  • UTILITY COST ESTIMATING

    Committee on Right of Way, Utilities, and Outdoor Advertising Control Annual Meeting, 2019

    Presented by:Anthony J. Carovillano, P.E., P.S.Railroads and Utilities Engineer

    West Virginia Division of Highways

    Patrick Allen, P.E.State Utilities Engineer

    Georgia Department of Transportation

  • UTILITY COST ESTIMATING

    Committee on Right of Way, Utilities, and Outdoor Advertising Control Annual Meeting, 2019

    Presented by:

    Anthony J. Carovillano, P.E., P.S.Railroads and Utilities Engineer

    West Virginia Division of Highways

  • UTILITY COST ESTIMATING

    Committee on Right of Way, Utilities, and Outdoor Advertising Control Annual Meeting, 2019

    What is a Cost Estimate?“A cost estimate is a prediction of the most probable cost to relocate certain utility facilities. The estimate will include the cost to replace the facilities and provide the same level of service which existed prior to the undertaking of the project.”

    Indiana DOT Design Manual, Chapter 104

  • UTILITY COST ESTIMATING

    Committee on Right of Way, Utilities, and Outdoor Advertising Control Annual Meeting, 2019

    The 3 “W”s of Utility Cost Estimatingand 1 “H”.

  • UTILITY COST ESTIMATING

    Committee on Right of Way, Utilities, and Outdoor Advertising Control Annual Meeting, 2019

    • Why Do We Need to Prepare A Cost Estimate?

    • When Do We Prepare a Cost Estimate?• Who Should Prepare the Cost Estimate?

    • How Do We prepare an Estimate?

  • UTILITY COST ESTIMATING

    Committee on Right of Way, Utilities, and Outdoor Advertising Control Annual Meeting, 2019

    • Why Do We Need to Prepare A Cost Estimate? Planning

    Set Aside Adequate Funds (Budgeting Purposes)Select Most Economical Alternative

    Establish The Items Of Work to be Performed

  • UTILITY COST ESTIMATING

    Committee on Right of Way, Utilities, and Outdoor Advertising Control Annual Meeting, 2019

    • When Do We Prepare a Cost Estimate? Design Study Report Preliminary Engineering (As plans are being

    developed) Reimbursement (Agreement)

  • UTILITY COST ESTIMATING

    Committee on Right of Way, Utilities, and Outdoor Advertising Control Annual Meeting, 2019

    • Who Should Prepare the Cost Estimate? Design Study Report – Engineer, Utility

    Coordinator Preliminary Engineering – Utility Coordinator Reimbursement – Utility Company

  • UTILITY COST ESTIMATING

    Committee on Right of Way, Utilities, and Outdoor Advertising Control Annual Meeting, 2019

    • How Do We prepare an Estimate? Design Study Report

    Determine Impacts• Review Plans• Site Visit• Mapping Software

    Unit CostState’s Reimbursement Policy

  • UTILITY COST ESTIMATING

    Committee on Right of Way, Utilities, and Outdoor Advertising Control Annual Meeting, 2019

    • How Do We prepare an Estimate (cont.)? Preliminary Engineering

    Determine Impacts• Review Plans• Site Visit• Mapping Software

    Unit CostState’s Reimbursement Policy

  • UTILITY COST ESTIMATING

    Committee on Right of Way, Utilities, and Outdoor Advertising Control Annual Meeting, 2019

    • How Do We prepare an Estimate (cont.)? Reimbursement (Agreement)

    Develop Relocation Plans• Review Plans• Site Visit• Mapping Software

    Prepare Detailed Cost Estimate (Utility Company)• State’s Reimbursement Policy (Eligibility for

    Reimbursement)• Unit Cost

  • UTILITY COST ESTIMATING

    Committee on Right of Way, Utilities, and Outdoor Advertising Control Annual Meeting, 2019

    • What is Eligible for Reimbursement? Material and Supplies Labor Overhead Transportation Equipment Traffic Control Right of Way

  • UTILITY COST ESTIMATING

    Committee on Right of Way, Utilities, and Outdoor Advertising Control Annual Meeting, 2019

    • Deduction (Credits) from a Reimbursement?Betterments

    • Upgrading of a Facility that is not attributable to the project.

    Salvage• Removed Components that still have Value. Estimated

    by Utility Company.Accrued Depreciation

    • Applies to Plants, Stations and Buildings.

  • UTILITY COST ESTIMATING

    Committee on Right of Way, Utilities, and Outdoor Advertising Control Annual Meeting, 2019

    • What is NOT Eligible for Reimbursement?AdvertisingSales PromotionInterest on BorrowingBad Debts and Uncollected Accounts ReceivableDonationsEntertainmentsFines and PenaltiesLobbying

  • UTILITY COST ESTIMATING

    Committee on Right of Way, Utilities, and Outdoor Advertising Control Annual Meeting, 2019

    • Parts of a Cost Estimate Preliminary Engineering Temporary Construction Permanent Construction Construction Engineering and Inspection Accounting Overheads Betterments Right of Way Acquisition

  • UTILITY COST ESTIMATING

    Committee on Right of Way, Utilities, and Outdoor Advertising Control Annual Meeting, 2019

    • Parts of a Cost Estimate (cont.) Preliminary Engineering

    Research Existing EasementsConduct Preliminary Studies and SurveysReview As-Built PlansPrepare Work Plans and Relocation DrawingsDevelop Cost EstimatesAcquire EasementsPrepare and Evaluate Bid Documents

  • UTILITY COST ESTIMATING

    Committee on Right of Way, Utilities, and Outdoor Advertising Control Annual Meeting, 2019

    • Parts of a Cost Estimate (cont.) Permanent Construction

    Mobilization and DemobilizationEngineeringRemoval or Abandonment of Existing FacilitiesInstallation of New FacilitiesE&S Control and Site RestorationTemporary Traffic Control

  • UTILITY COST ESTIMATING

    Committee on Right of Way, Utilities, and Outdoor Advertising Control Annual Meeting, 2019

    Patrick Allen, P.E.State Utilities EngineerGeorgia Department of

    Transportation

  • • Utility Cost Estimating Tools Reimbursable Agreements PE Phase Utility Cost Estimates &Updates

    UTILITY COST ESTIMATING

  • • Utility Agreement Estimates Prepared by Utility 23 CFR 645 Compliance Applicable Federal & State Laws Utility Accommodations Policy

    UTILITY COST ESTIMATING

  • Case I – Prior Rights/Compensable Property Interest Case II – “Utility Aid” Case III – State Highway Revision Case IV – “Make-Ready”/Transportation Purpose

    Department facilities are attached to third-party facility/pole. Applies to pole owner only

    Case V – Safety/Clear Roadside (CRC) Utility relocates its facilities to improve safety along roadway

    Case VI – Future Project Accommodation Advance installation of new facilities for future GDOT project

    Conditions for Reimbursement

  • Conditions for Reimbursement

    Case VII – Property Interest Affidavit Facilities requiring relocation are located off existing R/W and no

    documentation can be found by Utility to establish a property interest Case VIII – Public Interest Determination (PID)

    Utility included in the Roadway contract Case IX – 2nd Relocations

    Utility facilities require additional relocation or adjustment due to a plan change

    Case X – Undergrounding Department determines it is in public interest to relocate aerial facilities to

    underground

  • Utility Agreement Estimate I. Company:

    Address:

    *Estimate Prepared By:

    II. Project #: County:PI #:

    III. Georgia Department of Transportation (GDOT) Project Description:

    ABC Power

    Patrick Allen

    Atlanta, GA

    SR 3/Northside Dr from MLK to SR 8 Hollowell Pkwy

    123456 Fulton

  • Utility Agreement Estimate Method of Accounting: [Section 645.113f and Section 645.117, 23 CFR 645A]

    Work Order Accounting Procedure prescribed by regulatory body.

    Established accounting procedure approved by State and FHWA.

    Agreed Lump Sum.

    Other (Including use of GDOT Form 8465):

    (Check Method that Applies)

    This estimate has been prepared by the Company in accordance with Title 23 of the Code of Federal Regulations (CFR), Chapter 1, Subchapter G, Part 645, Subpart A and in accordance with the Department's Utility Accommodation Policy and Standards Manual, Current Edition (Manual), to support a Utility Relocation Agreement between the Utility Company and the Department. The work will be performed and the costs accounted for in accordance with the methods described herein. Costs will be recorded as provided in Section 645.113f or Section 645.117, 23 CFR 645A. Equipment rental rates, salvage credit, accrued depreciation credit (expired service life) and betterment credit have been given due consideration and proper explanations have been noted in the estimate where applicable and as provided by 23 CFR 645A. Claim for reimbursement costs shown in the Estimate is based on the attached Certificate of Eligibility for reimbursement which is made a part hereof.

  • Utility Agreement Estimate

    Total Preliminary Engineering CostsAttach Support Documentation to Estimate - See Exhibit:

    Total Construction Engineering CostsAttach Support Documentation to Estimate - See Exhibit:

    NOTE: Payment for Construction Engineering will not be allowed for Work included in GDOT Contracts.

    Total Preliminary and Construction Engineering Costs

    $10,518.50

    $35,300.00

    $45,818.50

  • Utility Agreement Estimate

    VI. Right of Way Acquisition [Section 645.111, 23 CFR 645A](Check Applicable Section)

    Replacement R/W or Easements are not required for adjustment of utilities facilities on this Project.

    Replacement R/W or Easements shown on the attached plans will be acquired by the Company.Total Cost of Right of Way Acquisition $25,000.00

    Replacement R/W shown on plans will be acquired by the Department (Separate written request must be furnished).

    Attach Support Documentation to Estimate. Include Estimates for Appraisal, Negotiation, Recording, and Right-of-Way or Easement Costs - See Exhibit:

  • Utility Agreement Estimate VII. Construction [Section 645.115 and Section 645.117, 23 CFR 645A]

    A. Description of Proposed Utility Work:

    B. The Company will perform the work provided for in this Estimate by the following method: (Check Applicable Method - see page 3 for continuation)

    By Company's Regular Forces

    By ContractThe Company does not have adequate staff or equipment to perform the necessary work with its own forces; therefore, the Company, subject to approval of the Department and FHWA, proposes to contract the work covered by this estimate in accordance with the provisions of Section 645.115 (a), 23 CFR 645A. The items of work to be accomplished by contract are noted in this estimate. When the Company elects to solicit competitive bids from a list of qualified contractors rather than through advertising in a publication, the names and addresses of these contractors so circularized shall be noted on the estimate and furnished to the Department in advance of the Company's solicitation of bids. The Department shall approve the low bidder before work can began. Please provide Company Name, Address, and

    The Company Proposes to use its regular construction or maintenance crews and personnel at its standard schedule of wages and working hours in accordance with the terms of its Agreement with such employees.

  • Utility Agreement Estimate

    C. Detail of Construction CostsLabor Costs [Section 645.117, 23 CFR 645A]Attach Support Documentation to Estimate, Including Additives - See Exhibit:Materials Costs [Section 645.117(e), 23 CFR 645A]

    Attach Support Documentation to Estimate - See Exhibit:Right-of-Way Clearing & Trimming Costs

    Attach Support Documentation to Estimate - See Exhibit:Equipment Costs [Section 645.117(f), 23 CFR 645A]

    Attach Support Documentation to Estimate - See Exhibit:Total Construction Costs

    Total Costs of Proposed Relocation (V through VII)

    $1,430,000.00

    250,000.00

    $1,500,818.50

    1

    $350,000.00

    $750,000.00

    $80,000.00

  • Utility Agreement Estimate

    Total Salvage CreditTotal Accrued Depreciation and Salvage Credit

    $75,000.00$140,000.00

    The Department and the FHWA shall have the right to inspect recovered materials prior to disposal by sale or scrap. This requirement will be satisfied by the Company giving two weeks written notice to the Department or oral notice followed by written confirmation of the time and place the materials will be available for inspection. This notice is the responsibility of the Company and it may be held accountable for full value of materials disposed of without notice. If recovered materials are not reusable, they shall be disposed of as outlined in Section 645.117(e), 23 CFR 645A.

  • Utility Agreement Estimate X. Total Cost of Relocation

    (Less Credits for Accrued Depreciation and Salvage Value, VIII-IX)

    XI. Betterment Credit [Section 645.117(h), 23 CFR 645A (Check Applicable Statement) Betterment credit is not allowed in this estimate since there is to be no functional

    increase in size in the replaced facility unless caused by proposed highway constructionBetterment credit is allowed as shown in the following comparison:Location of Betterment: (Please indicate Station, Route Name, and Number)

    Betterment Credit Amount*Attach Support Documentation to Estimate - See Exhibit:

    *Include Estimate for Cost to Install Proposed Facilities to Produce Current Capacity and the Cost to Install Proposed Facilities for Increased Capacity.

    $1,360,818.50

    $0.00

  • Utility Agreement Estimate XIII. Proportionate Share

    (Check Applicable Statement - 1, 2, or 2 & 3)

    1. The Department will bear 100 percent of the cost of the adjustments.

    2. The Company will participate in a pro rata share of the cost of adjustments (No Betterments).

    Percentage Split: Company Participation (If 0%, insert 100% for GDOT Participation)GDOT Participation

    Total (Total Shall be 100%)Attach Support Documentation/Detailed Calculations to Estimate - See Exhibit:

    30.00%100.00%

    3. The Company will participate in a pro rata share of the cost of the adjustments determined as Betterments.

    70.00%

  • Utility Agreement Estimate Items

    V. Preliminary and Construction Engineering VI. Right-of-Way Acquisition CostsVII. Construction CostsVIII. Total for Proposed Relocation Work (V+VI+VII)IX. Total Accrued Depreciation and Salvage Credits ( - )X. Total Relocation WorkXI. Betterment Credit ( - )XII. Total Estimate of Reimbursable Adjustments (X-XI)XIII. Proportionate Share: Check Applicable Statement and Insert Above Estimate Amounts from X, XI, and XII

    1. The Department will bear 100 percent of the cost of the adjustments (See XII).XII. Total Estimate of Reimbursable Adjustments

    2. The Company will Participate in a pro rata share of the cost of adjustments (No Betterments).XII. Total Estimate of Reimbursable Adjustments

    Percentage Split (Insert From Page 4) Proportionate Share:70.00% Company Participation Company Participation30.00% GDOT Participation GDOT Participation

    $0.00

    $952,572.95$408,245.55

    $1,360,818.50

    (OR)

    $1,360,818.50$0.00$1,360,818.50

    $140,000.00

    Total$45,818.50$25,000.00$1,430,000.00$1,500,818.50

  • Utility Agreement Estimate Items

    V. Preliminary and Construction Engineering VI. Right-of-Way Acquisition CostsVII. Construction CostsVIII. Total for Proposed Relocation Work (V+VI+VII)IX. Total Accrued Depreciation and Salvage Credits ( - )X. Total Relocation WorkXI. Betterment Credit ( - )XII. Total Estimate of Reimbursable Adjustments (X-XI)XIII. Proportionate Share: Check Applicable Statement and Insert Above Estimate Amounts from X, XI, and XII

    1. The Department will bear 100 percent of the cost of the adjustments (See XII).XII. Total Estimate of Reimbursable Adjustments

    2. The Company will Participate in a pro rata share of the cost of adjustments (No Betterments).XII. Total Estimate of Reimbursable Adjustments

    Percentage Split (Insert From Page 4) Proportionate Share:70.00% Company Participation Company Participation30.00% GDOT Participation GDOT Participation

    3. The Company will participate in a pro rata share of the cost of the adjustments determined as Betterments.

    X. Total Relocation WorkXI. Betterment CreditXII. Total Estimate of Reimbursable Adjustments

    Percentage Split Proportionate Share:#DIV/0! Company Participation Company Participation#DIV/0! GDOT Participation GDOT Participation

    Combination of 2. and 3.X. Total Relocation WorkXI. Betterment CreditXII. Total Estimate of Reimbursable Adjustments

    2. Percentage Spilt (Insert From Page 4) 0.00% Company Participation0.00% GDOT Participation

    3. Plus Betterment Credit

    2 Plus 3 Proportionate Share#DIV/0! Company Participation#DIV/0! GDOT Participation#DIV/0! Total

    Arithmetic Extensions Checked and Found Correct.

    District Utilities Engineer (Signature) (Date)

    $0.00

    $0.00

    $0.00$0.00

    Company ParticipationGDOT Participation

    Company Participation$0.00

    $0.00$0.00

    $0.00$0.00

    $0.00$0.00$0.00

    (OR)

    Company Participation $0.00$0.00GDOT Participation

    $1,360,818.50$0.00$1,360,818.50

    $140,000.00

    Total$45,818.50$25,000.00$1,430,000.00$1,500,818.50

    (OR)

    $0.00

    $952,572.95$408,245.55

    $1,360,818.50

    (OR)

    Page 1

    I.Company:ABC Power

    Address:Atlanta, GA

    *Estimate Prepared By:

    II.Project #:123456County:Fulton

    PI #:

    III.Georgia Department of Transportation (GDOT) Project Description:

    IV.Method of Accounting: [Section 645.113f and Section 645.117, 23 CFR 645A]

    (Check Method that Applies)

    Work Order Accounting Procedure prescribed by regulatory body.

    Established accounting procedure approved by State and FHWA.

    Agreed Lump Sum.

    Other (Including use of GDOT Form 8465):

    This estimate has been prepared by the Company in accordance with Title 23 of the Code of Federal Regulations (CFR), Chapter 1, Subchapter G, Part 645, Subpart A and in accordance with the Department's Utility Accommodation Policy and Standards Manual, Current Edition (Manual), to support a Utility Relocation Agreement between the Utility Company and the Department. The work will be performed and the costs accounted for in accordance with the methods described herein. Costs will be recorded as provided in Section 645.113f or Section 645.117, 23 CFR 645A. Equipment rental rates, salvage credit, accrued depreciation credit (expired service life) and betterment credit have been given due consideration and proper explanations have been noted in the estimate where applicable and as provided by 23 CFR 645A. Claim for reimbursement costs shown in the Estimate is based on the attached Certificate of Eligibility for reimbursement which is made a part hereof.

    Name and Title of Authorized Company RepresentativeDate

    Company Representative hereby certifies the Estimate and agrees that the Estimate shall remain valid for one year from the above authorized date. After one year from the authorized date, the Estimate may be subject to revision by the Utility Company.

    *Please Provide Two (2) sets of Relocation Plans and Two (2) sets of signed estimates.

    Estimate to Support Agreement for Relocation, Removal, or Adjustment of Facilities in Conflict with Proposed Transportation Construction

    Estimate to Support Agreement for Relocation, Removal, or Adjustment of Facilities in Conflict with Proposed Transportation Construction

    Estimate to Support Agreement for Relocation, Removal, or Adjustment of Facilities in Conflict with Proposed Transportation Construction

    Estimate to Support Agreement for Relocation, Removal, or Adjustment of Facilities in Conflict with Proposed Transportation Construction

    Estimate to Support Agreement for Relocation, Removal, or Adjustment of Facilities in Conflict with Proposed Transportation Construction

    Estimate to Support Agreement for Relocation, Removal, or Adjustment of Facilities in Conflict with Proposed Transportation Construction

    GDOT - State Utilities Office1First Use: September 24, 2009Revised January 9, 2015

    GDOT - State Utilities Office1First Use: September 24, 2009Revised January 9, 2015

    GDOT - State Utilities Office1First Use: September 24, 2009Revised January 9, 2015

    GDOT - State Utilities Office1First Use: September 24, 2009Revised January 9, 2015

    GDOT - State Utilities Office1First Use: September 24, 2009Revised January 9, 2015

    GDOT - State Utilities Office1First Use: September 24, 2009Revised January 9, 2015

    Page 2

    V.Preliminary and Construction Engineering [Section 645.109, 23 CFR 645A, & 23 CFR 140B]

    1. Preliminary Engineering authorized on this project by GDOT letter dated:

    2. Plans and Estimate Prepared By:(Check Applicable Party)

    Forces of this Company

    Consultant: (Name and Address)

    Approval of Consultant given by GDOT letter dated:Amount:

    Effective date of Contract, if a Continuing Contract:Exp. Date:

    The Certificate of Consultant Form is attached to the Consultant's Estimate of Engineering Services.

    Scope of Work Detailing Preliminary Engineering and Construction Engineering attached to Consultant's Estimate of Engineering Services.

    Total Preliminary Engineering Costs$10,518.50

    Attach Support Documentation to Estimate - See Exhibit:

    Total Construction Engineering Costs$35,300.00

    Attach Support Documentation to Estimate - See Exhibit:

    NOTE: Payment for Construction Engineering will not be allowed for Work included in GDOT Contracts.

    Total Preliminary and Construction Engineering Costs$45,818.50

    VI.Right of Way Acquisition [Section 645.111, 23 CFR 645A]

    (Check Applicable Section)

    Replacement R/W or Easements are not required for adjustment of utilities facilities on this Project.

    Replacement R/W shown on plans will be acquired by the Department (Separate written request must be furnished).

    Replacement R/W or Easements shown on the attached plans will be acquired by the Company.

    Total Cost of Right of Way Acquisition$25,000.00

    Attach Support Documentation to Estimate. Include Estimates for Appraisal, Negotiation, Recording, and Right-of-Way or Easement Costs - See Exhibit:

    VII.Construction [Section 645.115 and Section 645.117, 23 CFR 645A]

    A. Description of Proposed Utility Work:

    B. The Company will perform the work provided for in this Estimate by the following method:

    (Check Applicable Method - see page 3 for continuation)

    By Company's Regular Forces

    The Company Proposes to use its regular construction or maintenance crews and personnel at its standard schedule of wages and working hours in accordance with the terms of its Agreement with such employees.

    By Contract

    The Company does not have adequate staff or equipment to perform the necessary work with its own forces; therefore, the Company, subject to approval of the Department and FHWA, proposes to contract the work covered by this estimate in accordance with the provisions of Section 645.115 (a), 23 CFR 645A. The items of work to be accomplished by contract are noted in this estimate. When the Company elects to solicit competitive bids from a list of qualified contractors rather than through advertising in a publication, the names and addresses of these contractors so circularized shall be noted on the estimate and furnished to the Department in advance of the Company's solicitation of bids. The Department shall approve the low bidder before work can began. Please provide Company Name, Address, and Contact Person and Number below:

    Estimate for Relocation, Removal, or Adjustment of Utility Facilities

    Estimate for Relocation, Removal, or Adjustment of Utility Facilities

    Estimate for Relocation, Removal, or Adjustment of Utility Facilities

    Estimate for Relocation, Removal, or Adjustment of Utility Facilities

    Estimate for Relocation, Removal, or Adjustment of Utility Facilities

    Estimate for Relocation, Removal, or Adjustment of Utility Facilities

    GDOT - State Utilities Office2First Use: September 24, 2009Revised January 9, 2015

    GDOT - State Utilities Office2First Use: September 24, 2009Revised January 9, 2015

    GDOT - State Utilities Office2First Use: September 24, 2009Revised January 9, 2015

    GDOT - State Utilities Office2First Use: September 24, 2009Revised January 9, 2015

    GDOT - State Utilities Office2First Use: September 24, 2009Revised January 9, 2015

    GDOT - State Utilities Office2First Use: September 24, 2009Revised January 9, 2015

    Page 3

    By Existing Continuing Contract

    Subject to the approval of the Department and the FHWA, the Company proposes to use an existing continuing contract performed under which certain work as shown by the Company's estimate is regularly performed for the Company and under which the lowest available costs are developed. The name of the contractor or contractors are listed in the company's estimate. Please indicate the Company Name, Address, and Contact Person and Number below (If needed, attach additional names to Estimate). Once the Company selects a continuing contractor, a copy of the continuing contract has to be submitted to the Department for approval before any work begans.

    Effective Date of Continuing Contract:Expiration Date:

    C. Detail of Construction Costs

    Labor Costs [Section 645.117, 23 CFR 645A]$350,000.00

    Attach Support Documentation to Estimate, Including Additives - See Exhibit:

    Materials Costs [Section 645.117(e), 23 CFR 645A] $750,000.00

    Attach Support Documentation to Estimate - See Exhibit:

    Right-of-Way Clearing & Trimming Costs$80,000.00

    Attach Support Documentation to Estimate - See Exhibit:

    Equipment Costs [Section 645.117(f), 23 CFR 645A]250,000.00

    Attach Support Documentation to Estimate - See Exhibit:1

    Total Construction Costs$1,430,000.00

    VIII.Total Costs of Proposed Relocation (V through VII)$1,500,818.50

    IX.Detail of Accrued Depreciation and Salvage Credits

    A. Accrued Depreciation (Expired Service Life) [Section 645.117(h), 23 CFR 645A]

    (Check Applicable Statement)

    Accrued Depreciation is not allowed in this estimate.

    Accrued Depreciation is allowed in this estimate.

    (Please Provide Detailed Description/Explanation i.e. Pumping Station, Filtration Plant, Power Plant, Substation, etc.)

    Accrued Depreciation Credit$65,000.00

    Attach Support Documentation to Estimate - See Exhibit:1

    B. Salvage [Section 645.117(e), 23 CFR 645A]

    (Check Applicable Statement)

    Salvage is not allowed in this estimate because:

    Salvage from temporary material is not allowed because:

    Salvage is allowed in this estimate.

    Salvage from temporary material is allowed.

    The Department and the FHWA shall have the right to inspect recovered materials prior to disposal by sale or scrap. This requirement will be satisfied by the Company giving two weeks written notice to the Department or oral notice followed by written confirmation of the time and place the materials will be available for inspection. This notice is the responsibility of the Company and it may be held accountable for full value of materials disposed of without notice. If recovered materials are not reusable, they shall be disposed of as outlined in Section 645.117(e), 23 CFR 645A.

    Total Salvage Credit$75,000.00

    Total Accrued Depreciation and Salvage Credit$140,000.00

    * See Contingencies & Markups

    Estimate for Relocation, Removal, or Adjustment of Utility Facilities

    Estimate for Relocation, Removal, or Adjustment of Utility Facilities

    Estimate for Relocation, Removal, or Adjustment of Utility Facilities

    Estimate for Relocation, Removal, or Adjustment of Utility Facilities

    Estimate for Relocation, Removal, or Adjustment of Utility Facilities

    Estimate for Relocation, Removal, or Adjustment of Utility Facilities

    GDOT - State Utilities Office3First Use: September 24, 2009Revised January 9, 2015

    GDOT - State Utilities Office3First Use: September 24, 2009Revised January 9, 2015

    GDOT - State Utilities Office3First Use: September 24, 2009Revised January 9, 2015

    GDOT - State Utilities Office3First Use: September 24, 2009Revised January 9, 2015

    GDOT - State Utilities Office3First Use: September 24, 2009Revised January 9, 2015

    GDOT - State Utilities Office3First Use: September 24, 2009Revised January 9, 2015

    Page 4

    X.Total Cost of Relocation$1,360,818.50

    (Less Credits for Accrued Depreciation and Salvage Value, VIII-IX)

    XI.Betterment Credit [Section 645.117(h), 23 CFR 645A](Check Applicable Statement)

    Betterment credit is not allowed in this estimate since there is to be no functional

    increase in size in the replaced facility unless caused by proposed highway construction

    Betterment credit is allowed as shown in the following comparison:

    Location of Betterment: (Please indicate Station, Route Name, and Number)

    Betterment Credit Amount$0.00

    *Attach Support Documentation to Estimate - See Exhibit:

    *Include Estimate for Cost to Install Proposed Facilities to Produce Current Capacity and the Cost to Install Proposed Facilities for Increased Capacity.

    XII.Total Estimated Cost of Reimbursable Adjustments$1,360,818.50

    (Item X less Item XI)

    XIII.Proportionate Share

    (Check Applicable Statement - 1, 2, or 2 & 3)

    1. The Department will bear 100 percent of the cost of the adjustments.

    2. The Company will participate in a pro rata share of the cost of adjustments (No Betterments).

    Percentage Split:70.00%Company Participation (If 0%, insert 100% for GDOT Participation)

    30.00%GDOT Participation

    Total100.00%(Total Shall be 100%)

    Attach Support Documentation/Detailed Calculations to Estimate - See Exhibit:

    3. The Company will participate in a pro rata share of the cost of the adjustments determined as Betterments.

    Estimate for Relocation, Removal, or Adjustment of Utility Facilities

    Estimate for Relocation, Removal, or Adjustment of Utility Facilities

    Estimate for Relocation, Removal, or Adjustment of Utility Facilities

    Estimate for Relocation, Removal, or Adjustment of Utility Facilities

    Estimate for Relocation, Removal, or Adjustment of Utility Facilities

    Estimate for Relocation, Removal, or Adjustment of Utility Facilities

    GDOT - State Utilities Office4First Use: September 24, 2009Revised January 9, 2015

    GDOT - State Utilities Office4First Use: September 24, 2009Revised January 9, 2015

    GDOT - State Utilities Office4First Use: September 24, 2009Revised January 9, 2015

    GDOT - State Utilities Office4First Use: September 24, 2009Revised January 9, 2015

    GDOT - State Utilities Office4First Use: September 24, 2009Revised January 9, 2015

    GDOT - State Utilities Office4First Use: September 24, 2009Revised January 9, 2015

    Page 5

    ItemsTotal

    V.Preliminary and Construction Engineering $45,818.50

    VI.Right-of-Way Acquisition Costs$25,000.00

    VII.Construction Costs$1,430,000.00

    VIII.Total for Proposed Relocation Work (V+VI+VII)$1,500,818.50

    IX.Total Accrued Depreciation and Salvage Credits( - )$140,000.00

    X.Total Relocation Work$1,360,818.50

    XI.Betterment Credit( - )$0.00

    XII.Total Estimate of Reimbursable Adjustments (X-XI)$1,360,818.50

    XIII.Proportionate Share: Check Applicable Statement and Insert Above Estimate Amounts from X, XI, and XII

    1. The Department will bear 100 percent of the cost of the adjustments (See XII).

    XII. Total Estimate of Reimbursable Adjustments$0.00

    (OR)

    2. The Company will Participate in a pro rata share of the cost of adjustments (No Betterments).

    XII. Total Estimate of Reimbursable Adjustments$1,360,818.50

    Percentage Split (Insert From Page 4)Proportionate Share:

    70.00%Company Participation$952,572.95Company Participation

    30.00%GDOT Participation$408,245.55GDOT Participation

    (OR)

    3. The Company will participate in a pro rata share of the cost of the adjustments determined as Betterments.

    X. Total Relocation Work$0.00

    XI. Betterment Credit$0.00

    XII. Total Estimate of Reimbursable Adjustments$0.00

    Percentage SplitProportionate Share:

    ERROR:#DIV/0!Company Participation$0.00Company Participation

    ERROR:#DIV/0!GDOT Participation$0.00GDOT Participation

    (OR)

    Combination of 2. and 3.

    X. Total Relocation Work$0.00

    XI. Betterment Credit$0.00

    XII. Total Estimate of Reimbursable Adjustments$0.00

    2. Percentage Spilt (Insert From Page 4)

    0.00%Company Participation$0.00Company Participation

    0.00%GDOT Participation$0.00GDOT Participation

    3. Plus Betterment Credit

    $0.00Company Participation

    2 Plus 3 Proportionate Share

    ERROR:#DIV/0!Company Participation$0.00Company Participation

    ERROR:#DIV/0!GDOT Participation$0.00GDOT Participation

    ERROR:#DIV/0!$0.00Total

    Arithmetic Extensions Checked and Found Correct.

    District Utilities Engineer (Signature)(Date)

    &"Arial,Bold"&12Estimate for Relocation, Removal, or Adjustment of Utility FacilitiesSummary of Costs

    &"Arial,Bold"&12Estimate for Relocation, Removal, or Adjustment of Utility FacilitiesSummary of Costs

    &"Arial,Bold"&12Estimate for Relocation, Removal, or Adjustment of Utility FacilitiesSummary of Costs

    &"Arial,Bold"&12Estimate for Relocation, Removal, or Adjustment of Utility FacilitiesSummary of Costs

    &"Arial,Bold"&12Estimate for Relocation, Removal, or Adjustment of Utility FacilitiesSummary of Costs

    &"Arial,Bold"&12Estimate for Relocation, Removal, or Adjustment of Utility FacilitiesSummary of Costs

    GDOT - State Utilities Office5First Use: September 24, 2009Revised January 9, 2015

    GDOT - State Utilities Office5First Use: September 24, 2009Revised January 9, 2015

    GDOT - State Utilities Office5First Use: September 24, 2009Revised January 9, 2015

    GDOT - State Utilities Office5First Use: September 24, 2009Revised January 9, 2015

    GDOT - State Utilities Office5First Use: September 24, 2009Revised January 9, 2015

    GDOT - State Utilities Office5First Use: September 24, 2009Revised January 9, 2015

    Page 6

    Company Name:

    GDOT Project No:

    GDOT PI No:123456

    County:

    The Company shall attach a completed Facility Detail Summary to substantiate and prove its facilities are eligible for reimbursement. As a minimum, the Company shall provide the following information:

    Location of Facility (Referencing Project Station Number and intersecting street, road, or highway)

    Date Existing Facility was installed by Utility Owner

    Indicate location of utilities: Private property by deed or easement or on a public facility by permit. Indicate dates of all applicable deeds, easements, or permits.

    Case Number of Reimbursement eligibility (See Chapter 4 of the Utility Accommodation Policy and Standards Manual - classification to be made by the Utility Company and Verified by GDOT District Utilities Office)

    Any other information that may assist the Department in certifying eligibility.

    This is to certify that the utility facilities as presently existing and as to be adjusted or relocated and as shown on the plans and estimate of cost supporting the Utility Relocation Agreement for which reimbursement is to be claimed, are owned, operated and maintained the company listed above. The facts concerning location of utility facilities, dates of installations and records of the Company showing its property interests will be made available for inspections by representatives of the Department at the office of the Company. It is further certified that the facilities shown as located on private property are correctly shown; that the facilities as located on streets and roads or other permits and franchise rights are correctly shown. Further, the above information as to title records, permits and franchise rights are correctly shown.

    John DoeApril 28, 2019

    Name and Title of Authorized Company RepresentativeDate

    The facilities noted on the attached summary, as required by this estimate, have been reviewed in the field with a representative of the Utility Owner. This is to certify that the facilities noted on the attached summary and shown to be on streets, roads, highways, or other public facilities are correct, and the facilities shown to be on private property are correct; further, that the cost of adjustment as covered by the attached estimate is eligible for reimbursement by the Department under the noted case(s) as described in Chapter 4 of the Utility Accommodation Policy and Standards Manual.

    Jane WiiliiamsMay 3, 2019

    GDOT District EngineerDate

    Certificate of Eligibility for Utility Reimbursement

    Certificate of Eligibility for Utility Reimbursement

    Certificate of Eligibility for Utility Reimbursement

    Certificate of Eligibility for Utility Reimbursement

    Certificate of Eligibility for Utility Reimbursement

    Certificate of Eligibility for Utility Reimbursement

    GDOT - State Utilities Office6First Use: September 24, 2009Revised January 9, 2015

    GDOT - State Utilities Office6First Use: September 24, 2009Revised January 9, 2015

    GDOT - State Utilities Office6First Use: September 24, 2009Revised January 9, 2015

    GDOT - State Utilities Office6First Use: September 24, 2009Revised January 9, 2015

    GDOT - State Utilities Office6First Use: September 24, 2009Revised January 9, 2015

    GDOT - State Utilities Office6First Use: September 24, 2009Revised January 9, 2015

    Certificate of Eligilibility

    Company Name:

    Georgia Project No:

    Georgia PI No:123456

    County:

    Facility Right or Permission

    Facility Location (Provide Station Number and Intersecting Streets, Roads, or Highways)Date Existing Facility InstalledPrivate Property by Deed or EasementPublic Facility by Permit or FranchiseInsert Reimbursement Case Number 1-10 as outlined in 4.2.A.2 ManualSupplemental Information

    DB 23 Pg 275-279I

    Certificate of Eligibility for Utility ReimbursementFacility Detail Summary

    Certificate of Eligibility for Utility ReimbursementFacility Detail Summary

    Certificate of Eligibility for Utility ReimbursementFacility Detail Summary

    Certificate of Eligibility for Utility ReimbursementFacility Detail Summary

    Certificate of Eligibility for Utility ReimbursementFacility Detail Summary

    Certificate of Eligibility for Utility ReimbursementFacility Detail Summary

    GDOT - State Utilities OfficeFirst Use: September 24, 2009Revised January 9, 2015

    GDOT - State Utilities OfficeFirst Use: September 24, 2009Revised January 9, 2015

    GDOT - State Utilities OfficeFirst Use: September 24, 2009Revised January 9, 2015

    GDOT - State Utilities OfficeFirst Use: September 24, 2009Revised January 9, 2015

    GDOT - State Utilities OfficeFirst Use: September 24, 2009Revised January 9, 2015

    GDOT - State Utilities OfficeFirst Use: September 24, 2009Revised January 9, 2015

    Engineering Billing Breakdown

    REQUIRED FORMAT FOR PRESENTING ENGINEERING FEES - BILLING

    PRELIMINARY ENGINEERINGHOURSAMOUNT

    CLASSIFICATIONBare Labor (per hr.)Overhead (per hr.)Total RateThis BillTOTAL TO DATEThis BillTOTAL TO DATEApproved Estimate

    Design Engineer$ 20.00$ 20.0084$ 1,680.00$ 20.00

    CADD Operator$ 18.00$ 18.00160$ 2,880.00$ 18.00

    Survey Chief$ 16.00$ 16.00160$ 2,560.00$ 16.00

    Laborer$ 12.00$ 12.00210$ 2,520.00$ 12.00

    Other (Specify)$ - 0$ - 0$ - 0

    COST OF LABOR$ 9,640.00$ 66.00

    INCIDENTALS

    Transportation700miles @0.055per mile=$ 38.50

    Subsistance30days @28per day=$ 840.00

    Other(specify)

    COST OF INCIDENTALS$ 878.50$ 878.50

    *FIXED FEE(PROFIT)

    TOTAL PRELIMINARY ENGINEERING$ 10,518.50$ 944.50$ - 0

    CONSTRUCTION ENGINEERING

    HOURSAMOUNT

    CLASSIFICATIONBare Labor (per hr.)Overhead (per hr.)Total RateThis BillTOTAL TO DATEThis BillTOTAL TO DATEApproved Estimate

    Engineer

    Inspector$ 25.00$ 25.00728$ 18,200.00$ 25.00

    Survey Chief$ 18.00$ 18.00650$ 11,700.00$ 18.00

    Laborer$ 12.00$ 12.00450$ 5,400.00$ 12.00

    Other (Specify)$ - 0$ - 0$ - 0

    COST OF LABOR$ 35,300.00$ 55.00

    INCIDENTALS

    Transportation729miles @0.55per mile=$ 400.95

    Subsistance60days @28per day=$ 1,680.00

    Other(specify)

    COST OF INCIDENTALS$ - 0$ 2,080.95

    *FIXED FEE(PROFIT)

    TOTAL CONSTRUCTION ENGINEERING$ 35,300.00$ 2,135.95$ - 0

    Estimated

    TOTAL PRELIMINARY AND CONSTRUCTION ENGINEERING$ 45,818.50$ 3,080.45$ - 0

    * If the scope of work changes, a revised estimate will be required and the FIXED FEE may be renegotiated.

    Certificate of Consultant

    Certificate of Consultant

    I hereby certify that I am the _________________ representative of the firm of ______________________________________________________________________________________, and that except as expressly stated and described herein, neither I nor the firm of ___________________________________________has, in connection with its contract with ________________________, entered into pursuant to provisions of an agreement between the (Name of Utility)aforementioned utility and the State of _____________, as a part of Federal-aid project___________________________.

       (A) employed or retained for a commission, percentage, brokerage, contingent fee, or other consideration , any firm, company, or person, other than a bona fide employee working solely for me or the aforementioned firm, to solicit or secure the contract, or(B) agreed, as an express or implied condition for obtaining the award of the contract, to employ or retain the services of any firm, company, or person in connection with the carrying out of the contract, or(C) paid, or agreed to pay, to any firm, company organization, or person, other than a bona fide employee working solely for me or the aforementioned firm, any fee, contribution, donation, or consideration of any kind for, or in connection with, procuring or carrying out the contract. 

     (Statement and Explanation of exception, if any):    I acknowledge that this certificate is to be furnished to the Department of Transportation in connection with the aforementioned project involving participation of Federal-aid Highway funds, and is subject to applicable State and federal laws, both criminal and civil. _______________________________________Date Signature

    Guidelines

    &"Tahoma,Regular"&12Guidelines for Completing the Estimate for Relocation, Removal, or Adjustment of Utility Facilities

    &"Tahoma,Regular"&12Guidelines for Completing the Estimate for Relocation, Removal, or Adjustment of Utility Facilities

    &"Tahoma,Regular"&12Guidelines for Completing the Estimate for Relocation, Removal, or Adjustment of Utility Facilities

    &"Tahoma,Regular"&12Guidelines for Completing the Estimate for Relocation, Removal, or Adjustment of Utility Facilities

    &"Tahoma,Regular"&12Guidelines for Completing the Estimate for Relocation, Removal, or Adjustment of Utility Facilities

    &"Tahoma,Regular"&12Guidelines for Completing the Estimate for Relocation, Removal, or Adjustment of Utility Facilities

    GDOT - State Utilities OfficeFirst Use: September 24, 2009Revised January 9, 2015

    GDOT - State Utilities OfficeFirst Use: September 24, 2009Revised January 9, 2015

    GDOT - State Utilities OfficeFirst Use: September 24, 2009Revised January 9, 2015

    GDOT - State Utilities OfficeFirst Use: September 24, 2009Revised January 9, 2015

    GDOT - State Utilities OfficeFirst Use: September 24, 2009Revised January 9, 2015

    GDOT - State Utilities OfficeFirst Use: September 24, 2009Revised January 9, 2015

    The Utility Agreement Cost Estimate (Estimate), formerly known as the 10 Page Estimate, has been revised to accommodate current practices of Utility Companies use of attachments and exhibits to support the estimate categories and overall totals. The Estimate has been streamlined by requiring the Company to insert the final estimate amounts for the major categories of the work such as Engineering, Right-of-Way, Construction, Salvage and Depreciation, Betterment, and Proportionate Share. The Company will need to provide documentation (“Exhibits”) to support the estimate categories. The Estimate no longer has separate tables under the major categories for the Company to complete. The Company’s exhibits (or attachments) will take the place of the tables in the previous Estimate versions. The Company should insert data into all of the applicable orange shaded fields. The Company should note all exhibits/attachments in the Estimate with the appropriate designation (Example – Exhibit A, Exhibit B, etc.).

    Page 3: The Company will need to provide a copy of the Continuing Contract for the contractor selected to complete the relocation work.

    Page 4: For Item XIII, the Company shall check the appropriate statement: Either the Department will participate at 100%, or…  The Company and the Department will share in the costs with no betterments, or… The Company and the Department will share in the costs with the Company funding betterments, or…, The Company and the Department will share in the costs with the Company funding betterments and non-betterments. Page 5: Items V through XII will calculate or populate automatically. However, as stated above, the Company will need to check the appropriate statements as applicable to the specific estimate and project. In addition, the Company will need to complete the section by inserting the numbers calculated/populated at the top of the page into the applicable section and shaded fields. Depending on which statement is selected, the Company will also need to insert the participation percentages from Page 4. Remember, if the section or field is shaded, input, if applicable to the section or item, is required from the Company.

    Contingencies and Markups

    To promote accuracy and consistency, the Office of Utilities at the Georgia Department of Transportation (GDOT) is providing clarification for Contingencies and Markups when preparing the estimates for utilities relocation work. Please note that GDOT’s Estimate for Relocation, Removal, or Adjustment of Facilities conveniently refers to the corresponding Federal Regulations listed below. CONTIGENCIES: Contingencies cost are generally unallowable except in some cases as outlined in the Federal Acquisition Regulation (FAR) 31.205-7(c) (2). See link below and attachment for excerpt. https://acquisition.gov/far/current/html/Subpart%2031_2.html#wp1095552 MARKUPS: The 23 CFR, Part 645, Subpart A, Section 645.117 “Cost development and reimbursement” explains in detail what costs are allowable. See link below and attachment for excerpt. http://www.fhwa.dot.gov/legsregs/directives/fapg/cfr0645a.htm23 CFR, Part 645, Subpart A, Section 645.117 allows for the utility to bill direct labor and additives such as labor surcharge (cost of benefits) and overhead.  Theses additives can be billed as a percentage of cost.  The regulation also requires the utility to provide documentation of the rate(s) charged, the components of the rate(s), and the basis of the allocation (the cost to rate(s) were applied to) of the each additive. Any additional additives to the direct labor other than the above, is not allowed. For Material and supply costs, the “Handling Cost” can be shown as an actual cost or as a percentage in lieu of the actual or average cost (refer to Sec. 645.117 (e) (4)).

  • Utility Agreement Estimate

    • Project Cost Updates

    Concept Development

    Project Milestones

    • Historical Data

    Items included in the roadway contract

    Agreement Estimates provided by Utilities

    Directly from Utility Owners

  • Utility Estimates

    FILE

    Project No: Office:County Date:P.I.#

    Description:

    FROM

    TO

    SUBJECT

    Reimbursable Non-Reimbursable

    $715,000.00 $677,500.00$1,250,000.00 $500,000.00

    $0.00 $0.00$0.00 $74,000.00

    ** $0.00 $215,750.00** $0.00 $120,000.00** $41,000.00 $60,000.00

    $36,000.00 $120,000.00$0.00 $124,000.00$0.00 $36,000.00

    100.00% $2,042,000.00 $1,927,250.00100.00% $2,042,000.00

    0.00% $0.00

    ** Indicates Potential Utility Aid Request from Local Gov't

    City of AtlantaClayton CountyCity of AtlantaColonial PipelineTelephone 1

    Department ResponsibilityLocal Sponsor Responsibility

    Site Visit / Available Drawings

    Zayo

    Site Visit / Available Drawings

    Georgia Transmission CorpGeorgai Power

    Estimate Based onUtility Owner

    PFA Dated N/A with N/A

    Power Co 3Comcast

    Total

    Site Visit / Available DrawingsSite Visit / Available Drawings

    Site Visit / Available Drawings

    Site Visit / Available DrawingsSite Visit / Available DrawingsSite Visit / Available DrawingsSite Visit / Available Drawings

    DEPARTMENT OF TRANSPORTATIONSTATE OF GEORGIA

    A review of utilities located on the above referenced project has been conducted without a design concept. Listed below is a breakdown of the anticipated reimbursable and non-reimbursable cost.

    Site Visit / Available Drawings

    ___________

    ATLANTAMay 2, 2019

    INTERDEPARTMENT CORRESPONDENCE

    AASHTO CRUO Chattanooga

    n/aForsyth1234567

    PRELIMINARY UTILITY COST ESTIMATE

    xxxx xxxxx, Project Manager

    Robby Oliver, District Utilities Manager

    Utility Owner Reimbursable Non-Reimbursable Estimate Based on

    Georgia Power $715,000.00 $677,500.00 Site Visit / Available DrawingsGeorgia Transmission Corp $1,250,000.00 $500,000.00 Site Visit / Available DrawingsPower Co 3 $0.00 $0.00 Site Visit / Available DrawingsComcast $0.00 $74,000.00 Site Visit / Available DrawingsCity of Atlanta ** $0.00 $215,750.00 Site Visit / Available DrawingsClayton County ** $0.00 $120,000.00 Site Visit / Available DrawingsCity of Atlanta ** $41,000.00 $60,000.00 Site Visit / Available DrawingsColonial Pipeline $36,000.00 $120,000.00 Site Visit / Available DrawingsAT&T $0.00 $124,000.00 Site Visit / Available DrawingsZayo $0.00 $36,000.00 Site Visit / Available Drawings

    Total 100.00% $2,042,000.00 $1,927,250.00Department Responsibility 100.00% $2,042,000.00

    Local Sponsor Responsibility 0.00% $0.00 PFA Dated N/A with N/A

    ** Indicates Potential Utility Aid Request from Local Gov't

  • Utility EstimatesP.I.# 1234567

    Power Company Name

    Reimbursable Costs 5/3/2019 5/3/2019 5/3/2019

    Units Quantity Unit Cost Subtotal Units Quantity Unit Cost Subtotal Units Quantity Unit Cost SubtotalPrel Eng. -$ -$ -$ Constr Eng. -$ -$ -$ Easements -$ -$ -$ Facilities, Poles - type 1 EA 2 35,000.00$ 70,000.00$ EA -$ EA -$ Facilities, Poles - type 2 EA -$ EA 5 250,000.00$ 1,250,000.00$ EA -$ Facilities, Poles - type 3 EA 15 43,000.00$ 645,000.00$ EA -$ EA 0 22,000.00$ -$ Facilities, Other -$ -$ -$

    Total 715,000.00$ 1,250,000.00$ -$

    Non Reimbursable Costs

    Units Quantity Unit Cost Subtotal Units Quantity Unit Cost Subtotal Units Quantity Unit Cost SubtotalPrel Eng. -$ -$ -$ Constr Eng. -$ -$ -$ Easements -$ -$ -$ Facilities, Poles - type 1 EA 10 35,000.00$ 350,000.00$ EA -$ EA -$ Facilities, Poles - type 2 EA -$ EA 2 250,000.00$ 500,000.00$ EA -$ Facilities, Poles - type 3 EA 5 43,000.00$ 215,000.00$ EA -$ EA 0 22,000.00$ -$ UG electric LF 750 150.00$ 112,500.00$ -$ -$

    Total 677,500.00$ 500,000.00$ -$

    Georgia Power Georgai Transmission Corp Power Company 3

    Power Company Relocation Costs

  • Utility Estimates

    FILE

    Project No: Office:County Date:P.I.#

    Description:

    FROM

    TO

    SUBJECT

    Formats are set. I would prefer that you do not change any fonts, sizes etc, with the exception of the "Additional comments" go here box. You can make that box taller if needed to show entire comment added.

    Reimbursable Non-Reimbursable

    $70,000.00 $350,000.00 These boxes are drop down choices. Verify that choice shown is what you want to show.$1,250,000.00 $500,000.00

    $0.00 $0.00 These box contain formulas, but you may need to change them as they are location specific.$0.00 $74,000.00 I can help with this.

    ** $0.00 $215,750.00** $0.00 $120,000.00 These boxes are where data needs to be filled in and/or changed.** $41,000.00 $60,000.00 May just be part of the box (e.g. add an appropriate date or name to PFA box).

    $36,000.00 $120,000.00$0.00 $124,000.00 These boxes contain formulas that I would prefer not be changed. However, they can be$0.00 $36,000.00 changed if necessary - just be sure to let me know.

    100.00% $1,397,000.00 $1,599,750.00100.00% $1,397,000.00

    0.00% $0.00

    For ease of your estimates, you can just put the information in as if it is the Initial estimate.Estimate is based on the best available information at the current stage, unforeseen prior rights information may be provided by the Utility Company at a later date that could cause some non-reimbursable costs to shift to the reimbursable cost column.

    Additional comments go here if needed. Delete this line if not needed.

    If additional information is needed, please contact Robby Oliver at 770-531-5772.

    cc: Patrick Allen, State Utilities AdministratorYulonda Pride-Foster, State Utilities Preconstruction Manager???, DesignerBrandon Kirby, District Preconstruction EngineerScott Frederick, Area ManagerFile

    ** Indicates Potential Utility Aid Request from Local Gov't

    City of AtlantaClayton CountyCity of AtlantaColonial PipelineTelephone 1

    Department ResponsibilityLocal Sponsor Responsibility

    Site Visit / Available Drawings

    Zayo

    Site Visit / Available Drawings

    Georgia Transmission CorpGeorgai Power

    Estimate Based onUtility Owner

    PFA Dated N/A with N/A

    Power Co 3Comcast

    Total

    Site Visit / Available DrawingsSite Visit / Available Drawings

    Site Visit / Available Drawings

    Site Visit / Available DrawingsSite Visit / Available DrawingsSite Visit / Available DrawingsSite Visit / Available Drawings

    DEPARTMENT OF TRANSPORTATIONSTATE OF GEORGIA

    A review of utilities located on the above referenced project has been conducted without a design concept. Listed below is a breakdown of the anticipated reimbursable and non-reimbursable cost.

    Site Visit / Available Drawings

    ___________

    ATLANTAMay 3, 2019

    INTERDEPARTMENT CORRESPONDENCE

    AASHTO CRUO Chattanooga

    n/aForsyth1234567

    PRELIMINARY UTILITY COST ESTIMATE

    xxxx xxxxx, Project Manager

    Robby Oliver, District Utilities Manager

  • Unit Cost

    660-1215 SEWER FORCE MAIN, 4 IN, - 5,880.00 4 LF 41.76 38.65

    660-1220 SEWER FORCE MAIN, 6 IN, - 14,841.00 5 LF 32.89 15.71

    660-1225 SEWER FORCE MAIN, 8 IN, - 8,016.00 6 LF 135.61 61.60

    660-1230 SEWER FORCE MAIN, 10 IN, - 1,185.00 2 LF 34.35 34.56

    Georgia Department Of TransportationItem Mean Summary for May-06-2005 to Mar-26-2019

    2013 Spec

    ITEM CODE ITEM DESCRIPTION QUANTITY USE UM MEAN WTD AVG

  • Unit Cost

    670-1120 WATER MAIN, 12 IN 179,264.00 45 LF 110.46 84.74

    670-1140 WATER MAIN, 14 IN 2,265.00 3 LF 164.92 71.72

    670-1160 WATER MAIN, 16 IN 34,641.00 15 LF 169.57 88.96

    670-1180 WATER MAIN, 18 IN 200.00 1 LF 109.62 109.62

    Georgia Department Of TransportationProcessed Date: Mar-26-2019

    Item Mean Summary for May-06-2005 to Mar-26-20192013 Spec

    ITEM CODE ITEM DESCRIPTION QUANTITY USE UM MEAN WTD AVG

  • References

    Federal Acquisition Regulations (FAR) – CFR 48 – Part 31https://www.ecfr.gov/cgi-bin/text-idx?tpl=/ecfrbrowse/Title48/48cfr31_main_02.tpl

    23 CFR 645.109https://www.gpo.gov/fdsys/pkg/CFR-2017-title23-vol1/pdf/CFR-2017-title23-vol1-sec645-

    109.pdf

    23 CFR 172https://www.gpo.gov/fdsys/pkg/CFR-2017-title23-vol1/xml/CFR-2017-title23-vol1-part172.xml

    https://www.ecfr.gov/cgi-bin/text-idx?tpl=/ecfrbrowse/Title48/48cfr31_main_02.tplhttps://www.gpo.gov/fdsys/pkg/CFR-2017-title23-vol1/pdf/CFR-2017-title23-vol1-sec645-109.pdfhttp://www.fhwa.dot.gov/legsregs/directives/fapg/cfr0645a.htm

  • Code of Federal Regulations, Title 23, Part 645 Part A & B Utilities

    http://www.fhwa.dot.gov/legsregs/directives/fapg/cfr0645a.htm

    http://www.fhwa.dot.gov/legsregs/directives/fapg/cfr0645b.htm

    GDOT Reimbursable Utilities Estimate www.dot.ga.gov/PartnerSmart/utilities/Pages/Details.aspx?categoryID=8

    Program Guide, Utility Relocation and Accommodation https://www.fhwa.dot.gov/reports/utilguid/if03014.pdf

    References

    http://www.fhwa.dot.gov/legsregs/directives/fapg/cfr0645a.htmhttp://www.fhwa.dot.gov/legsregs/directives/fapg/cfr0645b.htmhttp://www.dot.ga.gov/PartnerSmart/utilities/Pages/Details.aspx?categoryID=8https://www.fhwa.dot.gov/reports/utilguid/if03014.pdf

  • Questions?

  • FILE

    Project No: Office:County Date:P.I.#

    Description:

    FROM

    TO

    SUBJECT

    Reimbursable Non-Reimbursable$715,000.00 $677,500.00

    $1,250,000.00 $500,000.00$0.00 $0.00$0.00 $74,000.00

    ** $0.00 $215,750.00** $0.00 $120,000.00** $41,000.00 $60,000.00

    $36,000.00 $120,000.00$0.00 $124,000.00$0.00 $36,000.00

    100.00% $2,042,000.00 $1,927,250.00100.00% $2,042,000.00

    0.00% $0.00

    DEPARTMENT OF TRANSPORTATIONSTATE OF GEORGIA

    A review of utilities located on the above referenced project has been conducted without a design concept. Listed below is a breakdown of the anticipated reimbursable and non-reimbursable cost.

    Site Visit / Available Drawings

    ___________

    ATLANTAMay 2, 2019

    INTERDEPARTMENT CORRESPONDENCE

    AASHTO CRUO Chattanooga

    n/aForsyth1234567

    PRELIMINARY UTILITY COST ESTIMATE

    xxxx xxxxx, Project Manager

    Robby Oliver, District Utilities Manager

    Georgia Transmission CorpGeorgai Power

    Estimate Based onUtility Owner

    PFA Dated N/A with N/A

    Power Co 3Comcast

    Total

    Site Visit / Available DrawingsSite Visit / Available Drawings

    Site Visit / Available Drawings

    Site Visit / Available DrawingsSite Visit / Available DrawingsSite Visit / Available DrawingsSite Visit / Available Drawings

    ** Indicates Potential Utility Aid Request from Local Gov't

    City of AtlantaClayton CountyCity of AtlantaColonial PipelineTelephone 1

    Department ResponsibilityLocal Sponsor Responsibility

    Site Visit / Available Drawings

    Zayo

    Site Visit / Available Drawings

    Estimate is based on the best available information at the current stage, unforeseen prior rights information may be provided by the Utility Company at a later date that could cause some non-reimbursable costs to shift to the reimbursable cost column.

    Additional comments go here if needed. Delete this line if not needed.

    If additional information is needed, please contact Robby Oliver at 770-531-5772.

    cc: Patrick Allen, State Utilities AdministratorYulonda Pride-Foster, State Utilities Preconstruction Manager???, DesignerBrandon Kirby, District Preconstruction EngineerScott Frederick, Area ManagerFile

  • ITEM CODE

    150-0008

    150-0009

    150-1000

    150-5010

    150-6000

    150-7010

    150-9011

    151-1000

    153-1300

    153-1400

    154-1000

    156-0100

    158-1000

    163-0232

    163-0240

    163-0300

    163-0501

    163-0502

    163-0503

    163-0520

    163-0527

    163-0528

    163-0529

    163-0531

    163-0535

    163-0539

    163-0540

    163-0541

    163-0542

    163-0543

    163-0550

    163-1930

    165-0010

    165-0030

    165-0041

    165-0050

    13

  • ITEM CODE

    165-0060

    165-0071

    165-0085

    165-0086

    165-0087

    165-0095

    165-0096

    165-0101

    165-0105

    165-0107

    165-0110

    165-0111

    165-0112

    165-1500

    166-0400

    166-0500

    166-0651

    167-1000

    167-1500

    169-0015

    170-1000

    170-2000

    171-0010

    171-0030

    201-1500

    204-0001

    205-0001

    205-0100

    205-0210

    206-0002

    207-0203

    207-2003

    208-0100

    208-0200

    208-0500

    210-0100

    210-0200

    210-0250

    211-0200

  • ITEM CODE

    211-0300

    212-1000

    215-4000

    217-1000

    217-1500

    222-0900

    222-1002

    222-2001

    222-2225

    225-4340

    225-9001

    231-1250

    232-0001

    232-4000

    301-2170

    301-4161

    301-4171

    301-5000

    301-6000

    310-1101

    310-1201

    310-5030

    310-5040

    310-5060

    310-5080

    310-5100

    310-5120

    310-5140

    318-1000

    318-3000

    400-3101

    400-3205

    400-3206

    400-3600

    400-3624

    402-1801

    402-1802

    402-1803

    402-1812

    402-1818

  • ITEM CODE

    402-3100

    402-3101

    402-3102

    402-3103

    402-3111

    402-3113

    402-3121

    402-3129

    402-3130

    402-3133

    402-3141

    402-3143

    402-3190

    402-3192

    402-3600

    402-3605

    402-3606

    402-3815

    402-3818

    402-3910

    402-4012

    402-4310

    402-4506

    402-4510

    402-4512

    402-4514

    402-4605

    402-4610

    407-0010

    407-0020

    410-0300

    413-0750

    413-1000

    413-1200

    413-1250

    415-5000

    418-1000

    418-1100

    418-1200

    418-1300

  • ITEM CODE

    419-1000

    420-0030

    424-5007

    424-5090

    424-5107

    424-6089

    424-6196

    424-6201

    424-7205

    429-1000

    430-0160

    430-0180

    430-0185

    430-0190

    430-0200

    430-0220

    430-0600

    431-1000

    432-0204

    432-0205

    432-0206

    432-0208

    432-0212

    432-0214

    432-0300

    432-0305

    432-0350

    432-4000

    432-5010

    433-1000

    433-1100

    433-1200

    433-1300

    436-1000

    437-1200

    437-1300

    437-1571

    437-2571

    437-2600

    439-0018

  • ITEM CODE

    439-0020

    439-0021

    439-0022

    439-0024

    439-0026

    439-0044

    439-0048

    439-0050

    439-0052

    439-0056

    439-0084

    439-0086

    439-0280

    439-0300

    441-0004

    441-0006

    441-0014

    441-0016

    441-0018

    441-0050

    441-0100

    441-0104

    441-0105

    441-0106

    441-0108

    441-0204

    441-0206

    441-0216

    441-0300

    441-0301

    441-0302

    441-0303

    441-0304

    441-0600

    441-0740

    441-0746

    441-0748

    441-0754

    441-0756

    441-0764

  • ITEM CODE

    441-3999

    441-4020

    441-4030

    441-4040

    441-4050

    441-4130

    441-5001

    441-5002

    441-5003

    441-5004

    441-5007

    441-5008

    441-5010

    441-5025

    441-5052

    441-5053

    441-5057

    441-6002

    441-6012

    441-6022

    441-6216

    441-6221

    441-6222

    441-6223

    441-6718

    441-6720

    441-6725

    441-6730

    441-6740

    441-7011

    441-7012

    441-7013

    441-7014

    441-9500

    442-0100

    443-1000

    444-1000

    446-1100

    446-1200

    446-2118

  • ITEM CODE

    447-1010

    447-1050

    449-1000

    449-1350

    449-1620

    449-1700

    449-1705

    449-1800

    449-3800

    449-3805

    451-1100

    451-1105

    452-1000

    453-1000

    454-0100

    455-1000

    456-2012

    456-2015

    456-2020

    456-2022

    456-2025

    457-1005

    457-1010

    461-1000

    461-2000

    461-4000

    500-0100

    500-1005

    500-1006

    500-1008

    500-1009

    500-1011

    500-2100

    500-2110

    500-3002

    500-3101

    500-3104

    500-3107

    500-3110

  • ITEM CODE

    500-3115

    500-3120

    500-3191

    500-3200

    500-3201

    500-3600

    500-3650

    500-3700

    500-3800

    500-3900

    500-5000

    500-9999

    501-2000

    501-2001

    501-2100

    501-3000

    501-3001

    502-1300

    502-1400

    504-0600

    505-1100

    507-0017

    507-0027

    507-1021

    507-1024

    507-5035

    507-5045

    507-5050

    507-8900

    507-9001

    507-9002

    507-9003

    507-9030

    507-9031

    507-9032

    507-9033

    507-9034

    507-9035

  • ITEM CODE

    507-9240

    509-0001

    509-0005

    511-1000

    511-3000

    514-0500

    514-1000

    515-1001

    515-1002

    515-2015

    515-2020

    516-1100

    518-1000

    519-0225

    519-0400

    519-0515

    519-0520

    519-0530

    519-0700

    520-0242

    520-0353

    520-0573

    520-0589

    520-0595

    520-0597

    520-1104

    520-1125

    520-1147

    520-1151

    520-1173

    520-1179

    520-1314

    520-1316

    520-1318

    520-1320

    520-1324

    520-1330

    520-2214

    520-2216

  • ITEM CODE

    520-2218

    520-2220

    520-2224

    520-2230

    520-2414

    520-2416

    520-2500

    520-3214

    520-3216

    520-3218

    520-3220

    520-3224

    520-3230

    520-3414

    520-3416

    520-3500

    520-4104

    520-4125

    520-4147

    520-4151

    520-4173

    520-4179

    520-4214

    520-4216

    520-4218

    520-4220

    520-4224

    520-4230

    520-4314

    520-4316

    520-4318

    520-4320

    520-4324

    520-4330

    520-5000

    520-9000

    521-1000

    521-3000

    522-1000

    523-1100

    524-0010

  • ITEM CODE

    524-0300

    524-0350

    524-0500

    524-0550

    525-1000

    527-0015

    527-0020

    527-0040

    527-0050

    527-0057

    527-0070

    527-0500

    528-0500

    528-0501

    528-0750

    529-1000

    530-0105

    531-1000

    533-0010

    534-1000

    535-1005

    535-1105

    535-1500

    540-1101

    540-1102

    540-1201

    540-1202

    541-0001

    544-1000

    547-2010

    547-2012

    547-2014

    547-2018

    550-1120

    550-1150

    550-1180

    550-1181

    550-1182

    550-1183

    550-1184

  • ITEM CODE

    550-1185

    550-1186

    550-1187

    550-1240

    550-1241

    550-1242

    550-1243

    550-1245

    550-1247

    550-1300

    550-1301

    550-1302

    550-1303

    550-1304

    550-1306

    550-1360

    550-1361

    550-1362

    550-1363

    550-1364

    550-1420

    550-1421

    550-1422

    550-1424

    550-1480

    550-1481

    550-1482

    550-1483

    550-1484

    550-1486

    550-1487

    550-1540

    550-1541

    550-1542

    550-1543

    550-1544

    550-1600

    550-1601

    550-1603

  • ITEM CODE

    550-1604

    550-1605

    550-1660

    550-1720

    550-1721

    550-1722

    550-1726

    550-1728

    550-1780

    550-1840

    550-1842

    550-2108

    550-2120

    550-2150

    550-2180

    550-2182

    550-2240

    550-2241

    550-2242

    550-2300

    550-2301

    550-2360

    550-2420

    550-2480

    550-3000

    550-3100

    550-3315

    550-3318

    550-3324

    550-3330

    550-3336

    550-3342

    550-3348

    550-3415

    550-3418

    550-3424

    550-3430

    550-3436

    550-3442

    550-3448

    550-3515

  • ITEM CODE

    550-3518

    550-3524

    550-3530

    550-3536

    550-3615

    550-3618

    550-3624

    550-3630

    550-3636

    550-3648

    550-4112

    550-4118

    550-4124

    550-4130

    550-4136

    550-4142

    550-4212

    550-4215

    550-4218

    550-4224

    550-4230

    550-4236

    550-4242

    550-4248

    550-4415

    550-4418

    550-4436

    550-4442

    561-1024

    570-1000

    572-1000

    573-1004

    573-1006

    573-1010

    573-2004

    573-2006

    573-2008

    576-1006

    576-1008

    576-1010

  • ITEM CODE

    576-1012

    576-1015

    576-1018

    576-1024

    576-1030

    576-1036

    577-1100

    581-1000

    590-1000

    600-0001

    603-0006

    603-1012

    603-1018

    603-1024

    603-1050

    603-1056

    603-1059

    603-1224

    603-1300

    603-2012

    603-2018

    603-2024

    603-2030

    603-2036

    603-2048

    603-2180

    603-2181

    603-2182

    603-2184

    603-2186

    603-6006

    603-6008

    603-6012

    603-7000

    607-1000

    607-3000

    607-4000

    608-1050

    608-4000

    609-1000

  • ITEM CODE

    610-0016

    610-0100

    610-0110

    610-0200

    610-0209

    610-0215

    610-0300

    610-0301

    610-0306

    610-0355

    610-0400

    610-0714

    610-0716

    610-0719

    610-0725

    610-0810

    610-0815

    610-0959

    610-1005

    610-1055

    610-1065

    610-1066

    610-1074

    610-1075

    610-1076

    610-1575

    610-1700

    610-1725

    610-1730

    610-1735

    610-1745

    610-1755

    610-1770

    610-1840

    610-2355

    610-2360

    610-2365

    610-2370

    610-2375

    610-2380

    610-2383

  • ITEM CODE

    610-2385

    610-2395

    610-2396

    610-2398

    610-2401

    610-2586

    610-2705

    610-2815

    610-5705

    610-5715

    610-5788

    610-5791

    610-5815

    610-5825

    610-6015

    610-6510

    610-6512

    610-6515

    610-6520

    610-6545

    610-6555

    610-6560

    610-6575

    610-6605

    610-6611

    610-6625

    610-6850

    610-6872

    610-6873

    610-6874

    610-6945

    610-7010

    610-7015

    610-9000

    610-9001

    610-9006

    610-9008

    610-9097

    610-9099

    610-9230

    610-9310

  • ITEM CODE

    610-9401

    610-9402

    610-9403

    610-9407

    611-3000

    611-3001

    611-3002

    611-3010

    611-3012

    611-3020

    611-3021

    611-3030

    611-3031

    611-3032

    611-3035

    611-3036

    611-3100

    611-4001

    611-4003

    611-4890

    611-4990

    611-4996

    611-4997

    611-5001

    611-5002

    611-5004

    611-5029

    611-5280

    611-5300

    611-5301

    611-5320

    611-5360

    611-5380

    611-5400

    611-5420

    611-5460

    611-5480

    611-5485

    611-5500

    611-5550

    611-5551

    611-5572

  • ITEM CODE

    611-5588

    611-5589

    611-5590

    611-5591

    611-5592

    611-5660

    611-8000

    611-8010

    611-8020

    611-8040

    611-8050

    611-8055

    611-8120

    611-8140

    611-9000

    611-9995

    615-1000

    615-1100

    615-2540

    615-2550

    617-0510

    617-1050

    620-0100

    620-0200

    621-3020

    621-3021

    621-3022

    621-3120

    621-3121

    621-3125

    621-3126

    621-3150

    621-4020

    621-4021

    621-4022

    621-4023

    621-4060

    621-4061

    621-4062

    621-4063

  • ITEM CODE

    621-4070

    621-4080

    621-4082

    621-4085

    621-4086

    621-5503

    621-6001

    621-6002

    621-6003

    621-6004

    621-6005

    621-6008

    621-6012

    621-6013

    621-6050

    621-6200

    621-6201

    621-6202

    621-6203

    621-6204

    621-6210

    621-6211

    621-6212

    621-6213

    624-0400

    624-0410

    624-0415

    625-0100

    626-0602

    627-1000

    627-1010

    627-1020

    627-1030

    627-1100

    627-1120

    627-1140

    627-1160

    627-1180

    628-0100

  • ITEM CODE

    630-0010

    630-0600

    631-2343

    631-2463

    631-8000

    631-8500

    632-0003

    633-3010

    633-3020

    633-5000

    633-9000

    634-1200

    634-1700

    634-1800

    635-1000

    635-2000

    636-1020

    636-1025

    636-1029

    636-1033

    636-1036

    636-1041

    636-1045

    636-1072

    636-1077

    636-2010

    636-2020

    636-2070

    636-2080

    636-2090

    636-3000

    636-3010

    636-4101

    636-4104

    636-5010

    636-5011

    636-5020

    636-5021

    636-5030

    636-5031

  • ITEM CODE

    636-5100

    636-6025

    636-9094

    638-1001

    638-1003

    638-1004

    638-1007

    638-1011

    638-1013

    638-1017

    639-1240

    639-1245

    639-1535

    639-1600

    639-2001

    639-2002

    639-3001

    639-3002

    639-3003

    639-3004

    639-3014

    639-4002

    639-4003

    639-4004

    639-4014

    639-5000

    641-1100

    641-1105

    641-1200

    641-1205

    641-2100

    641-2200

    641-5000

    641-5001

    641-5005

    641-5006

    641-5012

    641-5015

    641-5020

    641-5025

  • ITEM CODE

    641-6000

    641-7500

    641-7520

    641-9912

    642-0100

    642-0300

    642-0400

    643-0010

    643-0050

    643-0103

    643-0104

    643-0105

    643-0155

    643-0204

    643-1132

    643-1137

    643-1138

    643-1152

    643-1153

    643-1171

    643-1452

    643-2147

    643-2152

    643-2156

    643-2162

    643-2163

    643-4000

    643-5000

    643-8000

    643-8001

    643-8010

    643-8030

    643-8040

    643-8050

    643-8103

    643-8104

    643-8106

    643-8200

    643-8210

  • ITEM CODE

    643-8300

    643-8405

    647-0200

    647-0220

    647-1000

    647-1300

    647-1310

    647-1330

    647-2120

    647-2130

    647-2140

    647-2141

    647-2150

    647-2151

    647-2160

    647-2170

    647-3000

    647-3100

    647-5230

    647-6057

    647-6058

    647-6085

    647-6086

    647-6200

    647-6250

    647-6300

    648-1350

    648-1550

    649-0018

    649-0027

    652-0091

    652-0094

    652-0095

    652-0100

    652-0105

    652-0110

    652-0120

    652-0130

    652-0210

    652-2501

  • ITEM CODE

    652-2502

    652-3501

    652-3502

    652-5301

    652-5303

    652-5451

    652-5452

    652-5701

    652-5801

    652-6301

    652-6402

    652-6501

    652-6502

    652-9001

    652-9002

    653-0095

    653-0100

    653-0105

    653-0110

    653-0112

    653-0120

    653-0122

    653-0130

    653-0132

    653-0133

    653-0140

    653-0150

    653-0152

    653-0153

    653-0160

    653-0170

    653-0180

    653-0205

    653-0210

    653-0220

    653-0230

    653-0235

    653-0240

    653-0250

  • ITEM CODE

    653-0291

    653-0292

    653-0293

    653-0294

    653-0296

    653-0297

    653-0298

    653-0300

    653-0320

    653-0330

    653-0400

    653-0410

    653-0415

    653-0420

    653-1501

    653-1502

    653-1504

    653-1604

    653-1606

    653-1704

    653-1706

    653-1804

    653-1810

    653-1906

    653-2501

    653-2502

    653-2804

    653-2810

    653-3501

    653-3502

    653-3804

    653-3810

    653-4501

    653-4502

    653-4505

    653-4804

    653-4810

    653-4830

    653-6004

  • ITEM CODE

    653-6006

    653-8025

    653-8030

    653-8050

    653-8070

    653-8075

    653-8085

    653-8090

    653-8095

    654-1001

    654-1002

    654-1003

    654-1005

    654-1007

    654-1010

    655-5000

    655-7000

    656-0004

    656-0005

    656-0050

    656-0080

    656-0100

    656-0240

    656-1004

    656-1005

    656-1050

    656-2050

    656-3050

    656-3600

    656-4001

    656-5000

    656-5500

    656-5505

    656-5510

    656-5520

    656-5521

    656-5525

    656-5535

    656-5540

  • ITEM CODE

    656-5550

    657-1054

    657-1084

    657-1085

    657-1104

    657-1105

    657-1110

    657-1130

    657-1243

    657-1244

    657-2054

    657-2085

    657-2086

    657-3054

    657-3085

    657-3086

    657-3104

    657-4054

    657-4085

    657-4998

    657-4999

    657-5000

    657-5001

    657-5002

    657-5003

    657-5004

    657-5005

    657-5014

    657-5016

    657-5017

    657-5018

    657-5019

    657-5020

    657-5515

    657-5525

    657-5575

    657-6054

    657-6085

    657-6086

    657-7054

  • ITEM CODE

    657-7085

    657-8045

    657-8049

    657-8050

    657-8054

    657-8095

    657-8150

    657-9110

    657-9111

    657-9122

    657-9150

    657-9180

    657-9210

    657-9211

    657-9215

    657-9230

    657-9235

    657-9310

    657-9313

    657-9315

    657-9410

    657-9413

    657-9415

    657-9430

    657-9435

    657-9437

    657-9510

    657-9512

    657-9530

    657-9535

    657-9540

    657-9545

    657-9550

    657-9565

    657-9570

    657-9610

    657-9620

    657-9625

    657-9630

  • ITEM CODE

    658-1200

    658-1201

    658-1210

    658-1300

    658-1301

    658-1310

    658-1350

    658-1365

    658-1380

    659-5000

    659-5011

    659-5013

    659-7005

    659-7010

    659-7015

    660-0004

    660-0006

    660-0008

    660-0010

    660-0012

    660-0015

    660-0018

    660-0024

    660-0036

    660-0352

    660-0804

    660-0806

    660-0808

    660-0810

    660-0812

    660-0816

    660-0818

    660-0824

    660-0836

    660-1110

    660-1115

    660-1120

    660-1150

    660-1205

    660-1215

  • ITEM CODE

    660-1220

    660-1225

    660-1230

    660-1235

    660-1245

    660-1425

    660-1430

    660-1500

    660-1510

    660-1625

    660-1640

    660-1810

    660-1915

    660-1920

    660-1925

    660-2000

    660-2020

    660-2040

    660-2042

    660-2043

    660-2050

    660-2070

    660-2235

    660-2245

    660-2320

    660-2325

    660-2330

    660-2405

    660-2420

    660-2435

    660-2600

    660-3225

    660-3275

    660-3300

    660-3500

    660-3550

    660-4035

    660-4040

    660-4055

    660-4065

    660-4100

    663-0105

    663-0205

  • ITEM CODE

    664-0100

    664-0155

    664-0300

    664-0310

    664-0400

    664-0455

    664-0600

    664-0610

    665-0005

    665-0010

    665-0015

    665-0030

    665-0040

    665-0050

    665-0060

    665-0070

    665-0100

    665-0105

    665-0110

    665-0250

    666-0010

    666-0020

    668-1100

    668-1105

    668-1110

    668-1115

    668-1200

    668-1210

    668-2100

    668-2105

    668-2110

    668-2115

    668-2200

    668-2205

    668-2210

    668-2231

    668-2233

    668-3300

    668-3311

  • ITEM CODE

    668-3312

    668-3313

    668-3314

    668-3400

    668-3411

    668-3412

    668-3413

    668-4300

    668-4311

    668-4312

    668-4313

    668-4400

    668-4411

    668-4412

    668-4413

    668-4414

    668-5000

    668-5005

    668-5020

    668-6000

    668-6106

    668-7000

    668-7008

    668-7012

    668-7015

    668-7018

    668-7024

    668-8011

    668-8012

    668-8013

    668-8014

    668-8015

    668-9800

    670-0500

    670-0505

    670-0515

    670-0535

    670-0800

    670-0801

    670-0803

    670-0805

  • ITEM CODE

    670-0810

    670-0815

    670-0910

    670-0935

    670-0940

    670-1010

    670-1020

    670-1040

    670-1060

    670-1080

    670-1085

    670-1100

    670-1120

    670-1140

    670-1160

    670-1180

    670-1200

    670-1240

    670-1360

    670-1490

    670-1500

    670-1505

    670-1508

    670-1510

    670-1513

    670-1518

    670-1523

    670-1528

    670-1590

    670-1600

    670-1650

    670-1900

    670-2002

    670-2003

    670-2005

    670-2006

    670-2008

    670-2020

    670-2040

    670-2060

    670-2080

  • ITEM CODE

    670-2100

    670-2120

    670-2160

    670-2180

    670-2200

    670-2360

    670-2500

    670-2700

    670-2800

    670-3000

    670-3015

    670-3065

    670-3066

    670-3086

    670-3087

    670-3108

    670-3122

    670-3126

    670-3127

    670-3129

    670-3166

    670-3167

    670-3169

    670-3171

    670-3175

    670-3190

    670-4000

    670-4450

    670-4490

    670-4500

    670-4510

    670-4515

    670-4520

    670-4530

    670-4540

    670-4555

    670-5000

    670-5010

    670-5015

    670-5020

    670-5022

  • ITEM CODE

    670-5025

    670-5030

    670-5040

    670-5610

    670-5620

    670-5622

    670-5750

    670-5800

    670-5850

    670-6050

    670-6309

    670-7000

    670-7215

    670-7220

    670-7225

    670-7230

    670-7240

    670-7315

    670-7320

    670-7325

    670-7330

    670-7340

    670-8050

    670-9220

    670-9225

    670-9245

    670-9250

    670-9255

    670-9260

    670-9265

    670-9270

    670-9275

    670-9280

    670-9285

    670-9290

    670-9325

    670-9340

    670-9400

    670-9450

    670-9710

    670-9712

    670-9720

  • ITEM CODE

    670-9725

    670-9730

    670-9731

    670-9736

    670-9737

    670-9738

    670-9740

    670-9741

    670-9742

    670-9743

    670-9810

    670-9890

    670-9895

    670-9900

    670-9905

    670-9910

    670-9920

    670-9930

    676-1000

    676-3000

    681-0525

    681-1150

    681-1160

    681-2200

    681-2250

    681-2504

    681-2505

    681-3600

    681-3750

    681-4120

    681-4121

    681-4150

    681-4155

    681-4210

    681-4211

    681-4215

    681-4220

    681-4230

    681-4253

    681-4255

    681-4257

    681-4258

    681-4270

  • ITEM CODE

    681-4278

    681-4280

    681-4282

    681-4289

    681-4299

    681-4300

    681-4301

    681-4302

    681-4303

    681-4304

    681-4307

    681-4347

    681-4348

    681-4350

    681-4358

    681-4359

    681-4360

    681-4361

    681-4362

    681-4363

    681-4400

    681-4415

    681-4500

    681-4501

    681-4503

    681-4505

    681-4555

    681-5112

    681-5113

    681-5115

    681-5255

    681-5257

    681-5260

    681-6200

    681-6205

    681-6220

    681-6246

    681-6264

    681-6290

    681-6295

    681-6303

    681-6304

    681-6307

  • ITEM CODE

    681-6309

    681-6310

    681-6311

    681-6312

    681-6315

    681-6317

    681-6318

    681-6319

    681-6320

    681-6336

    681-6346

    681-6364

    681-6366

    681-6390

    681-6392

    681-6393

    681-6400

    681-6403

    681-6405

    681-6410

    681-6411

    681-6413

    681-6416

    681-6417

    681-6418

    681-6419

    681-6420

    681-6421

    681-6446

    681-6466

    681-6470

    681-6520

    681-6546

    681-6600

    681-6608

    681-6610

    681-6614

    681-6620

    681-6624

    681-6646

    681-6850

    681-6852

    681-6900

  • ITEM CODE

    681-7000

    682-1303

    682-1304

    682-1305

    682-1306

    682-1307

    682-1403

    682-1404

    682-1405

    682-1406

    682-1407

    682-1408

    682-1409

    682-1413

    682-1415

    682-1503

    682-1504

    682-1505

    682-1506

    682-1507

    682-1509

    682-1510

    682-1511

    682-1514

    682-3146

    682-3324

    682-3424

    682-3430