Vsphere Esxi Vcenter Server 50 Command Line Interface Solutions and Examples Guide
Command Solutions
-
Upload
kelleywalkup -
Category
Documents
-
view
145 -
download
0
Transcript of Command Solutions
![Page 1: Command Solutions](https://reader036.fdocuments.net/reader036/viewer/2022071901/55c160d7bb61eb8f508b4681/html5/thumbnails/1.jpg)
ACS Expedited Solutions
Problem: High cost of driver orientation
Solution:
![Page 2: Command Solutions](https://reader036.fdocuments.net/reader036/viewer/2022071901/55c160d7bb61eb8f508b4681/html5/thumbnails/2.jpg)
Benefits - Reduce travel, housing and per diem costs
- Improve learning retention
- Condense hiring cycle (increase asset utilization)
- Documentation against litigation
![Page 3: Command Solutions](https://reader036.fdocuments.net/reader036/viewer/2022071901/55c160d7bb61eb8f508b4681/html5/thumbnails/3.jpg)
The Process
Pre-Hire Paperwork Orientation Testing
Completed Online
Driver isHired
Road Test Drug Test Meet Staff at Facility
Significant Cost Savings
![Page 4: Command Solutions](https://reader036.fdocuments.net/reader036/viewer/2022071901/55c160d7bb61eb8f508b4681/html5/thumbnails/4.jpg)
ROI Number of Drivers in Orientation Annually: 200Traditional Orientation Expense Annually: $160,000Total Orientation Expense Using ACS: $56,000Annual Savings using ACS (year one): $224,000(includes increased revenue and savings)
Number of Drivers in Orientation Annually: 500Traditional Orientation Expense Annually: $400,000Total Orientation Expense Using ACS: $65,000Annual Savings using ACS (year one): $635,000(includes increased revenue and savings)
Number of Drivers in Orientation Annually: 1,000Traditional Orientation Expense Annually: $800,000Total Orientation Expense Using ACS: $80,000Annual Savings using ACS (year one): $1,320,000(includes increased revenue and savings)