COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM 2018 WORKSHOP
![Page 2: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/2.jpg)
LEGAL DISCLAIMER • This presentation is being provided for informational purposes
only and does not purport to be comprehensive. Neither CenterPoint Energy, Inc., together with its subsidiaries and affiliates (the “Company”), nor its employees or representatives, make any representation or warranty (express or implied) relating to this information. By reviewing this presentation, you agree that the Company will not have any liability related to this information or any omissions or misstatements contained herein. You are encouraged to perform your own independent evaluation and analysis. This presentation has been prepared for informational purposes solely for recipient’s use in evaluating the program described herein. By receiving these materials, recipient agrees not to further distribute this presentation. This presentation contains time sensitive information that is accurate as of the date hereof. We undertake no obligation to update the information presented herein except as required by law.
![Page 3: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/3.jpg)
WELCOME & INTRODUCTION • Dan Dippon
• Director, Energy Efficiency
• Cheryl Bowman
• Manager, Program Implementation
• Loretta Battles
• Administration, Commercial Standard Offer
• Yolanda Slade
• Program Manager, Commercial Standard Offer
![Page 4: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/4.jpg)
INTRODUCTIONS (CONT.)
• Inspection Team • Tim Griffin
• Tim Glenn
• Byron Prince
• Bernardo Lopez
• Nexant Team • David Ashley
• Ding Li
• Kai Qiu
• Database Team – ETrack
![Page 5: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/5.jpg)
AGENDA • Safety Share
• CenterPoint Commercial Energy Efficiency Programs
• 2017 Program Summary
• 2018 Program Outline
• 2018 Program Highlights
• ETrack Database
• Supplier Diversity
• Q&A
![Page 6: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/6.jpg)
SAFETY SHARE • DRIVING SAFETY – Always Appropriate
• Whether on the job, at home or even vacation, it is always appropriate to remember road safety. As a reminder, safe drivers always exercise the following: • Full Attention – Avoid distractions
• Cell phones – If there is an absolute need to use the cell, use a hands free device and keep both hands available for steering
• Radio – Keep volume at a level which makes it easy to hear sounds outside the vehicle, in case an emergency should arise
• Eating/Drinking or any activity which causes the driver to not have both hands available for steering and controlling the vehicle is a hazard; postpone eating for the end of the trip
• Other Passengers – avoid taking your eyes of the road to speak (or yell at) children, or other members in the car
• Continually search roadway for situations that may require quick action
• Keep your cool in traffic
• Be patient and courteous
![Page 7: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/7.jpg)
CENTERPOINT ENERGY 2018 COMMERCIAL PROGRAMS
![Page 8: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/8.jpg)
COMMERCIAL ENERGY EFFICIENCY PROGRAMS Centerpoint.anbetrack.com
• Texas Score/City Smart Program • Andrew Scatizzi– [email protected]
• Offered to school districts K-12, Higher Education, city and county
facilities. Services include: planning, financial analysis and technical support.
• Retro-Commissioning Program • Calvin Burnham – [email protected]
• Promotes the tune-up of existing commercial and industrial buildings by evaluating facility systems and implementing low-cost/no-cost measures.
![Page 9: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/9.jpg)
COMMERCIAL ENERGY EFFICIENCY PROGRAMS (CONT.)
• Energy Share Load Management Program • Calvin Burnham – [email protected]
• Demand Response Program for non – transmission commercial customers. The objective is to reduce summer peak demand and achieve annual demand savings.
• Healthcare Market Transformation Program (HEEP)
• David Dzierski – [email protected]
• Targets small to mid size healthcare facilities. Services include: Savings Calculations, assistance with measurement and verification, energy assessments, recommendations for operational improvements.
![Page 10: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/10.jpg)
COMMERCIAL ENERGY EFFICIENCY PROGRAMS (CONT.)
• Data Center Energy Efficiency Program (DCEEP) • Yolanda Slade – [email protected]
• Assists data center owners and operators with reduction in energy costs through practical technical assistance and cash incentives, while recognizing the importance of sustaining reliability and maximizing uptime. The DCEEP team will help you identify and implement energy saving projects that reduce your energy costs without sacrificing reliability. By investing in IT, cooling and power projects, you can optimize your data center’s energy use and reduce your electricity costs. These projects may also help increase IT capacity while minimizing facility expansion costs.
Implementer – Willdan Energy Solutions
Contact Jessy Shao – [email protected]
![Page 11: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/11.jpg)
2017 PROGRAM SUMMARY
![Page 12: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/12.jpg)
2017 PROGRAM SUMMARY • $6.5M Original Budget • 15 MW Goal
• EOY Totals (estimate)
• $5.1M Incentives Reserved • 9MW reduction • 211 projects submitted
• 96 projects complete and closed YTD • 60 projects in progress • 55 cancelled projects
![Page 13: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/13.jpg)
MEASURE DISTRIBUTION
0%
73%
9%
6%
1% 4%
4%
3%
2017 C&I SOP Program Incentive Distribution by
Measure Type
Lighting-LED
Cooling-Chiller
Cooling-DX units
Roofing
Motor
VFD
Other Measures
![Page 14: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/14.jpg)
CONSTRUCTION TYPE
14%
86%
2017 C&I SOP Program Incentive Distribution by Construction Type
New Construction Retrofit
![Page 15: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/15.jpg)
2017 PROGRAM CONCERNS • Provide Project ID number with all correspondence, especially
deposit check
• Failure to enter project into required work schedule via eTrack
• If for any reason, cannot enter in eTrack, email Program Manager
• Not ready for installation on date of work schedule, ie no
equipment on site, no material on site, no crew on site
• Perform proper audit of existing material, incorrect measure
types/counts can result in lower incentives
![Page 16: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/16.jpg)
2017 PROGRAM CONCERNS (cont.)
• Project Sponsor representative not on site at inspections
• Project Sponsors scheduling post inspections in eTrack
• New sponsors to CenterPoint Energy program complete
and return vendor form and W9
• Any sponsor who has not completed form in 3 years should
complete new form to ensure all information is still current
• Read and understand Commercial and Industrial Standard
Offer Program Manual
• If there is a question – ASK!
![Page 17: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/17.jpg)
2018 PROGRAM OUTLINE
![Page 18: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/18.jpg)
STANDARD OFFER PROGRAM
• Open to all eligible providers within the CNP Territory
• Transmission class (>69kv) are excluded
• First come, first serve
• Payments tied to verified savings
• Standardized terms for all participants
• Retrofit and new construction measures
• Follows the current Technical Resource Manual (TRM)
• http://www.texasefficiency.com/index.php/emv
![Page 19: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/19.jpg)
PROGRAM FLOWCHART • Create application via eTrack
• Acknowledge reading and understanding current Program Manual
• Complete/update Vendor Form
• Secure eligible project • Conduct accurate audit of existing facilities
• Submit required deposit to reserve funds
• Upload project documentation to eTrack • ie cut sheets, layouts, LED validation screen shot, calculation tools, M&V
plans
• Receipt of Project Application approval letter from CenterPoint Energy • Projects must not begin installation/demolition prior to receipt of the PA
approval letter
![Page 20: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/20.jpg)
PROGRAM FLOWCHART • Sign and return Project Authorization form
• Sponsor and Customer signature required
• Enter project work schedule via eTrack • Allow 48 hour notification before project installation
• Pre inspection • Once work schedule entered, sponsor may begin work as indicated, no
need to wait for CNP approval or arrival on site • If workschedule should change, email notification to Program Manager no later
than 7am
• Crews, materials and necessary installation equipment on site
• Complete install, update eTrack with installation complete status
• Post inspection • Not scheduled in eTrack, inspection team will schedule as time permits • CNP discretion • Sponsor or representative should be available
![Page 21: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/21.jpg)
PROGRAM FLOWCHART • Installation and Savings Report issued by CenterPoint
Energy • 100% incentive payment, provided M&V not required
• If M&V is required: • Notify via eTrack of project completion
• Begin M&V requirements
• At the discretion of CNP, 40% of incentive payment issued
• Submit M&V data to eTrack upon completion
• Final 60% payment at the conclusion of M&V review and approval • Deposit return with 60% payment, subject to deposit return policy
• Submit final invoices and any necessary follow up documentation
• ie final material and labor invoices
![Page 22: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/22.jpg)
PROJECT SPONSOR
• May be:
• National or local energy service companies (ESCOs)
• National or local companies that provide energy-related services or products
• Local contractors
• Commercial property developers
• Design/build firms
• Architectural and engineering firms
• Individual commercial customers
![Page 23: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/23.jpg)
PROJECT SPONSOR REQUIREMENTS
• Project Sponsor must have:
• All appropriate licenses/certifications
• Evidence of technical and managerial capability
• Evidence of financial capability
• Adequate insurance
• Relevant References
• Collect incentives and distribute according to
contract with end use customer
![Page 24: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/24.jpg)
CUSTOMER
• May be: • Any non-residential customer taking service at a
metered point of delivery at a distribution voltage (<69KV)
• Non-profit
• Government entity
• Educational institution
• Must allow inspection at customer site
• Signs Project Authorization Form
• Listed as site contact in ETrack
![Page 25: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/25.jpg)
PROJECT ELIGIBILITY
• Within CenterPoint Energy electric service territory
• PROVIDE ESI NUMBER, BEGINNING 100890
• Complete Sponsor application and deposit required to submit application
• Savings calculations must be complete within the sponsor application
![Page 26: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/26.jpg)
PROJECT ELIGIBILITY (cont.)
• LARGE COMMERCIAL • Minimum reduction of 15kw and/or 100,000kwh for single
site project • Minimum reduction of 30kw and/or 200,000kwh for
aggregated sites project • Cust must have minimum load of 100kw at peak, aggregate
cust must reach 250kw
• SMALL COMMERCIAL • May not have more than 100kw peak demand at a single site • Allows up to 15kw and/or 100,000kwh reduction at non-
residential site
• MULTI-FAMILY/STRIP CENTER • Same qualification as large commercial, single site
• 15kW and/or 100,000kWh minimum reduction
![Page 27: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/27.jpg)
AGGREGATING PROJECTS
• Eligible in Large Commercial Only
• 5 sites per project (recommended)
• Similar projects should:
• Have Same Project Sponsor
• Incorporate Same Measures
• Have like Occupancy Schedules
• Have same Functional Use
• Have same Energy Consumption Patterns
• Common Measurement & Verification Plan
![Page 28: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/28.jpg)
MEASURE ELIGIBILITY • Produces measurable peak demand and/or energy savings
• Follows guidelines set in current TRM
• Peak demand is defined as:
• Summer - June 1 through September 30, M – F, 1pm – 7pm
• Winter – December 1 through February 28, M – F, 6AM – 10AM & 6PM –
10PM
• Excluding weekends and Federal Holidays
• Permanently installed (no plug load)
• Exceeds minimum efficiency standards
![Page 29: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/29.jpg)
INELIGIBLE MEASURES • Fuel Switching
• Measures that require no Capital Investment
• Measures that receive Incentives in other CNP programs
• Redundant Equipment (i.e. Backup Chillers)
• Removable Measures (i.e. Plug Load, Vending Machines)
• O&M Measures (i.e. Air Filters)
• Measures installed without proper work schedule
![Page 30: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/30.jpg)
LARGE COMMERCIAL • Requires deposit equal to 5% of the total
incentive request
• Deemed savings, Simplified M&V and Full M&V projects
• Lighting only projects should complete within 90 days or by Program deadline of December 1, 2018, when applicable
• Request for follow up documentation must be returned within 10 business days to avoid project cancellation • Any exception should be approved by Program
Manager
![Page 31: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/31.jpg)
SMALL COMMERCIAL • Requires $250 deposit per site • One site per project • Deemed savings measures only • Project should complete within 45 days of project
approval or by Program deadline • Request for follow up documentation must be
returned within 10 business days to avoid project cancellation • Any exception must be approved by Program
Manager
• Adhere to set milestone schedule outline in 2018 Commercial and Industrial Standard Offer Program Manual
![Page 32: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/32.jpg)
MULTI-FAMILY/STRIP CENTER • Requires deposit equal to 5% of the total
incentive request
• Deemed savings, Simplified M&V and Full M&V projects
• Lighting only projects should complete within 90 days or by Program deadline of December 1, 2018, when applicable
• Request for follow up documentation must be returned within 10 business days to avoid project cancellation • Any exception must be approved by Program
Manager
![Page 33: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/33.jpg)
APPLICATION DEPOSIT • Application deposit
• 5% of requested incentive for Large Commercial/Multi-Family; any discrepancy requires approval by Program Manager
• $250 per site in Small Commercial
• Deposit must be submitted before any review of the project can begin
• Modification of PA within14 calendar days from submittal will not affect deposit
• Deposit refund criteria: PERCENT OF ESTIMATED
INCENTIVE PAYMENT RECEIVED PERCENT OF
DEPOSIT REFUNDED
75%+ 100%
50%-74.9% 50%
0%-49.9% 0%
![Page 34: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/34.jpg)
DEPOSIT SUBMITTAL
• OPTIONS
• Submit hard copy check via mail system
• CNP will not accept hand deliveries from Sponsors
• Electronic Option
• Must notate Project ID number
• Must email notification that deposit has been submitted
• CNP must be able to locate deposit in the applicable account
• Rollout ETA – January 2018
![Page 35: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/35.jpg)
APPLICATION SUBMITTALS • Documents must be provided as part of the application
process:
LIGHTING
CUT SHEET OF NEW LIGHTING FIXTURE, LAMP TYPE, LAMP WATTAGE, BALLAST TYPE AND BALLAST FACTOR
LIGHTING LAYOUT INDICATING SQUARE FOOTAGE OF THE FACILITY
CERTIFICATE OF THE LED FIXTURE INDICATING IT IS A CERTIFIED APPROVED FIXTURE
WHEN REBRANDING FIXTURES, THE LABEL OF CERTIFICATION MUST MATCH THE LABEL ON THE FIXTURE
COOLING
MANUFACTURER’S EQUIPMENT SPECIFICATION SHEET OF THE NEW COOLING EQUIPMENT PERFORMANCE AT ARI STANDARD CONDITIONS
CUT SHEET OF THE NEW ROOFING OR WINDOWS MATERIAL INDICATING THE INSULATION EFFICIENCY
ROOFING AND WINDOWS
BUILDING LAYOUT, SQUARE FOOTAGE INFORMATION
![Page 36: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/36.jpg)
WAITLIST
• Activated in order of when the deposit is received
• Installation may not begin until the project is activated
and approved
![Page 37: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/37.jpg)
2018 PROGRAM HIGHLIGHTS
![Page 38: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/38.jpg)
PROGRAM GOALS/BUDGET
2018 SAVINGS GOAL 2018 INCENTIVE BUDGET
14.5 MW $6 MILLION
• One Project Sponsor may reserve up to 20% of the total
Program Budget ($1.2M)
![Page 39: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/39.jpg)
2018 INCENTIVE RATES MEASURE TYPE $/KW $/KWH
LIGHTING – FLUORESCENT, HID, CFL
110 .03
LIGHTING – LED with FIXTURE 180 .05
COOLING – DX UNITS 275 .08
COOLING – CHILLER 325 .08
MOTOR 180 .07
VFD 200 .06
WINDOW FILM 180 .06
ROOFING 240 .09
REFRIGERATION 220 .06
OTHER MEASURES 175 .06
![Page 40: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/40.jpg)
NEW FOR 2018 • Project Sponsors may opt to pay required deposit
electronically
• Refrigeration measures have specific kw/kwh incentive rates
• Photocells required for all exterior lighting installs
• New construction should be applied when the temporary meter is in place and no equipment has been installed
![Page 41: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/41.jpg)
CONTINUES IN 2018 • All utility programs will follow the current Technical
Resource Manual (TRM)
• Project Sponsors will be evaluated based on project performance • Could result in fewer on site inspections
• Could result in removal from the 2018 program
• Inspection errors totaling more than 10% of approved incentive will be charged a failed inspection fee ($1,000)
• Screw-in LED lamps, including ‘plug and play’ are not eligible for program incentives • Tube style; Types A, B and C, as defined by UL
• Lighting retrofits which occurred in previous years are eligible, provided the savings meet minimum requirements
![Page 42: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/42.jpg)
CONTINUES FOR 2018 • New Construction installs must exceed current City of Houston
Energy Code (IECC 2015)
• Failed inspection fee increases to $1000 per instance for large commercial, $250 for small commercial
• Audits shall remain the sole responsibility of the project sponsor
• Project Sponsors must give a minimum 48 hour notification via eTrack for all project installs
• Mailed deposits must be submitted via established postal service and should be addressed to: CenterPoint Energy, 1111 Louisiana, Houston TX 77002; Attention Loretta Battles
• Request copy of final material and labor invoice with every project
• Small commercial installs must complete within 45 days of approval
• Chiller projects must submit proof of purchase
![Page 43: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/43.jpg)
2018 COMPLIANCE PROJECT CONCERN CENTERPOINT ACTION
On site inspection differs from submitted calculations/documents
Update savings based on inspection results
Inspection results is more than 10% difference
$1000 fee for large commercial $250 fee for small commercial
Installation begins before work schedule or no work schedule entered
Remove any installed fixture from project scope, project cancels if minimums are not met
Additional inspection required due to Project Sponsor error
$1000 fee for large commercial $250 fee for small commercial
Equipment does not meet minimum efficiency standards
Remove equipment from project scope
Inspection not complete due to lack of materials or required equipment
Applicable additional inspection fee deducted from deposit
![Page 44: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/44.jpg)
2018 COMPLIANCE If a Project Sponsor continues to repeat the same infractions across multiple projects, (more than 3
infractions), that sponsor will be advised to review the program requirements and communicate those
requirements within the company, including sub contractors and self installed projects. During the
review, that Sponsor will not be allowed to participate in the 2018 program. At CNP
discretion, the infraction could cause project cancellation and forfeiture of existing deposit. The
suspension period could span the balance of the program year.
![Page 45: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/45.jpg)
PROGRAM TIMELINE • December 15, 2017 - 2017 project documentation
should be submitted • All payments must be requested no later than 12/20 for 2017
payment
• January 8, 2018 – ETrack Database opens • Tutorials and entering 2018 applications • Deposit checks may be transmitted electronically, mailed or
couriered once project application is entered
• October 12, 2018 – Final submittal of 2018 projects • Deposits must be received • Applicable when ample program budget remains
• December 1, 2018 – 2018 Installations must
be complete
![Page 46: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/46.jpg)
PROGRAM RESOURCES • centerpoint.anbetrack.com:
• Program Announcements
• Program Manual
• Applicable Estimation Workbooks
• Workshop Presentation
• Service Area Map
• Active Project Sponsor Listing
• Available Funding
• Program contacts and links
• FAQ
![Page 47: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/47.jpg)
ETRACK DATABASE
![Page 48: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/48.jpg)
![Page 49: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/49.jpg)
![Page 50: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/50.jpg)
![Page 51: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/51.jpg)
![Page 52: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/52.jpg)
![Page 53: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/53.jpg)
Adding Contacts
Step 1: Go to Contacts tab
![Page 54: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/54.jpg)
Adding Contacts
Step 2: Enter Contact Information and Save
![Page 55: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/55.jpg)
Adding Project Sites Step 1: Type ESI ID in search field
Step 2: Click search icon in action
![Page 56: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/56.jpg)
Adding Project Sites
Step 3: Once Site Found Click ‘Save and Show’
![Page 57: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/57.jpg)
Uploading Measures to Projects
Step 1: Go to ‘Upload Measure’
![Page 58: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/58.jpg)
Uploading Measures to Projects Step 1: Select ESI ID Step 3: Browse to calculator file
Step 2: Select upload type Step 4: Click add
![Page 59: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/59.jpg)
Uploading Documents to eTrack
Step 1: Click on upload button for proper document category
![Page 60: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/60.jpg)
Uploading Documents to eTrack Step 1: Name document Step 3: Click ‘Add’ button
Step 2: Browse to file
![Page 61: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/61.jpg)
REQUIRED DOCUMENTS • Cutsheets
• Insurance documents for sub-contractors
• LED only—proof of DLC, LDL, EnergyStar, Lighting Facts qualification
• Calculator files
• M&V only—M&V plan
![Page 62: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/62.jpg)
ETRACK • Reminders
• Only those projects which have submitted the required deposit, will be moved to the next workflow and are eligible for review
• ‘New’ project status is for projects which have not submitted a deposit and are not ready for review, still in data entry mode, project ID number is provided
• ‘Submitted’ project status is for projects which are complete on data entry and deposit is in route to CenterPoint Energy
• Once the deposit is received by CenterPoint Energy, the status will change from ‘Deposit Submitted’ ‘Deposit Received’ ‘PA Submitted’ or ‘Clarification Requested’
![Page 63: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/63.jpg)
ETRACK • Project Sponsor can move projects in workflow in the following status • ‘New’ to ‘Submitted’
• ‘Clarification Requested’ to ‘Clarification Submitted’
• ‘Inspection Complete’ to ‘Install Complete’
• New eTrack feature (coming soon) • Deposit will be calculated based on incentive amount
• 100% dependent on data entry by Project Sponsor
![Page 64: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/64.jpg)
SUPPLIER DIVERSITY
![Page 65: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/65.jpg)
SUPPLIER DIVERSITY POLICY STATEMENT • CENTERPOINT ENERGY, INC. RECOGNIZES THE
IMPORTANCE OF MINORITY AND WOMEN-OWNED BUSINESS ENTERPRISES (MWBE), AS WELL AS SMALL BUSINESSES, TO THE ECONOMIES OF THE NATION, THE STATE, AND THE COMMUNITIES IT SERVES, AS WELL AS THE CORPORATION ITSELF.
• THEREFORE, WE ARE COMMITTED TO PURSUING BUSINESS RELATIONSHIPS WITH SUCH ENTERPRISES AND USING INNOVATIVE APPROACHES DESIGNED TO CONTINUALLY IMPROVE BUSINESS OPPORTUNITIES.
![Page 66: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/66.jpg)
SUPPLIER DIVERSITY CENTERPOINT ENERGY
• JEWEL SMITH, MANAGER OF SUPPLIER DIVERSITY (713)207- 6951; [email protected]
• STEVE DUKES, SUPPLIER DIVERSITY COORDINATOR
(713)207- 3388; [email protected]
HOUSTON MINORITY SUPPLIER DEVELOPMENT COUNCIL
INGRID ROBINSON (713)271–7805; [email protected]
WOMEN’S BUSINESS ENTERPRISE ALLIANCE
APRIL DAY (713)681–9232; [email protected]
![Page 67: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/67.jpg)
QUESTIONS?
![Page 68: COMMERCIAL & INDUSTRIAL STANDARD OFFER PROGRAM · certificate of the led fixture indicating it is a certified approved fixture when rebranding fixtures, the label of certification](https://reader034.fdocuments.net/reader034/viewer/2022050208/5f5ae76103a0f9322f34a406/html5/thumbnails/68.jpg)
CONTACT INFORMATION