0 0 0 0 303 126,383
Tigray 0 8 1 2 0 3 0 0 14 4,113 0 3 2 1 0 1 0 0 7 4,273 0 11 3 3 0 4 0 0 21 8,386
SNNPR 0 5 3 0 0 0 0 0 8 7,109 0 4 7 0 0 0 0 0 11 2,462 0 9 10 0 0 0 0 0 19 9,571
Oromia 0 16 6 0 0 0 0 0 22 11,979 0 7 0 0 0 0 2 0 9 4,650 0 23 6 0 0 0 2 0 31 16,629
BSG 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Subtotal 0 210 20 2 0 3 0 0 235 89,887 0 118 17 1 0 1 2 0 139 71,082 0 328 37 3 0 4 2 0 374 160,969
Amhara 0 44 3 0 0 0 0 0 47 8,074 0 11 1 0 0 0 0 0 12 1,268 0 55 4 0 0 0 0 0 59 9,342
Tigray 0 0 1 1 0 0 0 0 2 100 0 1 1 0 0 0 0 0 2 25 0 1 2 1 0 0 0 0 4 125
SNNPR 0 1 1 0 0 0 0 0 2 445 0 0 2 0 0 0 0 0 2 68 0 1 3 0 0 0 0 0 4 513
Oromia 0 7 1 0 0 0 0 0 8 4,349 0 0 0 0 0 0 0 0 0 0 7 1 0 0 0 0 0 8 4,349
BSG 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Subtotal 0 52 6 1 0 0 0 0 59 12,968 0 12 4 0 0 0 0 0 16 1,361 0 64 10 1 0 0 0 0 75 14,329
Amhara 15 3,245 877 13 0 0 0 0 4,150 3 1,619 648 29 0 0 8 0 2,307 18 4864 1525 42 0 0 8 0 6,457
Tigray 0 92 93 36 0 3 0 0 224 0 92 43 36 0 1 0 0 172 0 184 136 72 0 4 0 0 396
SNNPR 0 14 165 0 0 0 0 0 179 0 9 329 0 0 0 2 0 340 0 23 494 0 0 0 2 0 519
Oromia 0 275 206 0 0 0 0 0 481 0 145 158 3 0 0 2 0 308 0 420 364 3 0 0 2 0 789
BSG 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Grandtotal 15 3,626 1,341 49 0 3 0 0 5,034 3 1,865 1,178 68 0 1 12 0 3,127 18 5,491 2,519 117 0 4 12 0 8,161
c. Health Institution
Total Water Points (Community + School + Health Institution)
2004-2006 EFY 2007 EFY Cumulative
A. Community
B. School
Region
Number of Water Points Constructed in COWASH Woredas
Note: HDW with RP - Hand dug well with Rope Pump; SW - Shallow Well
HDW - Hand dug well with Afridev pump; DW - Deep well
SPD - Spring On Spot; RWH - Roof water harvesting
57
5.3.2 Output 2: Access to Sanitation for Household and Institutions Increased and
Hygiene Behavior Improved
Number and Percentage of ODF kebeles in the COWASH intervention woredas (disaggregated
by project regions), number of new institutional latrines constructed (disaggregated by institu-
tions) are the indicators of measuring the achievement of the output.
Among the 221 institutional latrines planned to be constructed by COWASH until end of 2007
EFY, 137 (62.0 %) were completed, through the CMP approach, in the four project regions
(Amhara, Tigray, SNNPR and Oromia). With regards to ODF status of kebeles, much of the
data of woredas was found to be unreliable as there have not been verifications and/or re-
verifications made on many of the kebeles. Anyhow, according to the regional reports, the
number of ODF kebeles increased from 0 (0.0 % of rural kebeles in the project woredas),
0(0.0%) and 10 (3.8 %) in 2003 EFY to 340 (32.0%), 69 (51.1%) and 132 (50.8%) at the end
of 2006 EFY and 627 (58.7 %), 115 (82.2%) and 157 (60.4 %) at the end of 2007 EFY in
Amhara, Tigray and SNNP region project woredas, respectively due to all WASH actors in the
woredas.
In Oromia region, the number of ODF kebeles in the project woredas rose from 21 (12.1%) in
2004 EFY to 28 (10.7 %) and 48 (18.3%) at the end of 2006 and 2007 EFY, respectively.
COWASH’s contribution in improving the ODF status of the woredas has been through provid-
ing CLTSH trainings, WSR workshops and building the physical capacity of the implementing
sector offices at all levels – region, zone and woreda.
Regional reports reveal that, 531 (84.7 %), 49 (42.6%), 71 (61.7 %), and 27 (56.3.%) of the
ODF kebeles in Amhara, Tigray, SNNPR, Oromia and BSG project woredas, respectively are
COWASH/CMP kebeles. Among the total number of CMP kebeles in Amhara, Tigray, SNNPR,
and Oromia, 531 (68.5 %), 49(79.0 %), 71(67.5 %), and 27(26.7 %), respectively are report-
ed to be free from open defecation. In BSG woredas all the rural kebeles are not ODF.
In 2007 EFY, a number of sanitation and hygiene and related activities were planned in the
project woredas. The major ones and their achievements are presented hereunder.
COWASH is one of the actors engaged in improving the sanitation and hygiene situation of the
project woredas. It has been contributing in improving the sanitation and hygiene situation in
institutions (schools and health facilities) through construction of facilities and capacitating and
raising the awareness level of implementers and beneficiaries. In the reporting period, 101
institutional latrines (62 for schools and 29 for health institutions) were planned to be con-
structed in the five regions of the project. Among these latrines, 46 are in Amhara, 20 in
Tigray, 14 in SNNPR, 13 in Oromia and 8 in BSG regions.
Performance reports of the regions reveal that 111 applications (73 for schools and 38 for
health facilities), 110.0% of the plan, were submitted by Parent Teacher Associations and
Health Committees of institutions in the CMP kebeles of the project woredas. Among these
applications submitted, 107 (96.4 %) were desk appraised and majority of these (97.2 %)
were appraised at the field level by trained woreda appraisal team. Among the field appraised
applications, 100(96.2%) were approved by WWTs for funding.
58
Table 39: Number of Latrines applications submitted, appraisals made and applications ap-
proved in 2007 EFY
< 50% > 50% Total
Amhara 23 23 23 23 23 0 0 0
Tigray 14 26 26 25 25 0 24 24
SNNPR 14 15 11 11 10 0 6 6
Oromia 6 6 6 6 5 2 2 4
BSG 5 3 3 3 3 0 0 0
Subtotal 62 73 69 68 66 2 32 34
Amhara 23 23 23 23 23 0
Tigray 6 8 8 7 7 0 7 7
SNNPR 0 0 0 0 0 0 0 0
Oromia 7 6 6 5 3 0 2 2
BSG 3 1 1 1 1 0 0 0
Subtotal 39 38 38 36 34 0 9 9
Total 101 111 107 104 100 2 41 43
No. of Latrines under
construction
B. Health Institutions
A. Schools
No. of
Latrines
Applications
Approved by
WWT
Type of
Institution/Region
No. of
Planned
Latrines
No. of
Latrines
Applications
made
No. of Latrines
Applications
Desk
Appraised
No. of
Latrines
Application
Field
Appraised
In the period under reporting, 51 (50.5 % of the institutional latrines planned) were construct-
ed in kebeles of the four regions (Amhara, Tigray, SNNPR and Oromia). Among the completed
latrines, 23 are for schools and 28 for health institutions. Amhara, Tigray, SNNPR, Oromia and
BSG regions have accomplished 71.7 %, 60.0 %, 14.3 %, 30.8% and 0.0% of their plans, re-
spectively. The latrines have started giving service to 29,473 students and teachers (52.8%
female) and 910 health staff and clients of the institutions (48.1 % female).
Table 40: Number of Institutional Latrines Constructed in 2007 EFY
4th
QuarterAnnual
4th
QuarterAnnual Male Female Total
A. School
Amhara - 23 10 13 7,849 9,856 17,705
Tigray* - 14 3 5 1,485 1,215 2,700
SNNPR 5 14 1 2 1,025 820 1,845
Oromia - 6 2 3 3,540 3,683 7,223
BSG 5 5 - - -
Subtotal 10 62 16 23 13899 15574 29473
B. Health Institution
Amhara 0 23 16 20 441 385 826
Tigray 0 6 2 7 31 47 78
SNNPR - - - - -
Oromia - 7 1 1 - 6 6
BSG 3 3 - - -
Subtotal 3 39 19 28 472 438 910
Total 13 101 35 51 14,371 16,012 30,383
Region
No. of Latrines
Construction
Completed
Estimated No. of People using
the Completed Latrines
No. of Latrines
Planned to be
Constructed
Note: * In 2007 EFY, Tigray woredas constructed a total of 24 blocks of school latrines- 1 block each for 4 schools, 2
blocks each for 15 schools and 3 blocks each for 5 schools. Hence, the blocks constructed in the 19 schools are
upgradings benefiting more than 10,260 students and teachers.
The community contribution in terms of labour and materials was encouraging. In Amhara, on
the average, 23.6% (6.53% to 44.0%) school latrine construction cost and 27.1% (6.2% to
48.0%) health facility latrine construction cost was contributed from the beneficiary communi-
ty. The contribution of the community in institutional latrine construction was about 12.0%
(7.6% to 16.9%) of the total cost of construction.
59
Since the launching of COWASH/CMP in the regions in 2004 EFY, a total of 137 latrines (75 for
schools and 62 for health facilities) have been constructed in the COWASH woredas of the four
project regions (Amhara, Tigray, SNNPR and Oromia) through the CMP approach (Table 41).
This accounts 62.0 % of the 221 institutional latrines target set for end of 2007 EFY. Over 0.87
million students and teachers (51.7% female) and 2,147 health extension workers and clients
of the health facilities are using the latrines constructed through the CMP approach with the
support of COWASH.
Table 41: Number of Institutional Latrines Constructed until end of July 7, 2015
M F T M F T M F T
Amhara 45 25,082 24,117 49,199 13 7,849 9,856 17,705 58 32,931 33,973 66,904
Tigray* 0 0 0 0 5 1,485 1,215 2,700 5 1,485 1,215 2,700
SNNPR 2 858 787 1,645 2 1,025 820 1,845 4 1,883 1,607 3,490
Oromia 5 2,245 4,446 6,691 3 3,540 3,683 7,223 8 5,785 8,129 13,914
BSG 0 0 0 0 0 0 0 0 0 0 0 0
Subtotal 52 28,185 29,350 57,535 23 13,899 15,574 29,473 75 42,084 44,924 87,008
Amhara 27 228 206 434 20 411 385 796 47 639 591 1,230
Tigray 3 20 38 58 7 31 47 78 10 51 85 136
SNNPR 0 0 0 0 0 0 0 0 0 0
Oromia 4 265 510 775 1 0 6 6 5 265 516 781
BSG 0 0 0 0 0 0 0 0 0 0 0 0
Subtotal 34 513 754 1,267 28 442 438 880 62 955 1,192 2,147
Amhara 72 25,310 24,323 49,633 33 8,260 10,241 18,501 105 33,570 34,564 68,134
Tigray 3 20 38 58 12 1,516 1,262 2,778 15 1,536 1,300 2,836
SNNPR 2 858 787 1,645 2 1,025 820 1,845 4 1,883 1,607 3,490
Oromia 9 2,510 4,956 7,466 4 3,540 3,689 7,229 13 6,050 8,645 14,695
BSG 0 0 0 0 0 0 0 0 0 0 0 0
Grandtotal 86 28,698 30,104 58,802 51 14,341 16,012 30,353 137 43,039 46,116 89,155
Total (School + Health Institution)
Cumulative
Number of Latrines Constructed in COWASH Woredas
A. School
B. Health Institution
Region
No. of
Latrines
Population Served
2007 EFY
No. of
Latrines
Population Served
2004-2006 EFY
No. of
Latrines
Population Served
Note: * From 2005-2007 EFY, Tigray woredas constructed 1 to 2 blocks of latrines for 24 schools (2 in 2005 EFY, 7 in 2006 EFY and 15 in 2007 EFY) already included in school latrine coverage. These latrines constructed are considered as upgrading and benefit more than 16,137 students and teachers.
The table contains school latrines constructed with the standard (3 blocks for a school and 1 block with 2 seats for a health post and 1 block with 4 seats for a health center).
5.3.3 Output 3: Sustainability of Communal and Institutional Water Schemes in the
Targeted Woredas Strengthened
Three indicators are set to measure the achievement of the output. These are: i) number of
CMP schemes with trained pump attendants and caretakers; ii) number of water points rehabil-
itated (disaggregated by communal and institutional); and iii) percentage of WASHCOs with at
least 50% women members.
COWASH promotes the need for having trained pump attendants and care takers for every
water point with the view to sustaining the water supply facilities. In line with this, the project
has been training members of WASHCOs or people assigned by the communities themselves to
maintain or repair their water points. Moreover, rehabilitation of water points (both communal
and institutional) has been done so as to improve the functionality rate of water points.
60
Among the total number of water supply schemes constructed (7,372) in the three regions
(Amhara, Tigray and SNNPR) in the four years of implementation of COWASH(2004-2007 EFY),
7,090 (96.2 %) were reported to have trained pump attendants or care takers. The breakdown
by region shows that 100.0 % of the Amhara, 84.8 % Tigray and 57.2 % of SNNPR water
points have trained pump attendants or care takers. Besides, a total of 449 water points (438
communal & 11 schools), 55.2 % of those planned, have been rehabilitated in the four regions
over the four years of implementation of COWASH. Oromia region didn’t report the number of
WPs with trained pump attendants and care takers.
With the aim of empowering women and thereby sustaining water points COWASH insists
WASHCOs of community WPs to have at least 50% female members. The number of WASHCOs
with 50% or more women members varies across the regions. Accordingly, all of the 373
(100.0%) and 388 (78.2%) WASHCOs of the community water supply schemes in Tigray and
SNNPR, respectively have at least 50% women members (Table 44). Information on composi-
tion of WASHCO members was not reported from Amhara and Oromia as the regions didn’t
complete the collection of COWASH/CMP water points data from the kebeles.
In 2007 EFY, the five project regions planned to rehabilitate a total of 285 water points -241
community and 44 institutional (Table 37). All regions except Oromia planned to rehabilitate
institutional water points. Nonetheless, the performance of the regions in rehabilitating water
points in the reporting period was very low primarily due to priority given for the construction
of new water points and the delay in the approval of the annual plan and hence the delay in
the fund transfer.
Table 42: Number of Water Points Planned and Rehabilitated in the Five Regions in 2007 EFY
Planned
(Annual)
Rehabilit
ated
Planned
(Annual)
Rehabilit
ated
Planned
(Annual)
Rehabilit
ated% Community Institutions
Amhara 105 92 23 5 128 97 75.8 21,311 1,314
Tigray 95 11 12 0 107 11 10.3 2,250 0
SNNPR 31 24 6 0 37 24 64.9 6,340 0
Oromia 2 2 0 0 2 2 100.0 294 0
BSGR 8 0 3 0 11 0 0.0
Total 241 129 44 5 285 134 47.0 30,195 1,314
CommunityProject
Region
TotalInstitutional
Number of WPs Planned to be Rehabilitated
No. of Beneficiary
Population of the
Rehabilitated WPs
Anyhow, 134 water points (129 community and 5 institutional), accounting to 47.0 % of the
plan, were rehabilitated during the reporting period. Amhara, Tigray, SNNPR, Oromia and BSG
have rehabilitated 75.8% %, 10.3 %, 64.9 %, 100.0 % and 0.0% of their annual plans, re-
spectively. The water points rehabilitated benefited over 30,195 rural people & 1,314 students,
teachers and health extension workers and clients of the health facilities in the project kebeles.
The performances of the regions show that much effort needs to be exerted to improve the
functionality status of water supplies in the woredas.
Altogether, from 2004-2007 EFY, 449 water points (438 for community and 11 for schools)
were rehabilitated in COWASH woredas. The regional disaggregation shows that 385 of the
water points rehabilitated are in Amhara, 23 in Tigray, 32 in SNNPR, 9 in Oroimia and 0 in BSG
regions (Table 43). The water points rehabilitated in the four regions have benefited over 0.11
million rural people and 3,628 students and teachers in the CMP kebeles of the project
woredas.
61
Table 43: Number of Water Points Rehabilitated until end of July 7, 2015
HDW
with
RP
HDW SPD SW DW RWH TotalPopulation
Served
HDW
with
RP
HDW SPD SW DW RWH TotalPopulation
Served
HDW
with
RP
HDW SPD SW DW RWH TotalPopulation
Served
Amhara 0 206 78 0 0 0 284 68,850 0 74 18 0 0 0 92 21,311 0 280 96 0 0 0 376 90,161
Tigray 0 7 5 0 0 0 12 3,000 0 11 0 0 0 0 11 2,250 0 18 5 0 0 0 23 5,250
SNNPR 0 4 4 0 0 0 8 6,855 0 6 18 0 0 0 24 6,340 0 10 22 0 0 0 32 13,195
Oromia 0 3 2 0 0 0 5 558 0 1 1 0 0 0 2 294 0 4 3 0 0 0 7 852
BSG 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Subtotal 0 220 89 0 0 0 309 79,263 0 92 37 0 0 0 129 30,195 0 312 126 0 0 0 438 109,458
Amhara 0 4 0 0 0 0 4 1080 0 4 1 0 0 0 5 1314 0 8 1 0 0 0 9 2,394
Tigray 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
SNNPR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Oromia 0 2 0 0 0 0 2 1234 0 0 0 0 0 0 0 0 2 0 0 0 0 2 1,234
BSG 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Subtotal 0 6 0 0 0 0 6 2,314 0 4 1 0 0 0 5 1,314 0 10 1 0 0 0 11 3,628
Amhara 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Tigray 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
SNNPR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Oromia 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
BSG 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Subtotal 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Amhara 0 210 78 0 0 0 288 0 78 19 0 0 0 97 22625 0 288 97 0 0 0 385
Tigray 0 7 5 0 0 0 12 0 11 0 0 0 0 11 2250 0 18 5 0 0 0 23
SNNPR 0 4 4 0 0 0 8 0 6 18 0 0 0 24 6340 0 10 22 0 0 0 32
Oromia 0 5 2 0 0 0 7 0 1 1 0 0 0 2 294 0 6 3 0 0 0 9
BSG 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Grandtotal 0 226 89 0 0 0 315 0 96 38 0 0 0 134 31,509 0 322 127 0 0 0 449
c. Health Institution
Total Rehabilitated (Community + School + Health Institution)
Cumulative (2004 - 2007 EFY)
Number of Water Points Rehabilitated in COWASH Woredas
A. Community
B. School
Region2004-2006 EFY 2007 EFY
Note: HDW with RP - Hand dug well with Rope Pump; SW - Shallow Well
HDW - Hand dug well with Afridev pump; DW - Deep well
SPD - Spring On Spot; RWH - Roof water harvesting
62
Table 44: Number of Water Points with Trained Pump Attendants and Care takers and Water
Quality Tests made until end of July 7, 2015
5.3.4 Output 4: Potable Water Quality Ensured in Targeted Woredas
Number of water quality tests (post construction) made on CMP water schemes; number of
chlorination made (post construction) on CMP water schemes and number of CMP water
schemes with Water Safety Plans are the indicators set to measure the achievement of the
output.
Project woredas have been planning to execute a number of water quality related activities.
Some of the major activities planned for the fiscal year to attain the output are: i) chlorination
of water schemes before taken into use; ii) carrying out testing of quality of water schemes
before taken into use and periodically; iii) train WASHCOs in Water Safety Planning;
iv) conduct periodic water safety planning by WASHCOs; v) procure water quality testing kits
for woredas; and vi) train woreda staff on the use of water quality testing kits.
In COWASH, every water point completed is expected to be tested and chlorinated twice in a
fiscal year. However, the practice of testing and chlorinating of water points have not been
encouraging due to lack of water quality test kits, chlorines and lack of systems and staff in
the woredas. Anyhow, some tests and chlorinations have been made in the woredas.
In Amhara, Tigray and SNNPR, it was reported that only 460 & 6,457, 155 & 155, and 120 &
169 water quality tests and chlorinations were made on CMP water points in the four years of
the project (Table 44 above). Oromia region didn’t report performance data on water quality
test and chlorination made.
Amhara Tigray SNNPR Oromia BSG All Regions
2004 - 2007 EFY 2004 - 2007 EFY 2004 - 2007 EFY 2004- 2007 EFY 2007 EFY 2004 - 2007 EFY
1Total number of (community + institutional) WASHCOs of WPs constructed with the
support of COWASH (1a + 1b +1c)6,457 397 520 789 0 8,163
1aTotal Number of WASHCOs of community WPs constructed with the support of
COWASH6,095 373 496 750 0 7,714
1bTotal Number of Parent-Teacher Associations (PTAs) of school WPs constructed
with the support of COWASH303 20 19 31 0 373
1cTotal Number of Health Committees of health institutions WPs constructed with
the support of COWASH59 4 5 8 0 76
2Total number of COWASH CMP Schemes (community + institutional) with trained
pump attendants & caretakers (2a + 2b +2c)6,457 336 297 0 0 7,090
2aTotal number of Community COWASH CMP Water Supply Schemes with trained
pump attendants or caretakers6,095 312 150 0 6,557
2bTotal number of School COWASH CMP Water Supply Schemes with trained pump
attendants or caretakers303 20 133 0 456
2cTotal number of Health Institutions COWASH CMP Water Supply Schemes with
trained pump attendants or caretakers59 4 14 0 77
3Total number of WASHCOs (of community WPs constructed with the support of
COWASH) with at least 50% women members373 388 0 761
4Total number of water quality tests made on COWASH Community CMP water
supply schemes (post construction period)460 155 120 0 735
5Total number of chlorinations made on COWASH Community CMP water supply
schemes (post construction period)6,457 155 169 0 6,781
S/n Indicator/Type of Data Required
63
The practice of preparing Water Safety Plans for water points is not common in Ethiopia.
COWASH has started to introduce Water Safety Planning in the project woredas. As indicated
in Component 1 above, with the view to sustaining the water points and maintain the quality of
the water, training of trainers (ToT) on Water Safety Planning (WSP) was given, by WHO and
Meta Meta in collaboration with COWASH, to COWASH RSU and some regional water bureau
and MoWIE staff. Water Safety Planning is being piloted in one micro-watershed of a kebele in
Yilmana Densa woreda of Amhara region with the cooperation of an international organization
called MetaMeta. To scale-up the process in other regions, COWASH in collaboration of
MetaMeta conducted Training of Trainers (ToT) training for RSU and some regional staff.
Guidelines and training manuals are being prepared to implement Water Safety Planning in
some woredas of all COWASH regions. Besides, COWASH is finalizing O&MM manuals and
strategy to launch O&M system in the country.
In the period under reporting, Amhara and SNNPR have procured 20 & 5 Water Quality Test
Kits, respectively with the support of the project. The other regions are re-planning to procure
the test kits and reagents for the woredas and zones. Woreda and zonal staff will receive prop-
er training from the regional water bureaus on the use of the test kits and reagents.
64
6 FINANCIAL PERFORMANCE
In this chapter, the financial utilization performance of Component 1 (C-1) and Component 2
in the reporting period is described.
6.1 FINANCIAL PERFORMANCE OF COMPONENT 1
The COWASH expenditures started to build-up already during 2003 Ethiopian Fiscal Year
(EFY1). The financial plan and usage of C-1 for the Phase I and II until the end of June 2015
are presented as follows.
6.1.1 Cumulative expenditures of Phase I and II
The total C-1 five year budget is EUR 3, 730, 392 (Table 45). The total budget usage at the
end of June 2015 is EUR 2,821,008. This represents 76 % total usage of Component 1. The
usage of the fee component is 74 %. The usage of the reimbursable costs is 85 % and the us-
age of the capacity building and sector support component is 61 %.
A total of EUR 850,000 was allocated for undertaking the Component 1 planned activities in
2007 EFY (July 2014 to June 2015). Of this about EUR 816,342 (96.0%) has been utilized in
the reporting period. The budget use compared to Phase II 1st year budget period (October
2014-June 2015) was 93 %. The fee usage was 86 %, reimbursable usage was 107 % and
sector support usage was 96 %. The reimbursable utilization exceeded the plan due to the
increase in the cost of domestic travel, 1 year house rent for the CTA and school fee for the
first semester of 2008 academic was paid from the 2007 EFY budget.
Table 45: Total C-1 Usage Follow-up compared to the 5 year budget (2011-2016)
Figure 7 below illustrates the total budget utilization of C-1. The budget use is about EUR
33,000 behind of the 5 year budget.
The budget between the Fee, Reimbursable costs and Sector Support and Capacity Building
was re-adjusted for Phase II of C-1 starting from October 1, 2014.
1 Ethiopian Fiscal Year (EFY) is for a period of July-June.
65
Figure 7. Illustration of the C-1 Budget Utilization based on the 5 year budget period (2011-
2016).
6.2 FINANCIAL PERFORMANCE OF COMPONENT 2
The financial performances of Project Regions (Amhara, Tigray, SNNPR and Oromia) are elabo-
rated.
6.2.1 Financial Performance of Amhara region
As per the funding agreement signed between the Bureau of Finance and Economic Develop-
ment (BoFED) of Amhara National Regional State and Embassy of Finland, all capacity building
and some operational costs (including all RSU costs) are covered from GoF contribution while
all investment costs and some operational costs are covered from GoE fund allocations. All the
investment funds from GoE is being channeled to the communities through Amhara Credit and
Saving Institution (ACSI) with a commission of 3% while the capacity building funds and oper-
ational costs from the Finnish Government has been channeled through the government finan-
cial structure - BoFED-ZoFED/WoFED.
A total of about Birr 196.79 million (Birr 95.90 million from GoF and Birr 100.89 million from
GoE) is allocated, including BoFED Treasury contingency, for 2007 EFY. Report of the regional
performance revealed that of the total amount allocated, 91.1 % of funds allocated for the
reporting period has been utilized by the beneficiaries (regional, zonal and woreda sector offic-
es and RSU).
66
Table 46: Fund allocated and Utilized in Amhara Region in 2007 EFY
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Planned for
4th Quarter
(14 +17)
Utilized 4th
Quarter
(15+18 )
Planned for
4th Quarter
Utilized 4th
Quarter
Planned for
4th Quarter
Utilized 4th
Quarter
GoF GoE Total (1+2 ) GoF GoE GoF+GoE GoF GoE GoF+GoE GoF + GoE GoF + GoE
Cumulat ive
( 9 / 6 ) *10
0
4th Quarter
(11/ 10 ) *10
0
GoF GoF GoE GoE
INVESTM ENT
COST648,223 93,336,812 93,985,035 648,223 93,336,812 93,985,035 112,373 96,392,880 96,505,253 1,200,000 66,075,124 112,373 - 1,200,000 65,962,751
PHYSICAL
CAPACITY
BUILDING
COST
63,635,920 63,635,920 63,635,920 63,635,920 51,499,021 51,499,021 - 43,359,585 80.9 # DIV/0! - 43,359,585 # DIV/0! -
HUM AN
CAPACITY
BUILDING
COST
23,847,708 23,847,708 23,847,708 23,847,708 20,628,058 20,628,058 457,488 13,253,590 86.5 2,897.0 457,488 13,253,590 2,897.0 -
OPERATIONAL
COST 7,202,760 7,548,450 14,751,210 7,202,760 7,548,450 14,751,210 3,813,248 6,908,443 10,721,690 1,272,432 7,481,537 72.7 588.0 1,272,432 1,291,424 101.5 - 6,190,113 # DIV/0!
BoFED
Treasury &
Contingency
565,389 565,389 565,389 565,389 2,282 2,282 282,695 0 - 282,695 - - -
TOTAL 95,900,000 100,885,262 196,785,262 95,900,000 100,885,262 196,785,262 76,054,982 103,301,323 179,356,305 3,212,615 130,169,835 91.1 4,051.8 2,012,615 58,016,971 2,882.7 1,200,000 72,152,864 6,012.7
Ut ilizat ion (%)
( 18 / 17) *10
0
Category
Planned(Annual) Cumulat ive Planned Cumulat ive Utilized Utilizat ion(%)Utilizat ion
(%)
( 15/ 16 ) *1
0 0
So far, BoFED of Amhara region has received about Birr 449.94 million (9,173,016.71 Euro or
Birr 226.58 million from Government of Finland including Birr 4,291,860.92 RWSEP savings
and Birr 223.36 million from Amhara Regional Bureaus) for the implementation of planned ac-
tivities in the woredas, zones and sector bureaus in the region. Of this amount, approximately
Birr 434.04 million (Birr 210.68 million from GoF and all of the GoE contribution) has been
transferred to beneficiaries of the project until July 7, 2015. This accounts 96.5 % of the total
received from the two funding sources-GoF and GoE/Regional bureaus.
From the total funds transferred to beneficiary sector offices, woredas and zones, about
Birr 412.93 million (95.1 %) has been utilized until end of the reporting period (Table 47). In
terms of fund source, Birr 206.74 million (98.1 %) and Birr 206.19 million (92.3 %) of GoF
and GoE funds transferred, respectively, has been utilized by beneficiaries of the project.
As indicated in Table 47 below, a total of about Birr 37.01 million (Birr 19.84 million from GoF
and Birr 17.16 million from GoE) was left from the reporting period and it will be included in
the 2008 EFY annual budget of the project.
Table 47: Funds received, transferred and utilized in Amhara Region until end of July 7, 2015
Received
(%)
Transferred
(%)
GoF (including
RWSEP saving)226,580,502.43 210,682,172.34 206,738,885.38 19,841,617.05 3,943,286.96 91.2 98.1
GoE 223,357,071.61 223,357,071.61 206,192,384.35 17,164,687.26 17,164,687.26 92.3 92.3
Total 449,937,574.04 434,039,243.95 412,931,269.73 37,006,304.31 21,107,974.22 91.8 95.1
Usage from
Budget
Source
Received from
Source to date
Transferred to
Beneficiaries
to date
Utilized by
Beneficiaries to
date
Balance from
Received
Balance from
Transferred
Note:
Some Birr 4,291,860.92 of the funds received from GoF is RWSEP savings
Of the Birr 209,461,912.25 received from GoF, Birr 20,558,150.19 is exchange rate gain deposited at COWASH account in BoFED. All of this amount is utilized by including it in the annual budget of the project.
Birr 19.84 million GoF and Birr 17.16 million GoE funds were leftover from 2007 EFY and included in the 2008 EFY annual budget of the project
67
6.2.2 Financial Performance of Tigray Region
The funding arrangement in Tigray is governed by the funding agreement signed between the
Bureau of Plan and Finance (BoPF) of Tigray National Regional State and Embassy of Finland.
All the investment and some operational costs are covered by the Tigray National Regional
State while the (human and physical) capacity building fund is contributed from the Finland
Government. The investment funds and capacity building funds are being channeled in differ-
ent ways. All the investment funds from the regional government are being channeled to the
communities through Dedebit Credit and Saving Institution (DECSI) with a commission of 5%
while the capacity building fund from the Finnish Government has been channeled through the
government financial structure.
An estimated amount of Birr 54.94 million (Birr 16.26 million from GoE and Birr 38.69 million
from GoF) was allocated for 2007 EFY. Some 65.1 %, 5.9 %, 11.3 %, and 17.6 % of the an-
nual budget was allocated for investment, physical capacity building, human capacity building
and operational cost (including RSU costs), respectively.
The financial utilization performance report of the region shows that less than 52.0% of the
funds allocated have been utilized in the reporting period (Table 48). The breakdown of budget
utilization by cost categories shows that 53.8 % of the investment funds, 24.0 % of the physi-
cal capacity building funds, 73.7 % of the human capacity building funds, and 39.8 % of the
operational costs allocated for the reporting period have been utilized until 7th July 2015.
Table 48: Fund allocated and Utilized in Tigray region in 2007 EFY
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Planned for 4th
Quarter
(14 +17)
Utilized 4th
Quarter (15+18 )
Planned for
4th Quarter
Utilized 4th
Quarter
Planned for
4th Quarter
Utilized 4th
Quarter
GoF GoE Total (1+2 ) GoF GoE GoF+GoE GoF GoE GoF+GoE GoF + GoE GoF + GoE
Cumulat ive
( 9 / 6 ) *10
0
4th
Quarter
(11/ 10 ) *1
0 0
GoF GoF GoE GoE
INVESTM ENT
COST0.00 35,795,025 35,795,025 0.00 35,795,025 35,795,025 0.00 19,253,740.00 19,253,740.00 0 13,894,703.00 53.8 #DIV/0! 0.00 0.00 #DIV/0! 0 13,894,703.00 #DIV/0!
PHYSICAL
CAPACITY
BUILDING
3,263,750 0.00 3,263,750 3,263,750 0.00 3,263,750 783,556.00 0.00 783,556.00 0 666,994.00 24.0 #DIV/0! 0 666,994.00 #DIV/0! 0.00 0.00
HUM AN
CAPACITY
BUILDING
6,219,486 0.00 6,219,486 6,219,486 0.00 6,219,486 4,586,499.00 0.00 4,586,499.00 316,501 2,650,402.00 73.7 837.41 316,501 2,650,402.00 837.41 0.00 0.00
OPERATIONA
L COST6,772,806 2,893,500 9,666,306 6,772,806 2,893,500 9,666,306 1,840,988.00 2,002,638.00 3,843,626.00 1,398,385 2,909,082.00 39.8 208.03 609,235 1,043,647.00 171.30 789,150 1,865,435.00 236.39
TOTAL 16,256,042 38,688,525 54,944,567 16,256,042 38,688,525 54,944,567 7,211,043 21,256,378 28,467,421 49,723,799 78,191,220 51.8 157.25 925,736 4,361,043.00 471.09 789,150 15,760,138.00 1,997.10
Total in Euro (1
Euro = 24 Birr)677,335 1,612,022 2,289,357 677,335 1,612,022 2,289,357 300,460 885,682 1,186,143 2,071,825 3,257,968 38,572 181,710 32,881 656,672
Utilizat ion
(%)
( 18 / 17) *1
0 0
Category
Planned(Annual) Cumulat ive Planned Cumulat ive Utilized Utilizat ion(%)Utilizat ion
(%)
( 15/ 16 ) *1
0 0
The total funds received from sources (GoE & GoF) and transferred to and utilized by sector
offices to date in Tigray are indicated in Table 49 below.
68
Table 49: Funds received, transferred and utilized in Tigray until end of July 7, 2015
Received
(%)
Transferred
(%)
GoF28,734,412.85 28,102,662.29 18,612,348.10 10,122,064.75 9,490,314.19 64.8 66.2
GoE31,217,328.00 31,217,328.00 29,042,690.68 2,174,637.32 2,174,637.32 93.0 93.0
Total 59,951,740.85 59,319,990.29 47,655,038.78 12,296,702.07 11,664,951.51 79.5 80.3
Usage from Budget
Source
Received
from Source
to date
Transferred to
Beneficiaries
to date
Utilized by
Beneficiaries
to date
Balance
from
Received to
date
Balance
from
Transferred
to date
Note:
Of the Birr 28,734,412.85 received from GoF, Birr 1,618,280.65 is exchange rate gain deposited at COWASH account in BoPF. All of this amount is utilized by including it in the annual budget of the project.
Birr 10.12 million GoF and Birr 2.17 million funds were leftover from 2007 EFY and included in the 2008 EFY annual budget of the pro-ject
As shown in Table 49 above, Tigray region received a total of Euro 1,200,462.77 (equivalent to
about Birr 28,734,412.85) from the Finland Government (GoF). In total, the region received
Birr 59.95 million from the two sources for the implementation of COWASH project in the re-
gion - Birr 28.73 million from GoF and Birr 31.22 million from GoE. Of this amount, approxi-
mately Birr 59.32 million (Birr 28.10 million from GoF and the entire amount received from
GoE) has been transferred to beneficiaries of the project. Until end of the reporting period
(July 7, 2015), 79.5 % of the amount received (64.8 % of the GoF and 93.0% off the GoE) or
80.3 % of the transferred (66.2 % of GoF and 93.0 % of GoE) has been utilized for investment
(construction of water supply schemes and institutional latrines), (physical and human) capaci-
ty building and covering the operational costs of the project.
6.2.3 Financial Performance of SNNP Region
The funding arrangement in SNNPR is governed by the funding agreement signed between the
Bureau of Finance and Economic Development of Southern Nations Nationalities and Peoples’
Regional State and Embassy of Finland. All the investment, some operational costs and all the
physical capacity building of the new woredas and zones are covered by the SNNPR while the
(human and physical) capacity building fund for the old woredas, zones and regional sector
offices and all the human capacity building funds for the new woredas and zones, including all
RSU costs, is contributed from the Finland Government. Like the other COWASH project re-
gions, the investment and capacity building funds are being channeled in different ways. All
the investment funds from the regional government are being channeled to the communities
through Omo Microfinance Institute (OMFI) with a commission of 3% while the capacity build-
ing funds from the regional state (including zones and woredas) and Finnish Government has
been channeled through the government financial structure.
The project allocated an estimated amount of Birr 47.36 million (Birr 17.22 million from GoF
and Birr 30.13 million from GoE) for 2007 EFY. Like the other project regions, the budget allo-
cated for reporting period was apportioned into four cost categories: investment cost (57.4%),
physical capacity building cost (11.8 %), human capacity building cost (23.7 %) and opera-
tional cost (7.0 %).
The financial performance of the region shows that approximately 56.3 % of the total fund
allocated for 2007 EFY has been utilized (Table 50). The budget utilization by cost category
shows that 51.3 % of the investment funds, 90.0 % of the physical capacity building budget,
48.5 % of the human capacity building funds and 63.9 % of the operational cost allocated for
the reporting period has been utilized. Some of the funds utilization rates in Table 50 exceed
69
100.0% as payments of activities performed in the 2nd and 3rd quarters were effected in the 4th
quarter of the fiscal year.
Table 50: COWAASH fund allocated and Utilized in SNNPR in 2007 EFY
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Planned for
4th Quarter
(14 +17)
Utilized 4th
Quarter
(15+18 )
Planned for
4th Quarter
Utilized 4th
Quarter
Planned for
4th Quarter
Utilized 4th
Quarter
GoF GoE Total (1+2 ) GoF GoE GoF+GoE GoF GoE GoF+GoE GoF + GoE GoF + GoE Cumulat ive
( 9 / 6 ) *10 0
4th Quarter
(11/ 10 ) *1
0 0
GoF GoF GoE GoE
INVESTM ENT
COST - 27,192,766 27,192,766 - 27,192,766 27,192,766 13,943,468 13,943,468 1,040,521 7,959,520 51.3 765.0 # DIV/0! 1,040,521 7,959,520 765.0
PHYSICAL
CAPACITY
BUILDING
COST
3,866,150 1,744,855 5,611,005 3,866,150 1,744,885 5,611,035 3,661,565 1,386,206 5,047,771 - 736,540 90.0 # DIV/0! - 264,951 # DIV/0! - 471,589 # DIV/0!
HUM AN
CAPACITY
BUILDING
COST
11,217,561 - 11,217,561 11,217,561 - 11,217,561 5,439,380 5,439,380 724,269 2,964,892 48.5 409.4 724,269 2,964,892 409.4 - # DIV/0!
OPERATIONAL
COST 2,140,296 1,195,843 3,336,139 2,140,296 1,195,843 3,336,139 1,709,142 422,433 2,131,575 910,288 740,759 63.9 81.4 583,164 525,989 90.2 327,124 214,770 65.7
TOTAL 17,224,007 30,133,464 47,357,471 17,224,007 30,133,494 47,357,501 10,810,087 15,752,107 26,562,194 2,675,078 12,401,711 56.1 463.6 1,307,433 3,755,832 287.3 1,367,645 8,645,879 632.2
Total in Euro (1
Euro = 22 Birr) 782,909 1,369,703 2,152,612 782,909 1,369,704 2,152,614 491,368 716,005 1,207,372 121,594 563,714 56.0886733 463.6018 59,429 170,720 287.2676 62,166 392,995 632.17
Utilizat ion (%)
( 18 / 17) *10
0
Category
Planned(Annual) Cumulat ive Planned Cumulat ive Utilized Utilizat ion(%)Utilizat ion
(%)
( 15/ 14 ) *1
0 0
Table 51 below presents the total funds received from sources (GoE & GoF) and transferred to
and utilized by sector offices until end of the reporting period in SNNPR.
Table 51: Funds received, transferred & utilized in SNNPR until end of 2007 EFY (July 7, 2015)
Received
(%)
Transferred
(%)
GoF25,743,063.86 23,782,248.26 21,235,310.14 4,507,753.72 2,546,938.12 82.5 89.3
GoE35,116,139.00 32,924,593.14 24,822,937.94 10,293,201.06 8,101,655.20 70.7 75.4
Total 60,859,202.86 56,706,841.40 46,058,248.08 14,800,954.78 10,648,593.32 75.7 81.2
Usage from Budget
Source
Received from
Source to date
Transferred to
Beneficiaries
to date
Utilized by
Beneficiaries to
date
Balance from
Received to
date
Balance from
Transferred to
date
Note: Of the Birr 25,743,058.86 received from GoF, Birr 2,106,038.86 is exchange rate gain deposited at COWASH account in
BoFED. Of this amount about Birr 1,441,961.86 is not yet utilized and the RWSC will decide on the utilization of this funds. Birr 4.51 million GoF (including the exchange rate gains) and Birr 24.82 million GoE funds were leftover from 2007 EFY and included in
the 208 EFY annual budget of the project
iIn the four years of implementation of COWASH (2004 to 2007 EFY), the SNNPR BoFED re-
ceived a total of Euro 1,074,410 (equivalent to about Birr 25,743,063.86) from the Finland
Government for implementing COWASH activities in the region. This is about 61.5 % of the
total Euro 1,746,084 agreed for the five years of COWASH in SNNPR. In the same period, the
project received Birr 35,116,139 (accounting to 45.4 % of the total committed by the regional
government, Birr 77,400,262) from the regional government (BoFED, zones and woredas). On
the whole, the project received about Birr 60.86 million from the two sources- Birr 25.74 mil-
lion from GoF and Birr 35.12 million from GoE. Of this amount, approximately Birr 56.71 mil-
lion (Birr 23.78 million from GoF and Birr 32.92 million from GoE) or 93.2 % of the amount
received has been transferred to beneficiary offices until end of July 7, 2015. As of this date,
70
75.7 % of the amount received (82.5 % of the GoF and 70.7 % of the GoE received) or 81.2
% of the transferred (89.3 % of GoF and 75.4 % of GoE transferred) has been utilized by ben-
eficiary institutions in SNNP region.
6.2.4 Financial Performance of Oromia region
The funding arrangement in Oromia is governed by the funding agreement signed between the
Bureau of Finance and Economic Development of Oromia National Regional State and Embassy
of Finland. All the investment and some operational costs are covered by Oromia regional state
while all the (human and physical) capacity building fund is contributed from the Finland Gov-
ernment. Funds are being channeled in two ways: all the investment funds from the regional
government are being channeled to the communities through Oromo Credit and Saving Share
Company (OCSSCo) with a commission of 4% while the capacity building funds from the Finn-
ish Government has been channeled through the government financial structure.
An estimated amount of Birr 35.62 million (Birr 21.21 million from GoF and Birr 14.41 million
from GoE) was allocated for implementation of planned activities in the fiscal year at all levels:
regional, zonal and woreda.
Funds allocated for Oromia region was apportioned into the four cost categories: investment
costs, physical capacity building costs, human capacity building costs and operational costs. Of
the total budget allocated for the reporting period, 40.4%, 23.5 %, 30.4%, and 5.7 % was
allocated for investment, physical capacity building, human capacity building and operational
costs, respectively.
The region’s performance report revealed that about 53.0 % of the total fund allocated for the
fiscal year has been utilized (Table 52). In terms of cost category, 69.4 % of the investment
funds, 49.3 % of the physical capacity building, 33.9 % of the human capacity building funds
and 80.7 % of the funds allocated for operation have been utilized in the reporting period. This
shows that the fund utilization performance of the region is low and about 47.0% of the funds
leftover will be allocated for the upcoming fiscal year.
Table 52: Fund allocated and Utilized in Oromia Region in 2007 EFY
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Planned for
4th Quarter
(14 +17)
Utilized 4th
Quarter
(15+18 )
Planned for
4th Quarter
Utilized 4th
Quarter
Planned for
4th Quarter
Utilized 4th
Quarter
GoF GoE Total (1+2 ) GoF GoE GoF+GoE GoF GoE GoF+GoE GoF + GoE GoF + GoE
Cumulat ive
( 9 / 6 ) *10
0
This
Quarter
(11/ 10 ) *10
0
GoF GoF GoE GoE
INVESTM ENT
COST13,152,617 13,152,617 13,152,617 13,152,617 9,123,717 9,123,717 - 4,612,439 69.4 - 4,612,439
PHYSICAL
CAPACITY
BUILDING
COST
7,664,250 7,664,250 7,664,250 7,664,250 3,775,645 - 3,775,645 - 3,410,849 49.3 - 3,410,849
HUM AN
CAPACITY
BUILDING
COST
12,788,460 12,788,460 12,788,460 12,788,460 4,341,597 - 4,341,597 288,358 3,009,641 33.9 1,043.7 288,358 3,009,641 1,043.7
OPERATIONAL
COST758,400 1,259,273 2,017,673 758,400 1,259,273 2,017,673 732,048 896,886 1,628,934 - 646,484 80.7 # DIV/0! 646,484.0
TOTAL 21,211,110 14,411,890 35,623,000 21,211,110 14,411,890 35,623,000 8,849,290 10,020,603 18,869,893 288,358 11,679,413 53.0 4,050.3 288,358 6,420,490 2,226.6 - 5,258,923
Ut ilizat ion (%)
( 18 / 17) *10 0
Category
Planned(Annual) Cumulat ive Planned Cumulat ive Utilized Utilizat ion(%)Utilizat ion
(%)
( 15/ 16 ) *
10 0
Total fund received and utilized to date in Oromia region, by fund source, is indicated in Table
53. The region has received Euro 1,158,347 (equivalent to Birr 28,016,347.24) GoF contribu-
tion from Ministry of Foreign Affairs (MFA) of Finland and Birr 33.71 million from Oromia re-
71
gional government. About 97.03 % of the amount received from the two sources (99.2 % of
the GoF and 95.1 % of the GoE) has been transferred to beneficiary sector offices as per their
annual plans approved by the Regional WaSH Steering Committee (RWSC). Of the total
amount of funds transferred to beneficiary sector offices, 75.5 % (62.6 % of the GoF and 86.6
% of the GoE) has been utilized until end of July 7, 2015. About 73.2% (62.2 % of the GoF
and 82.4 % of the GoE) of the amount received from the sources (GoF & GoE) has been uti-
lized by beneficiary sector offices including RSU.
Table 53: Funds received, transferred and utilized in Oromia Region until end of July 7, 2015
Received
(%)
Transferred
(%)
GoF 28,016,347.24 27,823,787.44 17,424,409.49 10,399,377.95 10,591,937.75 62.2 62.6
GoE 33,706,573.62 32,068,971.00 27,776,572.00 4,292,399.00 5,930,001.62 82.4 86.6
Total 61,722,920.86 59,892,758.44 45,200,981.49 14,691,776.95 16,521,939.37 73.2 75.5
Usage from Budget
Source
Received from
Source to date
Transferred to
Beneficiaries
to date
Utilized by
Beneficiaries
to date
Balance from
Received to
date
Balance from
Transferred to
date
Note: Of the Birr 28,016,347.24 received from GoF, Birr 502,942.47 is exchange rate gain deposited at COWASH account in
BoFED. No exchange rate gain unutilized. Birr 10.59 million from GoF and Birr 5.93 million from GoE funds were leftover from 2007 EFY and included in the 208 EFY annual budget
of the project
6.2.5 Benishangul Gumuz region
All the investment funds from the two fund sources (GoF and GoE/Benishangul Gumuz Nation-
al Regional State) is being channeled to the communities through Benishangul Gumuz Credit
and Saving Institution (BECSI) with a commission of 5% while the capacity building fund from
the Finnish Government and operational cost from both sources have been channeled through
the government financial structure. The project fund is administered as per the funding
agreement signed between the Benishangul Gumuz Bureau of Finance and Economic Develop-
ment (BoFED) and Embassy of Finland.
A total of about Birr 28.58 million (Birr 24.58 million from GoF and Birr 4.00 million from GoE)
was allocated for 2007 EFY. However, the region made available only Birr 150,000 or 3.8% of
the committed funds for the fiscal year.
In the reporting period, funds amounting to Birr 4.28 million, or 15.0% of the funds allocated
for the fiscal year, have been utilized for different activities at the woreda, zone and regional
level. This shows that the fund utilization of the region was very low as much of the activities
were started late and the procurement of vehicles and motorbikes, which contains much of the
planned funds, is still on process.
72
Table 54: Fund allocated and Utilized in BSG Region in 2007 EFY
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Planned for
4th Quarter
(14 +17)
Utilized 4th
Quarter
(15+18 )
Planned for
4th Quarter
Utilized 3rd
Quarter
Planned for
4th Quarter
Utilized 4th
Quarter
GoF GoE Total (1+2 ) GoF GoE GoF+GoE GoF GoE GoF+GoE GoF + GoE GoF + GoE Cumulat ive
( 9 / 6 ) *10 0
4th Quarter
(11/ 10 ) *10 0GoF GoF GoE GoE
INVESTM ENT
COST3,843,000 2,845,500 6,688,500 3,843,000 2,845,500 6,688,500 389,841 150,000 539,841 3,047,625 539,842 1,842,750 389,842 - 1,204,875 150,000 12.4
PHYSICAL
CAPACITY
BUILDING
COST
13,840,900 734,013 14,574,913 13,840,900 734,013 14,574,913 1,104,683 1,104,683 - 887,868 7.6 # DIV/0! 887,868 # DIV/0! # DIV/0!
HUM AN
CAPACITY
BUILDING
COST
3,085,195 9,000 3,094,195 3,085,195 9,000 3,094,195 1,058,607 1,058,607 794,297 833,979 34.2 105.0 794,297 833,979 105.0 # DIV/0!
OPERATIONAL
COST3,809,758 411,487 4,221,245 3,809,758 411,487 4,221,245 1,578,399 - 1,578,399 1,702,902 1,310,615 37.4 77.0 1,511,158 1,310,615 86.7 191,744 - -
TOTAL 24,578,853 4,000,000 28,578,853 24,578,853 4,000,000 28,578,853 4,131,530 150,000 4,281,530 5,544,824 3,572,304 15.0 64.4 4,148,205 3,422,304 82.5 1,396,619 150,000 10.7
Utilizat ion (%)
( 18 / 17) *10 0
Category
Planned(Annual) Cumulat ive Planned Cumulat ive Utilized Utilizat ion(%)Utilizat ion
(%)
( 15/ 16 ) *
10 0
So far, BSG region has received Birr 23.69 million (Birr 23.54 million equivalent to Euro
974,280.466 from GoF and only Birr 0.15 million from GoE). The GoE fund received is part of
Birr 4.00 million allocated for the fiscal year from BSG regional government. Of this amount,
about Birr 8.5 million (Birr 8.33 million from GoF and Birr 0.15 million from GoE) has been
transferred to beneficiary sector offices. It was reported from the region that only 18.1% of
the received or 50.5 % of the transferred has been utilized until end of the reporting period
(7th July 2015).
Table 55: Funds received, transferred and utilized in BSG Region in 2007 EFY
Receive
d(%)
Transferred
(%)
GoF 23,540,525.94 8,332,546.00 4,131,530.73 19,408,995.21 4,201,015.27 17.6 49.6
GoE 150,000.00 150,000.00 150,000.00 0.00 0.00 100.0 100.0
Total 23,690,525.94 8,482,546.00 4,281,530.73 19,408,995.21 4,201,015.27 18.1 50.5
Usage from
Budget
Source
Received from
Source to date
Transferred to
Beneficiaries
to date
Utilized by
Beneficiaries
to date
Balance from
Received
Balance from
Transferred
Note:
The region didn’t get any exchange rate gain as Euro to Birr rate has been declining in the reporting year.
Birr 19.87 million is transferred to 2008 EFY year to be included into the annual budget of the project.
73
7 PROJECT COORDINATION WITH KEY STAKEHOLDERS
The scaling-up of the CMP approach at the national level requires having meetings and discus-
sions with different WaSH stakeholders thereby sharing the success of the CMP approach and
raising awareness and generating funds for investments. Cognizant of this fact, COWASH has
been participating in a number of meetings and discussions held in the fiscal year at the na-
tional level to promote and share experience on the CMP approach and to attract more funds
for CMP. The major meetings and/or discussions that COWASH has participated are presented
hereunder.
Water Sector Working Group (WSWG)
WSWG WRM-TC kick-off meeting was held on August 14, 2014. A 5-year capacity building plan
of MoWIE was prepared as per the proposal of WSWG and the group members, including
COWASH, commented on the plan. Accordingly, comments, much of which is from COWASH,
were incorporated. In January 2015, WSWG secretariat submitted the second version of the 5-
year capacity building plan for development partners’ comments. The strategic plan of WSWG
Secretariat was in a process of preparation during January. WSWG released the MoWIE Annual
review meeting proceedings. Moreover, WRM-TC meeting was conducted in February and WRM
situation in Ethiopia was discussed but no clear decisions how to operationalize WRM-TC were
made. The second version of the 5-year capacity building plan was discussed and plenty of
new comments and concerns were addressed to WSWG secretariat. The issues did not get fur-
ther as “decision- makers” were absent of the meeting. WASH-TC have also held meeting on
April 27 and May 27, 2015. Sub-group ToR and annual plan, preparing proposal for the CBPF
joint administration with MoWIE and DPs and others were discussed during the April 27, 2015
meeting. Urban WASH sub-group meeting was organized on May 27, 2015 and COWASH be-
came a member of the sub-group and ToR of the urban WASH sub-group was discussed.
Local Capacity Development Facility (LCDF) Meeting
COWASH participated in a meeting on the development of Local Capacity Development Facility.
It was found out that currently SNV, PANE and RiPPLE are working together in LCDF project.
The required funding for the project is covered by SNV as donor and quality control works are
being done by SNV. COWASH is mentioned as a collaborator in the LCDF project document and
hence its grassroots level service provision experience is expected to be a springboard for the
project so as to avoid duplication of efforts in service provision.
MSF and JTR Meeting
COWASH CTA drafted the MSF 7 and JTR 9 concept paper for NWCO actions. However, the
meeting of development partners on MSF 7 and JTR 9 could not be made due to busy schedule
of NWCO staff. The MSF and JTR were postponed indefinitely.
MDG Achievement Celebration
The MoWIE Minister established a team, where COWASH CTA is a member, to prepare MDG
target achievement celebration event. The Team developed a brochure on the MDG achieve-
ment in Ethiopia on water and sanitation and started to prepare communication strategy and
event program. Later on the MDG celebration event idea was cancelled as it was found out
that the data on the water supply access was not reliable and transparent enough to conclude
the achievements in a way that the results would be also comparable and debatable at global
level. Finally, discussion has been made with JMP to use the NWI hh data for ascertaining the
attainment of MDG target (7c) in water. The 2015 JMP for Water and Sanitation indicated that
74
Ethiopia has met the target of 57 % (1990 baseline was 14% - un-served = 86%, MDG target
is therefore 86/2 = 43+14 = 57%) of the population using safe drinking water and has at-
tained the target by halving the number of people without access to safe water since 1990.
However, Ethiopia is way off the target for sanitation (baseline was 3%, MDG target was to
reach 52%, but the achievement is 28% in 2015). Ethiopia has therefore celebrated the Water
MDG target achievement on March 23, 2015 here in Addis Ababa at Sheraton Addis. COWASH
representative participated in the celebration of the target.
National Hygiene and Environmental Health Experience Sharing Forum
CTA and JE participated in the 6th National Hygiene and Environmental Health Experience
Sharing Forum held in Dire Dawa Dawa city on 26-28 Feb. 2015. COWASH CTA has facilitated
almost the entire forum and COWASH sponsored the event reporter and field day transporta-
tion. During the three-day forum, the performance of different regions in Hygiene and Envi-
ronmental Health were presented and discussed and research papers on rural sanitation and
hygiene; safe and green cities; Institutional WASH and Health Impacts of WASH were present-
ed. A site visit was organized to visit a closed landfill site or the site presenting the different
low cost sanitation technologies.
Self Supply Technical Working Group
The work of the Self Supply Technical Working Group resumed on April 20, 2015 after more
than one year break. In this meeting, where COWASH participated, Rope Pump newsletter was
changed to self-supply newsletter and two groups formed: main Self Supply Technical Working
Group and core SSTWG with few members.
Discussions (formal/informal) with different national and international organizations
and experts
Several unofficial discussions were held with MoWE/WSSD/NWCO/GIS directorate on
the development of OWNP and GIS-based mapping of water points and updating of NWI
data. Moreover, COWASH FTAT participated in MoWIE 2006 EFY Annual performance
and 2007 EFY annual plan review meeting in Adama and presented its three years per-
formance
COWASH CTA took part in the Federal Micro-and Small-Enterprise Development Agency
debriefing meeting on Business Plan Model that was organized by the WSP on July 1,
2014.
COWASH FTAT participated in the COWASH follow-up monthly meetings held in the
Embassy of Finland.
COWASH CTA held meeting with MetaMeta to plan the future COWASH RSU staff train-
ing on GLOWS/WSP. Accordingly, RSU staff and some regional water bureau and COWASH FTAT were trained on GLOWS/WSP by MetaMeta.
Several meetings were held with the Consultants who are preparing the O&M manual and carrying out Training Impact Research
COWASH CTA conducted Planning meeting with Quest consult.
COWASH FTAT held follow-up and supervision meeting with SNNP Water Bureau Head and relevant regional COWASH stakeholders.
CMP promotion meeting with local NGO called WCDO and the NGO is willing to include CMP into their food security concept note for financiers.
COWASH CTA conducted meeting with SNV on joint projects.
COWASH FTAT held meeting with WHO consultant on WSP was held in July 2014.
75
Meeting conducted on July 10, 2014 with IRC on their role in WASH in Ethiopia and on CMP in particular.
COWASH CTA participated in a meeting with UNICEF on CMP development.
COWASH CTA participated in the meeting with Water.org and WaterAid on WaterCredit workshop.
COWASH FTAT participated in a meeting held on SNNP implementation at Embassy of
Finland.
COWASH Steering Committee meeting was conducted through the facilitation of
COWASH FTAT
COWASH FTAT participated in a meeting conducted with South Pole on the ‘Result
Based Financing’
A meeting was conducted on UNICEF-SNV coordination on CMP Implementation Manual
approval and finalization process
COWASH CTA participated in the Stockholm World Water Week exhibition and assisted
in erecting MoWIE stand
A meeting with M-Birr Ethiopia was held and the possibilities to use mobile payments in
COWASH was discussed
COWASH CTA met the IRC auditor Mr. Bert L.M. Van Woersen and discussed the IRC
performance in Ethiopia
COWASH CTA participated in a meeting with Oromia Water Bureau Head (Ato Motuma)
with Anu Eskonheimo on COWASH in Oromia and CTA presented Oromia progress in
the last fiscal years
A meeting was conducted with Open University (OU) on WASH Capacity Building in
Ethiopia. OU has been contracted by World Vision in WASH +project to be responsible
of the capacity building component.
COWASH CTA participated in Disability Inclusion round table discussion on October 7,
2014.
COWASH CTA and GIS Expert participated in the FinnWASH-BG Board meeting on Oct.
17 in Assosa
Oxford Policy Management consultant Lucrezia Tincani visited COWASH and discussed
with COWASH CTA on the Value for Money and focusing on the Sustainability in rural
WaSH programs.
COWASH CTA participated in the sanitation marketing business group meeting on No-
vember 25 and workshop on latrine technology training manual held on Nov. 21 and
28; It was also managed to participate on Sanitation Marketing Multi-stakeholder
Platform Meeting conducted on Nov.6
COWASH FTAT participated in JMP meeting with development partners on Nov. 24 and
NWI data updating in relation to GTP II indicators was discussed
COWASH held meeting on Nov. 5 with IRC on WASH dynamics survey; COWASH also
participated on the 5-year strategy development of WaterAid.
COWASH CTA held extensive discussion with AGUACONSULT developing sustainability
check tools. UNICEF has drafted the TOR to recruit a consultant who will develop the
sustainability check tool for One WASH. Same time USAID has already employed a con-
sultant to carry out extensive WASH sustainability check in Ethiopia. COWASH also pro-
vided lots of comments on the sustainability check tools for AGUACONSULT.
COWASH CTA made discussion with WHO hired consultant conducting HWTS market as-
sessment in Ethiopia.
76
COWASH participated in the half-day discussion on the report of the ‘Private Sector
Landscape for WASH in Ethiopia – Bottlenecks and opportunities’ study commissioned
by UNICEF. The study focused on three major areas: well drilling, solid and liquid waste
management and small town water supply schemes through the Build-Operate-Transfer
(BOT) arrangement.
COWASH FTAT met and discussed with the COWASH Mid-Term Evaluation Team and
provided support in the data collection at the field level.
77
8 CHALLENGES
Like the previous fiscal year, different kinds of challenges have been faced during the reporting period. The major ones that require the
attention of National WaSH Steering Committee (NWSC) and Regional WaSH Steering Committee (RWSC) are indicated as follows.
Challenges Measures taken
Delay in preparation and approval of regional annual plans: The 2007 EFY annual plans of
COWASH in the regions were expected to be prepared before the end of 2006 EFY. However, the
plans were approved late in the 2nd quarter and early 3rd quarter of the reporting period. The delay in
the preparation and approval of annual plans hampered the implementation rate and budget utiliza-
tion of woredas thereby affecting the contribution of COWASH in accelerating the GTP/UAP WASH
targets. Some Component 1 activities have also been affected by this delay of preparation and ap-
proval regional plans.
COWASH provided technical assistance to
all the regions in the preparation of their
annual plans. Planning templates and unit
costs were prepared by COWASH FTAT and
sent to regions timely.
Delay in sending quarterly reports: BoFED of a project region is expected to report the project
performance quarterly to Embassy of Finland (EoF). COWASH FTAT has to prepare project level
quarterly performance reports by combining Component 1 and regional level (Component 2) reports
and disseminate to stakeholders timely. However, quarterly reports from the regions have been de-
layed and this, coupled with the low quality of the reports, has been affecting the timely preparation
and submission of project level reports.
The problem persists in the reporting quar-
ters. COWASH FTAT has been assisting
RSUs in preparing regional reports and
providing feedback on the reports shared
to COWASH FTAT.
Lack of field vehicle for fieldworks: Though with a delay for more than 2 years, Tigray and
Oromia RSUs have got field vehicles to provide technical assistance to the woredas and zones.
Amhara region has received field cars late in the fiscal year and BSG will receive cars in the first
quarter of the upcoming fiscal year. However, the delay in the procurement of cars and motorbikes
has been affecting the implementation of many project activities at woreda, zone and regional levels.
The delay in the procurement of the trans-
portation facilities has been under discus-
sion in the regional Steering Committee
meetings and alternative ways of quicken-
ing the procurement process has been
presented and decisions passed.
78
Challenges Measures taken
Delay or not transferring committed funds timely: In SNNPR, four new woredas and two zones
were added based on the agreement that physical capacity building budget, including investment
and some operational costs, is covered from the contribution of the woredas, zones and regional sec-
tor bureaus. However, some new woredas and zones (like Sidama zone) have not transferred the
committed funds timely and some have transferred funds late in the fiscal year.
The SNNPR Water Bureau had been com-
municating through writing and telephone
on the timely transfer of the funds com-
mitted. A team of experts has also made
discussions with the zonal and woreda offi-
cials and WASH sector offices reminding
the commitments made and the need for
transferring the funds timely.
Delay in sending quarterly reports to COWASH FTAT: Quarterly performance reports are ex-
pected from regions to prepare project performance report at the federal level and submit to the
pertinent bodies timely. However, quarterly reports from the regions are delayed and this takes
much time to prepare the performance report of the project at the federal level. Quality of the re-
gional reports is also a problem that is delaying the finalization of federal level reports.
The problem persists in the quarters of the
fiscal year. COWASH FTAT has been assist-
ing RSUs in preparing regional reports and
providing feedback on the reports sent to
COWASH FTAT.
Delay in the approval of CMP implementation guideline by MoFED: The CMP manual prepared
in line with the public finance management system was submitted by MoWIE for MoFED’s approval.
The manual, which is part of OWNP PoM, is meant to scale-up the CMP approach across the country.
However, nothing has come out yet and a lot of activities are pending due to the delay in the ap-
proval of the manual.
Discussions were held with the State Min-
ister and Channel I director of MoFED on
the status of the manual. It was promised
to review the manual and provide feedback
on manual.
Weak coordination of WASH sector offices: Coordination of WASH sector offices is central to the
effectiveness and sustainability of COWASH/CMP results. Implementation of the CMP approach re-
quires good governance and coordination from the RWSCs, ZWTs and WWTs. However, in all of the
regions except Amhara the participation of Bureau of Health and Education has been low and many
of them have not even implemented their COWASH planned activities and utilized allocated funds.
The technical support to the lower administrative structures and construction activities have not
been sufficient.
The issue has been raised in several of the
RWSC meetings, review and planning
workshops. COWASH FTAT have been try-
ing to raise the awareness levels through
trainings, workshops and supportive su-
pervisions.