Communications Systems Integration and Modeling Technical Committee

32
Communications Systems Integration and Modeling Technical Committee May 25th, 2010, 5.30pm-7.00pm

description

Communications Systems Integration and Modeling Technical Committee. May 25th, 2010, 5.30pm-7.00pm. Agenda. 1. Welcome and Introductions. 2. Minutes of GC’09 meeting. 3. Reports from ComSoc. 4. CSIM Status and Activities. 5. Sponsored Events. 6. Actions for the Next Period. - PowerPoint PPT Presentation

Transcript of Communications Systems Integration and Modeling Technical Committee

Page 1: Communications Systems Integration and Modeling Technical Committee

Communications Systems Integration and Modeling

Technical Committee

Communications Systems Integration and Modeling

Technical Committee

May 25th, 2010, 5.30pm-7.00pm

Page 2: Communications Systems Integration and Modeling Technical Committee

AgendaAgenda

1. Welcome and Introductions1. Welcome and Introductions

2. Minutes of GC’09 meeting2. Minutes of GC’09 meeting

3. Reports from ComSoc3. Reports from ComSoc

4. CSIM Status and Activities4. CSIM Status and Activities

5. Sponsored Events5. Sponsored Events

6. Actions for the Next Period6. Actions for the Next Period

7. Open Discussion7. Open Discussion

Page 3: Communications Systems Integration and Modeling Technical Committee

AgendaAgenda

1. Welcome and Introductions1. Welcome and Introductions

2. Minutes of ICC’09 meeting2. Minutes of ICC’09 meeting

3. Reports from ComSoc3. Reports from ComSoc

4. CSIM Status and Activities4. CSIM Status and Activities

5. Sponsored Events5. Sponsored Events

6. Actions for the Next Period6. Actions for the Next Period

7. Open Discussion7. Open Discussion

Page 4: Communications Systems Integration and Modeling Technical Committee

AgendaAgenda

1. Welcome and Introductions1. Welcome and Introductions

2. Minutes of GC’09 meeting2. Minutes of GC’09 meeting

3. Reports from ComSoc3. Reports from ComSoc

4. CSIM Status and Activities4. CSIM Status and Activities

5. Sponsored Events5. Sponsored Events

6. Actions for the Next Period6. Actions for the Next Period

7. Open Discussion7. Open Discussion

Page 5: Communications Systems Integration and Modeling Technical Committee

AgendaAgenda

1. Welcome and Introductions1. Welcome and Introductions

2. Minutes of GC’09 meeting2. Minutes of GC’09 meeting

3. Reports from ComSoc3. Reports from ComSoc

4. CSIM Status and Activities4. CSIM Status and Activities

5. Sponsored Events5. Sponsored Events

6. Actions for the Next Period6. Actions for the Next Period

7. Open Discussion7. Open Discussion

Page 6: Communications Systems Integration and Modeling Technical Committee

Report from TACReport from TAC

• New VP-Technical Activities: Mark Karol• New TAC Vice-Chair/Secretary: Mehmet Ulema• Presentation about TAC structure: awards (V. Poor), fellows (R. Hsing),

communications history (M. Schwartz), education board (S. Bregni), recertification, emerging technologies (N. Ohta), distinguished lecturers selection (M. Ulema), standards board (C. Siller)

• Recertification: a motion will be proposed to BoG to recertify 17 (CSIM included!) over 18 TCs

• Ad-hoc committee on Smart Grid Communications (one representative for each TC)

• Suggestions for TCs:– TCs should involve young members and industrial participants– More involvement is required on ComSoc Community Groups– Initiative on “Best Readings on PLC” (S. Galli, S. Benedetto, L. Cimini). Maybe it is

possible to have “Best Readings” on other topics (TCs?)

Page 7: Communications Systems Integration and Modeling Technical Committee

Report from GITCReport from GITC• Any news?

Page 8: Communications Systems Integration and Modeling Technical Committee

AgendaAgenda

1. Welcome and Introductions1. Welcome and Introductions

2. Minutes of GC’09 meeting2. Minutes of GC’09 meeting

3. Reports from ComSoc3. Reports from ComSoc

4. CSIM Status and Activities4. CSIM Status and Activities

5. Sponsored Events5. Sponsored Events

6. Actions for the Next Period6. Actions for the Next Period

7. Open Discussion7. Open Discussion

Page 9: Communications Systems Integration and Modeling Technical Committee

CSIMCSIM

• Scope: the committee is concerned with the systems disciplines and modeling tools that facilitate the integration of information-transport equipment, subsystems, and networks into communications systems.

• Current Officers:– F. Granelli (Chair)– H. Skianis (Vice-Chair)– S. Giordano (Secretary)

Page 10: Communications Systems Integration and Modeling Technical Committee

 Our world Our world

Performance

ModelingDesign

Simulation

Integration

Networks and Services

Networks and Services

We are here!

Page 11: Communications Systems Integration and Modeling Technical Committee

CSIM StatusCSIM Status

• Several active initiatives (see later)

• Currently: 174 members (May 21st, 2010)[+15 from GC’09]

• Interaction with members by means of:– Website(s):– http://www.comsoc.org/~csim– http://community.comsoc.org/groups/csim-tc – Mailing list

[email protected]

Visit our website to subscribe!

Page 12: Communications Systems Integration and Modeling Technical Committee

CSIM 2.0CSIM 2.0

• CSIM should provide a forum for and facilitate discussion and interaction among experts worldwide

• Through Web2.0 tools:

• Good success: 63 [+11] on LinkedIn, 16 [+2] on Twitter, 18 on Facebook

+ 43 [+9] on CSIM-TC group on ComSoc Community sitehttp://community.comsoc.org/groups/csim-tc

• Remote conferencing facilities (Elluminate)

Page 13: Communications Systems Integration and Modeling Technical Committee

CSIM VolunteersCSIM Volunteers

• N. Fonseca – Awards

• F. Granelli – Standard Liaison

• J. Ben-Othman – Membership Development

• Juliana Freitag – Web2.0 Management

• George Michailidis – Smart Grid Ad-Hoc Committee

Page 14: Communications Systems Integration and Modeling Technical Committee

Special Interest GroupsSpecial Interest GroupsSiG Contact person

Cross-Layering F. Granelli

Services Modeling and Simulation M. Devetsikiotis

Measurements A. Pescapè

Future Internet Testbeds H. Skianis

Modeling and Simulation Tools J. Rodrigues

• SiGs will report to the committee periodically • Tangible results are required to maintain the SiG active• Action: from next meeting one SiG will present activities, even remotely

Page 15: Communications Systems Integration and Modeling Technical Committee

CSIM eNewsletterCSIM eNewsletter

• Published on the website and on our mailing list

• Current issue: 2009

• Current editors:– Stefano Giordano– Dzmitry Kliazovich

Page 16: Communications Systems Integration and Modeling Technical Committee

CSIM AwardsCSIM Awards

• Current awards (from P&P):– Conference Best Paper Award– Best Paper Award– Distinguished Service Award– Career Achievement Award

• Need to indicate qualified members to ComSoc awards and well as to IEEE awards

• CSIM Awards Sub-Committee– Chair: N. Fonseca

Page 17: Communications Systems Integration and Modeling Technical Committee

PublicationsPublications

• CSIM is available to support proposals for special issues on IEEE journals (ComMag, JSAC, etc.) and other editorial activities

Page 18: Communications Systems Integration and Modeling Technical Committee

AgendaAgenda

1. Welcome and Introductions1. Welcome and Introductions

2. Minutes of GC’09 meeting2. Minutes of GC’09 meeting

3. Reports from ComSoc3. Reports from ComSoc

4. CSIM Status and Activities4. CSIM Status and Activities

5. Sponsored Events5. Sponsored Events

6. Actions for the Next Period6. Actions for the Next Period

7. Open Discussion7. Open Discussion

Page 19: Communications Systems Integration and Modeling Technical Committee

20102010

ICC CAMAD Globecom EFSOI

Officially IEEE

GeneralChairs:C. DouligerisF. Granelli

TPC Chairs:H. SkianisJ. Rodrigues

CFP is open: May 31th, 2010

Symp. on “Comm. QoS, Reliability and Performance Modeling”

Co-Chairs:N. FonsecaH. Skianis

Running

Symp. on “Comm. QoS, Reliability and Performance Modeling”

Co-Chair:M. Devetsikiotis

Papers: 293Paper selection in progress

Cape Town, South Africa

Miami, FL, USMiami, FL, US

In conjunction with GC’10

Co-Chairs:M.DevetsikiotisG.MichailidisB.Callaway

CFP is open: July 2nd, 2010

Page 20: Communications Systems Integration and Modeling Technical Committee

20102010

ICC CAMAD Globecom EFSOI

Officially IEEE

GeneralChairs:C. DouligerisF. Granelli

TPC Chairs:H. SkianisJ. Rodrigues

CFP is open: May 31th, 2010

Symp. on “Comm. QoS, Reliability and Performance Modeling”

Co-Chairs:N. FonsecaH. Skianis

Running

Symp. on “Comm. QoS, Reliability and Performance Modeling”

Co-Chair:M. Devetsikiotis

Papers: 293Paper selection in progress

In conjunction with GC’10

Co-Chairs:M.DevetsikiotisG.MichailidisB.Callaway

CFP is open: July 2nd, 2010

Cape Town, South Africa

Miami, FL, USMiami, FL, US

Page 21: Communications Systems Integration and Modeling Technical Committee

CAMAD 2010CAMAD 2010

• CSIM flagship event, now IEEE ComSoc!• Website: http://www.ieee-camad.org • Important Dates:

– Paper submission: May 31, 2010– Notification of acceptance: Aug. 2, 2010– Camera-ready papers: Sept. 15, 2010– Workshop dates: Dec. 3-4, 2010

• Be involved:– Submit now!– Ideas are always welcome…

Page 22: Communications Systems Integration and Modeling Technical Committee

CAMAD 2010CAMAD 2010

• Steering Committee:– Michael Devetsikiotis (Chair)– Nelson L.S. da Fonseca– Pascal Lorenz– Hussein Mouftah– Fabrizio Granelli– Charalabos Skianis– Stefano Giordano (incoming)

• Action required: to officially establish rules for steering committee members

Page 23: Communications Systems Integration and Modeling Technical Committee

20102010

ICC CAMAD Globecom EFSOI

Officially IEEE

GeneralChairs:C. DouligerisF. Granelli

TPC Chairs:H. SkianisJ. Rodrigues

CFP is open: May 31th, 2010

Symp. on “Comm. QoS, Reliability and Performance Modeling”

Co-Chairs:N. FonsecaH. Skianis

Running

Symp. on “Comm. QoS, Reliability and Performance Modeling”

Co-Chair:M. Devetsikiotis

Papers: 293Paper selection in progress

In conjunction with GC’10

Co-Chairs:M.DevetsikiotisG.MichailidisB.Callaway

CFP is open: July 2nd, 2010

Cape Town, South Africa

Miami, FL, USMiami, FL, US

Page 24: Communications Systems Integration and Modeling Technical Committee

20102010

ICC CAMAD Globecom EFSOI

Officially IEEE

GeneralChairs:C. DouligerisF. Granelli

TPC Chairs:H. SkianisJ. Rodrigues

CFP is open: May 31th, 2010

Symp. on “Comm. QoS, Reliability and Performance Modeling”Co-Chairs:N. FonsecaH. Skianis

Papers selection in progress

Symp. on “Comm. QoS, Reliability and Performance Modeling”

Co-Chair:M. Devetsikiotis

Papers: 293Paper selection in progress

In conjunction with GC’10

Co-Chairs:M.DevetsikiotisG.MichailidisB.Callaway

CFP is open: July 2nd, 2010

Cape Town, South Africa

Miami, FL, USMiami, FL, US

Page 25: Communications Systems Integration and Modeling Technical Committee

20112011

ICC CAMAD Globecom EFSOI

Expression of interest by George Michailidis (U. Michighan)

Symp. on “Comm. QoS, Reliability and Performance Modeling”

Co-Chair:H. Skianis

GC2011 TPC Chair: Xi Zhang

ProposedCo-Chair:S. Giordano

To be checked

Kyoto, Japan Houston, TX, US

Page 26: Communications Systems Integration and Modeling Technical Committee

20122012

ICC CAMAD Globecom EFSOI

To be checkedEarly stage

Symp. on “Comm. QoS, Reliability and Performance Modeling”

Co-Chair:H. Skianis

To be checked To be checked

Ottawa, Canada

Page 27: Communications Systems Integration and Modeling Technical Committee

AgendaAgenda

1. Welcome and Introductions1. Welcome and Introductions

2. Minutes of GC’09 meeting2. Minutes of GC’09 meeting

3. Reports from ComSoc3. Reports from ComSoc

4. CSIM Status and Activities4. CSIM Status and Activities

5. Sponsored Events5. Sponsored Events

6. Actions for the next period6. Actions for the next period

7. Open Discussion7. Open Discussion

Page 28: Communications Systems Integration and Modeling Technical Committee

Urgent ActionsUrgent Actions

• Open call for secretary– Elections at Globecom 2010

• Need to appoint a new standards liason– F. Granelli took the interim role– Preferably from U.S.

• Need to appoint a new membership development responsible

Page 29: Communications Systems Integration and Modeling Technical Committee

Interested in participating? Volunteer!

Interested in participating? Volunteer!

Phase 1Phase 1 Phase 2Phase 2 Phase 3Phase 3

• TPC member

• SiG proposals

• Volunteers

• Contributions to the enewsletter

• CSIM Officer

• Symposium Chair

Increasing effort, increased visibility, increased responsibilitiesIncreasing effort, increased visibility, increased responsibilities

• Organizing committee member

• Contribution to initiatives

Page 30: Communications Systems Integration and Modeling Technical Committee

Some ideas…Some ideas…

• For volunteers:– Volunteer for sub-committees– Propose contributions for eNewsletter

• Other suggestions?

Page 31: Communications Systems Integration and Modeling Technical Committee

AgendaAgenda

1. Welcome and Introductions1. Welcome and Introductions

2. Minutes of GC’09 meeting2. Minutes of GC’09 meeting

3. Reports from ComSoc3. Reports from ComSoc

4. CSIM Status and Activities4. CSIM Status and Activities

5. Sponsored Events5. Sponsored Events

6. Actions for the Next Period6. Actions for the Next Period

7. Open Discussion7. Open Discussion

Page 32: Communications Systems Integration and Modeling Technical Committee

Thanks for attending!Thanks for attending!

For contacts:

• Fabrizio Granelli: [email protected]

• Harry Skianis: [email protected]

• Stefano Giordano: [email protected]