Commander’s Package
-
Upload
sage-richard -
Category
Documents
-
view
94 -
download
1
description
Transcript of Commander’s Package
US Army Risk Reduction ProgramUS Army Risk Reduction Program
Commander’s Package
ACSAP sees commanders as an important part of the Risk Reduction Program.
Commanders have a way to view reports quickly and efficiently via “Quick Links”.
Quickly generate Shot Groups with one click. Matrix reports for commanders of multiple units enables
quick quarterly snapshot view of all units within a command. The following slide is setup for what a Brigade/BCT
commander might view.
Software – Cmdr’s PackSoftware – Cmdr’s Pack
US Army Risk Reduction ProgramUS Army Risk Reduction Program Software – Cmdr’s PackSoftware – Cmdr’s Pack
BDE UICBN UIC
BN UIC
BDE UICBN UIC
BN UIC
BDE UIC Fort Swampy
In these examples of “Quick Links” reports are set to
what a BDE CMDR might see.
All the report links within the “Commanders Package” will be “Quick Links”. These Quick Links will populate according to the users’ scope of visibility.
Currently only R-URI installation/Area rollups are available through the online software.
The “Matrix Report” is a quick way to view a
quarterly snapshot of a group of units. The
matrix shows rate/per 1000 and uses the
same color criteria as the shot group.
US Army Risk Reduction ProgramUS Army Risk Reduction Program Software – Cmdr’s PackSoftware – Cmdr’s Pack
BDE UICBN UIC
BN UIC
BN UIC
BDE UICBN UIC
BN UIC
BN UIC
BDE UICBN UIC
BN UIC
BN UIC
The systems’ user rights and privileges ensures correct visibility & security. A Garrison or Mission
Commander might see multiple Brigades or Brigade Combat Teams (BCT).
BN/CO UIC
A Battalion/Company Commander might see just one unit.
US Army Risk Reduction ProgramUS Army Risk Reduction Program
Deployment Cycle Support Directive
No cost for surveys Usually no more than 1000 surveys sent per shipment Turnaround time usually one week after receiving Contact your local ASAP for R-URI surveys
URI & R-URI – DCS DirectiveURI & R-URI – DCS Directive
Survey Administration Guidelines
URI surveys should be administrated not less than 30 days prior to deployment
R-URI surveys should be administrated between 120-180 days after redeployment