Communication from SYNERGIA about GSI benchmarking

15
SC-30 FS 1 Communication from Communication from SYNERGIA about GSI SYNERGIA about GSI benchmarking benchmarking 14/11/2013

description

Communication from SYNERGIA about GSI benchmarking. Step 6. Step 9 1/4. Long-term Simulation SYNERGIA Preliminary. Step 9 2/4. Long-term Simulation SYNERGIA Preliminary. 100’000 Turns. Step 9 3/4. Long-term Simulation SYNERGIA Preliminary. 100’000 Turns. Step 9 4/4. - PowerPoint PPT Presentation

Transcript of Communication from SYNERGIA about GSI benchmarking

Page 1: Communication from SYNERGIA about GSI benchmarking

SC-30 FS 1

Communication from Communication from SYNERGIA about GSI SYNERGIA about GSI

benchmarkingbenchmarking

14/11/2013

Page 2: Communication from SYNERGIA about GSI benchmarking

SC-30 FS 2

Step 6Step 6

14/11/2013

Page 3: Communication from SYNERGIA about GSI benchmarking

18/12/2013 SC Overview FS 3

Step 9 1/4Step 9 1/4

Long-term

Simulatio

n

SYNERGIA

Preliminary

Page 4: Communication from SYNERGIA about GSI benchmarking

18/12/2013 SC Overview FS 4

Step 9 2/4Step 9 2/4

Long-term

Simulatio

n

SYNERGIA

Preliminary

100’000 100’000 TurnsTurns

Page 5: Communication from SYNERGIA about GSI benchmarking

18/12/2013 SC Overview FS 5

Step 9 3/4Step 9 3/4

Long-term

Simulatio

n

SYNERGIA

Preliminary

100’000 100’000 TurnsTurns

Page 6: Communication from SYNERGIA about GSI benchmarking

18/12/2013 SC Overview FS 6

Step 9 4/4Step 9 4/4

SYNERGIASYNERGIA

Page 7: Communication from SYNERGIA about GSI benchmarking

18/12/2013 SC Overview FS 7

SC Collaboration MeetingSC Collaboration MeetingDate: Tuesday 20th and Wednesday 21st of MayInvitation only ~11!Preliminary Program:

- Status report for the PIC codes PTC-py_ORBIT, SYNERGIA and IMPACT.

- Report about results concerning the Giuliano benchmarking suite for the PIC codes covering all 9 steps.

- First results from the various investigations concerning noise in PIC codes and in particular for storage rings.

- Progress with the frozen space charge codes.

- How well do we understand the (2011-2013) PSB & PS experiments with simulations?

- Next plans for simulations for the CERN pre-accelerators and experiments planned for 2014.

Page 8: Communication from SYNERGIA about GSI benchmarking

18/12/2013 SC Overview FS 8

SC Collaboration Meeting OrganizationSC Collaboration Meeting Organization• Secretary: Delphine• Advertized with all in/ouside of CERN

• BE auditorium booked• Coffee from EuCard

• Foyer reservation: in process• Web page indico: in progress

• Finalized program with chairperson: early January

• Registration fee: advantage dinner with guests possible Wednesday evening

• External collaborators: Giuliano + student Frederic Kester, Oliver Boine-Frankenheim, Ingo Hofmann, Jeff Holmes, James Amundson + Eric Stern, Ji Qiang, Valery Kapin, Christoph Montag, Sinshy Machida• Alexander Molodozhentsev preferred not to come for 2 days only!

• Students needed for questions

Page 9: Communication from SYNERGIA about GSI benchmarking

18/12/2013 SC Overview FS 9

Educational Talk 2aEducational Talk 2a

Phase Advance and TunesPhase Advance and Tunes

• Tracking done for a FODO lattice with sextupoles including random component to create strong sextupole resonances to first order, in particular the Qx + 2 Qy = n coupled resonance.

• Non-linear only no space charge

• Tunes similar to the PS experiment Qx = 0.07 and Qy = 0.48.

• In the tracking just amplitudes are change in 4D.

Page 10: Communication from SYNERGIA about GSI benchmarking

18/12/2013 SC Overview FS 10

Constant Part of Hamiltonian in 5D & 6DConstant Part of Hamiltonian in 5D & 6D

ChromaticityChromaticityNon-linear detuningNon-linear detuning

Synchrotron TuneSynchrotron Tune

Longitudinal InvariantLongitudinal Invariant

Page 11: Communication from SYNERGIA about GSI benchmarking

14/11/2013 SC-30 FS 11H Phase

V P

ha

se

Page 12: Communication from SYNERGIA about GSI benchmarking

14/11/2013 SC-30 FS 12H Phase

V P

ha

se

Page 13: Communication from SYNERGIA about GSI benchmarking

14/11/2013 SC-30 FS 13H Phase

V P

ha

se

Tunes = Averaged Phase Advance

Page 14: Communication from SYNERGIA about GSI benchmarking

14/11/2013 SC-30 FS 14H Phase

V P

ha

se

Qx + 2 Qy = 1

12

34

56

78

910

11

Page 15: Communication from SYNERGIA about GSI benchmarking

14/11/2013 SC-30 FS 15

7

8

10

The numbers correspond to the previous plot