    > Commissioning & Maintenance of Protective Relays1

    Test Options (1)

    1. Primary injection sensitivity tests only

    Minimum of time consumed

    If results incorrect, secondary injection and CT testsrequired

    Unable to check !

    a. "dequate timin# curves

    b. $irectional %ro%erties

    c. Po&er and im%edance relays

    'ot suitable for maintenance tests

  • 8/20/2019 commissioning lecture (1).ppt

    2/59

    > Commissioning & Maintenance of Protective Relays2 

    Test Options (2)

    (. )econdary injection tests

    *+ut &ith C.T.s still connected-

    True %rimary sensitivity easily equated

    If results incorrect isolated relay and CT ma#.curve checks necessary

    ef. for maint., but system outa#e required

    Primary tests on C.T. ratio and %olarity stillrequired on commissionin#

  • 8/20/2019 commissioning lecture (1).ppt

    3/59

    > Commissioning & Maintenance of Protective Relays3

    /. )econdary injection tests

    *+ut &ith relays isolated by test facility-

    Proof of isolated relay characteristic obtained

    ef. for maintenance obtained*relay if necessary tested &ith system on load-

    0ull %rimary injectionon load tests done on initial

    commissionin# only

    Test Options (3)

  • 8/20/2019 commissioning lecture (1).ppt

    4/59

    > Commissioning & Maintenance of Protective Relays4

    2. 3n load tests

    Checks that e4%ected C.T. 5.T. quantities %resent at test

    facility

    )cheme stability for e4ternal faults

    Proof of correct directional characteristics

    Test Options (4)

  • 8/20/2019 commissioning lecture (1).ppt

    5/59

    > Commissioning & Maintenance of Protective Relays5 

    1. )econdary injection *isolated relay-

    (. Primary injection

    *incl. C.T. ratio, %hasin# and ma#. curve-

    /. 3n load tests

    Summary 

  • 8/20/2019 commissioning lecture (1).ppt

    6/59

    > Commissioning & Maintenance of Protective Relays6 

    To assure ourselves, and the interested authorities,

    that the overall %rotective system functions

    correctly

    esist %ressures to take risks

    )tudy &irin# dia#rams and %rotection requirements

    6ey dia#ram

    $ele#ate res%onsibilities

    3bserve safety of self and others

    Site Testing and Commissioning of Protection Equipment 

  • 8/20/2019 commissioning lecture (1).ppt

    7/59> Commissioning & Maintenance of Protective Relays7 

    Commissioning Fo! C"art 

    Summary (1)

    To assure ourselves, and the interested

    authorities, that the overall %rotective

    system functions correctly.

     

    )tudy of &irin# dia#rams and %rotection

    requirements.

     

    Careful dele#ation of res%onsibilities to

    reduce the du%lication of effort and to

    ensure that all the follo&in# as%ects are

    covered !

     

  • 8/20/2019 commissioning lecture (1).ppt

    8/59> Commissioning & Maintenance of Protective Relays8 

    Commissioning Fo! C"art 

    Summary (2) 

    Insulation Tests

     

    )econdary Injection Tests *elay Tests-

    7nsure clean dust free area

    Mechanical ins%ection

    3ut!#oin# contact &irin#

    74ternal resistors

    C.T. shortin# and isolatin# s&itches

    Contact follo&!throu#h and %ressures

    7lectrical checks on each basic electrical function

    to %rove satisfactory o%eration Prove tri% and alarm circuits

    Test results *record and maintenance %ur%oses-

     

  • 8/20/2019 commissioning lecture (1).ppt

    9/59> Commissioning & Maintenance of Protective Relays9

    Commissioning Fo! C"art 

    Summary (3)

     

    Primary injection tests

    $.C. flick tests on C.T.s

    C.T. ma# curve tests

    C.T. ratio and %olarity tests

    Primary sensitivity tests

    )tability tests

    Test results

     

  • 8/20/2019 commissioning lecture (1).ppt

    10/59> Commissioning & Maintenance of Protective Relays10 

    Commissioning Fo! C"art 

    Summary (4)

    8ine Transformer 9enerator ener#isation

    5.T. ratio and %hasin# tests

    3n load tests

    )tability tests

    $irectional %ro%erties

    At the end of each stage ask yourself :-

    Is there anything wrong, wiring or otherwise,

    that Ihave not checked that may prevent correctoperation 

    If so,  CHECK I !" #

  • 8/20/2019 commissioning lecture (1).ppt

    11/59> Commissioning & Maintenance of Protective Relays11

    #aintenance of 

    Protecti$e %eays (1)

    $re%uency of &aintenance

    'ictated (y :-

    a) he site condition

    () he availa(ility of maintenance sta* andresources

    c) he availa(ility of plant outage times

    d) he risks involved if the protection

    should fail

    e) he type of relay construction

  • 8/20/2019 commissioning lecture (1).ppt

    12/59> Commissioning & Maintenance of Protective Relays12 

    #aintenance of 

    Protecti$e %eays (2)

    $re%uency of &aintenance +continued)

    f) he proven relia(ility of devices underidentical site conditions

    g) he availa(ility of (uilt-in self-checkfeatures

    or semi-automatic test facilities, and thediculties of alternative tests

    h) he interval of time an unepectedcatastrophic

    failure, component or otherwise, thatmay go

    undetected and leave the systemunprotected

  • 8/20/2019 commissioning lecture (1).ppt

    13/59> Commissioning & Maintenance of Protective Relays13

    #aintenance of 

    Protecti$e %eays (3)

    3nerous site conditions !

    1. $usty or dirty environments

    (. Corrosive chemical atmos%heres

    /. 0requent or continuous vibration

    2. :i#h humidity

    ;. :i#h or cyclin# tem%eratures

  • 8/20/2019 commissioning lecture (1).ppt

    14/59> Commissioning & Maintenance of Protective Relays14

    #aintenance of 

    Protecti$e %eays (4)

    5isual ins%ections

    The commissionin# test sta#e

    "t each maintenance test

    "fter heavy fault clearance

    More re#ularly if onerous site conditions

    Calibration tests

    Tri% testin#

  • 8/20/2019 commissioning lecture (1).ppt

    15/59> Commissioning & Maintenance of Protective Relays15 

    #aintenance of 

    Protecti$e %eays (&)

    ecommended maintenance tests

    Instruction manuals

    ecord relay settin#s

    5isual ins%ection

    )econdary injection tests

    Contact inte#rity

    eturn to >in!service settin#s

    Check ener#isin# quantities

  • 8/20/2019 commissioning lecture (1).ppt

    16/59> Commissioning & Maintenance of Protective Relays16 

    #aintenance of 

    Protecti$e %eays (')

    elays involvin# static *electronic- com%onents

    7lectro!static dischar#e *7)$-

    ?rist stra%s

    Modern static relays *6!)7I7), MiC3M etc.-

    0ault find to board level only

    Protect boards

  • 8/20/2019 commissioning lecture (1).ppt

    17/59> Commissioning & Maintenance of Protective Relays17 

    Correcti$e #aintenance of 

    Protecti$e %eays (1)

    Cleanin# solvents

    Trichlortrifluorethane *3@one dama#in#-

    *"rklone, 0reon, 0lourisol and )u%ersolve-

      P3A3'7

    Contact lubricants and other lubricants

    Contact cleanin# burnishers

    Contact %ressures and settin#s

    $ust removal

    elay recalibration *?hyB-

  • 8/20/2019 commissioning lecture (1).ppt

    18/59> Commissioning & Maintenance of Protective Relays18 

    Contents of Section 23 of P%*+ (1)

    (Protecti$e %eay ppication *uide)

    Insulation tests

    Current transformer tests

    5olta#e transformer tests

    Test facilities

    )econdary injection tests

    3.C. and 7.0.

    $ifferential

    Pilot &ires

    'e#ative %hase sequence

    $irectional $istance

    $.C. o%erated

  • 8/20/2019 commissioning lecture (1).ppt

    19/59> Commissioning & Maintenance of Protective Relays19

    Primary Injection Test * on load tests-

    3.C. and 7.0. relays

    $irectional

    9enerator $ifferential Transformer $ifferential

    estricted 7.0.

    Pilot ?ire

    +usbar 

    'e#ative %hase sequence

    Contents of Section 23 of P%*+ (2)

    (Protecti$e %eay ppication *uide)

  • 8/20/2019 commissioning lecture (1).ppt

    20/59> Commissioning & Maintenance of Protective Relays20 

    Tri%%in# and "larm "nnunciation

    Periodic Maintenance

    In addition to P"9 !

    Consult instruction manuals

    Contents of Section 23 of P%*+ (3)

    (Protecti$e %eay ppication *uide)

  • 8/20/2019 commissioning lecture (1).ppt

    21/59> Commissioning & Maintenance of Protective Relays21

    o relay coils

    o main .o maincurrenttransformers

    o C testwindings+if any)

    Test Termina ,oc- 

    o relay coils

    o main .o maincurrent

    transformers

    o C testwindings+if any)

    A / C A / C 0 A

  • 8/20/2019 commissioning lecture (1).ppt

    22/59> Commissioning & Maintenance of Protective Relays22 

    o relay coils

    o main currenttransformers

    o main .

    A

    /

    C

    0

    A

    /

    C

    0

    Currenttestsockets

    .oltagetestsockets

    est selector swi&ake (efore (reon C Circuits

    Test S!itc" and Soc-ets

  • 8/20/2019 commissioning lecture (1).ppt

    23/59> Commissioning & Maintenance of Protective Relays23

    Current Transformer

    Poarity C"ec- 

    12

    13

    4342 5-

    1ush(uttonswitch

    /attery

    5-A

  • 8/20/2019 commissioning lecture (1).ppt

    24/59

    > Commissioning & Maintenance of Protective Relays24

    Current Transformer

    %atio C"ec- 

    A / C

    A2

    A3

    13 43

    4212

    1rimary in6ectiontest set

    278. AC supply

    9elay or test (lock contact ngers

    73

    est pluginsulation

    ;<

    73

    73

    emporaryshortcircuit

  • 8/20/2019 commissioning lecture (1).ppt

    25/59

    > Commissioning & Maintenance of Protective Relays25 

    Testing Current Transformer 

    #agneti.ing Cur$e

     

    A / C

    1343

    4212

    .

    est plug isolatingcurrent transformersfrom relay coils

    .aria(letransformer278. =A

    278.A Csupply

    4tep-up transforif re%uired

    &ain circuit(reaker open

    o relaycoils

    A

  • 8/20/2019 commissioning lecture (1).ppt

    26/59

    > Commissioning & Maintenance of Protective Relays26 

    /otage Transformer 

    P"asing C"ec- 

    A

    /C

    .3

    .2

    .0

    .>

    .

    A / C 1hase rotationmeter

    A

    /C

    .3

    .2

  • 8/20/2019 commissioning lecture (1).ppt

    27/59

    > Commissioning & Maintenance of Protective Relays27 

    K 2

    K 1

    A

    9ange

    ad6usting C

    Coarse

    controlreactor

    $ine controlvaria(letransformer

    278.A Csupply

    4upplyswitch

    /ackingtransformer38? control

    &ediumcontrolreactor

    In6ectiontransformer

    4tarttimer

    4toptimer

    73

    I

    9elaycoil

    9elay short-circuiting switch

    9elay current I  @ Ammeter reading +A)

    O$ercurrent Test Set 

    , i C C Ci i

  • 8/20/2019 commissioning lecture (1).ppt

    28/59

    > Commissioning & Maintenance of Protective Relays28 

    ,asic Current Contro Circuit 

    of CF, Test0Set 

    228278.AC4upply78;8HB

    hermal !verload !vervoltage1rotection

    4upplyContractor

    4upply 4horting4witch imer

    4tart+/reak to 4tart)

    >3 >2

    38

    .ariac .3

    In6ectionD&atchingCFF

       !      .   '  e   t  e  c   t  o  r

       C   i  r  c  u

       i   t

    !utputto9elay

    723

    ;8HB

    78HB

    ;8HB

    78HB

    3

    8F3A

    8F2A

    8F7A

    3A

    2A

    7A

    38A

    A

    S i i i C" -

  • 8/20/2019 commissioning lecture (1).ppt

    29/59

    > Commissioning & Maintenance of Protective Relays29

    Sensiti$ity C"ec- on

    ,iased ifferentia %eay 

    est plug

    ngers

    / /

    !1

    o main currenttransformers!ver current

    test set

    278.AFCF supply

    !1 9elay operating coi/ 9elay (ias coil

    T ti ,i C" t i ti

  • 8/20/2019 commissioning lecture (1).ppt

    30/59

    > Commissioning & Maintenance of Protective Relays30 

    Testing ,ias C"aracteristics

    (sing O$ercurrent Test Set)

    To main current

    transformers

    + +3P

    I1I(

    "1

    I(

    "(

    Test %lu#fin#ers

    I1

    (;D5 ".C.su%%ly

    3vercurrenttest set

    T ti % ,i C" t i ti

  • 8/20/2019 commissioning lecture (1).ppt

    31/59

    > Commissioning & Maintenance of Protective Relays31

    Testing %eay ,ias C"aracteristic 

    (sing %esistances)

    To main current

    transformers

    + +

    3P

    I1I(

    "1

    I(

    "(

    1 (

    Test %lu#fin#ers

    I1

    (;D5 ".C.su%%ly

    "1 and "(  "mmeters

    3P elay o%eratin# coil

    + elay bias coil

    S iti it T t

  • 8/20/2019 commissioning lecture (1).ppt

    32/59

    > Commissioning & Maintenance of Protective Relays32 

    est

    plug

    $eeder isolated

    /!1

    1ilots

    !vercurrenttest set

    278.AFCF supply

    A/C

    9elay

    contactngers

    /!1

    Sensiti$ity Test 

    T ti S iti it f ti

  • 8/20/2019 commissioning lecture (1).ppt

    33/59

    > Commissioning & Maintenance of Protective Relays33

    Testing Sensiti$ity of egati$e

    P"ase Sequence %eay 

    A

    /

    C

    0

    !vercurrent

    test set

  • 8/20/2019 commissioning lecture (1).ppt

    34/59

    > Commissioning & Maintenance of Protective Relays34

    Test Equipment for irectiona %eays

    . .oltmeterA Ammeter1A 1hase angle mete

    o other voltage coilsof relay under test+if re%uired)

    A

    /C0

    .aria(letransformerfor currentcontrol

    Choke

  • 8/20/2019 commissioning lecture (1).ppt

    35/59

    > Commissioning & Maintenance of Protective Relays35 

    Primary n5ection Test Set 

    278. AFCF

    supply

    A

    .aria(le transformer

  • 8/20/2019 commissioning lecture (1).ppt

    36/59

    > Commissioning & Maintenance of Protective Relays36 

    Primary C"ec- on

    #ain Current Transformers

    emporary threphase short circ

    1rimaryin6ectiontest set

    278.AFCF supply

    A

    /

    C

    73

    73

    73

    ;<

    A73 !vercurrent relay;< Earth fault relayA Ammeter

    Sensiti$ity Test on Eart" Faut %eay

  • 8/20/2019 commissioning lecture (1).ppt

    37/59

    > Commissioning & Maintenance of Protective Relays37 

    Sensiti$ity Test on Eart" Faut %eay 

    73

    73

    278.

    AFCFsupply

    A

    /

    C

    73

    ;<

    1rimaryin6ectiontest set

    6oad Test on irectiona

  • 8/20/2019 commissioning lecture (1).ppt

    38/59

    > Commissioning & Maintenance of Protective Relays38 

    6oad Test on irectiona 

    O$ercurrent %eays

    >oadcurrent

    A

    /

    C

    'irection of powerowfor relay operation

    1A

    1A

    A.

    'irectional overcurrentrelays

    A Ammeter. .oltmeter1A 1hase angle

      meter

    A /C

    Test Pug 6in- Connections to

  • 8/20/2019 commissioning lecture (1).ppt

    39/59

    > Commissioning & Maintenance of Protective Relays39

    Test Pug 6in- Connections to

    %e$erse Current seen 7y %eay 

    o relay

    o main . and C

    28 3J 3= 3 3; 37 3< 3G 32 33

    3 2 G < 7 ; = J 38est plug

    6oad Test on irectiona Eart" Faut %eay

  • 8/20/2019 commissioning lecture (1).ppt

    40/59

    > Commissioning & Maintenance of Protective Relays40 

    6oad Test on irectiona Eart" Faut %eay 

    A Ammeter. .oltmeter1A 1hase angle meter

    A

    1A

    .

    1A

    A / C 1

    3

    1

    24

    3

    4

    2

    IA

    7373

    73

    .

    3.

    2

    .

    >

    .

    0

    emporaryshortcircuitconnectionsInsulatingstrips inrelay or test

    (lock contact ngers

    'irectionalearthfault relay

    >oad

    current

    A Ammeter. .oltmeter1A 1hase angle meter

    A

    1A.

    1A

    A / C 1

    3

    1

    24

    3

    4

    2

    IA

    7373

    73

    .

    3.

    2

    .

    >

    .

    0

    emporaryshortcircuitconnectionsInsulatingstrips inrelay or test

    (lock contact ngers

    'irectionalearthfault relay

    >oadcurrent

    Testing Sensiti$ity of *enerator ifferentia

  • 8/20/2019 commissioning lecture (1).ppt

    41/59

    > Commissioning & Maintenance of Protective Relays41

    Testing Sensiti$ity of *enerator ifferentia

    Protection sing Primary n5ection Test 

    A/

    C

    = enerator di*erential r

    . .oltmeterA Ammeter

    1rimaryin6ectiontest set

    278. AFCFsupply

    enerator

    Isolatinglinks

    =.

    =

    A

    =

    Testing Sensiti$ity of *enerator ifferentia Protection

  • 8/20/2019 commissioning lecture (1).ppt

    42/59

    > Commissioning & Maintenance of Protective Relays42 

    Testing Sensiti$ity of *enerator ifferentia Protection

    sing *enerator to Suppy Primary Current 

    = enerator di*erential. .oltmeter

    enerator

    Isolatinglinks

    A

    /

    C

    emporary

    shortcircuit

    =.

    ==

    C"ec-ing Sta7iity of *enerator

  • 8/20/2019 commissioning lecture (1).ppt

    43/59

    > Commissioning & Maintenance of Protective Relays43

    C"ec-ing Sta7iity of *enerator

    ifferentia Protection

    A

    /

    C

    = enerator di*erentialA Ammeter

    enerator

    Isolating

    links

    emporaryshortcircuit

    =

    A

    ==

    AA

    4horts acrossrelaysta(ilising

    resistors

    Eart" Faut Sensiti$ity C"ec- on Transformer

  • 8/20/2019 commissioning lecture (1).ppt

    44/59

    > Commissioning & Maintenance of Protective Relays44

    Eart" Faut Sensiti$ity C"ec- on Transformer

    ifferentia Protection

    emporaryshortcircuit

    A

    278.AFCFsupply

    1rimary

    in6ection

    testset

    !peratingcoils

    = = =

    /iascoils

    A

    /

    C

    P"ase Faut Sensiti$ity C"ec- on Transformer

  • 8/20/2019 commissioning lecture (1).ppt

    45/59

    > Commissioning & Maintenance of Protective Relays45 

    P"ase Faut Sensiti$ity C"ec- on Transformer

    ifferentia Protection

    emporaryshortcircuit

    A

    278.AFCFsupply

    !peratingcoils

    = = =

    /iascoils

    A

    /

    C

    1rimaryin6ectiontest set

    Sta7iity C"ec- on Transformer

  • 8/20/2019 commissioning lecture (1).ppt

    46/59

    > Commissioning & Maintenance of Protective Relays46 

    Sta7iity C"ec- on Transformer 

    ifferentia Protection

    emporary shortcircuitenerator

    = ==

    /iascoils A

    L

    !peratingcoils

    Instantaneous current distri(ution forthree-phase short circuit with phase A

    current at maimum

    Sensiti$ity C"ec- of %estricted

  • 8/20/2019 commissioning lecture (1).ppt

    47/59

    > Commissioning & Maintenance of Protective Relays47 

    Sensiti$ity C"ec- of %estricted

    Eart" Faut Protection

    A278. AFCF

    supply

    1rimaryin6ectiontest set A

    /

    C

    ;<

    .

    ;< Earth $ault 9elayA Ammeter. .oltmeter

    Sta7iity C"ec- of %estricted Eart"

  • 8/20/2019 commissioning lecture (1).ppt

    48/59

    > Commissioning & Maintenance of Protective Relays48 

    Sta7iity C"ec- of %estricted Eart"

    Faut Protection

     ;< Earth $ault 9elA Ammeter

    278. AFCFsupply

    A

    /

    C

    ;<

    A emporary shortcircuit

    A

    1rimaryin6ectiontest set

    Sensiti$ity C"ec- of egati$e

  • 8/20/2019 commissioning lecture (1).ppt

    49/59

    > Commissioning & Maintenance of Protective Relays49

    Sensiti$ity C"ec- of egati$e

    P"ase Sequence %eay 

  • 8/20/2019 commissioning lecture (1).ppt

    50/59

    > Commissioning & Maintenance of Protective Relays50 

    Test Pug 6in- Connections for 

    6oad Current Test 

    o relay

    lter network 

    28 3J 3= 3 3; 37 3< 3G 32 33

    3 2 G < 7 ; = J 38

    A / C 0

    Eart" Faut Sensiti$ity C"ec-

  • 8/20/2019 commissioning lecture (1).ppt

    51/59

    > Commissioning & Maintenance of Protective Relays51

    Eart" Faut Sensiti$ity C"ec-

    of Piot 8ire %eay 

    / 9elay (ias coil !1 9elay operating coil A

    Ammeter

    A

    /

    C

    278. AFCF supply

    1rimaryin6ectiontest set

    A

    /

    !1

    1ilots toremoteend relay

    P"ase Faut Sensiti$ity C"ec-

  • 8/20/2019 commissioning lecture (1).ppt

    52/59

    > Commissioning & Maintenance of Protective Relays52 

    P"ase Faut Sensiti$ity C"ec- 

    of Piot 8ire %eay 

    / 9elay (ias coil!1 9elay operatingcoilA Ammeter

    A / C

    1rimaryin6ectiontest set

    A

    !1

    1ilots toremote

    end relay

    /

    278. AFCF supply

    6oad Current istri7ution

  • 8/20/2019 commissioning lecture (1).ppt

    53/59

    > Commissioning & Maintenance of Protective Relays53

    6oad Current istri7ution

    Instantaneous currentdistri(ution of three-phase

    (alanced load withphase A current atmaimum

    A / C A /C$eede

    r

    /

    !1

    /

    !1

    1ilots

    S"ort0Circuiting Connections

  • 8/20/2019 commissioning lecture (1).ppt

    54/59

    > Commissioning & Maintenance of Protective Relays54

    S"ort Circuiting Connections

    on Test Pug for 6oad Test 

    o relay summation C

    A / C 0

    28 3J 3= 3 3; 37 3< 3G 32

    3 2 G < 7 ; = J

    4hort circuiting connectionson rear of test plug

    o main currenttransformers

    A

    %atio C"ec- of Current Transformers

  • 8/20/2019 commissioning lecture (1).ppt

    55/59

    > Commissioning & Maintenance of Protective Relays55 

    %atio C"ec- of Current Transformers

    of %eference Circuit 

    A3 and A2  Ammeters

    = /us(ar 1rotectionrelayJ7 4upervision relayJ7 /us wires short-

    circuiting  relay

    = ==J7

    J7

    A/C

    0

    A2

    Mone(us

    wires

    estlinks

    1rimaryin6ectiontest set

    A3

    278.AFCFsupply

    Poarity C"ec- of %eference

  • 8/20/2019 commissioning lecture (1).ppt

    56/59

    > Commissioning & Maintenance of Protective Relays56 

    y

    Circuit Current Transformers

    A Ammeter

    = /us(ar 1rotection  relayJ7 4upervision relayJ7 /us wires short-  circuiting relay

    = ==J7

    J7

    A/C0

    A

    Mone

    (uswires

    estlink s

    1rimaryin6ectiontest set

    A278.AFCFsupply

    emporary short circuitA /

    C

    CT nter0*roup %atio and Poarity C"ec- in

  • 8/20/2019 commissioning lecture (1).ppt

    57/59

    > Commissioning & Maintenance of Protective Relays57 

    p y

    ,us7ar Protection Sc"eme

    A3  Ammeter for ratio check 

    A2  Ammeter for polarity

    check = /us(ar protection relayJ7 4upervision relayJ7 /us wires short-  circuiting relay

       2   7   8   .   A F   C

     F  s  u  p  p   l  y

    emporary

    shortcircuit

       1  r   i  m  a

      r  y

       i  n   6  e  c   t   i

      o  n

       t  e  s   t  s

      e   t

    A/C0

    A

    A

    3

    A

    3

    A

    3

    A

    3

    A2A2

    A2

    9eference

    circuit

    est circuit

    est

    link s

    Mone(uswires

    J7===J7

    Sensiti$ity C"ec- of ,us7ar 

  • 8/20/2019 commissioning lecture (1).ppt

    58/59

    > Commissioning & Maintenance of Protective Relays58 

    y

    Protection Sc"eme

    = ==J7

    J7

    A/C

    0

    Mone(us

    wires

    estlinks

    1rimaryin6ectiontest set

    A

    278.AFCFsupply

    .

    A /C

    Sta7iity Test 

  • 8/20/2019 commissioning lecture (1).ppt

    59/59

    y

    est

    plug

    /!1

    !vercurrenttest set

    278.AFCF supply

    A

    /C

    /!1

    est

    plug

    1ilots