Colt Resources Technical Report

21
Technical Presentation TSX-V: GTP FRANKFURT: P01 OTCQX International: COLTF November 2012 A GOLD COMPANY CREATED BY INVESTORS FOR INVESTORS A GOLD COMPANY CREATED BY INVESTORS FOR INVESTORS 11291201

description

 

Transcript of Colt Resources Technical Report

Page 1: Colt Resources Technical Report

Technical Presentation

TSX-V: GTPFRANKFURT: P01OTCQX International: COLTF

November 2012

A GOLD COMPANY CREATED BY INVESTORS FOR INVESTORSA GOLD COMPANY CREATED BY INVESTORS FOR INVESTORS11291201

Page 2: Colt Resources Technical Report

Cautionary Statement Disclaimer

This document has been prepared by Colt Resources Inc. (the “Company”) solely for investor presentations as of November 4th, 2012. This document does notconstitute an offering document. This document is the sole responsibility of the Company. Information contained herein does not purport to be complete and is subject tocertain qualifications and assumptions and should not be relied upon for the purpose of making an investment in the Company’s securities or entering into anytransaction in relation therewith. The information and opinions contained in this document are provided as at the date hereof and are subject to change without notice

d i f i hi thi d t th C d t d t k t bli ti t id i i t ith t dditi l i f ti t d tand, in furnishing this document, the Company does not undertake or agree to any obligation to provide recipients with access to any additional information or to updateor correct the document. No securities commission or similar regulatory authority has passed on the merits of any securities referred to in this document, nor has itreviewed this document.

Forward Looking InformationCertain of the information contained in this presentation may contain “forward-looking information”. Forward-looking information and statements may include, amongothers, statements regarding the future plans, costs, objectives or performance of the Company, or the assumptions underlying any of the foregoing. In this presentation,words such as “may” “would” “could” “will” “likely” “believe” “expect” “anticipate” “intend” “plan” “estimate” and similar words and the negative form thereof are usedwords such as may , would , could , will , likely , believe , expect , anticipate , intend , plan , estimate and similar words and the negative form thereof are usedto identify forward-looking statements. Forward-looking statements should not be read as guarantees of future performance or results, and will not necessarily beaccurate indications of whether, or the times at or by which, such future performance will be achieved. Forward-looking statements and information are based oninformation available at the time and/or management’s good-faith belief with respect to future events and are subject to known or unknown risks, uncertainties,assumptions and other unpredictable factors, many of which are beyond the Company’s control. These risks, uncertainties and assumptions include, but are not limitedto, those described under “Risk Factors” in the Company’s revised annual information form dated April 20, 2011 available on SEDAR at www.sedar.com and couldcause actual events or results to differ materially from those projected in any forward-looking statements. The Company does not intend, nor does the Companyundertake any obligation to update or revise any forward-looking information or statements contained in this presentation to reflect subsequent information events orundertake any obligation, to update or revise any forward looking information or statements contained in this presentation to reflect subsequent information, events orcircumstances or otherwise, except if required by applicable laws.

National Instrument 43-101Technical and scientific information contained in this document relating to the Company’s projects in Portugal is derived from the following National Instrument 43-101Standards of Disclosure for Mineral Projects (“NI 43-101”) compliant technical reports: the “Tabuaco Tungsten Project, Portugal. NI 43-101 Technical Report”, datedNovember 15th, 2012, the “NI 43-101 Technical Report Boa Fé/Montemor Gold Project Alentejo Region of Southern Portugal” dated August 16th, 2012, the “NI 43-101Technical Report Boa Fé/Montemor Gold Project Alentejo Region of Southern Portugal” dated December 21, 2011, the “NI 43-101 Technical Report on Exploration,Technical Report Boa Fé/Montemor Gold Project Alentejo Region of Southern Portugal dated December 21, 2011, the NI 43 101 Technical Report on Exploration,Montemor Gold Project, Alentejo Region of Southern Portugal” dated March 4, 2011, the “Technical Report (NI 43-101) on the Armamar Meda Concession, NorthernPortugal” dated September 6, 2010, the “Technical Report (NI 43-101) on the Penedono Gold Concession, Northern Portugal” dated August 27, 2010 and the “NI 43-101 Technical Report on the Santa Margarida do Sado Concession, Iberian Pyrite Belt, Southern Portugal” dated February 9, 2011 (collectively, the “TechnicalReports”). The Company has filed the Technical Reports under its profile on SEDAR at www.sedar.com.

Technical AdvisorSRK Consulting (U.S.) Inc. has been awarded a broad mandate to provide overall technical assistance to the Company in Portugal and will be producing several NI 43-

2

g ( ) p p y g p g101 compliant reports as projects progress (see: January 18, 2011 press release). Gareth O’Donovan CEng MSc BA (Hons) FIMMM FGS - SRK Exploration ServicesLtd. is the independent qualified person, as defined in NI 43-101, for the Company’s projects in Portugal.

Page 3: Colt Resources Technical Report

Southern Portugal: Boa Fé / MontemorAdvanced Stage Gold Project

3

Page 4: Colt Resources Technical Report

Boa Fé Gold Project / Montemor Concession Regional Setting - >30Km Gold Bearing Shear ZoneGeochemistryy

4

Page 5: Colt Resources Technical Report

Boa Fé Gold Project / Montemor Concession Regional Setting - >30Km Gold Bearing Shear ZoneGeologygy

Shear Zone

5

Page 6: Colt Resources Technical Report

Boa Fé Gold Project / Montemor ConcessionAeromagnetics indicate ideal structural setting and continuation of shear zone to the northwest

6

Page 7: Colt Resources Technical Report

Boa Fé Gold Project / Montemor ConcessionStill an underexplored area!Drilling and Trenchingg g

7

Page 8: Colt Resources Technical Report

Boa Fé Gold Project / Montemor ConcessionStill an underexplored area!Soils Surveysy

8

Page 9: Colt Resources Technical Report

Boa Fé Gold Project / Montemor ConcessionStill an underexplored area!Cassa Novas, Chaminé and Ligeiro Drilling, g g

9

Page 10: Colt Resources Technical Report

Boa Fé Gold Project / Montemor Concession3D Solid Modelling – Grades and Geology through Chaminé deposit looking southwest.p g

10

Page 11: Colt Resources Technical Report

Boa Fé Gold Project / Montemor ConcessionSolid Modeling – Grades and Geology through Central Chaminé deposit p

11

Page 12: Colt Resources Technical Report

Boa Fé Gold Project / Montemor ConcessionConceptual Open Pit Operation

Road

12

River

Page 13: Colt Resources Technical Report

Boa Fé Gold Project / Montemor Concession3D Grade Estimation and Block Modelling

13

Page 14: Colt Resources Technical Report

Northern Portugal: Tabuaço depositAdvanced Stage Tungsten Project (part of Armamar-Meda)

14

Page 15: Colt Resources Technical Report

Northern Portugal: Tabuaço depositAdvanced Stage Tungsten Project (part of Armamar-Meda)

15

Page 16: Colt Resources Technical Report

Tabuaço Tungsten Project Upside Potential

16

Page 17: Colt Resources Technical Report

Northern Portugal: Tabuaço depositAdvanced Stage Tungsten Project (part of Armamar-Meda)

Conceptual Formation M d l N t T S l

17

Model Not To Scale

Page 18: Colt Resources Technical Report

Tabuaço Tungsten Project Colt Drill Program – Collar Locations

18

Page 19: Colt Resources Technical Report

Tabuaço Tungsten Project 3D Mineralized Solid Modelling

19

Page 20: Colt Resources Technical Report

Tabuaço Tungsten Project 3D Grade Estimation and Block Modelling

20

3D perspective view looking East through the central zone of the Tabuaço deposit 3D grade block model. View includes drillholes overlain by the digital terrain model.

Page 21: Colt Resources Technical Report

Contact Information

Nikolas PerraultPresident & CEOColt Resources Inc.Tel: +351 916 150 926

Declan J. CostelloeExecutive VP and COOColt Resources Inc.Tel: +351 219 119 810

Natalia SokolovaVP, Investor RelationsColt Resources Inc.Tel: +1 917 574 2312

Christophe RomaryVP, Business DevelopmentColt Resources Inc.Tel: +1 514 843 7178Tel: +351-916-150-926

Fax: [email protected]

Tel: +351-219-119-810Fax: [email protected]

Tel: +1-917-574-2312Fax: +1-646-219-3341 [email protected]

Tel: +1-514-843-7178Fax: [email protected]

C b it ltCompany website: www.coltresources.com

TSX V: GTP21