COMMONWEALTH OF PUERTO RICO PUERTO RICO...

5
1 COMMONWEALTH OF PUERTO RICO PUERTO RICO ENERGY COMMISSION IN RE: STAYING OF PROCEEDINGS AND TEMPORARY ELECTRONIC FILING REQUIREMENTS Subject: Renewal of administrative proceedings. CASE NO.: CEPR-MI-2017-0006 CEPR-MI2017-0007 IN RE: AGUIRRE SITE ECONOMIC ANALYSIS IN RE: RATE DESIGN, COST ALLOCATION AND RELATED ISSUES APPLICABLE TO PREPA IN RE: THE PERFORMANCE OF THE PUERTO RICO ELECTRIC POWER AUTHORITY CASE NO.: CEPR-AP-2017-0001 CASE NO.: CEPR-IN-2017-0001 CASE NO.: CEPR-IN-2016-0002 SUNNOVA ENERGY CORPORATION V. THE PUERTO RICO ELECTRIC POWER AUTHORITY PV PROPERTIES, INC. V. THE PUERTO RICO ELECTRIC POWER AUTHORITY CASE NO.: CEPR-QR-2015-0004 CASE NO.: CEPR-QR-2017-0001 RESOLUTION I. Renewal of Administrative Proceedings Due to the imminent landfall of Hurricane María in Puerto Rico, on September 18, 2017, the Puerto Rico Energy Commission (“Commission”) issued a Resolution temporarily suspending, effective September 19, 2017, all administrative proceedings before the

Transcript of COMMONWEALTH OF PUERTO RICO PUERTO RICO...

Page 1: COMMONWEALTH OF PUERTO RICO PUERTO RICO …energia.pr.gov/wp-content/uploads/2017/11/Resolution... ·  · 2017-11-01SUNNOVA ENERGY CORPORATION V. THE PUERTO RICO ELECTRIC ... Microsoft

1

COMMONWEALTHOFPUERTORICOPUERTORICOENERGYCOMMISSION

IN RE: STAYING OFPROCEEDINGSANDTEMPORARYELECTRONIC FILINGREQUIREMENTS

Subject:Renewalofadministrativeproceedings.

CASENO.:CEPR-MI-2017-0006CEPR-MI2017-0007

INRE:AGUIRRESITEECONOMICANALYSISIN RE: RATE DESIGN, COSTALLOCATION AND RELATEDISSUESAPPLICABLETOPREPAIN RE: THE PERFORMANCE OFTHE PUERTO RICO ELECTRICPOWERAUTHORITY

CASENO.:CEPR-AP-2017-0001CASENO.:CEPR-IN-2017-0001CASENO.:CEPR-IN-2016-0002

SUNNOVAENERGYCORPORATION

V.THEPUERTORICOELECTRIC

POWERAUTHORITY

PVPROPERTIES,INC.V.

THEPUERTORICOELECTRICPOWERAUTHORITY

CASENO.:CEPR-QR-2015-0004CASENO.:CEPR-QR-2017-0001

RESOLUTIONI. RenewalofAdministrativeProceedings Dueto the imminent landfallofHurricaneMaría inPuertoRico,onSeptember18,2017,thePuertoRicoEnergyCommission(“Commission”)issuedaResolutiontemporarilysuspending, effective September 19, 2017, all administrative proceedings before the

Page 2: COMMONWEALTH OF PUERTO RICO PUERTO RICO …energia.pr.gov/wp-content/uploads/2017/11/Resolution... ·  · 2017-11-01SUNNOVA ENERGY CORPORATION V. THE PUERTO RICO ELECTRIC ... Microsoft

2

Commission and any term for a party to appear before the Commission or file anycorrespondingpleading,motionordocument.1

InlightoftheextentofthedamagescausedbyHurricaneMaría,onOctober5,2017,theCommissionissuedaResolutionthroughwhichitstayedalladministrativeproceedings(including applicable terms) until either the Governor of Puerto Rico, Hon. Ricardo A.Rosselló Nevares, declared that a state of emergency is no longer in effect or until theCommissionwasabletorenewitsoperationswithsufficientnormalcytocontinuewithitsproceedings.2

Through thisResolution, theCommissionherebyNOTIFIES that itwill resume itsadministrative proceedings on November 6, 2017. On that date, the temporary filinginstructionscontainedintheCommission’sOctober5,2017Resolutionshallnolongerbeineffect. Parties shall ensure the filing of all documents, pleadings and motions is madepursuanttoRegulation85433andtheproceduresestablishedintheCommission’sFebruary19,2015Order,asfurtheramendedbyOrderissuedonOctober7,2016.4

UnlessotherwiseorderedbytheCommission,anytermforthefilingofdocuments,motions,pleadingsoranyotherinformationorforanypartytotakeanyactioninrelationtoanyproceedingscheduledtoexpireonorafterSeptember19,2017shallbeextendedforthesameamountoftimeleftforittoexpireatthetimeofitssuspension,beginningonNovember6, 2017 (i.e. if on September 19, 2017 a party had ten days to file a document in anyproceeding, that party will have ten days, beginning on November 6, 2017, to file saiddocument.)TheCommissionwill issuespecificinstructionsoneachproceedingregardingthereschedulingofhearings. Any request for an additional extension of time to file any document, motion orpleadingdue on or after September 19, 2017 andwhichhas been extended as providedherein,mustbefiledpriortothedateinwhichthetermforfilingsaiddocument,motionorpleading is scheduled to expire andmust provide the specific reasons which justify theCommissiongrantingsuchrelief.II. PREPA’sSpecificRequests OnOctober23,2017, thePuertoRicoElectricPowerAuthority (“PREPA”) filedanUrgent Omnibus Motion for Extension of Due Dates for All Upcoming Submission, Filing,Conferences,andHearingsInvolvingPREPA(“PREPA’sMotion”).ThroughitsMotion,PREPA

1SeeCommissionResolutionCEPR-MI-2017-0006.2SeeCommissionResolutionCEPR-MI-2017-0007.3RegulationonAdjudicative,NoticeofNoncompliance,RateReviewandInvestigationProceedings.4SeeCommissionOrderCEPR-MI-2015-0001,asamended.

Page 3: COMMONWEALTH OF PUERTO RICO PUERTO RICO …energia.pr.gov/wp-content/uploads/2017/11/Resolution... ·  · 2017-11-01SUNNOVA ENERGY CORPORATION V. THE PUERTO RICO ELECTRIC ... Microsoft
Page 4: COMMONWEALTH OF PUERTO RICO PUERTO RICO …energia.pr.gov/wp-content/uploads/2017/11/Resolution... ·  · 2017-11-01SUNNOVA ENERGY CORPORATION V. THE PUERTO RICO ELECTRIC ... Microsoft
Page 5: COMMONWEALTH OF PUERTO RICO PUERTO RICO …energia.pr.gov/wp-content/uploads/2017/11/Resolution... ·  · 2017-11-01SUNNOVA ENERGY CORPORATION V. THE PUERTO RICO ELECTRIC ... Microsoft