Commissioning and Close-out of Technically Complex Buildings: A Lifecycle Approach

7
Commissioning and Close-out of Technically Complex Buildings: A Lifecycle Approach Presented to ISPE August 9, 2005 Facilitated by Ric Holman and Adam Benzuly Affiliated Engineers, Inc. – Walnut Creek, CA

description

Commissioning and Close-out of Technically Complex Buildings: A Lifecycle Approach. Presented to ISPE August 9, 2005 Facilitated by Ric Holman and Adam Benzuly Affiliated Engineers, Inc. – Walnut Creek, CA. A Quick Introduction of AEI…. Full service MEP firm with national resources. - PowerPoint PPT Presentation

Transcript of Commissioning and Close-out of Technically Complex Buildings: A Lifecycle Approach

Page 1: Commissioning and Close-out of Technically Complex Buildings: A Lifecycle Approach

Commissioning and Close-out of Technically Complex Buildings:

A Lifecycle Approach

Presented to ISPEAugust 9, 2005

Facilitated by Ric Holman and Adam BenzulyAffiliated Engineers, Inc. – Walnut Creek, CA

Page 2: Commissioning and Close-out of Technically Complex Buildings: A Lifecycle Approach

A Quick Introduction of AEI…A Quick Introduction of AEI…A Quick Introduction of AEI…A Quick Introduction of AEI…

• Full service MEP firm with national resources.

• Nationwide Cx provider for over 20 years.• Specialize in technically complex R&D and

healthcare projects.• 20+ dedicated Cx staff.• Recent clients include: Chiron, UCSF,

Alameda County, Gap Inc., Amgen, UCB, etc.

Page 3: Commissioning and Close-out of Technically Complex Buildings: A Lifecycle Approach

Our quick bio…Our quick bio…Our quick bio…Our quick bio…

• Ric Holman, CSI– 20+ years in

construction project delivery.

– Walnut Creek Cx Group Leader.

– Extensive field experience

– Has found a new home underwater.

• Adam Benzuly, P.E.– Background in HVAC

design.– Commissioned over

1,000,000 sq. ft. of new construction.

– Project Manager for Mechanical and Field Services Depts.

– Contributor to LBNL Cx study.

Page 4: Commissioning and Close-out of Technically Complex Buildings: A Lifecycle Approach

What Cx Means to AEIWhat Cx Means to AEIWhat Cx Means to AEIWhat Cx Means to AEI

• A systematic process of ensuring that all building systems perform interactively according to the design intent and the Owner’s operational needs.

• Design phase activities• Construction phase activities• Post-occupancy activities

Page 5: Commissioning and Close-out of Technically Complex Buildings: A Lifecycle Approach

Close-out IssuesClose-out IssuesClose-out IssuesClose-out Issues

• What are Contract Document requirements?– O&M Manuals– Punchlist– Validation– Warranty– Move-in– Record drawings– Training– Reconciliation of Change Orders?

Page 6: Commissioning and Close-out of Technically Complex Buildings: A Lifecycle Approach

The Quality Assurance CycleThe Quality Assurance CycleThe Quality Assurance CycleThe Quality Assurance Cycle

Communicate Expectations

RefineExpectations

Document Outcome

Verify Execution

Page 7: Commissioning and Close-out of Technically Complex Buildings: A Lifecycle Approach

Discussion Ideas…Discussion Ideas…Discussion Ideas…Discussion Ideas…

• Cx/validation similarities?

• Documentation vs. operational tools

• How to determine desired outcome?

• How to incorporate requirements into Contract Docs?

• Cx cost/benefits?

• Typical close-out problems?

• How to make sure things continue to work as intended?

• Tracking close-out items to completion.

• When Cx finds problems?