JOBDRIVER Font : Haettenschweiler Font ratio: Letters J and D are size 48 and all other letters are size 36 Colors: Black and orange letters only Author: (Trip) Syd W. Smith III Date: 9/16/19

Transcript of Colors: Black and orange letters only Author: (Trip) Syd W ...

 

 

JOBDRIVER

Font :  Haettenschweiler 

Font ratio: Letters J and D are size 48 and all other letters are size 36     

Colors:  Black and orange letters only          

Author: (Trip) Syd W. Smith III  

Date: 9/16/19                                                                  

 

 

 

 

 

 

JobDriver / CONSTRUCTION PRODUCTIVITY SOFTWARE APPLICATION NARRATIVE DESCRIPTION DATE 8/19/19 – Author – (Trip) Syd W. Smith III ‐ CONFIDENTIAL 

Page 1 of 1  

 

Introduction 

The names “JobDriver” and “software” are used interchangeably to describe the product throughout.  

JobDriver is a construction productivity matrix.  Construction is very limited when it comes to technical 

tools in the industry.  Data is collected at a selected interval and displayed over time to provide a visual 

dashboard of jobsite or project production.  JobDriver makes it easy to see a wide array of valuable 

productivity information and importantly JobDriver highlights areas of inefficiency where work could be 

happening, but is not. 

How it works – ATTACHED EXHIBIT A 

A basic template allows for information on an x, y and/or z axis to display production information in 2D, 

3D or as a model. Area information at a minimum is populated on an x and y axis to provide coordinates 

or detail for a location, or percent complete on y axis and plan numbers with activities for a trade on the 

x axis.  The display can mimic actual project shape, plan grid, thermometer style, or custom.  Second tier 

or additional location details are provided on an axis to help drill down specific locations. However the 

template is set the productivity matrix is by trade and trade specific activities are populated along a 

chosen axis to track for that trade. Field personnel verify the certain activities are complete for a trade. 

By populating complete items over a selected time period represents production or measures 

productivity for that trade. The trades are linked so that completion of one activity by a trade highlights 

that work is available for another following trade.  The software synchronizes trades and the flow of 

work to produce a live productivity matrix.  Parties can be notified that work is available. The software 

tracks and creates a history of how long work is available. Notification can be shared over a project 

group for accountability to the project.  Few markets or industries lend themselves to such valuable, 

actual measurable productivity as the construction industry. 

Results 

Productivity information in construction is paramount. The JobDriver dashboard allows management to 

see an enormous amount of vital information all on one dashboard. All trades and their activities are 

included for the entire project.  Production rates are key to managing manpower at a cost‐effective 

level. An all to common problem in construction projects are the items and areas of work that remain 

stagnant or areas of work that could be completed and no one is working there. There is always an area 

management walks by and thinks “why is this or that item not done”, or “why isn’t anyone working 

here”.   JobDriver creates a real productivity dashboard of what is happening and highlights what is not 

happening. There is enormous value in the number of work areas that sit inactive for great lengths of 

time.  JobDriver can identify a problem area and provide a reason something has stopped.  Moreover, 

most importantly JobDriver highlights areas of work that could be progressing and are not. 

Conclusion 

JobDriver increases production exponentially. JobDriver is a unique tool in the construction industry, 

which currently has limited technical tools. It can identify and highlight unproductive areas and activities 

and cut them multifold. JobDriver provides a visual dashboard of the most vital project information 

related to productivity in construction projects. JobDriver optimizes productivity and indisputably 

increases profitability. 

BAY PAINTING PROGRESS CHART

Prep

/ Po

int -

Agen

t

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

Prep

/ Po

int -

Agen

t

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

Prep

/ Po

int -

Agen

t

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

Prep

/ Po

int -

Agen

t

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

Prep

/ Po

int -

Agen

t

WC

DBL

Van

ity B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

Prep

/ Po

int -

Agen

t

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

Prep

/ Po

int -

Agen

t

WC

DBL

Van

ity B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

Prep

/ Po

int -

Agen

t

WC

DBL

Van

ity B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

Prep

/ Po

int -

Agen

t

WC

DBL

Van

ity B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12AREAS AVAILABLE FOR YOU TO WORK

* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES

20 Unit 21 Unit 23 Unit22 Unit 25 Unit

16

7

RUN DATE : 5/16/2019

26 Unit 24 Unit28 Unit 27 Unit

6

5

4

12

FLOOR18

17

N/A

N/A

N/A

2

11

10

9

3

15

14

13

8

JobD

river

EXHIBIT A

Confid

entia

l

BAY PAINTING PROGRESS CHART

Prep

/ Po

int -

Agen

t

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

Prep

/ Po

int -

Agen

t

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

Prep

/ Po

int -

Agen

t

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

Prep

/ Po

int -

Agen

t

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

Prep

/ Po

int -

Agen

t

WC

DBL

Van

ity B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

Prep

/ Po

int -

Agen

t

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

Prep

/ Po

int -

Agen

t

WC

DBL

Van

ity B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

Prep

/ Po

int -

Agen

t

WC

DBL

Van

ity B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

Prep

/ Po

int -

Agen

t

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12AREAS AVAILABLE FOR YOU TO WORK

* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES

16

7

6

5

4

5/16/2019

26 Unit 24 Unit28 Unit 27 Unit 20 Unit 21 Unit 23 Unit22 Unit 25 Unit

10

9

3

15

14

RUN DATE :

13

8

12

FLOOR18

17

N/A

N/A

N/A

2

11

JobD

river

EXHIBIT A

Confid

entia

l

BAY PAINTING PROGRESS CHART

Prep

/ Po

int -

Agen

t

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

Prep

/ Po

int -

Agen

t

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

Prep

/ Po

int -

Agen

t

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

Prep

/ Po

int -

Agen

t

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

Prep

/ Po

int -

Agen

t

WC

DBL

Van

ity B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

Prep

/ Po

int -

Agen

t

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

Prep

/ Po

int -

Agen

t

WC

DBL

Van

ity B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

Prep

/ Po

int -

Agen

t

WC

DBL

Van

ity B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

Prep

/ Po

int -

Agen

t

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12AREAS AVAILABLE FOR YOU TO WORK

* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATESWORK COMPLETE TO DATE 1/23/12

FLOOR18

17

N/A

N/A

N/A

2

11

15

14

RUN DATE :

13

8

12

24 Unit28 Unit 27 Unit 20 Unit 21 Unit 23 Unit22 Unit 25 Unit

16

7

6

5

4

5/16/2019

26 Unit

10

9

3

JobD

river

EXHIBIT A

Confid

entia

l

BAY PAINTING PROGRESS CHART

* * * * * * * * * * * * * *

* * * * * * * * * * * * * *

* * * * * *

* * * * * *

* * * * * * * * * * * * * * * * * * *

* * * * * * * * * * * * * * * * * * *

* * * * * *

* * * * * *

* * * * * *

* * * * * *

* * * * * * * * *

* * * * * * * * *

* * * * * * *

* * * * * * *

Prep

/ Po

int -

Agen

t

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

Prep

/ Po

int -

Agen

t

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

Prep

/ Po

int -

Agen

t

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

Prep

/ Po

int -

Agen

t

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

Prep

/ Po

int -

Agen

t

WC

DBL

Van

ity B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

Prep

/ Po

int -

Agen

t

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

Prep

/ Po

int -

Agen

t

WC

DBL

Van

ity B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

Prep

/ Po

int -

Agen

t

WC

DBL

Van

ity B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

Prep

/ Po

int -

Agen

t

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12AREAS AVAILABLE FOR YOU TO WORK SHEET ROCK REWORK/NEEDS PRIMING

* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATESWORK COMPLETE TO DATE 1/23/12

FLOOR18

17

N/A

N/A

2

11

N/A N/A

15

14

RUN DATE :

13

8

12

24 Unit28 Unit 27 Unit 20 Unit 21 Unit 23 Unit22 Unit 25 Unit

16

7

6

5

4

1/30/2012

26 Unit

10

9

3

JobD

river

EXHIBIT A

Confid

entia

l

BAY PAINTING PROGRESS CHART

2 2 2 2 2

2 2 2 2 2

2 2

2 2

2 2 2

2 2 2

4 4 5 4 4 5 4 4 2 5 4 4 5 3 5 2 2 4 5 3 5 3 3 * 5

4 4 5 4 4 5 4 4 2 5 4 4 5 3 5 2 2 4 5 3 5 3 3 * 5

2 2 2

2 2 2

2 2 2 2 2 5 2

2 2 2 2 2 5 2

2 2 2 4 2 2 2 2 5 2 2 2 2 2

2 2 2 4 2 2 2 2 5 2 2 2 2 2

3 5 3 3 4 3 2 3 5 3 2 5 2 2

3 5 3 3 4 3 2 3 5 3 2 5 2 2

4 5 4 4 4 5 4 5 3 4 5 4 5

4 5 4 4 4 5 4 5 3 4 5 4 5

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

WC

Hal

lway

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12AREAS AVAILABLE FOR YOU TO WORK SHEET ROCK REWORK/NEEDS PRIMING

* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/13/2011WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 2/20/2011

FLOOR18

17

N/A

2

11

15

14

unit 20unit 21unit 23unit 22unit 25

RUN DATE :

unit 24unit 28

1/30/2012

unit 26

9

3

unit 27

8

N/A

N/A

N/A

N/A

16

7

6

5

4

13

12

10

JobD

river

EXHIBIT A

Confid

entia

l

BAY PAINTING PROGRESS CHART

2 3 2 3 2 3 2

2 3 2 3 2 3 2

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

2 2 2 2 2 2 2 2 2

2 2 2 2 2 2 2 2 2

4 # 2 # 3 # 2 2 # # # # * #

4 # 2 # 3 # 2 2 # # # # * #

2 3

2 3

2 2

2 2

3 3 3 3 3 6 3

3 3 3 3 3 6 3

3 3 3 5 3 3 3 6 3 3 2 3 3 3

3 3 3 5 3 3 3 6 3 3 2 3 3 3

4 6 4 4 5 4 2 4 6 4 3 6 3 3

4 6 4 4 5 4 2 4 6 4 3 6 3 3

5 6 5 5 5 6 5 6 4 5 6 5 6

5 6 5 5 5 6 5 6 4 5 6 5 6

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

WC

Hal

lway

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12AREAS AVAILABLE FOR YOU TO WORK SHEET ROCK REWORK/NEEDS PRIMING

* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/13/2012WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 2/20/2012

FLOOR18

17

N/A

2

11

15

14

unit 20unit 21unit 23unit 22unit 25

RUN DATE :

unit 24unit 28

1/30/2012

unit 26

9

3

unit 27

8

N/A

N/A

N/A

N/A

16

7

6

5

4

13

12

10

JobD

river

EXHIBIT A

Confid

entia

l

BAY PAINTING PROGRESS CHART

2 3 3 3 3

2 3 3 3 3

3 3 2 2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3

3 3 2 2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3

3 2 3 3 2 3 3 2

3 2 3 3 2 3 3 2

5 3 4 3 3 2 *

5 3 4 3 3 2 *

3 2 4 2 2 2 2 2 2 2 2 2

3 2 4 2 2 2 2 2 2 2 2 2

2 2 3 2 2 2 3 2 2 2 2 2

2 2 3 2 2 2 3 2 2 2 2 2

2 4 2 4 2 2 2 4 2 2 2 4 2 2 4

2 4 2 4 2 2 2 4 2 2 2 4 2 2 4

4 4 4 6 4 2 4 2 4 7 4 4 4

4 4 4 6 4 2 4 2 4 7 4 4 4

5 7 5 5 6 5 3 5 7 5 4 7 4 2 4 2

5 7 5 5 6 5 3 5 7 5 4 7 4 2 4 2

6 7 6 6 6 7 6 7 5 6 7 6 7

6 7 6 6 6 7 6 7 5 6 7 6 7

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

WC

Hal

lway

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12AREAS AVAILABLE FOR YOU TO WORK SHEET ROCK REWORK/NEEDS PRIMING

* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/13/2012WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 2/20/2012

FLOOR18

17

N/A

2

11

15

14

unit 20unit 21unit 23unit 22unit 25

RUN DATE :

unit 24unit 28

1/30/2012

unit 26

9

3

unit 27

8

N/A

N/A

N/A

N/A

16

7

6

5

4

13

12

10

JobD

river

EXHIBIT A

Confid

entia

l

BAY PAINTING PROGRESS CHART

2 2 2 2 2 2 2 2 2 2 2 2

2 2 2 2 2 2 2 2 2 2 2 2

2 2 2 2 2 2 2 2 2 2

2 2 2 2 2 2 2 2 2 2

2 2 2 2 2 2 2 2 2 2 2 2

2 2 2 2 2 2 2 2 2 2 2 2

4 4 3 4 4 4 4 4 4 4 4 4 4 4

4 4 3 4 4 4 4 4 4 4 4 4 4 4

3 3 3

3 3 3

6 5 4 4 2 3 *

6 5 4 4 2 3 *

4 3 5 3 3 2 3 2 2 2 3 3 3 3 3 3

4 3 5 3 3 2 3 2 2 2 3 3 3 3 3 3

3 2 3 4 3 3 4 2 2 3 3 3 2 3 3

3 2 3 4 3 3 4 2 2 3 3 3 2 3 3

3 5 3 5 3 3 3 5 3 2 3 2 3 5 3 3 5

3 5 3 5 3 3 3 5 3 2 3 2 3 5 3 3 5

5 5 7 5 3 5 5 8 2 5 5 2 5

5 5 7 5 3 5 5 8 2 5 5 2 5

6 6 6 6 6 6 2 5 5 5

6 6 6 6 6 6 2 5 5 5

7 7 7 7 6 2 7 7

7 7 7 7 6 2 7 7

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

WC

Hal

lway

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12AREAS AVAILABLE FOR YOU TO WORK SHEET ROCK REWORK/NEEDS PRIMING WORK COMPLETE TO DATE 3/12/2012

* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/13/2012WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 2/20/2012

FLOOR18

17

N/A

2

11

15

14

unit 20unit 21unit 23unit 22unit 25

RUN DATE :

unit 24unit 28

1/30/2012

unit 26

9

3

unit 27

8

N/A

N/A

N/A

N/A

16

7

6

5

4

13

12

10

JobD

river

EXHIBIT A

Confid

entia

l

BAY PAINTING PROGRESS CHART

2 2 2 2 2

2 2 2 2 2

3 3 2 3 3 2 3 2 3 2 3

3 3 2 3 3 2 3 2 3 2 3

2 3 3 2 2 3 3 2 3 2 2 3 2 2 3

2 3 3 2 2 3 3 2 3 2 2 3 2 2 3

2 3 3 3 3 3 3 3 3 3 2 2 3

2 3 3 3 3 3 3 3 3 3 2 2 3

2 5 5 4 5 5 5 5 5 5 5 5 5 5 5

2 5 5 4 5 5 5 5 5 5 5 5 5 5 5

4 4 4

4 4 4

7 6 5 3 4 *

7 6 5 3 4 *

5 4 6 4 4 3 4 3 2 3 4 4 4 4 4 4

5 4 6 4 4 3 4 3 2 3 4 4 4 4 4 4

4 2 3 2 4 5 4 2 4 5 3 2 3 4 4 4 3 4 4

4 2 3 2 4 5 4 2 4 5 3 2 3 4 4 4 3 4 4

4 6 4 6 4 4 4 4 3 4 3 4 4 2 4

4 6 4 6 4 4 4 4 3 4 3 4 4 2 4

4 6 6 6 6 2 6 6 6

4 6 6 6 6 2 6 6 6

7 7 2 7 2 7 2 7 2 7 6 2 6 2 6 2

7 7 2 7 2 7 2 7 2 7 6 2 6 2 6 2

8 2 8 2 8 2 8 2 7 2 8 2 8 2

8 2 8 2 8 2 8 2 7 2 8 2 8 2

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

WC

Hal

lway

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12AREAS AVAILABLE FOR YOU TO WORK SHEET ROCK REWORK/NEEDS PRIMING WORK COMPLETE TO DATE 3/12/2012

* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/13/2012 WORK COMPLETE TO DATE 3/19/2012WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 2/20/2012

FLOOR18

17

N/A

2

11

15

14

unit 20unit 21unit 23unit 22unit 25

RUN DATE :

unit 24unit 28

1/30/2012

unit 26

9

3

unit 27

8

N/A

N/A

N/A

N/A

16

7

6

5

4

13

12

10

JobD

river

EXHIBIT A

Confid

entia

l

BAY PAINTING PROGRESS CHART

2 3 2 2 3 2 2 2 3 2 2 3 2 2 3 2

2 3 2 2 3 2 2 2 3 2 2 3 2 2 3 2

2 4 2 4 2 3 4 4 3 4 2 3 4 2 3 4

2 4 2 4 2 3 4 4 3 4 2 3 4 2 3 4

3 4 4 2 3 3 4 3 4 3 3 4 3 3 4

3 4 4 2 3 3 4 3 4 3 3 4 3 3 4

3 4 4 4 4 2 4 4 4 4 4 2 2 3 3 4 2

3 4 4 4 4 2 4 4 4 4 4 2 2 3 3 4 2

3 6 6 5 6 6 6 6 6 6 6 6 2 6 6 6 2

3 6 6 5 6 6 6 6 6 6 6 6 2 6 6 6 2

2 2 5 5 2 5 2

2 2 5 5 2 5 2

2 8 2 2 7 2 2 2 4 5 2 2 2

2 8 2 2 7 2 2 2 4 5 2 2 2

2 2 6 2 5 7 2 5 2 2 5 4 5 2 2 4 3 4 5 5 5 5 2 2 5 5 2

2 2 6 2 5 7 2 5 2 2 5 4 5 2 2 4 3 4 5 5 5 5 2 2 5 5 2

2 5 3 2 4 3 2 5 6 2 5 3 5 6 2 4 4 5 5 5 4 2 5 5

2 5 3 2 4 3 2 5 6 2 5 3 5 6 2 4 4 5 5 5 4 2 5 5

5 7 5 5 5 2 5 2 5 4 5 2 4 5 2 5 3 5 2

5 7 5 5 5 2 5 2 5 4 5 2 4 5 2 5 3 5 2

5 2 7 2 7 2 7 2 7 2 3 2 7 2 7 2 7

5 2 7 2 7 2 7 2 7 2 3 2 7 2 7 2 7

8 2 8 3 8 3 8 3 8 3 8 2 7 3 7 3 7 3

8 2 8 3 8 3 8 3 8 3 8 2 7 3 7 3 7 3

9 9 9 9 8 9 9

9 9 9 9 8 9 9

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

WC

Hal

lway

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12AREAS AVAILABLE FOR YOU TO WORK SHEET ROCK REWORK/NEEDS PRIMING WORK COMPLETE TO DATE 3/12/2012

* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/13/2012 WORK COMPLETE TO DATE 3/19/2012WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 2/20/2012 WORK COMPLETE TO DATE 3/26/2012

N/A

N/A

16

7

6

5

4

13

12

10

9

3

unit 27

8

N/A

N/A

unit 20unit 21unit 23unit 22unit 25

RUN DATE :

unit 24unit 28

1/30/2012

unit 26

FLOOR18

17

N/A

2

11

15

14

JobD

river

EXHIBIT A

Confid

entia

l

BAY PAINTING PROGRESS CHART

2 2 2 2 2 2

2 2 2 2 2 2

5 3 4 5 3 5 5 3 3 5 3 4 5 3

5 3 4 5 3 5 5 3 3 5 3 4 5 3

5 7 5 7 5 6 7 7 6 7 5 6 7 4 5 6 7 4

5 7 5 7 5 6 7 7 6 7 5 6 7 4 5 6 7 4

6 7 7 5 6 6 2 7 6 7 6 6 7 4 6 6 7

6 7 7 5 6 6 2 7 6 7 6 6 7 4 6 6 7

6 7 7 7 7 2 7 6 7 7 7 5 5 6 6 7 5

6 7 7 7 7 2 7 6 7 7 7 5 5 6 6 7 5

6 9 9 8 9 9 9 9 9 9 9 9 5 9 9 9 5

6 9 9 8 9 9 9 9 9 9 9 9 5 9 9 9 5

5 4 5 8 8 5 8 5

5 4 5 8 8 5 8 5

5 4 11 2 5 4 3 5 4 10 5 4 5 4 3 5 4 4 4 4 7 4 8 4 2 5 5 4 4 5

5 4 11 2 5 4 3 5 4 10 5 4 5 4 3 5 4 4 4 4 7 4 8 4 2 5 5 4 4 5

5 5 9 5 8 10 5 8 5 5 8 8 5 5 7 3 7 8 8 8 8 5 5 8 8 5

5 5 9 5 8 10 5 8 5 5 8 8 5 5 7 3 7 8 8 8 8 5 5 8 8 5

5 8 6 5 7 6 5 8 9 5 8 6 8 9 5 7 7 8 8 8 7 5 8 3

5 8 6 5 7 6 5 8 9 5 8 6 8 9 5 7 7 8 8 8 7 5 8 3

8 8 3 8 3 5 8 3 8 3 8 3 7 8 3 8 3 8 3

8 8 3 8 3 5 8 3 8 3 8 3 7 8 3 8 3 8 3

8 5 10 5 10 5 10 5 10 5 6 5 10 5 10 5 10 3

8 5 10 5 10 5 10 5 10 5 6 5 10 5 10 5 10 3

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

WC

Hal

lway

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c. T

rim a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

Cor

ridor

s

BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12AREAS AVAILABLE FOR YOU TO WORK SHEET ROCK REWORK/NEEDS PRIMING WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/16/2012

* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/13/2012 WORK COMPLETE TO DATE 3/19/2012WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 2/20/2012 WORK COMPLETE TO DATE 3/26/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETE TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/2/2012

No items were completed this week WORK COMPLETE TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/9/2012WORK COMPLETE TO DATE 2/6/2012

N/A

N/A

N/A

16

7

6

5

4

13

12

10

9

3

unit 27

8

N/A

N/A

unit 20unit 21unit 23unit 22unit 25

RUN DATE :

unit 24unit 28

1/30/2012

unit 26

FLOOR18

17

N/A

2

11

15

14

JobD

river

EXHIBIT A

Confid

entia

l

BAY PAINTING PROGRESS CHART

3 3 3 3 3

3 3 3 3 3

6 4 5 6 4 6 6 4 4 6 4 5 6 4

6 4 5 6 4 6 6 4 4 6 4 5 6 4

6 8 6 8 6 7 8 8 7 8 6 7 8 5 6 7 8

6 8 6 8 6 7 8 8 7 8 6 7 8 5 6 7 8

7 8 8 6 7 7 3 8 7 8 7 7 8 5 7 7 8

7 8 8 6 7 7 3 8 7 8 7 7 8 5 7 7 8

7 8 8 8 8 3 8 7 8 8 8 6 6 7 7 8

7 8 8 8 8 3 8 7 8 8 8 6 6 7 7 8

7 10 # 9 10 10 10 # 10 10 # 10 6 10 # 10

7 10 # 9 10 10 10 # 10 10 # 10 6 10 # 10

6 5 6 9 9 6 9

6 5 6 9 9 6 9

6 5 12 3 6 5 4 6 5 11 6 5 6 5 4 6 5 5 5 5 8 5 9 5 3 6 6 5 5

6 5 12 3 6 5 4 6 5 11 6 5 6 5 4 6 5 5 5 5 8 5 9 5 3 6 6 5 5

6 6 10 6 9 11 6 9 6 6 9 2 9 6 6 8 4 8 9 9 9 9 6 6 9 9

6 6 10 6 9 11 6 9 6 6 9 2 9 6 6 8 4 8 9 9 9 9 6 6 9 9

6 9 7 6 8 7 6 9 10 6 9 7 9 10 6 8 2 8 9 9 9 8 6 9 4

6 9 7 6 8 7 6 9 10 6 9 7 9 10 6 8 2 8 9 9 9 8 6 9 4

8

8

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

WC

Hal

lway

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c. T

rim a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12AREAS AVAILABLE FOR YOU TO WORK SHEET ROCK REWORK/NEEDS PRIMING WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/16/2012

* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/13/2012 WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/23/2012WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 2/20/2012 WORK COMPLETE TO DATE 3/26/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETE TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/2/2012

No items were completed this week WORK COMPLETE TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/9/2012WORK COMPLETE TO DATE 2/6/2012

FLOOR18

17

N/A

2

11

15

14

unit 20unit 21unit 23unit 22unit 25

RUN DATE :

unit 24unit 28

1/30/2012

unit 26

13

12

10

9

3

unit 27

8

N/A

N/A

N/A

N/A

N/A

16

7

6

5

4

JobD

river

EXHIBIT A

Confid

entia

l

BAY PAINTING PROGRESS CHART

5

5

6

6

6

6

6

6

6

6

6

6

Balc

ony

Fini

sh C

oate

d

JobD

river

EXHIBIT A

Confid

entia

l

BAY PAINTING PROGRESS CHART

3 3 3 3 3

3 3 3 3 3

6 4 5 6 4 6 6 4 4 6 4 5 6 4

6 4 5 6 4 6 6 4 4 6 4 5 6 4

6 8 6 8 6 7 8 8 7 8 6 7 8 5 6 7 8

6 8 6 8 6 7 8 8 7 8 6 7 8 5 6 7 8

7 8 8 6 7 7 3 8 7 8 7 7 8 5 7 7 8

7 8 8 6 7 7 3 8 7 8 7 7 8 5 7 7 8

7 8 8 8 8 3 8 7 8 8 8 6 6 7 7 8

7 8 8 8 8 3 8 7 8 8 8 6 6 7 7 8

7 10 # 9 10 10 10 # 10 10 # 10 6 10 # 10

7 10 # 9 10 10 10 # 10 10 # 10 6 10 # 10

6 5 6 9 9 6 9

6 5 6 9 9 6 9

6 5 12 3 6 5 4 6 5 11 6 5 6 5 4 6 5 5 5 5 8 5 9 5 3 6 6 5 5

6 5 12 3 6 5 4 6 5 11 6 5 6 5 4 6 5 5 5 5 8 5 9 5 3 6 6 5 5

6 6 10 6 9 11 6 9 6 6 9 2 9 6 6 8 4 8 9 9 9 9 6 6 9 9

6 6 10 6 9 11 6 9 6 6 9 2 9 6 6 8 4 8 9 9 9 9 6 6 9 9

6 9 8 9 9 9 8 8 9 9 9

6 9 8 9 9 9 8 8 9 9 9

8

8

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

WC

Hal

lway

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c. T

rim a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12AREAS AVAILABLE FOR YOU TO WORK SHEET ROCK REWORK/NEEDS PRIMING WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/16/2012

* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/13/2012 WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/23/2012WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 2/20/2012 WORK COMPLETE TO DATE 3/26/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETE TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/2/2012

No items were completed this week WORK COMPLETE TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/9/2012WORK COMPLETE TO DATE 2/6/2012

FLOOR18

17

N/A

2

11

15

14

unit 20unit 21unit 23unit 22unit 25

RUN DATE :

unit 24unit 28

1/30/2012

unit 26

13

12

10

9

3

unit 27

8

N/A

N/A

N/A

N/A

N/A

16

7

6

5

4

JobD

river

EXHIBIT A

Confid

entia

l

BAY PAINTING PROGRESS CHART

5

5

6

6

6

6

6

6

6

6

6

6

Balc

ony

Fini

sh C

oate

d

JobD

river

EXHIBIT A

Confid

entia

l

BAY PAINTING PROGRESS CHART

4 4 4 4 4

4 4 4 4 4

7 5 6 7 5 7 7 5 5 7 5 6 7 5

7 5 6 7 5 7 7 5 5 7 5 6 7 5

7 9 7 9 7 8 9 9 8 9 7 8 9 6 7 8 9

7 9 7 9 7 8 9 9 8 9 7 8 9 6 7 8 9

8 9 9 7 8 8 4 9 8 9 8 8 9 6 8 8 9

8 9 9 7 8 8 4 9 8 9 8 8 9 6 8 8 9

8 9 9 2 9 9 4 9 8 9 9 9 7 7 8 8 9

8 9 9 2 9 9 4 9 8 9 9 9 7 7 8 8 9

10 11 11 7 11

10 11 11 7 11

7 6 7 2 10 10 7 10

7 6 7 2 10 10 7 10

7 6 13 4 7 6 7 6 12 7 6 7 6 5 7 6 6 6 6 9 6 10 6 4 7 7 6 6

7 6 13 4 7 6 7 6 12 7 6 7 6 5 7 6 6 6 6 9 6 10 6 4 7 7 6 6

7 7 7 10 7 10 7 7 10 10 7 9 9 10 10 7 7 10

7 7 7 10 7 10 7 7 10 10 7 9 9 10 10 7 7 10

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

WC

Hal

lway

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c. T

rim a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

hal

lway

van

ity

WC

Sin

gle

Vani

ty

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

hal

lway

van

ity

WC

Sin

gle

Vani

ty

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12AREAS AVAILABLE FOR YOU TO WORK SHEET ROCK REWORK/NEEDS PRIMING WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/16/2012

* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/13/2012 WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/23/2012WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 2/20/2012 WORK COMPLETE TO DATE 3/26/2012 WORK COMPLETED TO DATE 4/30/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETE TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/2/2012

No items were completed this week WORK COMPLETE TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/9/2012WORK COMPLETE TO DATE 2/6/2012

14

unit 21unit 23unit 22unit 25

N/A

FLOOR18

17

N/A

2

11

RUN DATE :

unit 24unit 28

1/30/2012

unit 26

13

12

10

9

3

unit 27

8

N/A

N/A

N/A

N/A

unit 20

N/A

N/A

16

7

6

5

4

15

JobD

river

EXHIBIT A

Confid

entia

l

BAY PAINTING PROGRESS CHART

6

6

7

7

7

7

7

7

7

7

7

7

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

JobD

river

EXHIBIT A

Confid

entia

l

BAY PAINTING PROGRESS CHART

2 2 2 2 2 2

2 2 2 2 2 2

5 2 5 2 5 2 5 2 5

5 2 5 2 5 2 5 2 5

8 6 7 8 6 8 8 6 8 6 7 8 6

8 6 7 8 6 8 8 6 8 6 7 8 6

8 10 7 10 8 9 10 10 9 10 8 9 10 7 8 9 10

8 10 7 10 8 9 10 10 9 10 8 9 10 7 8 9 10

9 10 9 8 9 9 5 10 9 10 9 9 10 7 9 9 10

9 10 9 8 9 9 5 10 9 10 9 9 10 7 9 9 10

9 10 9 3 10 10 5 10 9 10 10 # 8 8 9 9 10

9 10 9 3 10 10 5 10 9 10 10 # 8 8 9 9 10

11 12 12 8 12

11 12 12 8 12

8 7 8 3 11 11 8 11

8 7 8 3 11 11 8 11

8 7 8 7 8 7 8 7 7 6 8 7 7 7 10 7 7 5 8 8 7

8 7 8 7 8 7 8 7 7 6 8 7 7 7 10 7 7 5 8 8 7

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

WC

Hal

lway

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c. T

rim a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Hal

lway

bat

hroo

m

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

hal

lway

bat

hroo

m

WC

Sin

gle

Vani

ty

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12AREAS AVAILABLE FOR YOU TO WORK SHEET ROCK REWORK/NEEDS PRIMING WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/16/2012

* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/13/2012 WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/23/2012WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 2/20/2012 WORK COMPLETE TO DATE 3/26/2012 WORK COMPLETED TO DATE 4/30/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETE TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012

No items were completed this week WORK COMPLETE TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/9/2012WORK COMPLETE TO DATE 2/6/2012

14

N/A

N/A

N/A

N/A

unit 21unit 23unit 22unit 25

FLOOR18

17

N/A

2

11

RUN DATE :

unit 24unit 28

1/30/2012

unit 26

13

12

10

9

3

unit 27

8

N/A

N/A

unit 20

N/A

16

7

6

5

4

15

JobD

river

EXHIBIT A

Confid

entia

l

BAY PAINTING PROGRESS CHART

7

7

8

8

8

8

8

8

8

8

8

8

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

JobD

river

EXHIBIT A

Confid

entia

l

BAY PAINTING PROGRESS CHART

3 3 3 3 3 3

3 3 3 3 3 3

6 2 6 3 6 3 6 3 6

6 2 6 3 6 3 6 3 6

9 7 8 9 7 9 9 7 9 7 8 9 7

9 7 8 9 7 9 9 7 9 7 8 9 7

9 11 8 11 9 10 11 11 # 11 9 # 11 8 9 # 11

9 11 8 11 9 10 11 11 # 11 9 # 11 8 9 # 11

10 11 # 9 10 10 6 11 # 11 10 # 11 8 10 # 11

10 11 # 9 10 10 6 11 # 11 10 # 11 8 10 # 11

10 11 # 4 11 11 6 11 # 11 11 # 9 9 10 # 11

10 11 # 4 11 11 6 11 # 11 11 # 9 9 10 # 11

12 13 13 9 13

12 13 13 9 13

9 8 9 4 12 12 9 12

9 8 9 4 12 12 9 12

8 2 8 2 9 8 2 8 2 8 9 8 8 11 8 2 8 9 8 2

8 2 8 2 9 8 2 8 2 8 9 8 8 11 8 2 8 9 8 2

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

WC

Hal

lway

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c. T

rim a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Hal

lway

bat

hroo

m

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

hal

lway

bat

hroo

m

WC

Sin

gle

Vani

ty

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/16/2012

* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/13/2012 WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/23/2012WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 2/20/2012 WORK COMPLETE TO DATE 3/26/2012 WORK COMPLETED TO DATE 4/30/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETE TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012

No items were completed this week WORK COMPLETE TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012WORK COMPLETE TO DATE 2/6/2012

unit 20

N/A

16

7

6

5

4

15

13

12

10

9

3

unit 27

8

N/A

N/A

FLOOR18

17

N/A

2

11

RUN DATE :

unit 24unit 28

1/30/2012

unit 26

14

N/A

N/A

N/A

N/A

unit 21unit 23unit 22unit 25

JobD

river

EXHIBIT A

Confid

entia

l

BAY PAINTING PROGRESS CHART

2

2

8

8

9

9

9

9

9

9

9

9

9

9

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

JobD

river

EXHIBIT A

Confid

entia

l

BAY PAINTING PROGRESS CHART

5 5 5 5 5 5

5 5 5 5 5 5

2 2 8 4 2 8 5 2 2 8 5 8 5 8

2 2 8 4 2 8 5 2 2 8 5 8 5 8

2 11 9 10 11 9 11 # 9 # 9 10 # 9

2 11 9 10 11 9 11 # 9 # 9 10 # 9

11 13 10 13 11 12 13 13 # 13 11 # 13 10 11 # 13

11 13 10 13 11 12 13 13 # 13 11 # 13 10 11 # 13

12 13 12 11 12 12 8 13 # 13 12 # 13 10 12 # 13

12 13 12 11 12 12 8 13 # 13 12 # 13 10 12 # 13

12 13 12 2 13 8 13 11 11 13

12 13 12 2 13 8 13 11 11 13

2 14 2 3 2 15 2 15 11 2 15

2 14 2 3 2 15 2 15 11 2 15

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

WC

Hal

lway

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c. T

rim a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Hal

lway

bat

hroo

m

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

hal

lway

bat

hroo

m

WC

Sin

gle

Vani

ty

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012

* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/13/2012 WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 5/30/2012WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 2/20/2012 WORK COMPLETE TO DATE 3/26/2012 WORK COMPLETED TO DATE 4/30/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETE TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012

No items were completed this week WORK COMPLETE TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012WORK COMPLETE TO DATE 2/6/2012

14

N/A

N/A

N/A

N/A

unit 21unit 23unit 22unit 25

FLOOR18

17

N/A

2

11

RUN DATE :

unit 24unit 28

1/30/2012

unit 26

13

12

10

9

3

unit 27

8

N/A

N/A

unit 20

N/A

16

7

6

5

4

15

JobD

river

EXHIBIT A

Confid

entia

l

BAY PAINTING PROGRESS CHART

4

4

3

3

3

3

10

10

11

11

11

11

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

JobD

river

EXHIBIT A

Confid

entia

l

BAY PAINTING PROGRESS CHART

6 6 6 6 6 6

6 6 6 6 6 6

3 9 5 3 9 6 3 9 6 2 2 9 6 2 9

3 9 5 3 9 6 3 9 6 2 2 9 6 2 9

3 12 10 11 12 10 12 # 10 # 10 11 # 10

3 12 10 11 12 10 12 # 10 # 10 11 # 10

12 14 11 14 12 13 14 14 # 14 12 # 14 11 12 # 14

12 14 11 14 12 13 14 14 # 14 12 # 14 11 12 # 14

13 14 13 12 13 13 9 14 # 14 14 11 14

13 14 13 12 13 13 9 14 # 14 14 11 14

3 9 14 12 12 14

3 9 14 12 12 14

3 15 3 4 3 16 3 12 3

3 15 3 4 3 16 3 12 3

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

WC

Hal

lway

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c. T

rim a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Hal

lway

bat

hroo

m

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

hal

lway

bat

hroo

m

WC

Sin

gle

Vani

ty

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012

* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/13/2012 WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 5/30/2012WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 2/20/2012 WORK COMPLETE TO DATE 3/26/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE 6/4/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETE TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012

No items were completed this week WORK COMPLETE TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012WORK COMPLETE TO DATE 2/6/2012

unit 20

N/A

16

7

6

5

4

15

13

12

10

9

3

unit 27

8

N/A

N/A

FLOOR18

17

N/A

2

11

RUN DATE :

unit 24unit 28

1/30/2012

unit 26

14

N/A

N/A

N/A

N/A

unit 21unit 23unit 22unit 25

JobD

river

EXHIBIT A

Confid

entia

l

BAY PAINTING PROGRESS CHART

5

5

4

4

4

4

11

11

12

12

12

12

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

JobD

river

EXHIBIT A

Confid

entia

l

BAY PAINTING PROGRESS CHART

2 2 7 7 2 2 7 7 7 2 2 7

2 2 7 7 2 2 7 7 7 2 2 7

4 10 6 4 10 7 4 10 7 3 3 10 7 2 10

4 10 6 4 10 7 4 10 7 3 3 10 7 2 10

4 13 11 12 13 11 13 # 11 # 11 12 # 11

4 13 11 12 13 11 13 # 11 # 11 12 # 11

13 15 12 15 13 14 15 15 # 15 13 # 15 12 13 # 15

13 15 12 15 13 14 15 15 # 15 13 # 15 12 13 # 15

13 10 15 15 12 15

13 10 15 15 12 15

4 10 15 13 13 15

4 10 15 13 13 15

4 16 4 4 4 2 13 4

4 16 4 4 4 2 13 4

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

WC

Hal

lway

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c. T

rim a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Hal

lway

bat

hroo

m

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

hal

lway

bat

hroo

m

WC

Sin

gle

Vani

ty

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012

* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/13/2012 WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 5/30/2012WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 2/20/2012 WORK COMPLETE TO DATE 3/26/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE 6/4/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETE TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012 WORK COMPLETED TO DATE 6/11/2012

No items were completed this week WORK COMPLETE TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012WORK COMPLETE TO DATE 2/6/2012

N/A

16

7

6

5

4

12

10

9

3

unit 20unit 25unit 27

8

N/A

N/A

FLOOR18

17

14

15

13

2

11

RUN DATE :

unit 24unit 28

1/30/2012

unit 26

N/A

N/A

N/A

N/A

unit 21unit 23unit 22

N/A

JobD

river

EXHIBIT A

Confid

entia

l

BAY PAINTING PROGRESS CHART

6

6

5

5

5

5

12

12

13

13

2 13

2 13

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

0

JobD

river

EXHIBIT A

Confid

entia

l

BAY PAINTING PROGRESS CHART

3 3 2 8 8 3 3 8 8 8 3 3 8

3 3 2 8 8 3 3 8 8 8 3 3 8

5 11 7 5 11 8 5 11 8 4 4 11 8 3 11

5 11 7 5 11 8 5 11 8 4 4 11 8 3 11

5 14 12 13 14 12 14 # 2 12 # 12 13 # 12

5 14 12 13 14 12 14 # 2 12 # 12 13 # 12

14 16 13 16 14 15 16 16 # 16 14 # 16 13 14 # 16

14 16 13 16 14 15 16 16 # 16 14 # 16 13 14 # 16

14 2 11 16 16 13 16

14 2 11 16 16 13 16

14

14

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

WC

Hal

lway

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c. T

rim a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Hal

lway

bat

hroo

m

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

hal

lway

bat

hroo

m

WC

Sin

gle

Vani

ty

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012

* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/13/2012 WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 5/30/2012WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 2/20/2012 WORK COMPLETE TO DATE 3/26/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE 6/4/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETE TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012 WORK COMPLETED TO DATE 6/11/2012

No items were completed this week WORK COMPLETE TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012 WORK COMPLETED TO DATE 6/18/2012WORK COMPLETE TO DATE 2/6/2012

N/A

N/A

N/A

N/A

unit 21unit 23unit 22

N/A

RUN DATE :

unit 24unit 28

1/30/2012

unit 26

17

14

15

13

2

11

3

unit 20unit 25unit 27

8

N/A

N/A

FLOOR18

N/A

16

7

6

5

4

12

10

9

JobD

river

EXHIBIT A

Confid

entia

l

BAY PAINTING PROGRESS CHART

7

7

6

6

6

6

13

13

14

14

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

0

JobD

river

EXHIBIT A

Confid

entia

l

BAY PAINTING PROGRESS CHART

2 2 2 2

2 2 2 2

4 3 9 9 4 4 9 9 9 4 4

4 3 9 9 4 4 9 9 9 4 4

6 12 8 6 12 9 6 12 9 5 5 12 9 4

6 12 8 6 12 9 6 12 9 5 5 12 9 4

6 15 13 14 15 13 15 # 13 # 13 14 #

6 15 13 14 15 13 15 # 13 # 13 14 #

15 14 17 15 17 17 # 17 17 14

15 14 17 15 17 17 # 17 17 14

3 14

3 14

2

2

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

WC

Hal

lway

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c. T

rim a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Hal

lway

bat

hroo

m

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

hal

lway

bat

hroo

m

WC

Sin

gle

Vani

ty

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012 WORK COMPLETED TO DATE 6/25/2012

* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/13/2012 WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 7/2/2012WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 2/20/2012 WORK COMPLETE TO DATE 3/26/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE 6/4/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETE TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012 WORK COMPLETED TO DATE 6/11/2012

No items were completed this week WORK COMPLETE TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012 WORK COMPLETED TO DATE 6/18/2012WORK COMPLETE TO DATE 2/6/2012

9

N/A

N/A

FLOOR18

N/A

16

7

6

5

4

17

14

15

13

2

11

3

8

12

10

RUN DATE :

unit 24unit 28

1/30/2012

unit 26 unit 25unit 27

N/A

N/A

N/A

unit 21unit 23unit 22

N/A

N/A

JobD

river

EXHIBIT A

Confid

entia

l

BAY PAINTING PROGRESS CHART

8

8

9 7

9 7

12 7

12 7

13

13

17 14

17 14

15

15

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

unit 20

JobD

river

EXHIBIT A

Confid

entia

l

BAY PAINTING PROGRESS CHART

3 3

3 3

5 4 10 5 5

5 4 10 5 5

2 7 9 2 7 10 2 7 10 6 6

2 7 9 2 7 10 2 7 10 6 6

14 14 2

14 14 2

2 2 2 2 2

2 2 2 2 2

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

WC

Hal

lway

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c. T

rim a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Hal

lway

bat

hroo

m

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

hal

lway

bat

hroo

m

WC

Sin

gle

Vani

ty

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty

BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012

* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/13/2012 WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 5/30/2012WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 2/20/2012 WORK COMPLETE TO DATE 3/26/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE 6/4/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETE TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012 WORK COMPLETED TO DATE 6/11/2012

No items were completed this week WORK COMPLETE TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012 WORK COMPLETED TO DATE 6/18/2012WORK COMPLETE TO DATE 2/6/2012

9

N/A

N/A

FLOOR18

N/A

16

7

6

5

4

17

14

15

13

2

11

3

8

12

N/A

unit 23unit 22

10

RUN DATE :

unit 24unit 28

1/30/2012

unit 26

N/

unit 25unit 27

N/A

N/A

JobD

river

EXHIBIT A

Confid

entia

l

BAY PAINTING PROGRESS CHART

3 3 9

3 3 9

10 10 5 5 8

10 10 5 5 8

10 5 8

10 5 8

14 14

14 14

15 15

15 15

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WORK COMPLETED TO DATE 6/25/2012WORK COMPLETED TO DATE 7/6/2012WORK COMPLETED TO DATE 7/9/2012

unit 21

N/A

/A

unit 20

JobD

river

EXHIBIT A

Confid

entia

l

BAY PAINTING PROGRESS CHART

2 2 4 4

2 2 4 4

6 5 2 6 6

6 5 2 6 6

3 8 2 3 8 2 3 8 2 7 7

3 8 2 3 8 2 3 8 2 7 7

15 15 3

15 15 3

2 2 2 2 2

2 2 2 2 2

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

WC

Hal

lway

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c. T

rim a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Hal

lway

bat

hroo

m

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

hal

lway

bat

hroo

m

WC

Sin

gle

Vani

ty

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty

BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012

* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/13/2012 WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 5/30/2012WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 2/20/2012 WORK COMPLETE TO DATE 3/26/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE 6/4/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETE TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012 WORK COMPLETED TO DATE 6/11/2012

No items were completed this week WORK COMPLETE TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012 WORK COMPLETED TO DATE 6/18/2012WORK COMPLETE TO DATE 2/6/2012

N/

unit 25unit 27

N/A

N/A

N/A

unit 23unit 22

10

RUN DATE :

unit 24unit 28

1/30/2012

unit 26

17

14

15

13

2

11

3

8

12

9

N/A

N/A

FLOOR18

N/A

16

7

6

5

4

JobD

river

EXHIBIT A

Confid

entia

l

BAY PAINTING PROGRESS CHART

2 4 4 2 10

2 4 4 2 10

2 11 6 6 2

2 11 6 6 2

2 6 2

2 6 2

15 15

15 15

16 16

16 16

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WORK COMPLETED TO DATE 6/25/2012WORK COMPLETED TO DATE 7/6/2012WORK COMPLETED TO DATE 7/9/2012

N/A

/A

unit 20unit 21

JobD

river

EXHIBIT A

Confid

entia

l

BAY PAINTING PROGRESS CHART

3 3 5 5

3 3 5 5

7 6 3 7 7

7 6 3 7 7

4 9 3 4 9 3 4 9 3 8 8

4 9 3 4 9 3 4 9 3 8 8

3 3 3

3 3 3

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

WC

Hal

lway

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c. T

rim a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Hal

lway

bat

hroo

m

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

hal

lway

bat

hroo

m

WC

Sin

gle

Vani

ty

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty

BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012

* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/13/2012 WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 5/30/2012WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 2/20/2012 WORK COMPLETE TO DATE 3/26/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE 6/4/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETE TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012 WORK COMPLETED TO DATE 6/11/2012

No items were completed this week WORK COMPLETE TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012 WORK COMPLETED TO DATE 6/18/2012WORK COMPLETE TO DATE 2/6/2012

N/

unit 25unit 27

N/A

N/A

N/A

unit 23unit 22

10

RUN DATE :

unit 24unit 28

1/30/2012

unit 26

17

14

15

13

2

11

3

8

12

9

N/A

N/A

FLOOR18

N/A

16

7

6

5

4

JobD

river

EXHIBIT A

Confid

entia

l

BAY PAINTING PROGRESS CHART

3 5 5 3 11

3 5 5 3 11

3 12 7 7 3

3 12 7 7 3

3 7 3

3 7 3

2 2

2 2

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WORK COMPLETED TO DATE 6/25/2012WORK COMPLETED TO DATE 7/6/2012WORK COMPLETED TO DATE 7/9/2012WORK COMPELTED TO DATE 7/16/2012

N/A

/A

unit 20unit 21

JobD

river

EXHIBIT A

Confid

entia

l

BAY PAINTING PROGRESS CHART

4 4 6 6

4 4 6 6

8 7 4 8 8

8 7 4 8 8

4 4 4

4 4 4

4 4 4

4 4 4

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

WC

Hal

lway

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c. T

rim a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Hal

lway

bat

hroo

m

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

hal

lway

bat

hroo

m

WC

Sin

gle

Vani

ty

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty

BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012

* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/13/2012 WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 5/30/2012WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 2/20/2012 WORK COMPLETE TO DATE 3/26/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE 6/4/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETE TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012 WORK COMPLETED TO DATE 6/11/2012

No items were completed this week WORK COMPLETE TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012 WORK COMPLETED TO DATE 6/18/2012WORK COMPLETE TO DATE 2/6/2012

9

N/A

N/A

FLOOR18

N/A

16

7

6

5

4

17

14

15

13

2

11

3

8

12

N/A

unit 23unit 22

10

RUN DATE :

unit 24unit 28

1/30/2012

unit 26

N/

unit 25unit 27

N/A

N/A

JobD

river

EXHIBIT A

Confid

entia

l

BAY PAINTING PROGRESS CHART

4 6 6 4 12

4 6 6 4 12

4 13 8 8 4

4 13 8 8 4

4 4

4 4

3 3

3 3

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WORK COMPLETED TO DATE 6/25/2012WORK COMPLETED TO DATE 7/6/2012WORK COMPLETED TO DATE 7/9/2012WORK COMPELTED TO DATE 7/16/2012WORK COMPLETED TO DATE 7/23/2012

unit 21

N/A

/A

unit 20

JobD

river

EXHIBIT A

Confid

entia

l

BAY PAINTING PROGRESS CHART

4 4 6 6

4 4 6 6

8 7 4 8 8

8 7 4 8 8

4 4 4

4 4 4

4 4 4

4 4 4

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

WC

Hal

lway

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c. T

rim a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Hal

lway

bat

hroo

m

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

hal

lway

bat

hroo

m

WC

Sin

gle

Vani

ty

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty

BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012

* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/13/2012 WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 5/30/2012WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 2/20/2012 WORK COMPLETE TO DATE 3/26/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE 6/4/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETE TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012 WORK COMPLETED TO DATE 6/11/2012

No items were completed this week WORK COMPLETE TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012 WORK COMPLETED TO DATE 6/18/2012WORK COMPLETE TO DATE 2/6/2012

9

N/A

N/A

FLOOR18

N/A

16

7

6

5

4

17

14

15

13

2

11

3

8

12

N/A

unit 23unit 22

10

RUN DATE :

unit 24unit 28

1/30/2012

unit 26

N/

unit 25unit 27

N/A

N/A

JobD

river

EXHIBIT A

Confid

entia

l

BAY PAINTING PROGRESS CHART

4 6 6 4 12

4 6 6 4 12

4 13 8 8 4

4 13 8 8 4

4 4

4 4

3 3

3 3

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WORK COMPLETED TO DATE 6/25/2012WORK COMPLETED TO DATE 7/6/2012WORK COMPLETED TO DATE 7/9/2012WORK COMPELTED TO DATE 7/16/2012WORK COMPLETED TO DATE 7/23/2012

unit 21

N/A

/A

unit 20

JobD

river

EXHIBIT A

Confid

entia

l

BAY PAINTING PROGRESS CHART

5 5 7 7

5 5 7 7

9 8 5 9 9

9 8 5 9 9

2 2

2 2

2 2 5 5 2 2 5

2 2 5 5 2 2 5

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

WC

Hal

lway

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c. T

rim a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Hal

lway

bat

hroo

m

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

hal

lway

bat

hroo

m

WC

Sin

gle

Vani

ty

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty

BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12 WORK COMPLETE TO DATE 2/13/2012 WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012 WORK COMPLETED TO DATE 6/25/2012 WORK COMP AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETE TO DATE 2/20/2012 WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 7/6/2012 WORK COMP

* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/27/2012 WORK COMPLETE TO DATE 3/26/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE 6/4/2012 WORK COMPLETED TO DATE 7/9/2012WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012 WORK COMPLETED TO DATE 6/11/2012 WORK COMPELTED TO DATE 7/16/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012 WORK COMPLETED TO DATE 6/18/2012 WORK COMPLETED TO DATE 7/23/2012

No items were completed this weekWORK COMPLETE TO DATE 2/6/2012

9

N/A

N/A

FLOOR18

N/A

16

7

6

5

4

17

14

15

13

2

11

3

8

12

N/A

unit 23unit 22

10

RUN DATE :

unit 24unit 28

1/30/2012

unit 26

N/

unit 25unit 27

N/A

N/A

JobD

river

EXHIBIT A

Confid

entia

l

BAY PAINTING PROGRESS CHART

5 7 7 5 13

5 7 7 5 13

5 14 9 9 5

5 14 9 9 5

2

2

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

PLETED TO DATE 7/30/2012 PLETED TO DATE 8/6/2012

unit 21

N/A

/A

unit 20

JobD

river

EXHIBIT A

Confid

entia

l

BAY PAINTING PROGRESS CHART

6 6 8 8

6 6 8 8

10 9 6 10 #

10 9 6 10 #

3 3 6 6 3 3 2 6

3 3 6 6 3 3 2 6

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

WC

Hal

lway

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c. T

rim a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Hal

lway

bat

hroo

m

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

hal

lway

bat

hroo

m

WC

Sin

gle

Vani

ty

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty

BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12 WORK COMPLETE TO DATE 2/13/2012 WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012 WORK COMPLETED TO DATE 6/25/2012 WORK COMP AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETE TO DATE 2/20/2012 WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 7/6/2012 WORK COMP

* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/27/2012 WORK COMPLETE TO DATE 3/26/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE 6/4/2012 WORK COMPLETED TO DATE 7/9/2012 WORK COMP WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012 WORK COMPLETED TO DATE 6/11/2012 WORK COMPELTED TO DATE 7/16/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012 WORK COMPLETED TO DATE 6/18/2012 WORK COMPLETED TO DATE 7/23/2012

No items were completed this weekWORK COMPLETE TO DATE 2/6/2012

N/

unit 25unit 27

N/A

N/A

N/A

unit 23unit 22

10

RUN DATE :

unit 24unit 28

1/30/2012

unit 26

17

14

15

13

2

11

3

8

12

9

N/A

N/A

FLOOR18

N/A

16

7

6

5

4

JobD

river

EXHIBIT A

Confid

entia

l

BAY PAINTING PROGRESS CHART

6 8 8 6 14

6 8 8 6 14

6 15 10 # 6

6 15 10 # 6

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

PLETED TO DATE 7/30/2012 PLETED TO DATE 8/6/2012 PLETED TO DATE 8/13/2012

N/A

/A

unit 20unit 21

JobD

river

EXHIBIT A

Confid

entia

l

BAY PAINTING PROGRESS CHART

7 7 9 9

7 7 9 9

7 11 11

7 11 11

4 4 7 7 4 4 3 7

4 4 7 7 4 4 3 7

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

WC

Hal

lway

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c. T

rim a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Hal

lway

bat

hroo

m

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

hal

lway

bat

hroo

m

WC

Sin

gle

Vani

ty

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty

BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12 WORK COMPLETE TO DATE 2/13/2012 WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012 WORK COMPLETED TO DATE 6/25/2012 WORK COMPL AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETE TO DATE 2/20/2012 WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 7/6/2012 WORK COMPL

* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/27/2012 WORK COMPLETE TO DATE 3/26/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE 6/4/2012 WORK COMPLETED TO DATE 7/9/2012 WORK COMPL WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012 WORK COMPLETED TO DATE 6/11/2012 WORK COMPELTED TO DATE 7/16/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012 WORK COMPLETED TO DATE 6/18/2012 WORK COMPLETED TO DATE 7/23/2012

No items were completed this weekWORK COMPLETE TO DATE 2/6/2012

9

N/A

N/A

FLOOR18

N/A

16

7

6

5

4

17

14

15

13

2

11

3

8

12

N/A

unit 23unit 22

10

RUN DATE :

unit 24unit 28

1/30/2012

unit 26

N/A

unit 25unit 27

N/A

N/A

JobD

river

EXHIBIT A

Confid

entia

l

BAY PAINTING PROGRESS CHART

7 9 9 7 15

7 9 9 7 15

2 7 16 11 # 2 7

2 7 16 11 # 2 7

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

LETED TO DATE 7/30/2012 LETED TO DATE 8/6/2012 LETED TO DATE 8/13/2012

unit 21

N/A

A

unit 20

JobD

river

EXHIBIT A

Confid

entia

l

BAY PAINTING PROGRESS CHART

8 8 10 10

8 8 10 10

8 2

8 2

8 4

8 4

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

WC

Hal

lway

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c. T

rim a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Hal

lway

bat

hroo

m

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

hal

lway

bat

hroo

m

WC

Sin

gle

Vani

ty

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty

BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12 WORK COMPLETE TO DATE 2/13/2012 WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012 WORK COMPLETED TO DATE 6/25/2012 WORK COMPL AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETE TO DATE 2/20/2012 WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 7/6/2012 WORK COMPL

* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/27/2012 WORK COMPLETE TO DATE 3/26/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE 6/4/2012 WORK COMPLETED TO DATE 7/9/2012 WORK COMPL WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012 WORK COMPLETED TO DATE 6/11/2012 WORK COMPELTED TO DATE 7/16/2012 WORK COMPL WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012 WORK COMPLETED TO DATE 6/18/2012 WORK COMPLETED TO DATE 7/23/2012

No items were completed this weekWORK COMPLETE TO DATE 2/6/2012

4

12

9

N/A

N/A

FLOOR18

N/A

16

7

6

5

RUN DATE :

unit 24unit 28

1/30/2012

unit 26

17

14

15

13

N/A

N/A

unit 23unit 22

10

2

11

3

8

N/A

unit 25unit 27

N/AJobD

river

EXHIBIT A

Confid

entia

l

BAY PAINTING PROGRESS CHART

8 10 # 8 16

8 10 # 8 16

3 17 3

3 17 3

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

LETED TO DATE 7/30/2012 LETED TO DATE 8/6/2012 LETED TO DATE 8/13/2012 LETED TO DATE 8/20/2012

unit 21

N/A

A

unit 20

JobD

river

EXHIBIT A

Confid

entia

l

BAY PAINTING PROGRESS CHART

9 9 11 11

9 9 11 11

9 3

9 3

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

WC

Hal

lway

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c. T

rim a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Hal

lway

bat

hroo

m

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

hal

lway

bat

hroo

m

WC

Sin

gle

Vani

ty

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty

BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12 WORK COMPLETE TO DATE 2/13/2012 WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012 WORK COMPLETED TO DATE 6/25/2012 WORK COMPL AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETE TO DATE 2/20/2012 WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 7/6/2012 WORK COMPL

* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/27/2012 WORK COMPLETE TO DATE 3/26/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE 6/4/2012 WORK COMPLETED TO DATE 7/9/2012 WORK COMPL WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012 WORK COMPLETED TO DATE 6/11/2012 WORK COMPELTED TO DATE 7/16/2012 WORK COMPL WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012 WORK COMPLETED TO DATE 6/18/2012 WORK COMPLETED TO DATE 7/23/2012 WORK COMPL

No items were completed this weekWORK COMPLETE TO DATE 2/6/2012

N/A

unit 25unit 27

N/A

N/A

unit 23unit 22

10

2

11

3

8

17

14

15

13

N/A

5

RUN DATE :

unit 24unit 28

1/30/2012

unit 26

4

12

9

N/A

N/A

FLOOR18

N/A

16

7

6 JobD

river

EXHIBIT A

Confid

entia

l

BAY PAINTING PROGRESS CHART

9 11 # 9 17

9 11 # 9 17

4 2 18 4 2

4 2 18 4 2

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

WC

DBL

Van

ity B

ath

WC

Sin

gle

Vani

ty B

ath

Acce

nt w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e Pa

int W

alls

Base

Coa

t Wal

ls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Popc

orn

Balc

ony

Fini

sh C

oate

d

LETED TO DATE 7/30/2012 LETED TO DATE 8/6/2012 LETED TO DATE 8/13/2012 LETED TO DATE 8/20/2012 LETED TO DATE 8/27/2012

N/A

A

unit 20unit 21

JobD

river

EXHIBIT A

Confid

entia

l

BAY PAINTING PROGRESS CHART

WC

DB

L V

anity

Bat

h

WC

Sin

gle

Van

ity B

ath

Acc

ent w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e P

aint

Wal

ls

Bas

e C

oat W

alls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Pop

corn

Bal

cony

Fin

ish

Coa

ted

WC

DB

L V

anity

Bat

h

WC

Sin

gle

Van

ity B

ath

Acc

ent w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e P

aint

Wal

ls

Bas

e C

oat W

alls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Pop

corn

Bal

cony

Fin

ish

Coa

ted

WC

DB

L V

anity

Bat

h

WC

Sin

gle

Van

ity B

ath

WC

Hal

lway

Acc

ent w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e P

aint

Wal

ls

Bas

e C

oat W

alls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Pop

corn

Bal

cony

Fin

ish

Coa

ted

WC

DB

L V

anity

Bat

h

WC

Sin

gle

Van

ity B

ath

Acc

ent w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e P

aint

Wal

ls

Bas

e C

oat W

alls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Pop

corn

Bal

cony

Fin

ish

Coa

ted

WC

DB

L V

anity

Bat

h

Doo

rs a

nd F

ram

es

Prim

e P

aint

Wal

ls

Bas

e C

oat W

alls

Fini

sh C

oat W

alls

Mis

c. T

rim a

nd V

alen

ce

Cau

lkin

g

Pop

corn

Bal

cony

Fin

ish

Coa

ted

WC

DB

L V

anity

Bat

h

WC

Hal

lway

bat

hroo

m

WC

Sin

gle

Van

ity B

ath

Acc

ent w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e P

aint

Wal

ls

Bas

e C

oat W

alls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Pop

corn

Bal

cony

Fin

ish

Coa

ted

WC

DB

L V

anity

Bat

h

WC

hal

lway

bat

hroo

m

WC

Sin

gle

Van

ity

Acc

ent w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e P

aint

Wal

ls

Bas

e C

oat W

alls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Pop

corn

Bal

cony

Fin

ish

Coa

ted

WC

DB

L V

anity

Bat

h

WC

Sin

gle

Van

ity

Acc

ent w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e P

aint

Wal

ls

Bas

e C

oat W

alls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Pop

corn

Bal

cony

Fin

ish

Coa

ted

WC

DB

L V

anity

Bat

h

WC

Sin

gle

Van

ity B

ath

Acc

ent w

all p

aint

ing

Doo

rs a

nd F

ram

es

Prim

e P

aint

Wal

ls

Bas

e C

oat W

alls

Fini

sh C

oat W

alls

Mis

c Tr

im a

nd V

alen

ce

Cau

lkin

g

Pop

corn

Bal

cony

Fin

ish

Coa

ted

Wal

lpap

er in

Cor

ridor

s

Pop

corn

in C

orrid

ors

BAY PAINT PROGRESS CHARTWORK COMPLETE TO DATE 1/16/12 WORK COMPLETE TO DATE 2/13/2012 WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012 WORK COMPLETED TO DATE 6/25/2012 WORK COMPLETED TO DATE 7/30/2012 9/3/2012 Labor dayAREAS AVAILABLE FOR YOU TO WORK WORK COMPLETE TO DATE 2/20/2012 WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 7/6/2012 WORK COMPLETED TO DATE 8/6/2012 WORK COMPLETED TO DATE 9/10/2012

* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETE TO DATE 2/27/2012 WORK COMPLETE TO DATE 3/26/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE 6/4/2012 WORK COMPLETED TO DATE 7/9/2012 WORK COMPLETED TO DATE 8/13/2012 WORK COMPLETED TO DATE 9/17/2012

WORK COMPLETE TO DATE 1/23/12 WORK COMPLETE TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012 WORK COMPLETED TO DATE 6/11/2012 WORK COMPELTED TO DATE 7/16/2012 WORK COMPLETED TO DATE 8/20/2012 WORK COMPLETED TO DATE 9/24/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012 WORK COMPLETED TO DATE 6/18/2012 WORK COMPLETED TO DATE 7/23/2012 WORK COMPLETED TO DATE 8/27/2012 WORK COMPLETED TO DATE 10/1/2012No items were completed this weekWORK COMPLETE TO DATE 2/6/2012

3

RUN DATE :

unit 24unit 28

1/30/2012

unit 26

17

14

15

13

unit 21unit 23unit 22

10

2

FLOOR18

N/A

16

5

12

N/A

4

N/A

7

6

9

N/A

11

8

unit 20unit 25unit 27

N/A

N/A

N/A

N/A

N/A

JobD

river

EXHIBIT A

Confid

entia

l

PLEASANTS HARDWARE PROGRESS CHART

Mai

n&Lo

ckou

t Ent

ry D

oor

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

rL.

Rm

Clo

set H

ardw

are

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

e

PLEASANTS HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12AREAS AVAILABLE FOR YOU TO WORK

* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES

2

11

10

9

3

15

27 Unit

6

5

4

12

FLOOR18

17

N/A

N/A

N/A14

13

8

16

7

RUN DATE : 5/16/2019

26 Unit 24 Unit28 Unit 20 Unit 21 Unit 23 Unit22 Unit 25 Unit

JobD

river

EXHIBIT A

Confid

entia

l

PLEASANTS HARDWARE PROGRESS CHART

Mai

n&Lo

ckou

t Ent

ry D

oor

Ent

ry d

oor h

ardw

are

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bat

hroo

m P

ocke

t doo

r

Poc

ket d

oor h

ardw

are

Mas

ter B

ath

Sw

ing

Doo

r

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Ent

ry d

oor h

ardw

are

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bat

hroo

m P

ocke

t doo

r

Poc

ket d

oor h

ardw

are

Mas

ter B

ath

Sw

ing

Doo

r

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Ent

ry d

oor h

ardw

are

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bat

hroo

m P

ocke

t doo

r

Poc

ket d

oor h

ardw

are

Mas

ter B

ath

Sw

ing

Doo

rM

.B. S

win

g D

r. H

ardw

are

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Ent

ry d

oor h

ardw

are

Livi

ng R

m C

lose

t doo

rL.

Rm

Clo

set H

ardw

are

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bat

hroo

m P

ocke

t doo

r

Poc

ket d

oor h

ardw

are

Mas

ter B

ath

Sw

ing

Doo

r

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eE

ntry

Doo

r

Ent

ry D

oor h

ardw

are

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Bat

hroo

m P

ocke

t doo

r

Poc

ket d

oor h

ardw

are

Mas

ter B

ath

Sw

ing

Doo

r

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Ent

ry d

oor h

ardw

are

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bat

hroo

m P

ocke

t doo

r

Poc

ket d

oor h

ardw

are

Mas

ter B

ath

Sw

ing

Doo

r

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eE

ntry

Doo

r

Ent

ry D

oor h

ardw

are

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Bat

hroo

m P

ocke

t doo

r

Poc

ket d

oor h

ardw

are

Mas

ter B

ath

Sw

ing

Doo

r

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eE

ntry

Doo

r

Ent

ry D

oor h

ardw

are

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Bat

hroo

m P

ocke

t doo

r

Poc

ket d

oor h

ardw

are

Mas

ter B

ath

Sw

ing

Doo

r

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain

& L

ocko

ut E

ntry

Ent

ry D

oor h

ardw

are

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

ath

Sw

ing

Doo

r

L.O

Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set H

arew

are

Bat

hroo

m P

ocke

t doo

r

Poc

ket d

oor h

ardw

are

Mas

ter B

ath

Sw

ing

Doo

r

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

e

PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12AREAS AVAILABLE FOR YOU TO WORK

* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES

16

7

6

5

4

5/16/2019

26 Unit 24 Unit28 Unit 27 Unit 20 Unit 21 Unit 23 Unit22 Unit 25 Unit

10

9

3

15

14

RUN DATE :

13

8

12

FLOOR18

17

N/A

N/A

N/A

2

11

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

3 3 3 3 3 2 3 2 3 3 3 3 3 3 2 3 3 3 3 3 3 2 3 2 3 3 3 2 3 3 3 3 2 3 3 3 3 3 3 3 2 3 3 3 2 3 3 3 2 2 3 2 3 3 3 3 3 2 3 3

3 3 3 3 3 2 3 2 3 3 3 3 3 3 2 3 3 3 3 3 3 2 3 2 3 3 3 2 3 3 3 3 2 3 3 3 3 3 3 3 2 3 3 3 2 3 3 3 2 2 3 2 3 3 3 3 3 2 3 3

3 3 3 3 3 2 3 2 3 3 3 3 3 2 2 3 3 3 3 2 3 3 2 3 2 3 3 3 3 3 2 3 4 3 2 3 2 2 3 2 3 3 3 3 3 2 3 3

3 3 3 3 3 2 3 2 3 3 3 3 3 2 2 3 3 3 3 2 3 3 2 3 2 3 3 3 3 3 2 3 4 3 2 3 2 2 3 2 3 3 3 3 3 2 3 3

3 3 3 2 3 3 3 3 2 3 3 3 2 3 3 3 2 4 2 4 3 2 4 4 2 4 2 2 2 4 2 2 2 2 2

3 3 3 2 3 3 3 3 2 3 3 3 2 3 3 3 2 4 2 4 3 2 4 4 2 4 2 2 2 4 2 2 2 2 2

2 4 2 2 2 2 2 2 4 2 2 2 2 2 2 2 4 2 2 2 2 2 2 2 4 2 2 2 2 2 2 2 2 2 2 2 3 2 2 2 2 2 2 2 2 2 2 2 2 2 4 2 2 2 2 2

2 4 2 2 2 2 2 2 4 2 2 2 2 2 2 2 4 2 2 2 2 2 2 2 4 2 2 2 2 2 2 2 2 2 2 2 3 2 2 2 2 2 2 2 2 2 2 2 2 2 4 2 2 2 2 2

3 3 3 2 2 2 2 2 3 3 3 2 2 2 2 2 3 2 4 2 2 2 2 3 3 2 4 2 2 2 2 2 3 2 2 2 2 3 3 3 3 3 2 3 3 3 2 2 2 2 3 3 2 3 3 3 2 4 2 2 2 2 2

3 3 3 2 2 2 2 2 3 3 3 2 2 2 2 2 3 2 4 2 2 2 2 3 3 2 4 2 2 2 2 2 3 2 2 2 2 3 3 3 3 3 2 3 3 3 2 2 2 2 3 3 2 3 3 3 2 4 2 2 2 2 2

4 4 3 2 4 4 3 2 3 3 4 2 2 3 2 4 3 2 3 3 4 4 3 2 4 3 3 4 4 3 2

4 4 3 2 4 4 3 2 3 3 4 2 2 3 2 4 3 2 3 3 4 4 3 2 4 3 3 4 4 3 2

4 4 3 3 4 4 2 4 3 4 4 3 4 3 4 4 4 4 4 3 3 4 4 3 4 4 4 4 4 4

4 4 3 3 4 4 2 4 3 4 4 3 4 3 4 4 4 4 4 3 3 4 4 3 4 4 4 4 4 4

Mai

n&Lo

ckou

t Ent

ry D

oor

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

eM

aste

r Bed

room

Doo

rM

aste

r Bed

room

Har

dwar

e

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

rL.

Rm

Clo

set H

ardw

are

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain

& Lo

ckou

t Ent

ry D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

ath

Swin

g D

oor

L.O

Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set H

arew

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

e

PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK ! 5TH FLOOR COULD NOT BE WALKED DUE TO PAINTING 2/15/2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATESWORK COMPLETED TO DATE 2/1/2012

20 Unit 21 Unit 23 Unit22 Unit 25 Unit

RUN DATE : 2/8/2012

26 Unit

13

8

12

7

6

4

9

N/A

N/A

N/A

2

11

24 Unit

14

28 Unit

3

27 Unit

15

5

16

10

FLOOR18

17

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

4 4 4 4 3 4 3 4 4 4 4 4 4 3 4 4 4 4 4 4 3 4 3 4 4 4 3 4 4 4 3 4 4 4 4 4 4 4 3 4 4 4 3 4 4 4 3 3 4 3 4 4 4 4 4 3 4 4

4 4 4 4 3 4 3 4 4 4 4 4 4 3 4 4 4 4 4 4 3 4 3 4 4 4 3 4 4 4 3 4 4 4 4 4 4 4 3 4 4 4 3 4 4 4 3 3 4 3 4 4 4 4 4 3 4 4

4 4 4 4 4 3 4 3 4 4 4 4 4 3 2 4 2 4 4 4 3 2 2 4 2 4 2 2 3 2 2 4 2 3 2 2 4 4 4 4 4 3 4 5 4 2 3 2 2 4 3 3 4 3 4 4 4 4 4 3 4 4

4 4 4 4 4 3 4 3 4 4 4 4 4 3 2 4 2 4 4 4 3 2 2 4 2 4 2 2 3 2 2 4 2 3 2 2 4 4 4 4 4 3 4 5 4 2 3 2 2 4 3 3 4 3 4 4 4 4 4 3 4 4

4 4 4 2 2 3 2 4 4 4 4 2 2 3 2 4 2 4 2 2 3 2 2 4 4 2 4 2 2 2 5 2 2 2 5 2 4 2 2 3 5 2 5 2 2 2 5 2 4 3 5 3 3 3 3

4 4 4 2 2 3 2 4 4 4 4 2 2 3 2 4 2 4 2 2 3 2 2 4 4 2 4 2 2 2 5 2 2 2 5 2 4 2 2 3 5 2 5 2 2 2 5 2 4 3 5 3 3 3 3

3 2 3 3 3 3 3 2 5 3 3 3 3 3 3 5 3 3 3 3 3 3 5 3 3 3 3 3 3 3 3 3 2 4 2 2 3 2 2 3 3 3 3 3 2 2 3 3 3 5 3 3 3 3

3 2 3 3 3 3 3 2 5 3 3 3 3 3 3 5 3 3 3 3 3 3 5 3 3 3 3 3 3 3 3 3 2 4 2 2 3 2 2 3 3 3 3 3 2 2 3 3 3 5 3 3 3 3

2 5 3 4 5 3 3 2 4 3 5 4 3 3 2 4 2 4 2 5 5 4 2 4 4 2 3 4 3 2

2 5 3 4 5 3 3 2 4 3 5 4 3 3 2 4 2 4 2 5 5 4 2 4 4 2 3 4 3 2

5 5 3 5 5 3 5 3 4 3 5 5 3 5 3 5 2 4 4 5 5 3

5 5 3 5 5 3 5 3 4 3 5 5 3 5 3 5 2 4 4 5 5 3

5 4 5 5 5 5 5 5 5 4 4 5 4 5 5

5 4 5 5 5 5 5 5 5 4 4 5 4 5 5

Mai

n&Lo

ckou

t Ent

ry D

oor

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

eM

aste

r Bed

room

Doo

rM

aste

r Bed

room

Har

dwar

e

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

rL.

Rm

Clo

set H

ardw

are

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain

& Lo

ckou

t Ent

ry D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

ath

Swin

g D

oor

L.O

Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set H

arew

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

e

PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATESWORK COMPLETED TO DATE 2/1/2012

RUN DATE : 2/8/2012

26 Unit

12

7

6

4

9

20 Unit 21 Unit 23 Unit22 Unit 25 Unit

N/A

N/A

2

11

24 Unit

14

28 Unit

3

27 Unit

13

N/A N/A

N/A

15

5

16

10

FLOOR18

17

8

JobD

river

EXHIBIT A

Confid

entia

l

PLEASANTS HARDWARE PROGRESS CHART

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 22 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 22 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 22 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 22 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 22 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 22 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 22 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 22 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

Mai

n&Lo

ckou

t Ent

ry D

oor

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

eM

aste

r Bed

room

Doo

rM

aste

r Bed

room

Har

dwar

e

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

rL.

Rm

Clo

set H

ardw

are

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain

& Lo

ckou

t Ent

ry D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

ath

Swin

g D

oor

L.O

Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set H

arew

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

e

PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12AREAS AVAILABLE FOR YOU TO WORK

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATESWORK COMPLETED TO DATE 2/1/2012

2/1/2012

26 Unit

10

9

3

27 Unit 20 Unit 21 Unit 23 Unit22 Unit 25 Unit

RUN DATE :

13

8

12

24 Unit28 Unit

7

6

5

4

FLOOR18

17

N/A

N/A

N/A

2

11

15

14

16

JobD

river

EXHIBIT A

Confid

entia

l

PLEASANTS HARDWARE PROGRESS CHART

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 22 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 22 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 22 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 23 3 3 3 3 2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 2 3 3 3 2 3 3 3 3 3 3 3 3 3 3 3 3 33 3 3 3 3 2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 2 3 3 3 2 3 3 3 3 3 3 3 3 3 3 3 3 3

3 3 3 3 3 2 3 3 33 3 3 3 3 2 3 3 3

3 3 2 2 2 3 3 2 2 3 3 2 3 2 2 2 3 2 3 3 3 3 2 2 2 2 2 2 23 3 2 2 2 3 3 2 2 3 3 2 3 2 2 2 3 2 3 3 3 3 2 2 2 2 2 2 2

3 3 3 2 2 3 3 2 2 2 2 2 3 2 2 2 2 2 2 3 2 2 3 2 2 2 3 2 3 2 2 2 3 3 2 2 2 2 2 2 2 2 3 2 3 3 2 2 33 3 3 2 2 3 3 2 2 2 2 2 3 2 2 2 2 2 2 3 2 2 3 2 2 2 3 2 3 2 2 2 3 3 2 2 2 2 2 2 2 2 3 2 3 3 2 2 33 3 2 2 2 3 3 2 3 2 3 3 2 2 3 2 3 3 3 3 3 3 2 3 2 3 3 3 2 3 3 3 3 3 3 33 3 2 2 2 3 3 2 3 2 3 3 2 2 3 2 3 3 3 3 3 3 2 3 2 3 3 3 2 3 3 3 3 3 3 3

Mai

n&Lo

ckou

t Ent

ry D

oor

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

eM

aste

r Bed

room

Doo

rM

aste

r Bed

room

Har

dwar

e

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

rL.

Rm

Clo

set H

ardw

are

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain

& Lo

ckou

t Ent

ry D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

ath

Swin

g D

oor

L.O

Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set H

arew

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

e

PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATESWORK COMPLETED TO DATE 2/1/2012

9

3

27 Unit 20 Unit 21 Unit 23 Unit22 Unit 25 Unit

RUN DATE : 2/8/2012

26 Unit

13

8

12

24 Unit28 Unit

7

6

5

4

10

FLOOR18

17

N/A

N/A

N/A

2

11

15

14

16

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

3 2 2 2 2 2 2 3 3 3 2 2 2 2 3 2 2 2 2 2 3 2 3 3 2 2 3 2 3 2 2 3 2 2

3 2 2 2 2 2 2 3 3 3 2 2 2 2 3 2 2 2 2 2 3 2 3 3 2 2 3 2 3 2 2 3 2 2

3 3 3 3 3 2 3 3 3 3 3 3 2 3 3 3 3 3 2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3

3 3 3 3 3 2 3 3 3 3 3 3 2 3 3 3 3 3 2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3

3 2 3 3 2 3 2 2 3 2 2 2 2 3 2 3 3 2 2 3 2 3 2 2 3 2 2 2

3 2 3 3 2 3 2 2 3 2 2 2 2 3 2 3 3 2 2 3 2 3 2 2 3 2 2 2

6 6 6 2 6 5 2 6 5 6 6 6 6 6 3 2 6 5 6 6 6 6 6 3 2 6 5 6 5 6 6 6 5 2 2 6 6 6 5 6 6 6 6 6 6 6 5 6 6 6 5 2 6 6 6 5 5 6 5 6 6 6 6 6 5 6 6

6 6 6 2 6 5 2 6 5 6 6 6 6 6 3 2 6 5 6 6 6 6 6 3 2 6 5 6 5 6 6 6 5 2 2 6 6 6 5 6 6 6 6 6 6 6 5 6 6 6 5 2 6 6 6 5 5 6 5 6 6 6 6 6 5 6 6

6 6 2 2 5 2 5 6 2 6 5 4 3 4 2 2 5 4 4 4 6 4 4 5 4 4 4 5 4 4 6 6 5 4 5 4 4 2 5 2 2 6 6 6 6 5 2

6 6 2 2 5 2 5 6 2 6 5 4 3 4 2 2 5 4 4 4 6 4 4 5 4 4 4 5 4 4 6 6 5 4 5 4 4 2 5 2 2 6 6 6 6 5 2

6 4 2 6 6 4 2 3 4 2 5 4 3 3 6 4 4 5 7 4 3 3 3 5 5 3 5

6 4 2 6 6 4 2 3 4 2 5 4 3 3 6 4 4 5 7 4 3 3 3 5 5 3 5

5 3 4 3 3 3 3 4 4 5 5 3 5 5 4 3 4 5 5 5 5 3 5 5

5 3 4 3 3 3 3 4 4 5 5 3 5 5 4 3 4 5 5 5 5 3 5 5

7 2 3 2 7 4 3 2 2 4 3 4 4 4 5 4 3

7 2 3 2 7 4 3 2 2 4 3 4 4 4 5 4 3

7 3 5 3 3 5 3 5 3 5 3 3 3 5 3

7 3 5 3 3 5 3 5 3 5 3 3 3 5 3

6 3 7 3 7 3 3 3 3 7 3

6 3 7 3 7 3 3 3 3 7 3

Mai

n&Lo

ckou

t Ent

ry D

oor

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Hal

lway

Bed

. Roo

m D

oor

Hal

lway

Bed

room

Doo

r har

dwar

e

Hal

lway

Bat

hroo

m D

oor

Hal

lway

Bat

hroo

m D

oor h

ardw

are

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

eM

aste

r Bed

room

Doo

rM

aste

r Bed

room

Har

dwar

e

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

rL.

Rm

Clo

set H

ardw

are

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

r

Com

mun

icat

ing

Doo

r har

dwar

e

L.O

. Bat

hroo

m S

win

g D

oor

ha

rdw

are

Lock

out C

lose

t Doo

r

hard

war

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

athr

oom

Sw

ing

Doo

r

hard

war

e

Lock

out C

lose

t doo

r

hard

war

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain

& Lo

ckou

t Ent

ry D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

ath

Swin

g D

oor

L.O

Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set H

arew

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

e

PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 2/15/2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 2/22/2012WORK COMPLETED TO DATE 2/1/2012 WORK COMPLETED TO DATE 2/29/2012WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/7/2012

16

10

FLOOR18

17

8

N/A

N/A N/A

N/A

N/A

N/A

27 Unit

13

N/A

20 Unit 21 Unit 23 Unit22 Unit 25 Unit

N/A2

N/A

24 Unit

14

28 Unit

3

15

RUN DATE : 2/8/2012

26 Unit

12

7

6

4

9

11

5

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

3 2 2 2 3 3 2 3 3

3 2 2 2 3 3 2 3 3

3 2 2 2 3 3 2 3 3

3 2 2 2 3 3 2 3 3

4 3 3 2 2 2 3 3 2 3

4 3 3 2 2 2 3 3 2 3

4 4 4 2 2 2 4 4 3 4 4

4 4 4 2 2 2 4 4 3 4 4

7 7 7 3 7 6 3 7 6 7 7 7 7 7 4 3 7 6 7 7 7 7 7 4 3 7 6 7 6 7 7 7 6 3 3 7 7 7 6

7 7 7 3 7 6 3 7 6 7 7 7 7 7 4 3 7 6 7 7 7 7 7 4 3 7 6 7 6 7 7 7 6 3 3 7 7 7 6

7 7 3 3 6 3 6 7 3 7 2 6 5 4 5 2 3 3 6 5 5 7 5 5 6 5 5 6

7 7 3 3 6 3 6 7 3 7 2 6 5 4 5 2 3 3 6 5 5 7 5 5 6 5 5 6

7 3 7 7 3 4 3 6 4

7 3 7 7 3 4 3 6 4

2 4 5 4 4 4

2 4 5 4 4 4

4 3 5 4 3 3 5 4

4 3 5 4 3 3 5 4

4 2 4 4 4

4 2 4 4 4

4 4 4

4 4 4

Mai

n&Lo

ckou

t Ent

ry D

oor

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Hal

lway

Bed

. Roo

m D

oor

Hal

lway

Bed

room

Doo

r har

dwar

e

Hal

lway

Bat

hroo

m D

oor

Hal

lway

Bat

hroo

m D

oor h

ardw

are

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

eM

aste

r Bed

room

Doo

rM

aste

r Bed

room

Har

dwar

e

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

rL.

Rm

Clo

set H

ardw

are

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Bath

room

Poc

ket d

oor

PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 WORK COMPLETED TO DATE 2/29/2012AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 3/7/2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/14/2012WORK COMPLETED TO DATE 2/1/2012

N/A

N/A

16

10

FLOOR18

17

8

N/A

24 Unit

14

28 Unit

3

15

5

N/A

27 Unit

13

N/A

2

RUN DATE : 2/8/2012

26 Unit

12

7

6

4

9

11

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

3 3 3 3 2 3 2 2 3 3 3 3 2 2 3 3 3 3 3 3 3 3 3

3 3 3 3 2 3 2 2 3 3 3 3 2 2 3 3 3 3 3 3 3 3 3

3 3 3 3 3 2 3 2 2 3 3 3 3 2 2 3 3 3 3 3 3 3 3 3

3 3 3 3 3 2 3 2 2 3 3 3 3 2 2 3 3 3 3 3 3 3 3 3

4 4 4 3 3 3 2 4 3 2 2 3 3 3 3 4 3 4 2 2 4 3 3 4 3 4 3 3 4 3 3

4 4 4 3 3 3 2 4 3 2 2 3 3 3 3 4 3 4 2 2 4 3 3 4 3 4 3 3 4 3 3

4 2 4 4 4 3 4 3 4 4 2 2 4 3 4 4 4 4 4 2 2 4 4 4 4 4 4 4 4 4 4 4

4 2 4 4 4 3 4 3 4 4 2 2 4 3 4 4 4 4 4 2 2 4 4 4 4 4 4 4 4 4 4 4

4 3 4 4 3 4 3 2 4 3 3 3 3 4 3 4 2 2 4 3 3 4 3 4 3 3 4 3 3 3

4 3 4 4 3 4 3 2 4 3 3 3 3 4 3 4 2 2 4 3 3 4 3 4 3 3 4 3 3 3

7 7 7 7 7 7 7 6 6 7 7 6 3 7 7 7 6 6 7 6 7 7 7 7 7 6 7 7

7 7 7 7 7 7 7 6 6 7 7 6 3 7 7 7 6 6 7 6 7 7 7 7 7 6 7 7

7 2 7 7 2 6 2 2 5 6 5 5 3 6 3 3 7 7 7 7 6 2

7 2 7 7 2 6 2 2 5 6 5 5 3 6 3 3 7 7 7 7 6 2

4 7 6 5 4 4 4

4 7 6 5 4 4 4

4 5 5 6 2 4 5 4 5 6 6 6 6 4 6 6

4 5 5 6 2 4 5 4 5 6 6 6 6 4 6 6

5 2 5 6 5 4

5 2 5 6 5 4

4 4 4 4 4

4 4 4 4 4

4 4 4 4

4 4 4 4

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

r

Com

mun

icat

ing

Doo

r har

dwar

e

L.O

. Bat

hroo

m S

win

g D

oor

L.O

. Bat

hroo

m D

oor

hard

war

e

Lock

out C

lose

t Doo

roc

out C

oset

oo

ha

rdw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

athr

oom

Sw

ing

Doo

rLo

ckou

t Bat

h. D

oor

hard

war

e

Lock

out C

lose

t doo

roc

out C

oset

oo

ha

rdw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain

& Lo

ckou

t Ent

ry D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

ath

Swin

g D

oor

L.O

Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set H

arew

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

e

N/A N/A

N/A

20 Unit 21 Unit 23 Unit22 Unit 25 Unit

N/A

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

4 3 3 3 4 4 4 4 4 2 4 4 4 3 4 3 3 4 4 4 4 3 3 4 4 4 4 4 4 4 4 4

4 3 3 3 4 4 4 4 4 2 4 4 4 3 4 3 3 4 4 4 4 3 3 4 4 4 4 4 4 4 4 4

4 3 3 3 4 4 4 4 4 4 4 4 4 3 4 3 3 4 4 4 4 3 3 4 4 4 4 4 4 4 4 4

4 3 3 3 4 4 4 4 4 4 4 4 4 3 4 3 3 4 4 4 4 3 3 4 4 4 4 4 4 4 4 4

5 4 4 3 3 3 4 4 4 5 5 5 4 4 4 3 5 4 3 3 4 4 5 4 5 3 3 5 4 4 5 4 5 4 4 5 4 4

5 4 4 3 3 3 4 4 4 5 5 5 4 4 4 3 5 4 3 3 4 4 5 4 5 3 3 5 4 4 5 4 5 4 4 5 4 4

5 5 5 3 3 3 5 5 5 5 5 3 5 5 5 5 4 5 5 3 3 5 5 5 5 5 5 3 3 5 5 5 5 5 5 5 5 5 5 5

5 5 5 3 3 3 5 5 5 5 5 3 5 5 5 5 4 5 5 3 3 5 5 5 5 5 5 3 3 5 5 5 5 5 5 5 5 5 5 5

5 4 5 5 4 5 4 3 5 4 4 4 4 5 4 5 3 3 5 4 4 5 4 5 4 4 5 4 4 4

5 4 5 5 4 5 4 3 5 4 4 4 4 5 4 5 3 3 5 4 4 5 4 5 4 4 5 4 4 4

8 8 8 4 8 7 4 8 7 8 8 8 8 8 5 4 8 8 8 8 8 5 4 8 8 8 8 7 4 4 8 7 8 8 8 8 8 8 7 7 8 8 7 4 8 8 7 7 8 7 8 8 8 8 8 7 8 8

8 8 8 4 8 7 4 8 7 8 8 8 8 8 5 4 8 8 8 8 8 5 4 8 8 8 8 7 4 4 8 7 8 8 8 8 8 8 7 7 8 8 7 4 8 8 7 7 8 7 8 8 8 8 8 7 8 8

8 8 4 4 7 4 7 8 4 8 3 7 6 5 6 3 4 4 7 6 6 8 6 6 7 6 6 8 3 8 8 3 7 3 3 6 6 6 4 4 4 8 8 8 7 3

8 8 4 4 7 4 7 8 4 8 3 7 6 5 6 3 4 4 7 6 6 8 6 6 7 6 6 8 3 8 8 3 7 3 3 6 6 6 4 4 4 8 8 8 7 3

8 4 8 8 4 5 4 5 5 7 2 6 5 5 5

8 4 8 8 4 5 4 5 5 7 2 6 5 5 5

3 5 6 5 5 5 5 6 6 3 5 6 5 6 7 7 7 7 5 7 7

3 5 6 5 5 5 5 6 6 3 5 6 5 6 7 7 7 7 5 7 7

2 4 6 5 4 4 5 6 3 7 6 5

2 4 6 5 4 4 5 6 3 7 6 5

5 5 5 5 5 5 5 5 5

5 5 5 5 5 5 5 5 5

5 5 5 5 5 5 5

5 5 5 5 5 5 5

Mai

n&Lo

ckou

t Ent

ry D

oor

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Hal

lway

Bed

. Roo

m D

oor

Hal

lway

Bed

room

Doo

r har

dwar

e

Hal

lway

Bat

hroo

m D

oor

Hal

lway

Bat

hroo

m D

oor h

ardw

are

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

eM

aste

r Bed

room

Doo

rM

aste

r Bed

room

Har

dwar

e

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

rL.

Rm

Clo

set H

ardw

are

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

r

Com

mun

icat

ing

Doo

r har

dwar

e

L.O

. Bat

hroo

m S

win

g D

oor

ha

rdw

are

Lock

out C

lose

t Doo

r

hard

war

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

athr

oom

Sw

ing

Doo

r

hard

war

e

Lock

out C

lose

t doo

r

hard

war

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain

& Lo

ckou

t Ent

ry D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

ath

Swin

g D

oor

L.O

Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set H

arew

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

e

PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 2/29/2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/7/2012WORK COMPLETED TO DATE 2/1/2012 WORK COMPLETED TO DATE 3/14/2012

RUN DATE : 2/8/2012

26 Unit

12

7

6

4

9

11

27 Unit

13

N/A

20 Unit 21 Unit 23 Unit22 Unit 25 Unit

N/A2

N/A

24 Unit

14

28 Unit

3

15

5

N/A

N/A N/A

N/A

N/A

N/A

16

10

FLOOR18

17

8

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

2 2 2 2 2 2 2 2

2 2 2 2 2 2 2 2

4 4 4 4 4 4 4 4

4 4 4 4 4 4 4 4

6 5 5 5 6 6 6 6

6 5 5 5 6 6 6 6

6 5 5 5 6 6 6 6

6 5 5 5 6 6 6 6

7 6 6 5 5 5 6 6 3 6

7 6 6 5 5 5 6 6 3 6

7 7 7 5 5 5 7 7 7 7

7 7 7 5 5 5 7 7 7 7

2 2 10 2 2 2 2 2 2 2 3 3 2 2 10 2 2 10 3 2 3 10 2 3 2 3 2 3

2 2 10 2 2 2 2 2 2 2 3 3 2 2 10 2 2 10 3 2 3 10 2 3 2 3 2 3

10 10 6 9 9 10 10 5 2 2 8 9 8

10 10 6 9 9 10 10 5 2 2 8 9 8

10 6 2 10 7

10 6 2 10 7

1 2 71 2 71

1

1

1

Mai

n&Lo

ckou

t Ent

ry D

oor

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Hal

lway

Bed

. Roo

m D

oor

Hal

lway

Bed

room

Doo

r har

dwar

e

Hal

lway

Bat

hroo

m D

oor

Hal

lway

Bat

hroo

m D

oor h

ardw

are

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

eM

aste

r Bed

room

Doo

rM

aste

r Bed

room

Har

dwar

e

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

rL.

Rm

Clo

set H

ardw

are

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Bath

room

Poc

ket d

oor

PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETED TO DATE 4/4/2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/7/2012WORK COMPLETED TO DATE 2/1/2012 WORK COMPLETED TO DATE 3/14/2012

N/A

N/A

16

10

FLOOR18

17

8

N/A

N/A

24 Unit

14

28 Unit

3

15

5

N/A

27 Unit

13

N/A

2

RUN DATE : 2/8/2012

26 Unit

12

7

6

4

9

11

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

4 4 4 4 4 3 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4

4 4 4 4 4 3 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4

6 4 6 6 6 5 6 5 5 6 6 6 6 5 5 6 6 6 6 6 6 6 6 6

6 4 6 6 6 5 6 5 5 6 6 6 6 5 5 6 6 6 6 6 6 6 6 6

6 6 6 6 6 5 6 5 5 6 6 6 6 5 5 6 6 6 6 6 6 6 6 6

6 6 6 6 6 5 6 5 5 6 6 6 6 5 5 6 6 6 6 6 6 6 6 6

7 7 7 6 6 6 5 7 6 5 5 6 6 7 6 7 5 5 7 6 6 7 6 7 6 6 7 6 6

7 7 7 6 6 6 5 7 6 5 5 6 6 7 6 7 5 5 7 6 6 7 6 7 6 6 7 6 6

7 5 7 7 7 7 6 7 7 5 5 7 7 7 7 7 7 5 5 7 7 7 7 7 7 7 7 7 7 7

7 5 7 7 7 7 6 7 7 5 5 7 7 7 7 7 7 5 5 7 7 7 7 7 7 7 7 7 7 7

7 6 7 7 6 7 6 5 7 6 6 6 6 7 6 7 5 5 7 6 6 7 6 7 6 6 7 6 6

7 6 7 7 6 7 6 5 7 6 6 6 6 7 6 7 5 5 7 6 6 7 6 7 6 6 7 6 6

2 3 2 2 10 2 2 9 2 2 2 2 3 2 2 2 9 2 2 2 2 10 2 2 9 2 2

2 3 2 2 10 2 2 9 2 2 2 2 3 2 2 2 9 2 2 2 2 10 2 2 9 2 2

3 10 10 5 2 3 8 3 10 10 2

3 10 10 5 2 3 8 3 10 10 2

7 9 4 7 7

7 9 4 7 7

7

7

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

r

Com

mun

icat

ing

Doo

r har

dwar

e

L.O

. Bat

hroo

m S

win

g D

oor

L.O

. Bat

hroo

m D

oor

hard

war

e

Lock

out C

lose

t Doo

roc

out C

oset

oo

ha

rdw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

athr

oom

Sw

ing

Doo

rLo

ckou

t Bat

h. D

oor

hard

war

e

Lock

out C

lose

t doo

roc

out C

oset

oo

ha

rdw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain

& Lo

ckou

t Ent

ry D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

ath

Swin

g D

oor

L.O

Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set H

arew

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

e

N/A N/A

N/A

20 Unit 21 Unit 23 Unit22 Unit 25 Unit

N/A

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

3 3 3 3 3 3 3 3

3 3 3 3 3 3 3 3

5 5 5 5 5 5 5 5

5 5 5 5 5 5 5 5

7 6 6 6 7 7 7 7

7 6 6 6 7 7 7 7

7 6 6 6 7 7 7 7

7 6 6 6 7 7 7 7

8 7 7 6 6 6 7 7 4 7

8 7 7 6 6 6 7 7 4 7

8 8 8 6 6 6 8 8 8 8

8 8 8 6 6 6 8 8 8 8

3 3 11 3 3 2 2 3 3 2 3 2 3 3 2 2 4 4 3 3 11 3 3 2 2 11 4 3 4 11 3 4 2 2 3 4 3 4

3 3 11 3 3 2 2 3 3 2 3 2 3 3 2 2 4 4 3 3 11 3 3 2 2 11 4 3 4 11 3 4 2 2 3 4 3 4

7 10 11 11 6 3 2 3 2 9 10 2 3 9 4 2

7 10 11 11 6 3 2 3 2 9 10 2 3 9 4 2

11 3 7 11 5 2 4 3 2 3 3 8 3 2

11 3 7 11 5 2 4 3 2 3 3 8 3 2

2 3 8 2 2 2 2

2 3 8 2 2 2 2

2 2 2 2 2

2 2 2 2 2

Mai

n&Lo

ckou

t Ent

ry D

oor

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Hal

lway

Bed

. Roo

m D

oor

Hal

lway

Bed

room

Doo

r har

dwar

e

Hal

lway

Bat

hroo

m D

oor

Hal

lway

Bat

hroo

m D

oor h

ardw

are

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

eM

aste

r Bed

room

Doo

rM

aste

r Bed

room

Har

dwar

e

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

rL.

Rm

Clo

set H

ardw

are

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETED TO DATE 4/4/2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/11/2012WORK COMPLETED TO DATE 2/1/2012 WORK COMPLETED TO DATE 3/14/2012WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/21/2012

WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 328.2012WORK COMPLETED TO DATE 2/22/2012

N/A

N/A

16

10

FLOOR18

17

8

N/A

N/A

24 Unit

14

28 Unit

3

15

5

N/A

27 Unit

13

N/A

25 Unit

2

RUN DATE : 2/8/2012

26 Unit

12

7

6

4

9

11

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3

3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3

3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3

3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3

5 5 5 5 5 4 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5

5 5 5 5 5 4 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5

7 5 7 7 7 6 7 6 6 7 7 7 7 6 6 7 7 7 7 7 7 7 7 7

7 5 7 7 7 6 7 6 6 7 7 7 7 6 6 7 7 7 7 7 7 7 7 7

7 7 7 7 7 6 7 6 6 7 7 7 7 6 6 7 7 7 7 7 7 7 7 7

7 7 7 7 7 6 7 6 6 7 7 7 7 6 6 7 7 7 7 7 7 7 7 7

8 8 8 7 7 7 6 8 7 6 6 7 7 8 7 8 6 6 8 7 7 8 7 8 7 7 8 7 7

8 8 8 7 7 7 6 8 7 6 6 7 7 8 7 8 6 6 8 7 7 8 7 8 7 7 8 7 7

8 6 8 8 8 8 7 8 8 6 6 8 8 8 8 8 8 6 6 8 8 8 8 8 8 8 8 8 8 8

8 6 8 8 8 8 7 8 8 6 6 8 8 8 8 8 8 6 6 8 8 8 8 8 8 8 8 8 8 8

8 7 8 8 7 8 7 6 8 7 7 7 7 8 7 8 6 6 8 2 7 7 8 7 8 7 7 8 2 7 7

8 7 8 8 7 8 7 6 8 7 7 7 7 8 7 8 6 6 8 2 7 7 8 7 8 7 7 8 2 7 7

3 4 3 3 11 3 3 10 3 3 3 3 2 2 4 3 3 3 10 3 3 3 3 11 3 3 3 3

3 4 3 3 11 3 3 10 3 3 3 3 2 2 4 3 3 3 10 3 3 3 3 11 3 3 3 311 6 3 2 4 2 9 4 2 11 3 11 3 211 6 3 2 4 2 9 4 2 11 3 11 3 2

2 2 5 8 2 3 2 8 2

2 2 5 8 2 3 2 8 2

2 2 2 2

2 2 2 2

2 2 2 2

2 2 2 2

2

2

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

r

Com

mun

icat

ing

Doo

r har

dwar

e

L.O

. Bat

hroo

m S

win

g D

oor

L.O

. Bat

hroo

m D

oor

hard

war

e

Lock

out C

lose

t Doo

rLo

ckou

t Clo

set D

oor

hard

war

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

athr

oom

Sw

ing

Doo

rLo

ckou

t Bat

h. D

oor

hard

war

e

Lock

out C

lose

t doo

rLo

ckou

t Clo

set D

oor

hard

war

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain

& Lo

ckou

t Ent

ry D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

ath

Swin

g D

oor

L.O

Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set H

arew

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

e

N/A N/A

N/A

20 Unit 21 Unit 23 Unit22 Unit

N/A

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

4 4 4 4 4 4 4 4

4 4 4 4 4 4 4 4

6 6 6 6 6 6 6 6

6 6 6 6 6 6 6 6

8 7 7 7 8 8 8 8

8 7 7 7 8 8 8 8

8 7 7 7 8 8 8 8

8 7 7 7 8 8 8 8

9 8 8 7 7 7 8 8 5 8

9 8 8 7 7 7 8 8 5 8

9 9 9 7 7 7 9 9 9 9

9 9 9 7 7 7 9 9 9 9

4 4 4 3 3 4 4 4 3 4 4 3 3 5 5 4 4 4 3 3 12 5 5 4 5 3 3 4 5 5 5 2

4 4 4 3 3 4 4 4 3 4 4 3 3 5 5 4 4 4 3 3 12 5 5 4 5 3 3 4 5 5 5 2

2 2 2 8 2 2 4 12 3 12 7 4 3 3 4 3 4 3 3 2 2 10 11 3 5 3

2 2 2 8 2 2 4 12 3 12 7 4 3 3 4 3 4 3 3 2 2 10 11 3 5 3

12 4 8 2 6 3 5 4 3 4 4 9 4 3

12 4 8 2 6 3 5 4 3 4 4 9 4 3

3 4 9 3 3 3 3

3 4 9 3 3 3 3

Mai

n&Lo

ckou

t Ent

ry D

oor

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Hal

lway

Bed

. Roo

m D

oor

Hal

lway

Bed

room

Doo

r har

dwar

e

Hal

lway

Bat

hroo

m D

oor

Hal

lway

Bat

hroo

m D

oor h

ardw

are

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

eM

aste

r Bed

room

Doo

rM

aste

r Bed

room

Har

dwar

e

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

rL.

Rm

Clo

set H

ardw

are

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETED TO DATE 4/4/2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/11/2012

WORK COMPLETED TO DATE 2/1/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/20/2012WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/21/2012

WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 328.2012WORK COMPLETED TO DATE 2/22/2012

N/A

N/A

FLOOR18

17

8

N/A

N/A

24 Unit

14

28 Unit

3

15

5

N/A

16

10

27 Unit

13

N/A

25 Unit

2

RUN DATE : 2/8/2012

26 Unit

12

7

6

4

9

11

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3

3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3

4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4

4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4

4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4

4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4

6 6 6 6 6 5 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6

6 6 6 6 6 5 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6

8 6 8 8 8 7 8 7 7 8 8 8 8 7 7 8 8 8 8 8 8 8 8 8

8 6 8 8 8 7 8 7 7 8 8 8 8 7 7 8 8 8 8 8 8 8 8 8

8 8 8 8 8 7 8 7 7 8 8 8 8 7 7 8 8 8 8 8 8 8 8 8

8 8 8 8 8 7 8 7 7 8 8 8 8 7 7 8 8 8 8 8 8 8 8 8

9 9 9 8 8 8 7 9 8 7 7 8 8 9 8 9 7 7 9 2 8 8 9 8 9 8 8 9 2 8 8

9 9 9 8 8 8 7 9 8 7 7 8 8 9 8 9 7 7 9 2 8 8 9 8 9 8 8 9 2 8 8

9 7 9 9 9 8 9 9 7 7 9 9 9 9 9 9 7 7 9 2 9 9 9 9 9 9 9 9 2 9 9

9 7 9 9 9 8 9 9 7 7 9 9 9 9 9 9 7 7 9 2 9 9 9 9 9 9 9 9 2 9 9

9 8 9 9 3 9 3

9 8 9 9 3 9 3

4 5 4 12 4 4 4 4 4 3 3 5 4 4 11 2 4 4 4 4 4 2 2 4 4

4 5 4 12 4 4 4 4 4 3 3 5 4 4 11 2 4 4 4 4 4 2 2 4 4

4 12 7 4 3 5 3 10 5 3 3 12 4 12 4 3

4 12 7 4 3 5 3 10 5 3 3 12 4 12 4 3

3 2 3 6 9 3 4 3 3 9 3 3

3 2 3 6 9 3 4 3 3 9 3 3

3 3 3 3

3 3 3 3

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

r

Com

mun

icat

ing

Doo

r har

dwar

e

L.O

. Bat

hroo

m S

win

g D

oor

L.O

. Bat

hroo

m D

oor

hard

war

e

Lock

out C

lose

t Doo

rLo

ckou

t Clo

set D

oor

hard

war

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

athr

oom

Sw

ing

Doo

r

Lock

out B

ath.

Doo

r har

dwar

e

Lock

out C

lose

t doo

r

Lock

out C

lose

t Doo

r har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain

& Lo

ckou

t Ent

ry D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

ath

Swin

g D

oor

L.O

Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set H

arew

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

e

N/A

N/A

N/A

20 Unit 21 Unit 23 Unit22 Unit

N/A

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

5 5 5 5 5 5 2 5 5

5 5 5 5 5 5 2 5 5

7 7 7 7 7 7 2 7 7

7 7 7 7 7 7 2 7 7

9 8 8 8 9 9 2 9 9

9 8 8 8 9 9 2 9 9

9 8 8 8 9 9 2 9 9

9 8 8 8 9 9 2 9 910 9 9 8 8 8 9 9 2 6 910 9 9 8 8 8 9 9 2 6 910 10 10 8 8 8 10 10 2 10 1010 10 10 8 8 8 10 10 2 10 10

5 2 5 5 4 5 5 5 4 5 5 4 6 6 5 2 5 5 4 4 12 6 6 2 5 6 4 4 5 6 6 6 3

5 2 5 5 4 5 5 5 4 5 5 4 6 6 5 2 5 5 4 4 12 6 6 2 5 6 4 4 5 6 6 6 3

3 3 3 9 3 5 2 13 8 4 4 4 4 4 3 11 12 4 4

3 3 3 9 3 5 2 13 8 4 4 4 4 4 3 11 12 4 4

9 2 6 10

9 2 6 10

Mai

n&Lo

ckou

t Ent

ry D

oor

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Hal

lway

Bed

. Roo

m D

oor

Hal

lway

Bed

room

Doo

r har

dwar

e

Hal

lway

Bat

hroo

m D

oor

Hal

lway

Bat

hroo

m D

oor h

ardw

are

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

eM

aste

r Bed

room

Doo

rM

aste

r Bed

room

Har

dwar

e

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

rL.

Rm

Clo

set H

ardw

are

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETED TO DATE 4/4/2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/11/2012

WORK COMPLETED TO DATE 2/1/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/20/2012WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/25/2012

WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 328.2012WORK COMPLETED TO DATE 2/22/2012

N/A

N/A

FLOOR18

17

8

N/A

N/A

24 Unit

14

28 Unit

3

15

5

N/A

16

10

27 Unit

13

N/A

25 Unit

2

RUN DATE : 2/8/2012

26 Unit

12

7

6

4

9

11

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

4 4 4 4 2 4 4 4 4 4 4 2 4 4 4 4 4 4 2 4 4 4 4 4 4 2 4 4

4 4 4 4 2 4 4 4 4 4 4 2 4 4 4 4 4 4 2 4 4 4 4 4 4 2 4 4

5 5 5 5 2 5 5 5 5 5 5 2 5 5 5 5 5 5 2 5 5 5 5 5 5 2 5 5

5 5 5 5 2 5 5 5 5 5 5 2 5 5 5 5 5 5 2 5 5 5 5 5 5 2 5 5

5 5 5 5 2 5 5 5 5 5 5 2 5 5 5 5 5 5 2 5 5 5 5 5 5 2 5 5

5 5 5 5 2 5 5 5 5 5 5 2 5 5 5 5 5 5 2 5 5 5 5 5 5 2 5 5

7 7 7 7 2 7 6 7 7 7 7 2 7 7 7 7 7 7 2 7 7 7 7 7 7 2 7 7

7 7 7 7 2 7 6 7 7 7 7 2 7 7 7 7 7 7 2 7 7 7 7 7 7 2 7 7

9 7 9 9 2 9 8 9 8 8 9 2 9 9 9 8 8 9 2 9 9 9 9 9 9 2 9 9

9 7 9 9 2 9 8 9 8 8 9 2 9 9 9 8 8 9 2 9 9 9 9 9 9 2 9 9

9 9 9 9 2 9 8 9 8 8 9 2 9 9 9 8 8 9 2 9 9 9 9 9 9 2 9 9

9 9 9 9 2 9 8 9 8 8 9 2 9 9 9 8 8 9 2 9 9 9 9 9 9 2 9 910 10 10 9 9 2 9 8 10 9 8 8 9 2 2 9 10 9 10 8 8 10 3 9 9 10 9 10 9 9 10 3 9 910 10 10 9 9 2 9 8 10 9 8 8 9 2 2 9 10 9 10 8 8 10 3 9 9 10 9 10 9 9 10 3 9 910 8 10 10 10 2 2 9 10 10 8 8 10 2 10 10 10 10 10 8 8 10 3 10 10 10 10 10 10 10 10 3 10 10

10 8 10 10 10 2 2 9 10 10 8 8 10 2 10 10 10 10 10 8 8 10 3 10 10 10 10 10 10 10 10 3 10 10

10 9 2 2 2 2 2 2 2 2 2 2 2 2 10 2 10 2 2 2 4 2 2 2 2 10 2 2 2 4 2 210 9 2 2 2 2 2 2 2 2 2 2 2 2 10 2 10 2 2 2 4 2 2 2 2 10 2 2 2 4 2 2

5 6 5 13 5 5 2 2 5 5 5 4 4 6 5 5 12 3 5 5 5 2 5 5 3 3 5 5

5 6 5 13 5 5 2 2 5 5 5 4 4 6 5 5 12 3 5 5 5 2 5 5 3 3 5 513 8 4 6 4 11 4 4 5 13 413 8 4 6 4 11 4 4 5 13 4

10 4 4 10

10 4 4 10

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

r

Com

mun

icat

ing

Doo

r har

dwar

e

L.O

. Bat

hroo

m S

win

g D

oor

L.O

. Bat

hroo

m D

oor

hard

war

e

Lock

out C

lose

t Doo

rLo

ckou

t Clo

set D

oor

hard

war

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

athr

oom

Sw

ing

Doo

r

Lock

out B

ath.

Doo

r har

dwar

e

Lock

out C

lose

t doo

r

Lock

out C

lose

t Doo

r har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain

& Lo

ckou

t Ent

ry D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

ath

Swin

g D

oor

L.O

Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set H

arew

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

e

N/A

N/A

N/A

20 Unit 21 Unit 23 Unit22 Unit

N/A

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

6 6 6 6 6 6 3 6 6

6 6 6 6 6 6 3 6 6

8 8 8 8 8 8 3 8 8

8 8 8 8 8 8 3 8 8

10 9 9 9 10 10 3 10 10

10 9 9 9 10 10 3 10 10

10 9 9 9 10 10 3 10 10

10 9 9 9 10 10 3 10 1011 10 10 9 9 9 10 10 3 7 1011 10 10 9 9 9 10 10 3 7 1011 11 11 9 9 9 11 11 3 11 1111 11 11 9 9 9 11 11 3 11 11

6 6 6 5 6 6 6 4 6 5 7 7 6 5 5 13 7 7 6 5 6 7 7

6 6 6 5 6 6 6 4 6 5 7 7 6 5 5 13 7 7 6 5 6 7 7

4 4 10 4 6 3 2 9 5 5 6 5 5 4 12 5

4 4 10 4 6 3 2 9 5 5 6 5 5 4 12 5

Mai

n&Lo

ckou

t Ent

ry D

oor

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Hal

lway

Bed

. Roo

m D

oor

Hal

lway

Bed

room

Doo

r har

dwar

e

Hal

lway

Bat

hroo

m D

oor

Hal

lway

Bat

hroo

m D

oor h

ardw

are

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

eM

aste

r Bed

room

Doo

rM

aste

r Bed

room

Har

dwar

e

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

rL.

Rm

Clo

set H

ardw

are

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETED TO DATE 4/4/2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/11/2012

WORK COMPLETED TO DATE 2/1/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/20/2012WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/25/2012

WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 328.2012 WORK COMPLETED TO DATE 5/2/2012WORK COMPLETED TO DATE 2/22/2012

RUN DATE : 2/8/2012

26 Unit

12

7

6

4

9

11

27 Unit

13

N/A

25 Unit

2

24 Unit

14

28 Unit

3

15

5

N/A

16

10

N/A

N/A

FLOOR18

17

8

N/A

N/A

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

5 5 5 5 3 5 5 5 5 5 5 3 5 5 5 5 5 5 3 5 5 5 5 4 4 2 4 4

5 5 5 5 3 5 5 5 5 5 5 3 5 5 5 5 5 5 3 5 5 5 5 4 4 2 4 4

6 6 6 6 3 6 6 6 6 6 6 3 6 6 6 6 6 6 3 6 6 6 6 5 5 2 5 5

6 6 6 6 3 6 6 6 6 6 6 3 6 6 6 6 6 6 3 6 6 6 6 5 5 2 5 5

6 6 6 6 3 6 6 6 6 6 6 3 6 6 6 6 6 6 3 6 6 6 6 5 5 2 5 5

6 6 6 6 3 6 6 6 6 6 6 3 6 6 6 6 6 6 3 6 6 6 6 5 5 2 5 5

8 8 8 8 3 8 7 8 8 8 8 3 8 8 8 8 8 8 3 8 8 8 8 7 7 2 7 7

8 8 8 8 3 8 7 8 8 8 8 3 8 8 8 8 8 8 3 8 8 8 8 7 7 2 7 7

10 8 10 10 3 10 9 10 9 9 10 3 10 10 10 9 9 10 3 10 10 10 10 9 9 2 9 9

10 8 10 10 3 10 9 10 9 9 10 3 10 10 10 9 9 10 3 10 10 10 10 9 9 2 9 9

10 10 10 10 3 10 9 10 9 9 10 3 10 10 10 9 9 10 3 10 10 10 10 9 9 2 9 9

10 10 10 10 3 10 9 10 9 9 10 3 10 10 10 9 9 10 3 10 10 10 10 9 9 2 9 911 11 11 10 10 3 10 9 11 10 9 9 10 3 3 10 11 10 11 9 9 11 4 10 10 11 10 11 10 9 10 3 9 911 11 11 10 10 3 10 9 11 10 9 9 10 3 3 10 11 10 11 9 9 11 4 10 10 11 10 11 10 9 10 3 9 911 9 11 11 3 3 10 11 11 9 9 11 3 11 11 11 11 11 9 9 11 4 11 11 11 11 11 11 10 10 3 10 10

11 9 11 11 3 3 10 11 11 9 9 11 3 11 11 11 11 11 9 9 11 4 11 11 11 11 11 11 10 10 3 10 10

11 10 3 4 3 3 3 3 3 3 3 3 3 3 11 3 11 3 3 3 5 3 3 3 3 11 3 3 3 5 3 311 10 3 4 3 3 3 3 3 3 3 3 3 3 11 3 11 3 3 3 5 3 3 3 3 11 3 3 3 5 3 3

4 6 7 6 14 6 6 3 6 6 6 5 7 6 6 4 6 6 6 6 6 4 6 6

4 6 7 6 14 6 6 3 6 6 6 5 7 6 6 4 6 6 6 6 6 4 6 6

5 9 5 5 12 6

5 9 5 5 12 6

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

r

Com

mun

icat

ing

Doo

r har

dwar

e

L.O

. Bat

hroo

m S

win

g D

oor

L.O

. Bat

hroo

m D

oor

hard

war

e

Lock

out C

lose

t Doo

rLo

ckou

t Clo

set D

oor

hard

war

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

athr

oom

Sw

ing

Doo

r

Lock

out B

ath.

Doo

r har

dwar

e

Lock

out C

lose

t doo

r

Lock

out C

lose

t Doo

r har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain

& Lo

ckou

t Ent

ry D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

ath

Swin

g D

oor

L.O

Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set H

arew

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

e

20 Unit 21 Unit 23 Unit22 Unit

N/A

N/A N/A

N/A

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

7 7 7 7 7 7 4 7 7

7 7 7 7 7 7 4 7 7

9 9 9 9 9 9 4 9 9

9 9 9 9 9 9 4 9 9

11 10 10 10 11 11 4 11 11

11 10 10 10 11 11 4 11 11

11 10 10 10 11 11 4 11 11

11 10 10 10 11 11 4 11 1112 11 11 10 10 10 11 11 4 8 1112 11 11 10 10 10 11 11 4 8 11

12 10 4 12

12 10 4 12

7 7 7 7 5 7 8 7 14 8 8 8 8

7 7 7 7 5 7 8 7 14 8 8 8 8

Mai

n&Lo

ckou

t Ent

ry D

oor

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Hal

lway

Bed

. Roo

m D

oor

Hal

lway

Bed

room

Doo

r har

dwar

e

Hal

lway

Bat

hroo

m D

oor

Hal

lway

Bat

hroo

m D

oor h

ardw

are

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

eM

aste

r Bed

room

Doo

rM

aste

r Bed

room

Har

dwar

e

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

rL.

Rm

Clo

set H

ardw

are

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE 5/9/2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/11/2012

WORK COMPLETED TO DATE 2/1/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/20/2012WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/25/2012

WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 328.2012 WORK COMPLETED TO DATE 5/2/2012WORK COMPLETED TO DATE 2/22/2012

RUN DATE : 2/8/2012

26 Unit

12

7

6

4

9

11

27 Unit

13

N/A

25 Unit

2

24 Unit

14

28 Unit

3

15

5

N/A

16

10

N/A

N/A

FLOOR18

17

8

N/A

N/A

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

6 6 6 6 4 6 6 6 6 6 6 4 6 6 6 6 6 6 4 6 6 6 6 5 5 3 5 5

6 6 6 6 4 6 6 6 6 6 6 4 6 6 6 6 6 6 4 6 6 6 6 5 5 3 5 5

7 7 7 7 4 7 7 7 7 7 7 4 7 7 7 7 7 7 4 7 7 7 7 6 6 3 6 6

7 7 7 7 4 7 7 7 7 7 7 4 7 7 7 7 7 7 4 7 7 7 7 6 6 3 6 6

7 7 7 7 4 7 7 7 7 7 7 4 7 7 7 7 7 7 4 7 7 7 7 6 6 3 6 6

7 7 7 7 4 7 7 7 7 7 7 4 7 7 7 7 7 7 4 7 7 7 7 6 6 3 6 6

9 9 9 9 4 9 8 9 9 9 9 4 9 9 9 9 9 9 4 9 9 9 9 8 8 3 8 8

9 9 9 9 4 9 8 9 9 9 9 4 9 9 9 9 9 9 4 9 9 9 9 8 8 3 8 8

11 9 11 11 4 11 10 11 10 10 11 4 11 11 11 10 10 11 4 11 11 11 11 10 10 3 10 10

11 9 11 11 4 11 10 11 10 10 11 4 11 11 11 10 10 11 4 11 11 11 11 10 10 3 10 10

11 11 11 11 4 11 10 11 10 10 11 4 11 11 11 10 10 11 4 11 11 11 11 10 10 3 10 10

11 11 11 11 4 11 10 11 10 10 11 4 11 11 11 10 10 11 4 11 11 11 11 10 10 3 10 10

12 12 12 11 11 4 11 10 12 11 10 10 11 4 4 11 12 11 12 10 10 12 5 11 11 12 11 12 11 10 11 4 10 10

12 12 12 11 11 4 11 10 12 11 10 10 11 4 4 11 12 11 12 10 10 12 5 11 11 12 11 12 11 10 11 4 10 10

10 12 2 12 4 4 12 4 12 12 10 10 5 12 4

10 12 2 12 4 4 12 4 12 12 10 10 5 12 412 4 5 4 4 4 4 4 4 4 4 12 4 12 4 4 6 4 4 4 4 12 4 4 6 4 412 4 5 4 4 4 4 4 4 4 4 12 4 12 4 4 6 4 4 4 4 12 4 4 6 4 4

8 7 15 7 7 7 7 7 7 7 7 7

8 7 15 7 7 7 7 7 7 7 7 7

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

r

Com

mun

icat

ing

Doo

r har

dwar

e

L.O

. Bat

hroo

m S

win

g D

oor

L.O

. Bat

hroo

m D

oor h

ardw

are

Lock

out C

lose

t Doo

rLo

ckou

t Clo

set D

oor

hard

war

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

athr

oom

Sw

ing

Doo

r

Lock

out B

ath.

Doo

r har

dwar

e

Lock

out C

lose

t doo

r

Lock

out C

lose

t Doo

r har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain

& Lo

ckou

t Ent

ry D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

ath

Swin

g D

oor

L.O

Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set H

arew

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

e

20 Unit 21 Unit 23 Unit22 Unit

N/A

N/A N/A

N/A

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

8 8 8 8 8 8 5 8 8

8 8 8 8 8 8 5 8 8

10 10 10 10 10 10 5 10 10

10 10 10 10 10 10 5 10 10

12 11 11 11 12 12 5 12 12

12 11 11 11 12 12 5 12 12

12 11 11 11 12 12 5 12 12

12 11 11 11 12 12 5 12 1213 12 12 11 11 11 12 12 5 9 1213 12 12 11 11 11 12 12 5 9 12

11 5 1311 5 13

15

15

Mai

n&Lo

ckou

t Ent

ry D

oor

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Hal

lway

Bed

. Roo

m D

oor

Hal

lway

Bed

room

Doo

r har

dwar

e

Hal

lway

Bat

hroo

m D

oor

Hal

lway

Bat

hroo

m D

oor h

ardw

are

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

eM

aste

r Bed

room

Doo

rM

aste

r Bed

room

Har

dwar

e

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

rL.

Rm

Clo

set H

ardw

are

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE 5/9/2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE 5/16/2012

WORK COMPLETED TO DATE 2/1/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/20/2012WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/25/2012

WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 328.2012 WORK COMPLETED TO DATE 5/2/2012WORK COMPLETED TO DATE 2/22/2012

RUN DATE : 2/8/2012

26 Unit

12

7

6

4

9

11

27 Unit

13

N/A

25 Unit

2

24 Unit

14

28 Unit

3

15

5

N/A

16

10

N/A

N/A

FLOOR18

17

8

N/A

N/A

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

7 7 7 7 5 7 7 7 7 7 7 5 7 7 7 7 7 7 5 7 7 7 7 6 6 4 6 6

7 7 7 7 5 7 7 7 7 7 7 5 7 7 7 7 7 7 5 7 7 7 7 6 6 4 6 6

8 8 8 8 5 8 8 8 8 8 8 5 8 8 8 8 8 8 5 8 8 8 8 7 7 4 7 7

8 8 8 8 5 8 8 8 8 8 8 5 8 8 8 8 8 8 5 8 8 8 8 7 7 4 7 7

8 8 8 8 5 8 8 8 8 8 8 5 8 8 8 8 8 8 5 8 8 8 8 7 7 4 7 7

8 8 8 8 5 8 8 8 8 8 8 5 8 8 8 8 8 8 5 8 8 8 8 7 7 4 7 7

10 10 10 10 5 10 9 10 10 10 10 5 10 10 10 10 10 10 5 10 10 10 # 9 9 4 9 9

10 10 10 10 5 10 9 10 10 10 10 5 10 10 10 10 10 10 5 10 10 10 # 9 9 4 9 9

12 10 12 12 5 12 11 12 11 11 12 5 12 12 12 11 11 12 5 12 12 12 12 11 11 4 11 11

12 10 12 12 5 12 11 12 11 11 12 5 12 12 12 11 11 12 5 12 12 12 12 11 11 4 11 11

12 12 12 12 5 12 11 12 11 11 12 5 12 12 12 11 11 12 5 12 12 12 12 11 11 4 11 11

12 12 12 12 5 12 11 12 11 11 12 5 12 12 12 11 11 12 5 12 12 12 12 11 11 4 11 11

13 13 13 12 12 5 12 11 13 12 11 11 12 5 5 12 12 13 11 11 13 6 12 12 12 13 12 11 12 5 11 11

13 13 13 12 12 5 12 11 13 12 11 11 12 5 5 12 12 13 11 11 13 6 12 12 12 13 12 11 12 5 11 11

11 13 13 5 13 12 5 13 11 11 2 13 2

11 13 13 5 13 12 5 13 11 11 2 13 2

5

5

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

r

Com

mun

icat

ing

Doo

r har

dwar

e

L.O

. Bat

hroo

m S

win

g D

oor

L.O

. Bat

hroo

m D

oor h

ardw

are

Lock

out C

lose

t Doo

r

Lock

out C

lose

t Doo

r har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

athr

oom

Sw

ing

Doo

r

Lock

out B

ath.

Doo

r har

dwar

e

Lock

out C

lose

t doo

r

Lock

out C

lose

t Doo

r har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain

& Lo

ckou

t Ent

ry D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

ath

Swin

g D

oor

L.O

Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set H

arew

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

e

20 Unit 21 Unit 23 Unit22 Unit

N/A

N/A N/A

N/A

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

9 2 9 6 9

9 2 9 6 9

2 11 2 11 11 11 11 10 6 11

2 11 2 11 11 11 11 10 6 11

13 2 12 12 12 13 12 6 13 13

13 2 12 12 12 13 12 6 13 13

2 13 2 6 13

2 13 2 6 13

14 13 13 614 13 13 6

6 14

6 14

Mai

n&Lo

ckou

t Ent

ry D

oor

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Hal

lway

Bed

. Roo

m D

oor

Hal

lway

Bed

room

Doo

r har

dwar

e

Hal

lway

Bat

hroo

m D

oor

Hal

lway

Bat

hroo

m D

oor h

ardw

are

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

eM

aste

r Bed

room

Doo

rM

aste

r Bed

room

Har

dwar

e

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

rL.

Rm

Clo

set H

ardw

are

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE 5/9/2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE 5/16/2012

WORK COMPLETED TO DATE 2/1/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE 5/23/2012WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/25/2012

WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 328.2012 WORK COMPLETED TO DATE 5/2/2012WORK COMPLETED TO DATE 2/22/2012

N/A

15

5

N/A

16

10

N/A

N/A

FLOOR18

17

2

24 Unit

14

28 Unit

3

8

N/A

9

11

27 Unit

13

N/A

25 Unit

RUN DATE : 2/8/2012

26 Unit

12

7

6

4

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

2 8 2 8 8 8 6 8 8 2 8 2 8 8 8 6 8 8 8 2 8 8 8 8 8 2 7

2 8 2 8 8 8 6 8 8 2 8 2 8 8 8 6 8 8 8 2 8 8 8 8 8 2 7

2 9 2 9 9 6 9 9 2 9 2 9 9 9 6 9 9 2 9 9 2 8

2 9 2 9 9 6 9 9 2 9 2 9 9 9 6 9 9 2 9 9 2 8

9 2 9 9 6 9 2 9 2 9 9 6 9 2 2 9 9 9 2 8 5 8

9 2 9 9 6 9 2 9 2 9 9 6 9 2 2 9 9 9 2 8 5 8

2 11 2 11 11 11 6 2 11 2 11 11 11 6 2 2 11 11 11 6 11 2 11 10 10 5

2 11 2 11 11 11 6 2 11 2 11 11 11 6 2 2 11 11 11 6 11 2 11 10 10 5

13 2 11 13 13 6 13 12 13 2 12 12 13 6 13 13 2 13 2 12 12 13 6 13 13 13 2 13 12 12 5 12

13 2 11 13 13 6 13 12 13 2 12 12 13 6 13 13 2 13 2 12 12 13 6 13 13 13 2 13 12 12 5 12

2 13 6 12 2 13 2 6 2 13 2 12 12 13 6 13 13 2 12 12 5

2 13 6 12 2 13 2 6 2 13 2 12 12 13 6 13 13 2 12 12 514 2 6 13 2 6 2 14 7 2 14 614 2 6 13 2 6 2 14 7 2 14 6

12 2 14 14 6 14 14 12 12 3 14 3

12 2 14 14 6 14 14 12 12 3 14 3

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Hal

lway

Bed

. Roo

m d

oor

Hal

lway

Bed

. Roo

m d

oor h

ardw

are

Hal

lway

Bat

hroo

m d

oor

Hal

lway

Bat

h. R

oom

doo

r har

dwar

e

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Hal

lway

Bed

. Roo

m d

oor

Hal

lway

Bed

. Roo

m d

oor h

ardw

are

Hal

lway

Bat

hroo

m d

oor

Hal

lway

Bat

h. R

oom

doo

r har

dwar

e

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Com

mun

icat

ing

Doo

r

Com

mun

icat

ing

Doo

r har

dwar

e

L.O

. Bat

hroo

m S

win

g D

oor

L.O

. Bat

hroo

m D

oor h

ardw

are

Lock

out C

lose

t Doo

r

Lock

out C

lose

t Doo

r har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

athr

oom

Sw

ing

Doo

r

Lock

out B

ath.

Doo

r har

dwar

e

Lock

out C

lose

t doo

r

Lock

out C

lose

t Doo

r har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain

& Lo

ckou

t Ent

ry D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

ath

Swin

g D

oor

L.O

Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set H

arew

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

N/A

N/A

N/A

20 Unit 21 Unit 23 Unit22 Unit

N/A

N/AJobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

12

12

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

e

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

2 10 3 2 10 2 2 2 7 2 10

2 10 3 2 10 2 2 2 7 2 10

3 12 3 12 12 12 12 11 7 2 12

3 12 3 12 12 12 12 11 7 2 12

2 14 3 7 14

2 14 3 7 14

3 14 3 7 14

3 14 3 7 14

15 14 715 14 7

7 15

7 15

Mai

n&Lo

ckou

t Ent

ry D

oor

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Hal

lway

Bed

. Roo

m D

oor

Hal

lway

Bed

room

Doo

r har

dwar

e

Hal

lway

Bat

hroo

m D

oor

Hal

lway

Bat

hroo

m D

oor h

ardw

are

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

eM

aste

r Bed

room

Doo

rM

aste

r Bed

room

Har

dwar

e

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

rL.

Rm

Clo

set H

ardw

are

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE 5/9/2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE 5/16/2012

WORK COMPLETED TO DATE 2/1/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE 5/23/2012WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE 5/30/2012

WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 328.2012 WORK COMPLETED TO DATE 5/2/2012WORK COMPLETED TO DATE 2/22/2012

RUN DATE : 2/8/2012

26 Unit

12

7

6

4

25 Unit24 Unit

14

28 Unit

3

8

N/A

9

11

27 Unit

N/A

N/A

FLOOR18

17

2

13

N/A

N/A

15

5

16

10

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

3 3 9 2 2 9 7 9 9 3 2 3 9 7 9 2 3 9 9 2 9 2 2 3 2 2 8 2

3 3 9 2 2 9 7 9 9 3 2 3 9 7 9 2 2 9 9 2 9 2 2 3 2 2 8 2

3 10 3 10 2 2 2 10 7 10 10 3 10 2 2 2 3 10 10 10 7 10 10 2 2 3 2 2 10 2 10 2 2 2 3 2 2 9 2

3 10 3 10 2 2 2 10 7 10 10 3 10 2 2 2 3 10 10 10 7 10 10 2 2 3 2 2 10 2 10 2 2 2 3 2 2 9 2

2 10 3 10 2 10 7 10 2 3 10 3 10 2 10 7 10 2 3 2 3 10 2 10 2 10 2 2 2 3 2 2 9 6 9

2 10 3 10 2 10 7 10 2 3 10 3 10 2 10 7 10 2 3 2 3 10 2 10 2 10 2 2 2 3 2 2 9 6 9

3 12 3 12 12 12 7 2 2 3 12 3 12 12 12 7 2 2 3 2 3 12 12 7 12 2 2 2 3 12 11 6

3 12 3 12 12 12 7 2 2 3 12 3 12 12 12 7 2 2 3 2 3 12 12 7 12 2 2 2 3 12 11 6

2 14 3 14 7 2 14 3 14 7 3 3 2 3 13 6

2 14 3 14 7 2 14 3 14 7 3 3 2 3 13 6

2 3 7 3 14 3 2 7 3 3 14 14 14 2 3 13 13

2 3 7 3 14 3 2 7 3 3 14 14 14 2 3 13 1315 2 7 2 14 2 7 3 15 2 3 15 2 715 2 7 2 14 2 7 3 15 2 3 15 2 7

3 15 15 15 15 13 13 4 15 4

3 15 15 15 15 13 13 4 15 4

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Hal

lway

Bed

. Roo

m d

oor

Hal

lway

Bed

. Roo

m d

oor h

ardw

are

Hal

lway

Bat

hroo

m d

oor

Hal

lway

Bat

h. R

oom

doo

r har

dwar

e

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Hal

lway

Bed

. Roo

m d

oor

Hal

lway

Bed

. Roo

m d

oor h

ardw

are

Hal

lway

Bat

hroo

m d

oor

Hal

lway

Bat

h. R

oom

doo

r har

dwar

e

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Com

mun

icat

ing

Doo

r

Com

mun

icat

ing

Doo

r har

dwar

e

L.O

. Bat

hroo

m S

win

g D

oor

L.O

. Bat

hroo

m D

oor h

ardw

are

Lock

out C

lose

t Doo

r

Lock

out C

lose

t Doo

r har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

athr

oom

Sw

ing

Doo

r

Lock

out B

ath.

Doo

r har

dwar

e

Lock

out C

lose

t doo

r

Lock

out C

lose

t Doo

r har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain

& Lo

ckou

t Ent

ry D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

ath

Swin

g D

oor

L.O

Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set H

arew

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

20 Unit 21 Unit 23 Unit22 Unit

N/A

N/A

N/A

N/A

N/A

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

2 2

2 2

2 2

2 2

2

2

2 2

2 2

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

e

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

11 4 3 11 3 3 3 8 3 11

11 4 3 11 3 3 3 8 3 11

4 8 3

4 8 3

15 2 2 2 2 8 15 2

15 2 2 2 2 8 15 2

15 2 8 15

15 2 8 15

16 2 2 816 2 2 8

16

16

Mai

n&Lo

ckou

t Ent

ry D

oor

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Hal

lway

Bed

. Roo

m D

oor

Hal

lway

Bed

room

Doo

r har

dwar

e

Hal

lway

Bat

hroo

m D

oor

Hal

lway

Bat

hroo

m D

oor h

ardw

are

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

eM

aste

r Bed

room

Doo

rM

aste

r Bed

room

Har

dwar

e

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

rL.

Rm

Clo

set H

ardw

are

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE 5/9/2012 WORK COMPLETED TO DATE 6/13/2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE 5/16/2012

WORK COMPLETED TO DATE 2/1/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE 5/23/2012WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE 5/30/2012

WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 328.2012 WORK COMPLETED TO DATE 5/2/2012 WORK COMPLETED TO DATE 6/6/2012WORK COMPLETED TO DATE 2/22/2012

17

2

13

N/A

15

5

16

8

N/A

9

11

27 Unit

N/A

N/A

FLOOR18

24 Unit

14

28 Unit

3

10

12

7

6

4

N/A

25 Unit

N/A N/A N/A

RUN DATE : 2/8/2012

26 Unit

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

4 2 4 10 2 3 3 2 10 8 10 10 4 2 2 3 2 4 2 2 10 8 2 10 2 3 10 2 10 3 2 10 3 4 3 3 9 3

4 2 4 10 2 3 3 2 10 8 10 10 4 2 2 3 2 4 2 2 10 8 2 10 2 3 10 2 10 3 2 10 3 4 3 3 9 3

4 11 4 11 3 3 3 2 11 8 11 11 4 11 3 3 3 4 11 11 11 8 11 11 3 3 4 3 3 11 3 11 3 3 3 4 3 3 10 3

4 11 4 11 3 3 3 2 11 8 11 11 4 11 3 3 3 4 11 11 11 8 11 11 3 3 4 3 3 11 3 11 3 3 3 4 3 3 10 3

11 4 11 3 11 8 11 3 11 4 11 3 11 8 11 3 4 3 4 11 3 11 3 11 3 3 4 3 3 10 7 10

11 4 11 3 11 8 11 3 11 4 11 3 11 8 11 3 4 3 4 11 3 11 3 11 3 3 4 3 3 10 7 10

4 13 13 13 8 13 8 3 4 8 13 4

4 13 13 13 8 13 8 3 4 8 13 4

15 4 2 15 8 15 2 15 8 4 4 2 4 2 14

15 4 2 15 8 15 2 15 8 4 4 2 4 2 14

2 8 15 3 8 4 15 15 4 14

2 8 15 3 8 4 15 15 4 14

16 2 3 15 2 3 8 16 3 16 316 2 3 15 2 3 8 16 3 16 3

16 14

16 14

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Hal

lway

Bed

. Roo

m d

oor

Hal

lway

Bed

. Roo

m d

oor h

ardw

are

Hal

lway

Bat

hroo

m d

oor

Hal

lway

Bat

h. R

oom

doo

r har

dwar

e

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Hal

lway

Bed

. Roo

m d

oor

Hal

lway

Bed

. Roo

m d

oor h

ardw

are

Hal

lway

Bat

hroo

m d

oor

Hal

lway

Bat

h. R

oom

doo

r har

dwar

e

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Com

mun

icat

ing

Doo

r

Com

mun

icat

ing

Doo

r har

dwar

e

L.O

. Bat

hroo

m S

win

g D

oor

L.O

. Bat

hroo

m D

oor h

ardw

are

Lock

out C

lose

t Doo

r

Lock

out C

lose

t Doo

r har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

athr

oom

Sw

ing

Doo

r

Lock

out B

ath.

Doo

r har

dwar

e

Lock

out C

lose

t doo

r

Lock

out C

lose

t Doo

r har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain

& Lo

ckou

t Ent

ry D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

ath

Swin

g D

oor

L.O

Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set H

arew

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

N/A

N/A

N/A

N/A

N/A

20 Unit 21 Unit 23 Unit22 Unit

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

3 3

3 3

3 3

3 3

3

3

2

2

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

e

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

12 5 4 12 4 4 4 9 4 12

12 5 4 12 4 4 4 9 4 12

2 5 2 2 2 2 9 4

2 5 2 2 2 2 9 4

16 2 3 3 3 3 9 16 3

16 2 3 3 3 3 9 16 3

2 3 9 16

2 3 9 16

2 3

2 3

Mai

n&Lo

ckou

t Ent

ry D

oor

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Hal

lway

Bed

. Roo

m D

oor

Hal

lway

Bed

room

Doo

r har

dwar

e

Hal

lway

Bat

hroo

m D

oor

Hal

lway

Bat

hroo

m D

oor h

ardw

are

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

eM

aste

r Bed

room

Doo

rM

aste

r Bed

room

Har

dwar

e

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

rL.

Rm

Clo

set H

ardw

are

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE 5/9/2012 WORK COMPLETED TO DATE 6/13/2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE 5/16/2012

WORK COMPLETED TO DATE 2/1/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE 5/23/2012WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE 5/30/2012

WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 328.2012 WORK COMPLETED TO DATE 5/2/2012 WORK COMPLETED TO DATE 6/6/2012WORK COMPLETED TO DATE 2/22/2012

N/A

RUN DATE : 2/8/2012

26 Unit

6

4

N/A

25 Unit

N/A N/A

24 Unit

14

28 Unit

3

10

12

7

8

N/A

9

11

27 Unit

N/A

N/A

FLOOR18

17

2

13

N/A

15

5

16

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

5 2 5 11 3 4 4 3 11 9 11 11 5 3 3 4 3 5 3 3 11 9 3 11 3 4 10 4 11 4 3 11 3 5 4 4 10 4

5 2 5 11 3 4 4 3 11 9 11 11 5 3 3 4 3 5 3 3 11 9 3 11 3 4 10 4 11 4 3 11 3 5 4 4 10 4

5 12 5 12 4 4 4 3 12 9 12 12 5 12 4 4 5 12 12 12 9 12 12 4 4 5 4 4 12 4 12 4 4 3 5 4 4 11 4

5 12 5 12 4 4 4 3 12 9 12 12 5 12 4 4 5 12 12 12 9 12 12 4 4 5 4 4 12 4 12 4 4 3 5 4 4 11 4

12 5 12 12 9 12 4 12 12 12 9 12 4 5 4 5 4 12 4 12 4 3 5 4 4 11 8 11

12 5 12 12 9 12 4 12 12 12 9 12 4 5 4 5 4 12 4 12 4 3 5 4 4 11 8 11

5 14 14 14 9 14 2 2 2 2 9 4 5 2 9 14 5

5 14 14 14 9 14 2 2 2 2 9 4 5 2 9 14 5

16 5 3 16 9 16 2 3 9 5 5 2 2 5 3 15

16 5 3 16 9 16 2 3 9 5 5 2 2 5 3 15

2 3 2 4 5 15 5 15 2

2 3 2 4 5 15 5 15 2

16 4 17 17

16 4 17 17

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Hal

lway

Bed

. Roo

m d

oor

Hal

lway

Bed

. Roo

m d

oor h

ardw

are

Hal

lway

Bat

hroo

m d

oor

Hal

lway

Bat

h. R

oom

doo

r har

dwar

e

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Hal

lway

Bed

. Roo

m d

oor

Hal

lway

Bed

. Roo

m d

oor h

ardw

are

Hal

lway

Bat

hroo

m d

oor

Hal

lway

Bat

h. R

oom

doo

r har

dwar

e

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Com

mun

icat

ing

Doo

r

Com

mun

icat

ing

Doo

r har

dwar

e

L.O

. Bat

hroo

m S

win

g D

oor

L.O

. Bat

hroo

m D

oor h

ardw

are

Lock

out C

lose

t Doo

r

Lock

out C

lose

t Doo

r har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

athr

oom

Sw

ing

Doo

r

Lock

out B

ath.

Doo

r har

dwar

e

Lock

out C

lose

t doo

r

Lock

out C

lose

t Doo

r har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain

& Lo

ckou

t Ent

ry D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

ath

Swin

g D

oor

L.O

Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set H

arew

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

20 Unit 21 Unit 23 Unit22 Unit

N/A

N/A

N/A

N/A

N/A

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

4 3

4 3

4 3

4 3

3

3

2

2

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

e

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

13 13 5 5 2 10 13

13 13 5 5 2 10 13

6 3 3 10

6 3 3 10

3 4 10

3 4 10

3 4

3 4

2 2 2 2 2 2 2 2 2 2

2 2 2 2 2 2 2 2 2 2

Mai

n&Lo

ckou

t Ent

ry D

oor

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Hal

lway

Bed

. Roo

m D

oor

Hal

lway

Bed

room

Doo

r har

dwar

e

Hal

lway

Bat

hroo

m D

oor

Hal

lway

Bat

hroo

m D

oor h

ardw

are

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

eM

aste

r Bed

room

Doo

rM

aste

r Bed

room

Har

dwar

e

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

rL.

Rm

Clo

set H

ardw

are

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE 5/9/2012 WORK COMPLETED TO DATE 6/13/2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE 5/16/2012 WORK COMPLETED TO DATE 6/20/2012

WORK COMPLETED TO DATE 2/1/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE 5/23/2012WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE 5/30/2012

WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 328.2012 WORK COMPLETED TO DATE 5/2/2012 WORK COMPLETED TO DATE 6/6/2012WORK COMPLETED TO DATE 2/22/2012

17

2

13

N/A

15

5

16

8

N/A

9

11

27 Unit

N/A

N/A

FLOOR18

24 Unit

14

28 Unit

3

10

12

7

25 Unit

N/A N/A N/A

RUN DATE : 2/8/2012

26 Unit

6

4

N/A

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

6 2 6 12 4 5 5 4 12 10 12 12 6 4 4 5 4 6 4 4 12 10 4 12 4 5 11 5 12 5 4 12 4 6 5 5 11 5

6 2 6 12 4 5 5 4 12 10 12 12 6 4 4 5 4 6 4 4 12 10 4 12 4 5 11 5 12 5 4 12 4 6 5 5 11 5

6 13 13 5 5 5 4 13 10 13 13 6 13 5 5 6 13 13 13 10 13 13 5 5 6 5 5 13 5 13 5 5 4 6 5 5 12 5

6 13 13 5 5 5 4 13 10 13 13 6 13 5 5 6 13 13 13 10 13 13 5 5 6 5 5 13 5 13 5 5 4 6 5 5 12 5

13 13 13 10 13 5 13 13 13 10 13 5 6 5 6 2 5 13 5 13 5 4 6 5 5 12 9 12

13 13 13 10 13 5 13 13 13 10 13 5 6 5 6 2 5 13 5 13 5 4 6 5 5 12 9 12

6 15 10 15 3 10 6 3 15 6 2

6 15 10 15 3 10 6 3 15 6 2

17 6 4 10 3 2 10 6 6 3 6 16

17 6 4 10 3 2 10 6 6 3 6 16

3 5 2 6 2 16 6

3 5 2 6 2 16 618 18

18 18

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Hal

lway

Bed

. Roo

m d

oor

Hal

lway

Bed

. Roo

m d

oor h

ardw

are

Hal

lway

Bat

hroo

m d

oor

Hal

lway

Bat

h. R

oom

doo

r har

dwar

e

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Hal

lway

Bed

. Roo

m d

oor

Hal

lway

Bed

. Roo

m d

oor h

ardw

are

Hal

lway

Bat

hroo

m d

oor

Hal

lway

Bat

h. R

oom

doo

r har

dwar

e

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Com

mun

icat

ing

Doo

r

Com

mun

icat

ing

Doo

r har

dwar

e

L.O

. Bat

hroo

m S

win

g D

oor

L.O

. Bat

hroo

m D

oor h

ardw

are

Lock

out C

lose

t Doo

r

Lock

out C

lose

t Doo

r har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

athr

oom

Sw

ing

Doo

r

Lock

out B

ath.

Doo

r har

dwar

e

Lock

out C

lose

t doo

r

Lock

out C

lose

t Doo

r har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain

& Lo

ckou

t Ent

ry D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

ath

Swin

g D

oor

L.O

Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set H

arew

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

N/A

N/A

N/A

N/A

N/A

20 Unit 21 Unit 23 Unit22 Unit

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

5 4

5 4

5 4

5 4

4

4

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

e

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

14 2 14 6 6 3 11 14

14 2 14 6 6 3 11 14

7 4 4 11

7 4 4 11

4 5 11 2

4 5 11 2

5

5

3 2 3 3 3 3

3 2 3 3 3 3

Mai

n&Lo

ckou

t Ent

ry D

oor

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Hal

lway

Bed

. Roo

m D

oor

Hal

lway

Bed

room

Doo

r har

dwar

e

Hal

lway

Bat

hroo

m D

oor

Hal

lway

Bat

hroo

m D

oor h

ardw

are

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

eM

aste

r Bed

room

Doo

rM

aste

r Bed

room

Har

dwar

e

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

rL.

Rm

Clo

set H

ardw

are

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE 5/9/2012 WORK COMPLETED TO DATE 6/13/2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE 5/16/2012 WORK COMPLETED TO DATE 6/20/2012

WORK COMPLETED TO DATE 2/1/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE 5/23/2012 WORK COMPLETED TO DATE 6/27/2012WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE 5/30/2012

WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 328.2012 WORK COMPLETED TO DATE 5/2/2012 WORK COMPLETED TO DATE 6/6/2012WORK COMPLETED TO DATE 2/22/2012

RUN DATE : 2/8/2012

26 Unit

6

4

N/A

25 Unit

N/A N/A N/A

24 Unit

14

28 Unit

3

10

12

7

8

N/A

9

11

27 Unit

N/A

N/A

FLOOR18

17

2

13

N/A

15

5

16

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

7 3 13 5 6 6 5 13 11 13 13 7 5 5 6 5 7 5 5 13 11 5 13 5 6 12 6 13 6 5 13 5 7 6 6 12 6

7 3 13 5 6 6 5 13 11 13 13 7 5 5 6 5 7 5 5 13 11 5 13 5 6 12 6 13 6 5 13 5 7 6 6 12 6

7 14 2 14 6 6 6 5 14 11 14 14 7 14 6 6 2 7 14 14 14 11 14 14 6 6 7 6 6 14 6 14 6 6 5 7 6 6 13 6

7 14 2 14 6 6 6 5 14 11 14 14 7 14 6 6 2 7 14 14 14 11 14 14 6 6 7 6 6 14 6 14 6 6 5 7 6 6 13 6

14 2 14 14 11 14 6 14 14 14 11 14 6 7 6 7 3 6 14 6 14 6 5 7 6 6 13 10

14 2 14 14 11 14 6 14 14 14 11 14 6 7 6 7 3 6 14 6 14 6 5 7 6 6 13 10

16 2 11 16 4 11 7 4 16 7 3

16 2 11 16 4 11 7 4 16 7 3

18 7 5 2 2 4 3 11 7 4 7

18 7 5 2 2 4 3 11 7 4 7

3 7 17 7

3 7 17 7

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Hal

lway

Bed

. Roo

m d

oor

Hal

lway

Bed

. Roo

m d

oor h

ardw

are

Hal

lway

Bat

hroo

m d

oor

Hal

lway

Bat

h. R

oom

doo

r har

dwar

e

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Hal

lway

Bed

. Roo

m d

oor

Hal

lway

Bed

. Roo

m d

oor h

ardw

are

Hal

lway

Bat

hroo

m d

oor

Hal

lway

Bat

h. R

oom

doo

r har

dwar

e

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Com

mun

icat

ing

Doo

r

Com

mun

icat

ing

Doo

r har

dwar

e

L.O

. Bat

hroo

m S

win

g D

oor

L.O

. Bat

hroo

m D

oor h

ardw

are

Lock

out C

lose

t Doo

r

Lock

out C

lose

t Doo

r har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

athr

oom

Sw

ing

Doo

r

Lock

out B

ath.

Doo

r har

dwar

e

Lock

out C

lose

t doo

r

Lock

out C

lose

t Doo

r har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain

& Lo

ckou

t Ent

ry D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

ath

Swin

g D

oor

L.O

Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set H

arew

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

20 Unit 21 Unit 23 Unit22 Unit

N/A

N/A

N/A

N/A

N/A

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

6 5

6 5

6 5

6 5

13 5

13 5

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

e

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

15 3 15 7 7 4 12 15

15 3 15 7 7 4 12 15

5 5 12

5 5 12

6 3

6 3

4 3 4 4 4 4

4 3 4 4 4 4

Mai

n&Lo

ckou

t Ent

ry D

oor

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Hal

lway

Bed

. Roo

m D

oor

Hal

lway

Bed

room

Doo

r har

dwar

e

Hal

lway

Bat

hroo

m D

oor

Hal

lway

Bat

hroo

m D

oor h

ardw

are

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

eM

aste

r Bed

room

Doo

rM

aste

r Bed

room

Har

dwar

e

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

rL.

Rm

Clo

set H

ardw

are

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE 5/9/2012 WORK COMPLETED TO DATE 6/13/2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE 5/16/2012 WORK COMPLETED TO DATE 6/20/2012

WORK COMPLETED TO DATE 2/1/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE 5/23/2012 WORK COMPLETED TO DATE 6/27/2012WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 7/6/2012

WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 328.2012 WORK COMPLETED TO DATE 5/2/2012 WORK COMPLETED TO DATE 6/6/2012WORK COMPLETED TO DATE 2/22/2012

17

2

13

N/A

15

5

16

8

N/A

9

11

27 Unit

N/A

N/A

FLOOR18

24 Unit

14

28 Unit

3

10

12

7

25 Unit

N/A N/A N/A

RUN DATE : 2/8/2012

26 Unit

6

4

N/A

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

8 4 2 14 6 7 7 6 14 12 14 14 8 6 6 7 6 8 6 6 14 12 6 14 6 7 13 7 14 7 6 14 6 8 7 7 13 7

8 4 2 14 6 7 7 6 14 12 14 14 8 6 6 7 6 8 6 6 14 12 6 14 6 7 13 7 14 7 6 14 6 8 7 7 13 7

8 3 7 7 15 12 15 15 8 15 7 6 3 8 15 15 15 12 15 15 7 7 8 7 7 15 7 15 7 7 6 7 7 14 7

8 3 7 7 15 12 15 15 8 15 7 6 3 8 15 15 15 12 15 15 7 7 8 7 7 15 7 15 7 7 6 7 7 14 7

15 3 15 15 12 15 7 15 15 15 12 15 7 8 7 8 4 7 15 7 15 7 6 8 7 7 14 11

15 3 15 15 12 15 7 15 15 15 12 15 7 8 7 8 4 7 15 7 15 7 6 8 7 7 14 11

3 17 3 12 17 5 12 8 5 4

3 17 3 12 17 5 12 8 5 4

8 6 3 2 3 2 5

8 6 3 2 3 2 5

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Hal

lway

Bed

. Roo

m d

oor

Hal

lway

Bed

. Roo

m d

oor h

ardw

are

Hal

lway

Bat

hroo

m d

oor

Hal

lway

Bat

h. R

oom

doo

r har

dwar

e

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Hal

lway

Bed

. Roo

m d

oor

Hal

lway

Bed

. Roo

m d

oor h

ardw

are

Hal

lway

Bat

hroo

m d

oor

Hal

lway

Bat

h. R

oom

doo

r har

dwar

e

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Com

mun

icat

ing

Doo

r

Com

mun

icat

ing

Doo

r har

dwar

e

L.O

. Bat

hroo

m S

win

g D

oor

L.O

. Bat

hroo

m D

oor h

ardw

are

Lock

out C

lose

t Doo

r

Lock

out C

lose

t Doo

r har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

athr

oom

Sw

ing

Doo

r

Lock

out B

ath.

Doo

r har

dwar

e

Lock

out C

lose

t doo

r

Lock

out C

lose

t Doo

r har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain

& Lo

ckou

t Ent

ry D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

ath

Swin

g D

oor

L.O

Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set H

arew

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

N/A

N/A

N/A

N/A

N/A

20 Unit 21 Unit 23 Unit22 Unit

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

7 6

7 6

7 6

7 6

14 6

14 6

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

e

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

16 4 16 8 8 5 13 16

16 4 16 8 8 5 13 16

6 6 13

6 6 13

7

7

2 2 2 2 2 4 5 5

2 2 2 2 2 4 5 5

Mai

n&Lo

ckou

t Ent

ry D

oor

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Hal

lway

Bed

. Roo

m D

oor

Hal

lway

Bed

room

Doo

r har

dwar

e

Hal

lway

Bat

hroo

m D

oor

Hal

lway

Bat

hroo

m D

oor h

ardw

are

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

eM

aste

r Bed

room

Doo

rM

aste

r Bed

room

Har

dwar

e

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

rL.

Rm

Clo

set H

ardw

are

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE 5/9/2012 WORK COMPLETED TO DATE 6/13/2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE 5/16/2012 WORK COMPLETED TO DATE 6/20/2012

WORK COMPLETED TO DATE 2/1/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE 5/23/2012 WORK COMPLETED TO DATE 6/27/2012WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 7/6/2012

WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 328.2012 WORK COMPLETED TO DATE 5/2/2012 WORK COMPLETED TO DATE 6/6/2012 WORK COMPLETED TO DATE 7/11/2012WORK COMPLETED TO DATE 2/22/2012

RUN DATE : 2/8/2012

26 Unit

6

4

N/A

25 Unit

N/A N/A N/A

24 Unit

14

28 Unit

3

10

12

7

8

N/A

9

11

27 Unit

N/A

N/A

FLOOR18

17

2

13

N/A

15

5

16

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

9 5 3 15 7 7 8 7 15 13 15 15 9 7 7 8 7 9 7 7 15 13 7 15 7 8 14 8 15 8 7 15 7 9 8 8 14 8

9 5 3 15 7 7 8 7 15 13 15 15 9 7 7 8 7 9 7 7 15 13 7 15 7 8 14 8 15 8 7 15 7 9 8 8 14 8

9 2 4 2 8 2 8 2 16 13 16 16 9 16 8 7 4 9 16 16 16 13 16 16 8 8 9 8 8 16 8 16 8 8 7 2 8 8 15 8

9 2 4 2 8 2 8 2 16 13 16 16 9 16 8 7 4 9 16 16 16 13 16 16 8 8 9 8 8 16 8 16 8 8 7 2 8 8 15 8

16 4 16 16 13 16 8 16 16 16 13 16 8 9 8 9 5 8 16 8 16 8 7 9 8 8 15 12

16 4 16 16 13 16 8 16 16 16 13 16 8 9 8 9 5 8 16 8 16 8 7 9 8 8 15 12

4 13 6 13 9 6 2 5

4 13 6 13 9 6 2 5

2 7 4 3 4 6

2 7 4 3 4 6

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Hal

lway

Bed

. Roo

m d

oor

Hal

lway

Bed

. Roo

m d

oor h

ardw

are

Hal

lway

Bat

hroo

m d

oor

Hal

lway

Bat

h. R

oom

doo

r har

dwar

e

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Hal

lway

Bed

. Roo

m d

oor

Hal

lway

Bed

. Roo

m d

oor h

ardw

are

Hal

lway

Bat

hroo

m d

oor

Hal

lway

Bat

h. R

oom

doo

r har

dwar

e

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Com

mun

icat

ing

Doo

r

Com

mun

icat

ing

Doo

r har

dwar

e

L.O

. Bat

hroo

m S

win

g D

oor

L.O

. Bat

hroo

m D

oor h

ardw

are

Lock

out C

lose

t Doo

r

Lock

out C

lose

t Doo

r har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

athr

oom

Sw

ing

Doo

r

Lock

out B

ath.

Doo

r har

dwar

e

Lock

out C

lose

t doo

r

Lock

out C

lose

t Doo

r har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain

& Lo

ckou

t Ent

ry D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

ath

Swin

g D

oor

L.O

Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set H

arew

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

20 Unit 21 Unit 23 Unit22 Unit

N/A

N/A

N/A

N/A

N/A

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

8 7

8 7

8 7

8 7

15 7

15 7

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

e

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

17 5 17 9 9 6 14 17

17 5 17 9 9 6 14 17

7 7

7 7

3 3 3 3 3 5 6 6 2 2

3 3 3 3 3 5 6 6 2 2

Mai

n&Lo

ckou

t Ent

ry D

oor

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Hal

lway

Bed

. Roo

m D

oor

Hal

lway

Bed

room

Doo

r har

dwar

e

Hal

lway

Bat

hroo

m D

oor

Hal

lway

Bat

hroo

m D

oor h

ardw

are

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

eM

aste

r Bed

room

Doo

rM

aste

r Bed

room

Har

dwar

e

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

rL.

Rm

Clo

set H

ardw

are

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE 5/9/2012 WORK COMPLETED TO DATE 6/13/2012 WORK COMPLETED TO DATE

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE 5/16/2012 WORK COMPLETED TO DATE 6/20/2012

WORK COMPLETED TO DATE 2/1/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE 5/23/2012 WORK COMPLETED TO DATE 6/27/2012WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 7/6/2012

WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 328.2012 WORK COMPLETED TO DATE 5/2/2012 WORK COMPLETED TO DATE 6/6/2012 WORK COMPLETED TO DATE 7/11/2012WORK COMPLETED TO DATE 2/22/2012

RUN DATE : 2/8/2012

26 Unit

6

4

N/A

25 Unit

N/A N/A N/A

24 Unit

14

28 Unit

3

10

12

7

8

N/A

9

11

27 Unit

N/A

N/A

FLOOR18

17

2

13

N/A

15

5

16

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

10 6 4 16 8 8 9 8 16 14 16 16 10 8 8 9 8 10 8 8 16 14 8 16 8 9 15 9 16 9 8 16 8 10 9 9 15

10 6 4 16 8 8 9 8 16 14 16 16 10 8 8 9 8 10 8 8 16 14 8 16 8 9 15 9 16 9 8 16 8 10 9 9 15

10 3 5 3 9 3 9 3 17 14 17 17 10 17 9 8 5 10 17 17 17 14 17 17 9 9 10 9 9 17 9 17 9 9 8 3 9 9 16

10 3 5 3 9 3 9 3 17 14 17 17 10 17 9 8 5 10 17 17 17 14 17 17 9 9 10 9 9 17 9 17 9 9 8 3 9 9 16

5 17 14 9 17 17 17 17 9 10 9 10 6 9 17 9 17 9 8 10 9 9 16 13

5 17 14 9 17 17 17 17 9 10 9 10 6 9 17 9 17 9 8 10 9 9 16 13

2 5 7 10 7 3 6

2 5 7 10 7 3 6

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

e

Mai

n&Lo

ckou

t Ent

ry D

oor

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Hal

lway

Bed

. Roo

m d

oor

Hal

lway

Bed

. Roo

m d

oor h

ardw

are

Hal

lway

Bat

hroo

m d

oor

Hal

lway

Bat

h. R

oom

doo

r har

dwar

e

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

e

Entry

Doo

r

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Hal

lway

Bed

. Roo

m d

oor

Hal

lway

Bed

. Roo

m d

oor h

ardw

are

Hal

lway

Bat

hroo

m d

oor

Hal

lway

Bat

h. R

oom

doo

r har

dwar

e

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Com

mun

icat

ing

Doo

r

Com

mun

icat

ing

Doo

r har

dwar

e

L.O

. Bat

hroo

m S

win

g D

oor

L.O

. Bat

hroo

m D

oor h

ardw

are

Lock

out C

lose

t Doo

r

Lock

out C

lose

t Doo

r har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

e

Entry

Doo

r

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

athr

oom

Sw

ing

Doo

r

Lock

out B

ath.

Doo

r har

dwar

e

Lock

out C

lose

t doo

r

Lock

out C

lose

t Doo

r har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain

& Lo

ckou

t Ent

ry D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

ath

Swin

g D

oor

L.O

Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set H

arew

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

E 7/18/2012

20 Unit 21 Unit 23 Unit22 Unit

N/A

N/A

N/A

N/A

N/A

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

9 9 8

9 9 8

9 9 8

9 9 8

16 8

16 8

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

e

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

Mai

n&Lo

ckou

t Ent

ry D

oor

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Hal

lway

Bed

. Roo

m D

oor

Hal

lway

Bed

room

Doo

r har

dwar

e

Hal

lway

Bat

hroo

m D

oor

Hal

lway

Bat

hroo

m D

oor h

ardw

are

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

eM

aste

r Bed

room

Doo

rM

aste

r Bed

room

Har

dwar

e

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

rL.

Rm

Clo

set H

ardw

are

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE 5/9/2012 WORK COMPLETED TO DATE 6/13/2012 WORK COMPLETED TO DATE

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE 5/16/2012 WORK COMPLETED TO DATE 6/20/2012 WORK COMPLETED TO DATE

WORK COMPLETED TO DATE 2/1/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE 5/23/2012 WORK COMPLETED TO DATE 6/27/2012 WORK COMPLETED TO DATE WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 7/6/2012 WORK COMPLETED TO DATE

WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 328.2012 WORK COMPLETED TO DATE 5/2/2012 WORK COMPLETED TO DATE 6/6/2012 WORK COMPLETED TO DATE 7/11/2012WORK COMPLETED TO DATE 2/22/2012

17

2

13

N/A

15

5

16

8

N/A

9

11

27 Unit

N/A

N/A

FLOOR18

24 Unit

14

28 Unit

3

10

12

7

25 Unit

N/A N/A N/A

RUN DATE : 2/8/2012

26 Unit

6

4

N/A

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

9 7 11 11 12 11 19 17 19 19 11 11 12 11 13 11 11 19 17 11 19 11 18 12 19 12 11 11 13 12

9 7 11 11 12 11 19 17 19 19 11 11 12 11 13 11 11 19 17 11 19 11 18 12 19 12 11 11 13 12

2 6 8 6 12 6 2 6 20 17 2 20 2 2 2 11 2 2 2 2 20 17 2 20 12 13 12 2 12 6

2 6 8 6 12 6 2 6 20 17 2 20 2 2 2 11 2 2 2 2 20 17 2 20 12 13 12 2 12 6

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

e

Mai

n&Lo

ckou

t Ent

ry D

oor

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Hal

lway

Bed

. Roo

m d

oor

Hal

lway

Bed

. Roo

m d

oor h

ardw

are

Hal

lway

Bat

hroo

m d

oor

Hal

lway

Bat

h. R

oom

doo

r har

dwar

e

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

e

Entry

Doo

r

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Hal

lway

Bed

. Roo

m d

oor

Hal

lway

Bed

. Roo

m d

oor h

ardw

are

Hal

lway

Bat

hroo

m d

oor

Hal

lway

Bat

h. R

oom

doo

r har

dwar

e

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Com

mun

icat

ing

Doo

r

Com

mun

icat

ing

Doo

r har

dwar

e

L.O

. Bat

hroo

m S

win

g D

oor

L.O

. Bat

hroo

m D

oor h

ardw

are

Lock

out C

lose

t Doo

r

Lock

out C

lose

t Doo

r har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

e

Entry

Doo

r

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

athr

oom

Sw

ing

Doo

r

Lock

out B

ath.

Doo

r har

dwar

e

Lock

out C

lose

t doo

r

Lock

out C

lose

t Doo

r har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain

& Lo

ckou

t Ent

ry D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

ath

Swin

g D

oor

L.O

Bat

h H

ardw

are

L.O

. Clo

set D

oor

E 7/18/2012

E 7/25/2012

E 8/1/2012 E 8/8/2012

N/A

N/A

N/A

N/A

N/A

20 21 Unit 23 Unit22 Unit

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

12 12 12 11

12 12 12 11

12 2

12 2

L.O

. Clo

set H

arew

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

e

Unit

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

Mai

n&Lo

ckou

t Ent

ry D

oor

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Hal

lway

Bed

. Roo

m D

oor

Hal

lway

Bed

room

Doo

r har

dwar

e

Hal

lway

Bat

hroo

m D

oor

Hal

lway

Bat

hroo

m D

oor h

ardw

are

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

eM

aste

r Bed

room

Doo

rM

aste

r Bed

room

Har

dwar

e

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

rL.

Rm

Clo

set H

ardw

are

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE 5/9/2012 WORK COMPLETED TO DATE 6/13/2012 WORK COMPLETED TO DATE

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE 5/16/2012 WORK COMPLETED TO DATE 6/20/2012 WORK COMPLETED TO DATE

WORK COMPLETED TO DATE 2/1/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE 5/23/2012 WORK COMPLETED TO DATE 6/27/2012 WORK COMPLETED TO DATE WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 7/6/2012 WORK COMPLETED TO DATE

WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 328.2012 WORK COMPLETED TO DATE 5/2/2012 WORK COMPLETED TO DATE 6/6/2012 WORK COMPLETED TO DATE 7/11/2012 WORK COMPLETED TO DATE WORK COMPLETED TO DATE 2/22/2012

RUN DATE : 2/8/2012

26 Unit

6

4

N/A

25 Unit

N/A N/A N/A

24 Unit

14

28 Unit

3

10

12

7

8

N/A

9

11

27 Unit

N/A

N/A

FLOOR18

17

2

13

N/A

15

5

16

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

8 12 13 13 12 12 2 13 20 13 12 2 12 14 13

8 12 13 13 12 12 2 13 20 13 12 2 12 14 13

3 7 18 21 3 3 3 12 3 3 3 3 18 3 21 13 13 3 13

3 7 18 21 3 3 3 12 3 3 3 3 18 3 21 13 13 3 13

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

e

Mai

n&Lo

ckou

t Ent

ry D

oor

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Hal

lway

Bed

. Roo

m d

oor

Hal

lway

Bed

. Roo

m d

oor h

ardw

are

Hal

lway

Bat

hroo

m d

oor

Hal

lway

Bat

h. R

oom

doo

r har

dwar

e

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

e

Entry

Doo

r

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Hal

lway

Bed

. Roo

m d

oor

Hal

lway

Bed

. Roo

m d

oor h

ardw

are

Hal

lway

Bat

hroo

m d

oor

Hal

lway

Bat

h. R

oom

doo

r har

dwar

e

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Com

mun

icat

ing

Doo

r

Com

mun

icat

ing

Doo

r har

dwar

e

L.O

. Bat

hroo

m S

win

g D

oor

L.O

. Bat

hroo

m D

oor h

ardw

are

Lock

out C

lose

t Doo

r

Lock

out C

lose

t Doo

r har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

e

Entry

Doo

r

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

athr

oom

Sw

ing

Doo

r

Lock

out B

ath.

Doo

r har

dwar

e

Lock

out C

lose

t doo

r

Lock

out C

lose

t Doo

r har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain

& Lo

ckou

t Ent

ry D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

ath

Swin

g D

oor

L.O

Bat

h H

ardw

are

L.O

. Clo

set D

oor

E 7/18/2012

E 7/25/2012

E 8/1/2012 E 8/8/2012 E 8/15/2012

20 21 Unit 23 Unit22 Unit

N/A

N/A

N/A

N/A

N/A

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

13 2 13 12

13 2 13 12

13 3

13 3

L.O

. Clo

set H

arew

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

e

Unit

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

Mai

n&Lo

ckou

t Ent

ry D

oor

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Hal

lway

Bed

. Roo

m D

oor

Hal

lway

Bed

room

Doo

r har

dwar

e

Hal

lway

Bat

hroo

m D

oor

Hal

lway

Bat

hroo

m D

oor h

ardw

are

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

eM

aste

r Bed

room

Doo

rM

aste

r Bed

room

Har

dwar

e

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

rL.

Rm

Clo

set H

ardw

are

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE 5/9/2012 WORK COMPLETED TO DATE 6/13/2012 WORK COMPLETED TO DATE

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE 5/16/2012 WORK COMPLETED TO DATE 6/20/2012 WORK COMPLETED TO DATE

WORK COMPLETED TO DATE 2/1/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE 5/23/2012 WORK COMPLETED TO DATE 6/27/2012 WORK COMPLETED TO DATE WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 7/6/2012 WORK COMPLETED TO DATE

WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 328.2012 WORK COMPLETED TO DATE 5/2/2012 WORK COMPLETED TO DATE 6/6/2012 WORK COMPLETED TO DATE 7/11/2012 WORK COMPLETED TO DATE WORK COMPLETED TO DATE 2/22/2012

RUN DATE : 2/8/2012

26 Unit

6

4

N/A

25 Unit

N/A N/A N/A

24 Unit

14

28 Unit

3

10

12

7

8

N/A

9

11

27 Unit

N/A

N/A

FLOOR18

17

2

13

N/A

15

5

16

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

2 13 2 3 2 14 21 14 15

2 13 2 3 2 14 21 14 15

19 4 4 4 4 2 4

19 4 4 4 4 2 4

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

e

Mai

n&Lo

ckou

t Ent

ry D

oor

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Hal

lway

Bed

. Roo

m d

oor

Hal

lway

Bed

. Roo

m d

oor h

ardw

are

Hal

lway

Bat

hroo

m d

oor

Hal

lway

Bat

h. R

oom

doo

r har

dwar

e

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

e

Entry

Doo

r

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Hal

lway

Bed

. Roo

m d

oor

Hal

lway

Bed

. Roo

m d

oor h

ardw

are

Hal

lway

Bat

hroo

m d

oor

Hal

lway

Bat

h. R

oom

doo

r har

dwar

e

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Com

mun

icat

ing

Doo

r

Com

mun

icat

ing

Doo

r har

dwar

e

L.O

. Bat

hroo

m S

win

g D

oor

L.O

. Bat

hroo

m D

oor h

ardw

are

Lock

out C

lose

t Doo

r

Lock

out C

lose

t Doo

r har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

e

Entry

Doo

r

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

athr

oom

Sw

ing

Doo

r

Lock

out B

ath.

Doo

r har

dwar

e

Lock

out C

lose

t doo

r

Lock

out C

lose

t Doo

r har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain

& Lo

ckou

t Ent

ry D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

ath

Swin

g D

oor

L.O

Bat

h H

ardw

are

L.O

. Clo

set D

oor

E 7/18/2012 WORK COMPLETED TO DATE 8/22/2012

E 7/25/2012

E 8/1/2012 E 8/8/2012 E 8/15/2012

20 21 Unit 23 Unit22 Unit

N/A

N/A

N/A

N/A

N/A

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

14 3 14

14 3 14

L.O

. Clo

set H

arew

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

e

Unit

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

Mai

n&Lo

ckou

t Ent

ry D

oor

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Hal

lway

Bed

. Roo

m D

oor

Hal

lway

Bed

room

Doo

r har

dwar

e

Hal

lway

Bat

hroo

m D

oor

Hal

lway

Bat

hroo

m D

oor h

ardw

are

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

eM

aste

r Bed

room

Doo

rM

aste

r Bed

room

Har

dwar

e

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

rL.

Rm

Clo

set H

ardw

are

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE 5/9/2012 WORK COMPLETED TO DATE 6/13/2012 WORK COMPLETED TO DATE

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE 5/16/2012 WORK COMPLETED TO DATE 6/20/2012 WORK COMPLETED TO DATE

WORK COMPLETED TO DATE 2/1/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE 5/23/2012 WORK COMPLETED TO DATE 6/27/2012 WORK COMPLETED TO DATE WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 7/6/2012 WORK COMPLETED TO DATE

WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 328.2012 WORK COMPLETED TO DATE 5/2/2012 WORK COMPLETED TO DATE 6/6/2012 WORK COMPLETED TO DATE 7/11/2012 WORK COMPLETED TO DATE WORK COMPLETED TO DATE 2/22/2012

17

2

13

N/A

15

5

16

8

N/A

9

11

27 Unit

N/A

N/A

FLOOR18

24 Unit

14

28 Unit

3

10

12

7

25 Unit

N/A N/A N/A

RUN DATE : 2/8/2012

26 Unit

6

4

N/A

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

2 3 14 3 4 3 15 15

2 3 14 3 4 3 15 15

20

20

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

e

Mai

n&Lo

ckou

t Ent

ry D

oor

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Hal

lway

Bed

. Roo

m d

oor

Hal

lway

Bed

. Roo

m d

oor h

ardw

are

Hal

lway

Bat

hroo

m d

oor

Hal

lway

Bat

h. R

oom

doo

r har

dwar

e

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

e

Entry

Doo

r

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Hal

lway

Bed

. Roo

m d

oor

Hal

lway

Bed

. Roo

m d

oor h

ardw

are

Hal

lway

Bat

hroo

m d

oor

Hal

lway

Bat

h. R

oom

doo

r har

dwar

e

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Com

mun

icat

ing

Doo

r

Com

mun

icat

ing

Doo

r har

dwar

e

L.O

. Bat

hroo

m S

win

g D

oor

L.O

. Bat

hroo

m D

oor h

ardw

are

Lock

out C

lose

t Doo

r

Lock

out C

lose

t Doo

r har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

e

Entry

Doo

r

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

athr

oom

Sw

ing

Doo

r

Lock

out B

ath.

Doo

r har

dwar

e

Lock

out C

lose

t doo

r

Lock

out C

lose

t Doo

r har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain

& Lo

ckou

t Ent

ry D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

ath

Swin

g D

oor

L.O

Bat

h H

ardw

are

L.O

. Clo

set D

oor

E 7/18/2012 WORK COMPLETED TO DATE 8/22/2012

E 7/25/2012 WORK COMPLETEED TO DATE 8/29/2012

E 8/1/2012 E 8/8/2012 E 8/15/2012

N/A

N/A

N/A

N/A

N/A

20 21 Unit 23 Unit22 Unit

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

15 4 15

15 4 15

L.O

. Clo

set H

arew

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

e

Unit

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

Mai

n&Lo

ckou

t Ent

ry D

oor

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Hal

lway

Bed

. Roo

m D

oor

Hal

lway

Bed

room

Doo

r har

dwar

e

Hal

lway

Bat

hroo

m D

oor

Hal

lway

Bat

hroo

m D

oor h

ardw

are

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

eM

aste

r Bed

room

Doo

rM

aste

r Bed

room

Har

dwar

e

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

rL.

Rm

Clo

set H

ardw

are

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE 5/9/2012 WORK COMPLETED TO DATE 6/13/2012 WORK COMPLETED TO DATE

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE 5/16/2012 WORK COMPLETED TO DATE 6/20/2012 WORK COMPLETED TO DATE

WORK COMPLETED TO DATE 2/1/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE 5/23/2012 WORK COMPLETED TO DATE 6/27/2012 WORK COMPLETED TO DATE WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 7/6/2012 WORK COMPLETED TO DATE

WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 328.2012 WORK COMPLETED TO DATE 5/2/2012 WORK COMPLETED TO DATE 6/6/2012 WORK COMPLETED TO DATE 7/11/2012 WORK COMPLETED TO DATE WORK COMPLETED TO DATE 2/22/2012

RUN DATE : 2/8/2012

26 Unit

6

4

N/A

25 Unit

N/A N/A N/A

24 Unit

14

28 Unit

3

10

12

7

8

N/A

9

11

27 Unit

N/A

N/A

FLOOR18

17

2

13

N/A

15

5

16

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

3 4 15 4 5 4 16 2 16 2

3 4 15 4 5 4 16 2 16 2

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

e

Mai

n&Lo

ckou

t Ent

ry D

oor

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Hal

lway

Bed

. Roo

m d

oor

Hal

lway

Bed

. Roo

m d

oor h

ardw

are

Hal

lway

Bat

hroo

m d

oor

Hal

lway

Bat

h. R

oom

doo

r har

dwar

e

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

e

Entry

Doo

r

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Hal

lway

Bed

. Roo

m d

oor

Hal

lway

Bed

. Roo

m d

oor h

ardw

are

Hal

lway

Bat

hroo

m d

oor

Hal

lway

Bat

h. R

oom

doo

r har

dwar

e

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Com

mun

icat

ing

Doo

r

Com

mun

icat

ing

Doo

r har

dwar

e

L.O

. Bat

hroo

m S

win

g D

oor

L.O

. Bat

hroo

m D

oor h

ardw

are

Lock

out C

lose

t Doo

r

Lock

out C

lose

t Doo

r har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

e

Entry

Doo

r

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

athr

oom

Sw

ing

Doo

r

Lock

out B

ath.

Doo

r har

dwar

e

Lock

out C

lose

t doo

r

Lock

out C

lose

t Doo

r har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain

& Lo

ckou

t Ent

ry D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

ath

Swin

g D

oor

L.O

Bat

h H

ardw

are

L.O

. Clo

set D

oor

E 7/18/2012 WORK COMPLETED TO DATE 8/22/2012

E 7/25/2012 WORK COMPLETEED TO DATE 8/29/2012

E 8/1/2012 9/5/2012- In the process of clearing out the diplomat E 8/8/2012 WORK COMPLETED TO DATE 9/12/2012 E 8/15/2012

20 21 Unit 23 Unit22 Unit

N/A

N/A

N/A

N/A

N/A

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

16 5 16

16 5 16

L.O

. Clo

set H

arew

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

e

Unit

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants Hardware

Mai

n&Lo

ckou

t Ent

ry D

oor

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Hal

lway

Bed

. Roo

m D

oor

Hal

lway

Bed

room

Doo

r har

dwar

e

Hal

lway

Bat

hroo

m D

oor

Hal

lway

Bat

hroo

m D

oor h

ardw

are

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

eM

aste

r Bed

room

Doo

rM

aste

r Bed

room

Har

dwar

e

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain&

Lock

out E

ntry

Doo

r

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

rL.

Rm

Clo

set H

ardw

are

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eEn

try D

oor

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

e

Mai

n&Lo

ckou

t Ent

ry D

oor

Entry

doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

door

s

Com

m. d

oor h

ardw

are

Lock

out B

ath

swin

g do

or

L.O

. Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set h

ardw

are

Hal

lway

Bed

. Roo

m d

oor

Hal

lway

Bed

. Roo

m d

oor h

ardw

are

Hal

lway

Bat

hroo

m d

oor

Hal

lway

Bat

h. R

oom

doo

r har

dwar

e

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

e

Entry

Doo

r

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Hal

lway

Bed

. Roo

m d

oor

Hal

lway

Bed

. Roo

m d

oor h

ardw

are

Hal

lway

Bat

hroo

m d

oor

Hal

lway

Bat

h. R

oom

doo

r har

dwar

e

Hal

lway

Clo

set D

oor

Hal

lway

Clo

set D

oor h

ardw

are

Com

mun

icat

ing

Doo

r

Com

mun

icat

ing

Doo

r har

dwar

e

L.O

. Bat

hroo

m S

win

g

L.O

. Bat

hroo

m D

oor h

ardw

are

Lock

out C

lose

t Doo

r

Lock

out C

lose

t Doo

r har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

e

Entry

Doo

r

Entry

Doo

r har

dwar

e

Livi

ng R

m C

lose

t doo

r

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

athr

oom

Sw

ing

Doo

r

Lock

out B

ath.

Doo

r har

dwar

e

Lock

out C

lose

t doo

r

Lock

out C

lose

t Doo

r har

dwar

e

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

eM

ain

& Lo

ckou

t Ent

ry

Entry

Doo

r har

dwar

e

PLEASEANT HARDWARE PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/27/12 All master bedroom swing doors are being re-worked to accommodate new doors.AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE 5/9/2012 WORK COMPLETED TO DATE 6/13/2012 WORK COMPLETED TO DATE 7/18/2012 WORK COMPLETED TO DATE 8/22/2012 WORK COMPLETED TO DATE 9/26/2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/11/2012WORK COMPLETED TO DATE 5/16/2012 WORK COMPLETED TO DATE 6/20/2012

WORK COMPLETED TO DATE 7/25/2012WORK COMPLETEED TO DATE 8/29/2012

WORK COMPLETED TO DATE 2/1/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/20/2012WORK COMPLETED TO DATE 5/23/2012 WORK COMPLETED TO DATE 6/27/2012

WORK COMPLETED TO DATE 8/1/20129/5/2012- In the process of clearing out the diplomat

WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 7/6/2012 WORK COMPLETED TO DATE 8/8/2012 WORK COMPLETED TO DATE 9/12/2012

WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 328.2012 WORK COMPLETED TO DATE 5/2/2012WORK COMPLETED TO DATE 6/6/2012

WORK COMPLETED TO DATE 7/11/2012WORK COMPLETED TO DATE 8/15/2012 WORK COMPLETED TO DATE 9/19/2012

WORK COMPLETED TO DATE 2/22/2012

17

N/A2

13

N/A

15

5

16

N/A

8

N/A

9

11

27 Unit

N/A

N/A

N/A

FLOOR18

N/A

N/A

24 Unit

14

28 Unit

3

10

12

7

21 Unit 23 Unit22 Unit 25 Unit

N/A N/A N/A

RUN DATE : 2/8/2012

26 Unit

6

4

N/A

JobD

river

EXHIBIT A

Confid

entia

l

Pleasants HardwareLi

ving

Rm

Clo

set d

oor

L. R

m C

lose

t Har

dwar

e

Com

mun

icat

ing

Doo

rs

Com

m. D

oor H

ardw

are

Lock

out B

ath

Swin

g D

oor

L.O

Bat

h H

ardw

are

L.O

. Clo

set D

oor

L.O

. Clo

set H

arew

are

Bath

room

Poc

ket d

oor

Pock

et d

oor h

ardw

are

Mas

ter B

ath

Swin

g D

oor

M.B

. Sw

ing

Dr.

Har

dwar

e

Mas

ter B

edro

om D

oor

Mas

ter B

edro

om H

ardw

are

M.B

ed C

lose

t Doo

rs

M. B

ed C

lose

t Har

dwar

e

20 Unit

JobD

river

EXHIBIT A

Confid

entia

l

POMPEI TILE PROGRESS CHART

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

POMPEI TILE PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12AREAS AVAILABLE FOR YOU TO WORK

* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES

3

15

14

13

8

12

FLOOR18

17

N/A

N/A

N/A

2

11

10

9

RUN DATE : 5/16/2019

26 Unit 24 Unit28 Unit 27 Unit 20 Unit 21 Unit 23 Unit22 Unit 25 Unit

16

7

6

5

4

JobD

river

EXHIBIT A

Confid

entia

l

POMPEI TILE PROGRESS CHART

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

POMPEI TILE PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12AREAS AVAILABLE FOR YOU TO WORK

* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES

16

7

6

5

4

5/16/2019

26 Unit 24 Unit28 Unit 27 Unit 20 Unit 21 Unit 23 Unit22 Unit 25 Unit

10

9

3

15

14

RUN DATE :

13

8

12

FLOOR18

17

N/A

N/A

N/A

2

11

JobD

river

EXHIBIT A

Confid

entia

l

POMPEI TILE PROGRESS CHART

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

HAL

L BA

TH S

HO

WER

HAL

L BA

TH F

LOO

R

HAL

L BA

TH B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

POMPEI TILE PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED TO DATE 1/10/2012 MASTER BATHROOM IN UNITS 1124 AND 1224 ARE BEING REWORKED. UNIT 1023 BATHROOM BEING REWORKED.AREAS AVAILABLE FOR YOU TO WORK 14TH FLOOR NOT READY FOR TILE INSTALLATION. MUDDING CEILINGS AND WALLS.

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATESWORK COMPLETED TO DATE 2/3/2012

25 Unit

16

7

RUN DATE : 5/16/2019

26 Unit

9

3

6

5

21 Unit

N/A

N/A

20 Unit 23 Unit22 Unit

2

11

10

FLOOR18

17

N/A

N/AN/A

12

N/A

N/A

24 Unit28 Unit 27 Unit

14

N/A

15

N/A

13

8

4

JobD

river

EXHIBIT A

Confid

entia

l

POMPEI TILE PROGRESS CHART

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

POMPEI TILE PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12AREAS AVAILABLE FOR YOU TO WORK

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATESWORK COMPLETED TO DATE 2/3/2012

24 Unit28 Unit 27 Unit

14

N/A

15

N/A

N/A

13

8

4

FLOOR18

17

N/A

N/AN/A

12

21 Unit

N/A

N/A

20 Unit 23 Unit22 Unit

2

11

10

25 Unit

16

7

RUN DATE : 5/16/2019

26 Unit

9

3

6

5

JobD

river

EXHIBIT A

Confid

entia

l

POMPEI TILE PROGRESS CHART

14

15

13

8

17

N/A

N/AN/A

12

N/A

N/A

11

10

FLOOR18

16

7

9

6

5

JobD

river

EXHIBIT A

Confid

entia

l

POMPEI TILE PROGRESS CHART

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

HAL

L BA

TH S

HO

WER

HAL

L BA

TH F

LOO

R

HAL

L BA

TH B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

POMPEI TILE PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED TO DATE 1/10/2012 Tile required at door jams that are installed in all units in bathrooms from the 3rd through the 8th floorsAREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 3/9/2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/16/2012WORK COMPLETED TO DATE 2/3/2012

24 Unit28 Unit 27 Unit

N/A

N/A

4

N/A

21 Unit 20 Unit 23 Unit22 Unit

2

25 Unit

RUN DATE : 5/16/2019

26 Unit

3

5

JobD

river

EXHIBIT A

Confid

entia

l

POMPEI TILE PROGRESS CHART

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

HAL

L BA

TH S

HO

WER

HAL

L BA

TH F

LOO

R

HAL

L BA

TH B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

POMPEI TILE PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED TO DATE 1/10/2012 Tile required at door jams that are installed in all units in bathrooms from the 3rd through the 8th floorsAREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 3/9/2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/16/2012WORK COMPLETED TO DATE 2/3/2012

24 Unit28 Unit 27 Unit

14

N/A

15

N/A

13

8

4

17

N/A

N/AN/A

12

N/A

N/A

21 Unit

N/A

20 Unit 23 Unit22 Unit

2

11

10

FLOOR18

25 Unit

16

7

RUN DATE : 5/16/2019

26 Unit

9

3

6

5

JobD

river

EXHIBIT A

Confid

entia

l

POMPEI TILE PROGRESS CHART

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

HAL

L BA

TH S

HO

WER

HAL

L BA

TH F

LOO

R

HAL

L BA

TH B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

POMPEI TILE PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED TO DATE 1/10/2012 Tile required at door jams that are installed in all units in bathrooms from the 3rd through the 8th floorsAREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 3/9/2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/16/2012WORK COMPLETED TO DATE 2/3/2012

25 Unit

16

7

RUN DATE : 5/16/2019

26 Unit

9

3

6

5

21 Unit

N/A

20 Unit 23 Unit22 Unit

2

11

10

FLOOR18

17

N/A

N/AN/A

12

N/A

N/A

24 Unit28 Unit 27 Unit

14

N/A

15

N/A

13

8

4

JobD

river

EXHIBIT A

Confid

entia

l

POMPEI TILE PROGRESS CHART

2 2 2 2 2 2 2 2

2 2 2 2 2 2 2 2

2 2

2 2

2

2

2 2 2

2 2 2

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

HAL

L BA

TH S

HO

WER

HAL

L BA

TH F

LOO

R

HAL

L BA

TH B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

POMPEI TILE PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED TO DATE 1/10/2012 Tile required at door jams that are installed in all units in bathrooms from the 3rd through the 8th floorsAREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 3/9/2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/16/2012WORK COMPLETED TO DATE 2/3/2012 WORK COMPLETED TO DATE 3/23/2012

24 Unit28 Unit 27 Unit

14

N/A

15

N/A

13

8

4

17

N/A

N/AN/A

12

N/A

N/A

21 Unit

N/A

20 Unit 23 Unit22 Unit

2

11

10

FLOOR18

25 Unit

16

7

RUN DATE : 5/16/2019

26 Unit

9

3

6

5

JobD

river

EXHIBIT A

Confid

entia

l

POMPEI TILE PROGRESS CHART

2

2

3 3

3 3

2

2

2 3

2 3

2

2

3 3 3

3 3 3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

HAL

L BA

TH S

HO

WER

HAL

L BA

TH F

LOO

R

HAL

L BA

TH B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

ELEV

ATO

R C

OR

RID

OR

POMPEI TILE PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED TO DATE 1/10/2012 Tile required at door jams that are installed in all units in bathrooms from the 3rd through the 8th floorsAREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 3/9/2012 WORK COMPLETED TO DATE 3-30-2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/16/2012WORK COMPLETED TO DATE 2/3/2012 WORK COMPLETED TO DATE 3/23/2012

24 Unit28 Unit 27 Unit

14

15

N/A

13

8

4

21 Unit

FLOOR18

17

N/A

N/AN/A

12

N/A

N/A

5

16

N/A

20 Unit 23 Unit22 Unit

2

11

10

N/A

25 Unit

7

RUN DATE : 5/16/2019

26 Unit

9

3

6 JobD

river

EXHIBIT A

Confid

entia

l

POMPEI TILE PROGRESS CHART

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

2 3

2 3

2 2 4

2 2 4

3 2

3 2

3 2 4

3 2 4

3 2 2

3 2 2

4 4 4

4 4 4

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

HAL

L BA

TH S

HO

WER

HAL

L BA

TH F

LOO

R

HAL

L BA

TH B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

ELEV

ATO

R C

OR

RID

OR

POMPEI TILE PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED TO DATE 1/10/2012 Tile required at door jams that are installed in all units in bathrooms from the 3rd through the 9th floorsAREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 3/9/2012 WORK COMPLETED TO DATE 3/30/2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/16/2012 WORK COMPLETED TO DATE 4/6/2012WORK COMPLETED TO DATE 2/3/2012 WORK COMPLETED TO DATE 3/23/2012

24 Unit28 Unit 27 Unit

14

15

N/A

13

8

4

21 Unit

FLOOR18

17

N/A

N/AN/A

12

N/A

N/A

5

16

N/A

20 Unit 23 Unit22 Unit

2

11

10

N/A

25 Unit

7

RUN DATE : 5/16/2019

26 Unit

9

3

6 JobD

river

EXHIBIT A

Confid

entia

l

POMPEI TILE PROGRESS CHART

3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3

3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3

3 4

3 4

3 3 5

3 3 5

4 3

4 3

4 2 3 2

4 2 3 2

4 3 3

4 3 3

5 5 5

5 5 5

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

HAL

L BA

TH S

HO

WER

HAL

L BA

TH F

LOO

R

HAL

L BA

TH B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

ELEV

ATO

R C

OR

RID

OR

POMPEI TILE PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED TO DATE 1/10/2012 Tile required at door jams that are installed in all units in bathrooms from the 3rd through the 9th floorsAREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 3/9/2012 WORK COMPLETED TO DATE 3/30/2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/16/2012 WORK COMPLETED TO DATE 4/6/2012WORK COMPLETED TO DATE 2/3/2012 WORK COMPLETED TO DATE 3/23/2012 WORK COMPLETED TO DATE 4/13/2012

24 Unit28 Unit 27 Unit

14

15

N/A

13

8

4

21 Unit

FLOOR18

17

N/A

N/AN/A

12

N/A

N/A

5

16

N/A

20 Unit 23 Unit22 Unit

2

11

10

N/A

25 Unit

7

RUN DATE : 5/16/2019

26 Unit

9

3

6 JobD

river

EXHIBIT A

Confid

entia

l

POMPEI TILE PROGRESS CHART

4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4

4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4

4 5

4 5

4 4

4 4

5 4

5 4

5 3 4 3

5 3 4 3

5 4 4

5 4 4

6 6 6

6 6 6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

HAL

L BA

TH S

HO

WER

HAL

L BA

TH F

LOO

R

HAL

L BA

TH B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

HAL

L BA

TH S

HO

WER

HAL

L BA

TH F

LOO

R

HAL

L BA

TH B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

HAL

L BA

TH S

HO

WER

HAL

L BA

TH F

LOO

R

HAL

L BA

TH B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

POMPEI TILE PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED TO DATE 1/10/2012 Tile required at door jams that are installed in all units in bathrooms from the 3rd through the 9th floorsAREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 3/9/2012 WORK COMPLETED TO DATE 3/30/2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/16/2012 WORK COMPLETED TO DATE 4/6/2012WORK COMPLETED TO DATE 2/3/2012 WORK COMPLETED TO DATE 3/23/2012 WORK COMPLETED TO DATE 4/13/2012

N/A

N/A N/A

24 Unit28 Unit 27 Unit 25 Unit

14

15

N/A

13

8

4

7

21 Unit

FLOOR18

17

N/A

N/AN/A

12

N/A

N/A

5

16

N/A

23 Unit22 Unit

2

11

10

N/A

RUN DATE : 5/16/2019

26 Unit

9

3

6 JobD

river

EXHIBIT A

Confid

entia

l

POMPEI TILE PROGRESS CHART

2

2

2

2

4 4 2

4 4 2

2

2

6 2

6 2

2

2

2

2

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

ELEV

ATO

R C

OR

RID

OR

20 Unit

JobD

river

EXHIBIT A

Confid

entia

l

POMPEI TILE PROGRESS CHART

2 2 2 2 2 2 3

2 2 2 2 2 2 3

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 3

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 3

5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 3

5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 3

5 6 3

5 6 3

5 5 7 3

5 5 7 3

6 5 3

6 5 3

6 4 5 4

6 4 5 4

6 5 5

6 5 5

7 7 7

7 7 7

3

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

HAL

L BA

TH S

HO

WER

HAL

L BA

TH F

LOO

R

HAL

L BA

TH B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

HAL

L BA

TH S

HO

WER

HAL

L BA

TH F

LOO

R

HAL

L BA

TH B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

HAL

L BA

TH S

HO

WER

HAL

L BA

TH F

LOO

R

HAL

L BA

TH B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

ELEV

ATO

R C

OR

RID

OR

POMPEI TILE PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED TO DATE 1/10/2012 WORK COMPLETED TO DATE 3/30/2012AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 3/9/2012 WORK COMPLETED TO DATE 4/6/2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/16/2012 WORK COMPLETED TO DATE 4/13/2012WORK COMPLETED TO DATE 2/3/2012 WORK COMPLETED TO DATE 3/23/2012 WORK COMPLETED TO DATE 4/27/2012

N/A

N/A N/A

24 Unit28 Unit 27 Unit 25 Unit

14

15

N/A

13

8

4

7

21 Unit

FLOOR18

17

N/A

N/AN/A

12

N/A

N/A

5

16

N/A

20 Unit 23 Unit22 Unit

2

11

10

N/A

RUN DATE : 5/16/2019

26 Unit

9

3

6 JobD

river

EXHIBIT A

Confid

entia

l

POMPEI TILE PROGRESS CHART

2 5

2 5

2 2 4 2 4 4 3 3 4 4 4 4 3 3 4 4 4 4 5

2 2 4 2 4 4 3 3 4 4 4 4 3 3 4 4 4 4 5

3 3 7 7 7 7 7 7 2 2 7 7 7 7 7 7 2 2 7 7 7 7 7 7 3 3 7 7 7 7 7 7 3 3 7 7 7 2 2 2 5

3 3 7 7 7 7 7 7 2 2 7 7 7 7 7 7 2 2 7 7 7 7 7 7 3 3 7 7 7 7 7 7 3 3 7 7 7 2 2 2 5

8

8

7 9

7 9

7

7

7 6

7 6

7 3

7 3

9 9 8

9 9 8

3

3

5

5

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

HAL

L BA

TH S

HO

WER

HAL

L BA

TH F

LOO

R

HAL

L BA

TH B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

HAL

L BA

TH S

HO

WER

HAL

L BA

TH F

LOO

R

HAL

L BA

TH B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

HAL

L BA

TH S

HO

WER

HAL

L BA

TH F

LOO

R

HAL

L BA

TH B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

ELEV

ATO

R C

OR

RID

OR

POMPEI TILE PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED TO DATE 1/10/2012 WORK COMPLETED TO DATE 3/30/2012 WORK COMPLETED TO DATE 5/4/2012AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 3/9/2012 WORK COMPLETED TO DATE 4/6/2012 POMPEI WAS ON FIRST FLOOR ALL WEEK

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/16/2012 WORK COMPLETED TO DATE 4/13/2012WORK COMPLETED TO DATE 2/3/2012 WORK COMPLETED TO DATE 3/23/2012 WORK COMPLETED TO DATE 4/27/2012

RUN DATE : 5/16/2019

26 Unit

9

3

6

5

N/A

20 Unit 23 Unit22 Unit

2

11

10

N/A

21 Unit

FLOOR18

17

N/AN/A

12

N/A

N/A

16

14

15

N/A

13

8

4

7

N/A N/A

24 Unit28 Unit 27 Unit 25 Unit

N/A

N/AJobD

river

EXHIBIT A

Confid

entia

l

POMPEI TILE PROGRESS CHART

7

7

4 4 6 6 3 6 5 5 6 6 6 6 6 6 6 6 7

4 4 6 6 3 6 5 5 6 6 6 6 6 6 6 6 7

9 9 9 9 9 9

9 9 9 9 9 9

10

10

9 11

9 11

9

9

9 8

9 8

9 5

9 5

7

7

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

HAL

L BA

TH S

HO

WER

HAL

L BA

TH F

LOO

R

HAL

L BA

TH B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

HAL

L BA

TH S

HO

WER

HAL

L BA

TH F

LOO

R

HAL

L BA

TH B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

HAL

L BA

TH S

HO

WER

HAL

L BA

TH F

LOO

R

HAL

L BA

TH B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

ELEV

ATO

R C

OR

RID

OR

POMPEI TILE PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED TO DATE 1/10/2012 WORK COMPLETED TO DATE 3/30/2012 WORK COMPLETED TO DATE 5/4/2012AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 3/9/2012 WORK COMPLETED TO DATE 4/6/2012 POMPEI WAS ON FIRST FLOOR ALL WEEK 5/11/2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/16/2012 WORK COMPLETED TO DATE 4/13/2012 POMPEI WAS ON FIRST FLOOR ALL WEEK 5/18/2012 Completed elevator 1 and 2 tileWORK COMPLETED TO DATE 2/3/2012 WORK COMPLETED TO DATE 3/23/2012 WORK COMPLETED TO DATE 4/27/2012 WORK COMPLETED TO DATE 5/25/2012

24 Unit28 Unit 27 Unit 25 Unit

N/A

N/A

N/A

13

8

4

7

N/A N/A

FLOOR18

17

N/AN/A

12

N/A

N/A

16

14

15

N/A

20 Unit 23 Unit22 Unit

2

11

10

N/A

21 Unit

RUN DATE : 5/16/2019

26 Unit

9

3

6

5 JobD

river

EXHIBIT A

Confid

entia

l

POMPEI TILE PROGRESS CHART

3 3 2 2 2 2 2 9

3 3 2 2 2 2 2 9

8 8 5 8 9

8 8 5 8 9

11 11 3 11 11 11 11 2

11 11 3 11 11 11 11 2

11

11

11 13

11 13

11

11

9

9

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

HAL

L BA

TH S

HO

WER

HAL

L BA

TH F

LOO

R

HAL

L BA

TH B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

HAL

L BA

TH S

HO

WER

HAL

L BA

TH F

LOO

R

HAL

L BA

TH B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

HAL

L BA

TH S

HO

WER

HAL

L BA

TH F

LOO

R

HAL

L BA

TH B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

ELEV

ATO

R C

OR

RID

OR

POMPEI TILE PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED TO DATE 1/10/2012 WORK COMPLETED TO DATE 3/30/2012 WORK COMPLETED TO DATE 5/4/2012 Working on floors with no completion 6/1/2012AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 3/9/2012 WORK COMPLETED TO DATE 4/6/2012 POMPEI WAS ON FIRST FLOOR ALL WEEK 5/11/2012 Working on floors with no completion 6/8/2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/16/2012 WORK COMPLETED TO DATE 4/13/2012 POMPEI WAS ON FIRST FLOOR ALL WEEK 5/18/2012 Completed elevator 1 and 2 tileWORK COMPLETED TO DATE 2/3/2012 WORK COMPLETED TO DATE 3/23/2012 WORK COMPLETED TO DATE 4/27/2012 WORK COMPLETED TO DATE 5/25/2012

24 Unit28 Unit 27 Unit 25 Unit

N/A

N/A

N/A

13

8

4

7

N/A N/A

FLOOR18

17

N/AN/A

12

N/A

N/A

16

14

15

N/A

20 Unit 23 Unit22 Unit

2

11

10

N/A

21 Unit

RUN DATE : 5/16/2019

26 Unit

9

3

6

5 JobD

river

EXHIBIT A

Confid

entia

l

POMPEI TILE PROGRESS CHART

2 5 2 5 2 4 2 2 2 2 2 2 2 10

2 5 2 5 2 4 2 2 2 2 2 2 2 10

10 2 2 10 2 2 7 2 2 2 10 2 2 2 10

10 2 2 10 2 2 7 2 2 2 10 2 2 2 10

5 3

5 3

13

13

13 14

13 14

13

13

10

10

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

HAL

L BA

TH S

HO

WER

HAL

L BA

TH F

LOO

R

HAL

L BA

TH B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

HAL

L BA

TH S

HO

WER

HAL

L BA

TH F

LOO

R

HAL

L BA

TH B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

HAL

L BA

TH S

HO

WER

HAL

L BA

TH F

LOO

R

HAL

L BA

TH B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

ELEV

ATO

R C

OR

RID

OR

POMPEI TILE PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED TO DATE 1/10/2012 WORK COMPLETED TO DATE 3/30/2012 WORK COMPLETED TO DATE 5/4/2012 Working on floors with no completion 6/1/2012 WORK COMPLETED TO DATE 6/22/

AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 3/9/2012 WORK COMPLETED TO DATE 4/6/2012 POMPEI WAS ON FIRST FLOOR ALL WEEK 5/11/2012 Working on floors with no completion 6/8/2012# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/16/2012 WORK COMPLETED TO DATE 4/13/2012 POMPEI WAS ON FIRST FLOOR ALL WEEK 5/18/2012 Completed elevator 1 and 2 tile

WORK COMPLETED TO DATE 2/3/2012 WORK COMPLETED TO DATE 3/23/2012 WORK COMPLETED TO DATE 4/27/2012 WORK COMPLETED TO DATE 5/25/2012 Work Completed To Date 6/14/2012

24 Unit28 Unit 27 Unit 25 Unit

N/A

N/A

N/A

13

8

4

7

N/A N/A

FLOOR18

17

N/AN/A

12

N/A

N/A

16

14

15

N/A

20 Unit 23 Unit22 Unit

2

11

10

N/A

21 Unit

RUN DATE : 5/16/2019

26 Unit

9

3

6

5 JobD

river

EXHIBIT A

Confid

entia

l

POMPEI TILE PROGRESS CHART

4 7 4 3 7 3 3 4 6 4 4 4 4 4 4 4

4 7 4 3 7 3 3 4 6 4 4 4 4 4 4 4

12 4 3 4 12 4 4 9 4 4 4 12 4 4 4

12 4 3 4 12 4 4 9 4 4 4 12 4 4 4

7

7

2 2 2 2 2 2

2 2 2 2 2 2

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

HAL

L BA

TH S

HO

WER

HAL

L BA

TH F

LOO

R

HAL

L BA

TH B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

HAL

L BA

TH S

HO

WER

HAL

L BA

TH F

LOO

R

HAL

L BA

TH B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

HAL

L BA

TH S

HO

WER

HAL

L BA

TH F

LOO

R

HAL

L BA

TH B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

POMPEI TILE PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED TO DATE 1/10/2012 WORK COMPLETED TO DATE 3/30/2012 WORK COMPLETED TO DATE 5/4/2012 Working on floors with no completion 6/1/2AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 3/9/2012 WORK COMPLETED TO DATE 4/6/2012 POMPEI WAS ON FIRST FLOOR ALL WEEK 5/11/2012 Working on floors with no completion 6/8/2

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/16/2012 WORK COMPLETED TO DATE 4/13/2012 POMPEI WAS ON FIRST FLOOR ALL WEEK 5/18/2012 Completed elevator 1 and 2 tileWORK COMPLETED TO DATE 2/3/2012 WORK COMPLETED TO DATE 3/23/2012 WORK COMPLETED TO DATE 4/27/2012 WORK COMPLETED TO DATE 5/25/2012 Work Completed To Date 6/14/2012

RUN DATE : 5/16/2019

26 Unit

9

3

6

5

N/A

23 Unit22 Unit

2

11

10

N/A

21 Unit

FLOOR18

17

N/AN/A

12

N/A

N/A

16

14

15

N/A

13

8

4

7

N/A N/A

24 Unit28 Unit 27 Unit 25 Unit

N/A

N/AJobD

river

EXHIBIT A

Confid

entia

l

POMPEI TILE PROGRESS CHART

12

12

12

12

5

5

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

ELEV

ATO

R C

OR

RID

OR

2012 WORK COMPLETED TO DATE 6/22/

2012 WORK COMPLETED TO DATE 7/2/27/6 Tile was installed on the 2nd floor m

WORK COMPLETED TO DATE 7/13/

20 Unit

JobD

river

EXHIBIT A

Confid

entia

l

POMPEI TILE PROGRESS CHART

5 8 5 4 8 4 4 5 7 5 5 5 5 5 5 5

5 8 5 4 8 4 4 5 7 5 5 5 5 5 5 5

13 5 4 5 13 5 5 10 5 5 5 13 5 5 5

13 5 4 5 13 5 5 10 5 5 5 13 5 5 5

8

8

2 3 3 3

2 3 3 3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

HAL

L BA

TH S

HO

WER

HAL

L BA

TH F

LOO

R

HAL

L BA

TH B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

HAL

L BA

TH S

HO

WER

HAL

L BA

TH F

LOO

R

HAL

L BA

TH B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

HAL

L BA

TH S

HO

WER

HAL

L BA

TH F

LOO

R

HAL

L BA

TH B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

POMPEI TILE PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED TO DATE 1/10/2012 WORK COMPLETED TO DATE 3/30/2012 WORK COMPLETED TO DATE 5/4/2012 Working on floors with no completion 6/1/2012AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 3/9/2012 WORK COMPLETED TO DATE 4/6/2012 POMPEI WAS ON FIRST FLOOR ALL WEEK 5/11/2012 Working on floors with no completion 6/8/2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/16/2012 WORK COMPLETED TO DATE 4/13/2012 POMPEI WAS ON FIRST FLOOR ALL WEEK 5/18/2012 Completed elevator 1 and 2 tileWORK COMPLETED TO DATE 2/3/2012 WORK COMPLETED TO DATE 3/23/2012 WORK COMPLETED TO DATE 4/27/2012 WORK COMPLETED TO DATE 5/25/2012 Work Completed To Date 6/14/2012

RUN DATE : 5/16/2019

26 Unit

9

3

6

5

N/A

23 Unit22 Unit

2

11

10

N/A

21 Unit

FLOOR18

17

N/AN/A

12

N/A

N/A

16

14

15

N/A

13

8

4

7

N/A N/A

24 Unit28 Unit 27 Unit 25 Unit

N/A

N/AJobD

river

EXHIBIT A

Confid

entia

l

POMPEI TILE PROGRESS CHART

13

13

13

13

6

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

ELEV

ATO

R C

OR

RID

OR

2 WORK COMPLETED TO DATE 6/22/

2 WORK COMPLETED TO DATE 7/2/27/6 Tile was installed on the 2nd floor m

WORK COMPLETED TO DATE 7/13/

20 Unit

JobD

river

EXHIBIT A

Confid

entia

l

POMPEI TILE PROGRESS CHART

6 9 6 5 9 5 5 6 8 6 6 6 6 6 6 6

6 9 6 5 9 5 5 6 8 6 6 6 6 6 6 6

14 6 5 6 14 6 6 11 6 6 6 14 6 6 6

14 6 5 6 14 6 6 11 6 6 6 14 6 6 6

9

9

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

HAL

L BA

TH S

HO

WER

HAL

L BA

TH F

LOO

R

HAL

L BA

TH B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

HAL

L BA

TH S

HO

WER

HAL

L BA

TH F

LOO

R

HAL

L BA

TH B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

HAL

L BA

TH S

HO

WER

HAL

L BA

TH F

LOO

R

HAL

L BA

TH B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

POMPEI TILE PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED TO DATE 1/10/2012 WORK COMPLETED TO DATE 3/30/2012 WORK COMPLETED TO DATE 5/4/2012 Working on floors with no completion 6/1/2012AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 3/9/2012 WORK COMPLETED TO DATE 4/6/2012 POMPEI WAS ON FIRST FLOOR ALL WEEK 5/11/2012 Working on floors with no completion 6/8/2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/16/2012 WORK COMPLETED TO DATE 4/13/2012 POMPEI WAS ON FIRST FLOOR ALL WEEK 5/18/2012 Completed elevator 1 and 2 tileWORK COMPLETED TO DATE 2/3/2012 WORK COMPLETED TO DATE 3/23/2012 WORK COMPLETED TO DATE 4/27/2012 WORK COMPLETED TO DATE 5/25/2012 Work Completed To Date 6/14/2012

24 Unit28 Unit 27 Unit 25 Unit

N/A

N/A

N/A

13

8

4

7

N/A N/A

FLOOR18

17

N/AN/A

12

N/A

N/A

16

14

15

N/A

23 Unit22 Unit

2

11

10

N/A

21 Unit

RUN DATE : 5/16/2019

26 Unit

9

3

6

5

JobD

river

EXHIBIT A

Confid

entia

l

POMPEI TILE PROGRESS CHART

14

14

14

14

2 2 2 7

2 2 2 7

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

ELEV

ATO

R C

OR

RID

OR

2 WORK COMPLETED TO DATE 6/22/

2 WORK COMPLETED TO DATE 7/2/27/6 Tile was installed on the 2nd floor m

WORK COMPLETED TO DATE 7/13/

20 Unit

JobD

river

EXHIBIT A

Confid

entia

l

POMPEI TILE PROGRESS CHART

7 10 7 6 10 6 6 7 9 7 7 7 7 7 7 7

7 10 7 6 10 6 6 7 9 7 7 7 7 7 7 7

15 7 6 7 15 7 7 12 7 7 7 15 7 7 7

15 7 6 7 15 7 7 12 7 7 7 15 7 7 7

10

10

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

HAL

L BA

TH S

HO

WER

HAL

L BA

TH F

LOO

R

HAL

L BA

TH B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

HAL

L BA

TH S

HO

WER

HAL

L BA

TH F

LOO

R

HAL

L BA

TH B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

HAL

L BA

TH S

HO

WER

HAL

L BA

TH F

LOO

R

HAL

L BA

TH B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

POMPEI TILE PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED TO DATE 1/10/2012 WORK COMPLETED TO DATE 3/30/2012 WORK COMPLETED TO DATE 5/4/2012 Working on floors with no completion 6/1/2012AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 3/9/2012 WORK COMPLETED TO DATE 4/6/2012 POMPEI WAS ON FIRST FLOOR ALL WEEK 5/11/2012 Working on floors with no completion 6/8/2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/16/2012 WORK COMPLETED TO DATE 4/13/2012 POMPEI WAS ON FIRST FLOOR ALL WEEK 5/18/2012 Completed elevator 1 and 2 tileWORK COMPLETED TO DATE 2/3/2012 WORK COMPLETED TO DATE 3/23/2012 WORK COMPLETED TO DATE 4/27/2012 WORK COMPLETED TO DATE 5/25/2012 Work Completed To Date 6/14/2012

24 Unit28 Unit 27 Unit 25 Unit

N/A

N/A

N/A

13

8

4

7

N/A N/A

FLOOR18

17

N/AN/A

12

N/A

N/A

16

14

15

N/A

23 Unit22 Unit

2

11

10

N/A

21 Unit

RUN DATE : 5/16/2019

26 Unit

9

3

6

5

JobD

river

EXHIBIT A

Confid

entia

l

POMPEI TILE PROGRESS CHART

15

15

15

15

3 3 3 8

3 3 3 8

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

ELEV

ATO

R C

OR

RID

OR

2 WORK COMPLETED TO DATE 6/22/

2 WORK COMPLETED TO DATE 7/2/27/6 Tile was installed on the 2nd floor m

WORK COMPLETED TO DATE 7/13/

20 Unit

JobD

river

EXHIBIT A

Confid

entia

l

POMPEI TILE PROGRESS CHART

9 12 9 8 2 12 8 8 9 11 9 9 9 9 9 9 9

9 12 9 8 2 12 8 8 9 11 9 9 9 9 9 9 9

17 9 8 9 17 9 9 13 9 9 9 17 9 9 9

17 9 8 9 17 9 9 13 9 9 9 17 9 9 9

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

HAL

L BA

TH S

HO

WER

HAL

L BA

TH F

LOO

R

HAL

L BA

TH B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

HAL

L BA

TH S

HO

WER

HAL

L BA

TH F

LOO

R

HAL

L BA

TH B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

HAL

L BA

TH S

HO

WER

HAL

L BA

TH F

LOO

R

HAL

L BA

TH B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

POMPEI TILE PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED TO DATE 1/10/2012 WORK COMPLETED TO DATE 3/30/2012 WORK COMPLETED TO DATE 5/4/2012 Working on floors with no completion 6/1/2AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 3/9/2012 WORK COMPLETED TO DATE 4/6/2012 POMPEI WAS ON FIRST FLOOR ALL WEEK 5/11/2012 Working on floors with no completion 6/8/2

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/16/2012 WORK COMPLETED TO DATE 4/13/2012 POMPEI WAS ON FIRST FLOOR ALL WEEK 5/18/2012 Completed elevator 1 and 2 tileWORK COMPLETED TO DATE 2/3/2012 WORK COMPLETED TO DATE 3/23/2012 WORK COMPLETED TO DATE 4/27/2012 WORK COMPLETED TO DATE 5/25/2012 Work Completed To Date 6/14/2012

24 Unit28 Unit 27 Unit 25 Unit

N/A

N/A

N/A

13

8

4

7

N/A N/A

FLOOR18

17

N/AN/A

12

N/A

N/A

16

14

15

N/A

23 Unit22 Unit

2

11

10

N/A

21 Unit

RUN DATE : 5/16/2019

26 Unit

9

3

6

5

JobD

river

EXHIBIT A

Confid

entia

l

POMPEI TILE PROGRESS CHART

17

17

17

17

5 5 5 10

5 5 5 10

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

ELEV

ATO

R C

OR

RID

OR

2012 WORK COMPLETED TO DATE 6/22/

2012 WORK COMPLETED TO DATE 7/2/27/6 Tile was installed on the 2nd floor m

WORK COMPLETED TO DATE 7/13/

20 Unit

JobD

river

EXHIBIT A

Confid

entia

l

POMPEI TILE PROGRESS CHART

14 11 4 14 10 10 13 11 11 11 11

14 11 4 14 10 10 13 11 11 11 11

10 11 11

10 11 11

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

HAL

L BA

TH S

HO

WER

HAL

L BA

TH F

LOO

R

HAL

L BA

TH B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

HAL

L BA

TH S

HO

WER

HAL

L BA

TH F

LOO

R

HAL

L BA

TH B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

HAL

L BA

TH S

HO

WER

HAL

L BA

TH F

LOO

R

HAL

L BA

TH B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

POMPEI TILE PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED TO DATE 1/10/2012 WORK COMPLETED TO DATE 3/30/2012 WORK COMPLETED TO DATE 5/4/2012 Working on floors with no completion 6/AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 3/9/2012 WORK COMPLETED TO DATE 4/6/2012 POMPEI WAS ON FIRST FLOOR ALL WEEK 5/11/2012 Working on floors with no completion 6/

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/16/2012 WORK COMPLETED TO DATE 4/13/2012 POMPEI WAS ON FIRST FLOOR ALL WEEK 5/18/2012 Completed elevator 1 and 2 tileWORK COMPLETED TO DATE 2/3/2012 WORK COMPLETED TO DATE 3/23/2012 WORK COMPLETED TO DATE 4/27/2012 WORK COMPLETED TO DATE 5/25/2012 Work Completed To Date 6/14/2012

24 Unit28 Unit 27 Unit 25 Unit

N/A

N/A

N/A

13

8

4

7

N/A N/A

FLOOR18

17

N/AN/A

12

N/A

N/A

16

14

15

N/A

23 Unit22 Unit

2

11

10

N/A

21 Unit

RUN DATE : 5/16/2019

26 Unit

9

3

6

5

JobD

river

EXHIBIT A

Confid

entia

l

POMPEI TILE PROGRESS CHART

19

19

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

ELEV

ATO

R C

OR

RID

OR

/1/2012 WORK COMPLETED TO DATE 6/22/

/8/2012 WORK COMPLETED TO DATE 7/2/27/6 Tile was installed on the 2nd floor m

WORK COMPLETED TO DATE 7/13/

20 Unit

JobD

river

EXHIBIT A

Confid

entia

l

POMPEI TILE PROGRESS CHART

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

HAL

L BA

TH S

HO

WER

HAL

L BA

TH F

LOO

R

HAL

L BA

TH B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

HAL

L BA

TH S

HO

WER

HAL

L BA

TH F

LOO

R

HAL

L BA

TH B

ASE

THR

ESH

OLD

S X

6

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

HAL

L BA

TH S

HO

WER

HAL

L BA

TH F

LOO

R

HAL

L BA

TH B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

3

FOYE

R T

ILE

KITC

HEN

TIL

E

LOC

KOU

T BA

TH S

HO

WER

LOC

KOU

T BA

TH F

LOO

R

LOC

KOU

T BA

TH B

ASE

MAS

TER

BAT

H S

HO

WER

MAS

TER

BAT

H F

LOO

R

MAS

TER

BAT

H B

ASE

THR

ESH

OLD

S X

6

ELEV

ATO

R C

OR

RID

OR

POMPEI TILE PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED TO DATE 1/10/2012 WORK COMPLETED TO DATE 3/30/2012 WORK COMPLETED TO DATE 5/4/2012 Working on floors with no completion 6/1/2012 WORK COMPLETED TO DATE 6/22/

AREAS AVAILABLE FOR YOU TO WORK WORK COMPLETED TO DATE 3/9/2012 WORK COMPLETED TO DATE 4/6/2012 POMPEI WAS ON FIRST FLOOR ALL WEEK 5/11/2012 Working on floors with no completion 6/8/2012 WORK COMPLETED TO DATE 7/2/2# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 3/16/2012 WORK COMPLETED TO DATE 4/13/2012 POMPEI WAS ON FIRST FLOOR ALL WEEK 5/18/2012 Completed elevator 1 and 2 tile 7/6 Tile was installed on the 2nd f loor

WORK COMPLETED TO DATE 2/3/2012 WORK COMPLETED TO DATE 3/23/2012 WORK COMPLETED TO DATE 4/27/2012 WORK COMPLETED TO DATE 5/25/2012 Work Completed To Date 6/14/2012 WORK COMPLETED TO DATE 7/13/

WORK COMPLETED TO DATE 7/20/

WORK COMPLETED TO DATE 7/27/2012 WORK COMPLETED TO DATE 8/24/2012 WORK COMPLETED TO DATE 9/21/2012WORK COMPLETED TO DATE 8/3/2012 8/31/2012 No internet access or printer accessWORK COMPLETED TO DATE 8/10/2012 9/7/2012 In the process of clearing out the diplomatWORK COMPLETED TO DATE 8/17/2012 WORK COMPLETED TO DATE 9/14/2012

RUN DATE : 5/16/2019

26 Unit

9

3

6

5

POMPEI

N/A

20 Unit 23 Unit22 Unit

2

11

10

N/A

21 Unit

FLOOR18

17

N/AN/A

12

N/A

N/A

16

14

15

N/A

13

8

4

7

N/A N/A

24 Unit28 Unit 27 Unit 25 Unit

N/A

N/A

JobD

river

EXHIBIT A

Confid

entia

l

PREMIER MILLWORK PROGRESS CHART

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Mas

ter B

ath

Cas

ing

& J

amb

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Mas

ter B

ath

Cas

ing

& J

amb

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Mas

ter B

ath

Cas

ing

& J

amb

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Mas

ter B

ath

Cas

ing

& J

amb

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Mas

ter B

ath

Cas

ing

& J

amb

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Mas

ter B

ath

Cas

ing

& J

amb

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Mas

ter B

ath

Cas

ing

& J

amb

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Mas

ter B

ath

Cas

ing

& J

amb

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Mas

ter B

ath

Cas

ing

& J

amb

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12AREAS AVAILABLE FOR YOU TO WORK

* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES

20 Unit 21 Unit 23 Unit22 Unit 25 Unit

16

7

RUN DATE : 5/16/2019

26 Unit 24 Unit28 Unit 27 Unit

6

5

4

12

FLOOR18

17

N/A

N/A

N/A

2

11

10

9

3

15

14

13

8

JobD

river

EXHIBIT A

Confid

entia

l

PREMIER MILLWORK PROGRESS CHART

Kitch

en

Ca

bin

ets

Co

un

tert

op

fu

rrin

g

Un

de

rca

bin

et lig

ht va

len

ce

Win

do

w V

ale

nce

Do

ub

le V

an

ity

Sin

gle

Va

nity

Lo

cko

ut K

itch

en

Ma

ste

r B

ath

Ca

sin

g &

Ja

mb

Liv

ing

Ro

om

Mir

ror

Kn

ee

wa

ll W

oo

d P

an

els

Kitch

en

Ca

bin

ets

Co

un

tert

op

fu

rrin

g

Un

de

rca

bin

et lig

ht va

len

ce

Win

do

w V

ale

nce

Do

ub

le V

an

ity

Sin

gle

Va

nity

Lo

cko

ut K

itch

en

Ma

ste

r B

ath

Ca

sin

g &

Ja

mb

Liv

ing

Ro

om

Mir

ror

Kn

ee

wa

ll W

oo

d P

an

els

Kitch

en

Ca

bin

ets

Co

un

tert

op

fu

rrin

g

Un

de

rca

bin

et lig

ht va

len

ce

Win

do

w V

ale

nce

Do

ub

le V

an

ity

Sin

gle

Va

nity

Lo

cko

ut K

itch

en

Ma

ste

r B

ath

Ca

sin

g &

Ja

mb

Liv

ing

Ro

om

Mir

ror

Kn

ee

wa

ll W

oo

d P

an

els

Kitch

en

Ca

bin

ets

Co

un

tert

op

fu

rrin

g

Un

de

rca

bin

et lig

ht va

len

ce

Win

do

w V

ale

nce

Do

ub

le V

an

ity

Sin

gle

Va

nity

Lo

cko

ut K

itch

en

Ma

ste

r B

ath

Ca

sin

g &

Ja

mb

Liv

ing

Ro

om

Mir

ror

Kn

ee

wa

ll W

oo

d P

an

els

Kitch

en

Ca

bin

ets

Co

un

tert

op

fu

rrin

g

Un

de

rca

bin

et lig

ht va

len

ce

Win

do

w V

ale

nce

Do

ub

le V

an

ity

Ma

ste

r B

ath

Ca

sin

g &

Ja

mb

Liv

ing

Ro

om

Mir

ror

Kn

ee

wa

ll W

oo

d P

an

els

Kitch

en

Ca

bin

ets

Co

un

tert

op

fu

rrin

g

Un

de

rca

bin

et lig

ht va

len

ce

Win

do

w V

ala

nce

Do

ub

le V

an

ity

Sin

gle

Va

nity

Lo

cko

ut K

itch

en

Ma

ste

r B

ath

Ca

sin

g &

Ja

mb

Liv

ing

Ro

om

Mir

ror

Kn

ee

wa

ll W

oo

d P

an

els

Kitch

en

Ca

bin

ets

Co

un

tert

op

fu

rrin

g

Un

de

rca

bin

et lig

ht va

len

ce

Win

do

w V

ale

nce

Do

ub

le V

an

ity

Ma

ste

r B

ath

Ca

sin

g &

Ja

mb

Liv

ing

Ro

om

Mir

ror

Kn

ee

wa

ll W

oo

d P

an

els

Kitch

en

Ca

bin

ets

Co

un

tert

op

fu

rrin

g

Un

de

rca

bin

et lig

ht va

len

ce

Win

do

w V

ale

nce

Do

ub

le V

an

ity

Ma

ste

r B

ath

Ca

sin

g &

Ja

mb

Liv

ing

Ro

om

Mir

ror

Kn

ee

wa

ll W

oo

d P

an

els

Kitch

en

Ca

bin

ets

Co

un

tert

op

fu

rrin

g

Un

de

rca

bin

et lig

ht va

len

ce

Win

do

w V

ale

nce

Do

ub

le V

an

ity

Sin

gle

Va

nity

Ma

ste

r B

ath

Ca

sin

g &

Ja

mb

Liv

ing

Ro

om

Mir

ror

Kn

ee

wa

ll W

oo

d P

an

els

PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12

AREAS AVAILABLE FOR YOU TO WORK

* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES

7

6

5

4

27 Unit 20 Unit 21 Unit 23 Unit22 Unit 25 Unit

RUN DATE : 1/18/2012

26 Unit 24 Unit28 Unit

N/A

N/A

N/A

2

11

10

9

3

15

14

13

8

12

FLOOR

18

17

16

JobD

river

EXHIBIT A

Confid

entia

l

PREMIER MILLWORK PROGRESS CHART

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Mas

ter B

ath

Cas

ing

& J

amb

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Mas

ter B

ath

Cas

ing

& J

amb

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Mas

ter B

ath

Cas

ing

& J

amb

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Mas

ter B

ath

Cas

ing

& J

amb

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Mas

ter B

ath

Cas

ing

& J

amb

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ance

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Mas

ter B

ath

Cas

ing

& J

amb

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Mas

ter B

ath

Cas

ing

& J

amb

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Mas

ter B

ath

Cas

ing

& J

amb

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Mas

ter B

ath

Cas

ing

& J

amb

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12AREAS AVAILABLE FOR YOU TO WORK

* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATESWORK COMPLETED TO DATE 1/23/2012

FLOOR18

17

N/A

N/A

N/A

2

11

15

14

RUN DATE :

13

8

12

24 Unit28 Unit 27 Unit 20 Unit 21 Unit 23 Unit22 Unit 25 Unit

16

7

6

5

4

1/24/2012

26 Unit

10

9

3

JobD

river

EXHIBIT A

Confid

entia

l

PREMIER MILLWORK PROGRESS CHART

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Mas

ter B

ath

Cas

ing

& J

amb

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Mas

ter B

ath

Cas

ing

& J

amb

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Mas

ter B

ath

Cas

ing

& J

amb

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Mas

ter B

ath

Cas

ing

& J

amb

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Mas

ter B

ath

Cas

ing

& J

amb

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ance

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Mas

ter B

ath

Cas

ing

& J

amb

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Mas

ter B

ath

Cas

ing

& J

amb

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Mas

ter B

ath

Cas

ing

& J

amb

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Mas

ter B

ath

Cas

ing

& J

amb

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12AREAS AVAILABLE FOR YOU TO WORK

* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATESWORK COMPLETED TO DATE 1/23/2012

FLOOR18

17

N/A

N/A

2

11

N/A

N/A N/A

15

14

RUN DATE :

13

8

12

24 Unit28 Unit 27 Unit 20 Unit 21 Unit 23 Unit22 Unit 25 Unit

16

7

6

5

4

1/31/2012

26 Unit

10

9

3

JobD

river

EXHIBIT A

Confid

entia

l

PREMIER MILLWORK PROGRESS CHART

3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3

3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3

3 3 3 3 3

3 3 3 3 3

3

3

3 D/H D/H

3 D/H D/H

3 2 D/H 2 D/H D/H 2 2 D/H 2 D/H 2 2 2

3 2 D/H 2 D/H D/H 2 2 D/H 2 D/H 2 2 2

2 2 2 2 2 2 2 2 2

2 2 2 2 2 2 2 2 2

2 2 2 2 2 2 2

2 2 2 2 2 2 2

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ance

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATESWORK COMPLETED TO DATE 1/23/2012

11

N/A

N/A N/A

15

17

27 Unit

RUN DATE :

28 Unit

N/A

20 Unit 21 Unit 23 Unit22 Unit 25 Unit24 Unit

2/6/2012

26 Unit

10

9

3

14

13

8

12

2

N/A

N/A

N/A

16

7

6

5

4

FLOOR18

JobD

river

EXHIBIT A

Confid

entia

l

PREMIER MILLWORK PROGRESS CHART

5 2 5 5 D/H 5 5 D/H 5 5 D/H D/H 2 5 5 5 D/H D/H 5

5 2 5 5 D/H 5 5 D/H 5 5 D/H D/H 2 5 5 5 D/H D/H 5

D/H D/H D/H

D/H D/H D/H

D/H

D/H

D/H D/H

D/H D/H

4 4 D/H 4 3

4 4 D/H 4 3

4 4 4

4 4 4

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ance

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012WORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012

N/A

N/A

N/A

16

7

6

5

4

FLOOR18

5/16/2019

26 Unit

10

9

3

14

13

8

12

2

27 Unit

RUN DATE :

28 Unit

N/A

20 Unit 21 Unit 23 Unit22 Unit 25 Unit24 Unit

11

N/A

N/A N/A

15

17

JobD

river

EXHIBIT A

Confid

entia

l

PREMIER MILLWORK PROGRESS CHART

PREMIER

2 2 2

2 2 2

D/H D/H

D/H D/H

6 3 D/H 6 D/H 6 D/H D/H D/H D/H 3 6 6 6 2 D/H D/H

6 3 D/H 6 D/H 6 D/H D/H D/H D/H 3 6 6 6 2 D/H D/H

D/H

D/H

D/H D/H

D/H D/H

2

2

2

2

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ance

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED TO DATE 2/6/2012AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED TO DATE 2/13/2012WORK COMPLETED TO DATE 1/23/2012 WORK COMPLETEDTO DATE 2/20/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 2-27-2012

11

N/A

N/A N/A

15

17

27 Unit

RUN DATE :

28 Unit

N/A

20 Unit 21 Unit 23 Unit22 Unit 25 Unit24 Unit

2/27/2012

26 Unit

10

9

3

14

13

8

12

2

N/A

N/A

N/A

16

7

6

5

4

FLOOR18

JobD

river

EXHIBIT A

Confid

entia

l

PREMIER MILLWORK PROGRESS CHART

D/H D/H

D/H D/H

2 3 3 D/H D/H

2 3 3 D/H D/H

2 D/H

2 D/H

7 5 D/H 7 D/H 7 D/H D/H D/H D/H 4 7 7 7 3 2 D/H

7 5 D/H 7 D/H 7 D/H D/H D/H D/H 4 7 7 7 3 2 D/H

2 D/H

2 D/H

2 2 2

2 2 2

D/H D/H

D/H D/H

3

3

3

3

3

3

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ance

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

PREMIER PROGRESS CHART WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 2/27/2012WORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETED TO DATE 3/5/2012AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012WORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012

N/A

N/A

N/A

16

7

6

5

4

FLOOR18

5/16/2019

26 Unit

10

9

3

14

13

8

12

2

27 Unit

RUN DATE :

28 Unit

N/A

20 Unit 21 Unit 23 Unit22 Unit 25 Unit24 Unit

11

N/A N/A

15

17

N/A

JobD

river

EXHIBIT A

Confid

entia

l

PREMIER MILLWORK PROGRESS CHART

3 3 3 3 3 3 3 3 3 3 3 3 3

3 3 3 3 3 3 3 3 3 3 3 3 3

2 2 3 3 D/H 3 2 2 2

2 2 3 3 D/H 3 2 2 2

2 2 5 2

2 2 5 2

4 4 2 2 2 2 2 D/H 2 2

4 4 2 2 2 2 2 D/H 2 2

6 9 5 2

6 9 5 2

2 2 2 2 2 2 2 2 2

2 2 2 2 2 2 2 2 2

4 2 4 2 2 2 2 3

4 2 4 2 2 2 2 3

D/H D/H 3 3

D/H D/H 3 3

3

3

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ance

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETE TO DATE 3/12/2012AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING WORK COMPLETE TO DATE 3/19/2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012WORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012

N/A

N/A

N/A

16

7

6

5

4

FLOOR18

5/16/2019

26 Unit

10

9

3

14

13

8

12

2

27 Unit

RUN DATE :

28 Unit

N/A

20 Unit 21 Unit 23 Unit22 Unit 25 Unit24 Unit

11

N/A N/A

15

17

N/A

JobD

river

EXHIBIT A

Confid

entia

l

PREMIER MILLWORK PROGRESS CHART

D/H D/H

D/H D/H

2 3 3 D/H D/H

2 3 3 D/H D/H

2 D/H

2 D/H

7 5 D/H 7 D/H 7 D/H D/H D/H D/H 4 7 7 7 3 2 D/H

7 5 D/H 7 D/H 7 D/H D/H D/H D/H 4 7 7 7 3 2 D/H

2 D/H

2 D/H

2 2 2

2 2 2

D/H D/H

D/H D/H

3

3

3

3

3

3

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ance

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012WORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012

11

N/A N/A

15

17

N/A

27 Unit

RUN DATE :

28 Unit

N/A

20 Unit 21 Unit 23 Unit22 Unit 25 Unit24 Unit

5/16/2019

26 Unit

10

9

3

14

13

8

12

2

N/A

N/A

N/A

16

7

6

5

4

FLOOR18

JobD

river

EXHIBIT A

Confid

entia

l

PREMIER MILLWORK PROGRESS CHART

2 2 2 2 2 2 2 2 2 2 2 2 2 2

2 2 2 2 2 2 2 2 2 2 2 2 2 2

2 2 2 2 2 2 2 D/H 2 2 2

2 2 2 2 2 2 2 D/H 2 2 2

2 2 4

2 2 4

3 3 D/H 2 2 D/H

3 3 D/H 2 2 D/H

8 6 8 8 D/H 5 8 D/H 4

8 6 8 8 D/H 5 8 D/H 4

D/H D/H

D/H D/H

D/H 3 3

D/H 3 3

D/H D/H 2 2 2

D/H D/H 2 2 2

2 4

2 4

3

3

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ance

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETE TO DATE 3/12/2012AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012WORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012

11

N/A N/A

15

17

N/A

27 Unit

RUN DATE :

28 Unit

N/A

20 Unit 21 Unit 23 Unit22 Unit 25 Unit24 Unit

5/16/2019

26 Unit

10

9

3

14

13

8

12

2

N/A

N/A

N/A

16

7

6

5

4

FLOOR18

JobD

river

EXHIBIT A

Confid

entia

l

PREMIER MILLWORK PROGRESS CHART

3 3 3 3 3 3 3 3 3 3 3 3 3

3 3 3 3 3 3 3 3 3 3 3 3 3

2 2 3 3 D/H 3 2 2 2

2 2 3 3 D/H 3 2 2 2

2 2 5 2

2 2 5 2

4 4 2 2 2 2 2 D/H 2 2

4 4 2 2 2 2 2 D/H 2 2

6 9 5 2

6 9 5 2

2 2 2 2 2 2 2 2 2

2 2 2 2 2 2 2 2 2

4 2 4 2 2 2 2 3

4 2 4 2 2 2 2 3

D/H D/H 3 3

D/H D/H 3 3

3

3

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ance

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETE TO DATE 3/12/2012AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING WORK COMPLETE TO DATE 3/19/2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012WORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012

11

N/A N/A

15

17

N/A

27 Unit

RUN DATE :

28 Unit

N/A

20 Unit 21 Unit 23 Unit22 Unit 25 Unit24 Unit

5/16/2019

26 Unit

10

9

3

14

13

8

12

2

N/A

N/A

N/A

16

7

6

5

4

FLOOR18

JobD

river

EXHIBIT A

Confid

entia

l

PREMIER MILLWORK PROGRESS CHART

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

4 4 4 4 4 4 4 4 4 4 D/H

4 4 4 4 4 4 4 4 4 4 D/H

3 3 4 2 2 D/H 4 3 3 3

3 3 4 2 2 D/H 4 3 3 3

2 2 3 3 6 3

2 2 3 3 6 3

5 D/H 3 D/H D/H

5 D/H 3 D/H D/H

7 10 6

7 10 6

3 3 3 3 3 3 3 3 3

3 3 3 3 3 3 3 3 3

5 5 3 3 3 3 4

5 5 3 3 3 3 4

D/H D/H 4 4

D/H D/H 4 4

4

4

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ance

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETE TO DATE 3/12/2012AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING WORK COMPLETE TO DATE 3/19/2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012 WORK COMPLETE TO DATE 3/26/2012WORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012

N/A

N/A

N/A

16

7

6

5

4

FLOOR18

5/16/2019

26 Unit

10

9

3

14

13

8

12

2

27 Unit

RUN DATE :

28 Unit

N/A

20 Unit 21 Unit 23 Unit22 Unit 25 Unit24 Unit

11

N/A N/A

15

17

N/A

JobD

river

EXHIBIT A

Confid

entia

l

PREMIER MILLWORK PROGRESS CHART

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

3 3 3 3 3 3 3 3 3 3 3 3 3 3 3

3 3 3 3 3 3 3 3 3 3 3 3 3 3 3

D/H 5 5 5 2 2

D/H 5 5 5 2 2

4 4 5 4

4 4 5 4

7

7

2 D/H D/H

2 D/H D/H

2 11 2 7

2 11 2 7

4 4 4 4 4 4 4 4 4

4 4 4 4 4 4 4 4 4

6 4 4

6 4 4

D/H D/H 5 5 2

D/H D/H 5 5 2

5

5

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ance

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETE TO DATE 3/12/2012AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING WORK COMPLETE TO DATE 3/19/2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012 WORK COMPLETE TO DATE 3/26/2012WORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012 WORK COMPLETED TO DATE 4/2/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 2/27/2012

WORK COMPLETED TO DATE 3/5/2012

11

N/A N/A

15

17

N/A

27 Unit

RUN DATE :

28 Unit

N/A

20 Unit 21 Unit 23 Unit22 Unit 25 Unit24 Unit

5/16/2019

26 Unit

10

9

3

14

13

8

12

2

N/A

N/A

N/A

16

7

6

5

4

FLOOR18

JobD

river

EXHIBIT A

Confid

entia

l

PREMIER MILLWORK PROGRESS CHART

3 3 3 3 3 3 3 3 3 3 3 2 3 3 3

3 3 3 3 3 3 3 3 3 3 3 2 3 3 3

4 4 4 4 4 4 4 4 4 4 4 3 4 4 4

4 4 4 4 4 4 4 4 4 4 4 3 4 4 4

D/H 6 6 2 3 3 2 2

D/H 6 6 2 3 3 2 2

5 5 D/H 6 5

5 5 D/H 6 5

2 8

2 8

3 D/H D/H D/H

3 D/H D/H D/H

3 12 3 8

3 12 3 8

5 5 5 5 5 5 5

5 5 5 5 5 5 5

7 5 5

7 5 5

D/H D/H 6 6 3

D/H D/H 6 6 3

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ance

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETE TO DATE 3/12/2012AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING WORK COMPLETE TO DATE 3/19/2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012 WORK COMPLETE TO DATE 3/26/2012WORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012 WORK COMPLETED TO DATE 4/2/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/9/2012

WORK COMPLETED TO DATE 3/5/2012

11

N/A N/A

15

17

N/A

27 Unit

RUN DATE :

28 Unit

N/A

20 Unit 21 Unit 23 Unit22 Unit 25 Unit24 Unit

5/16/2019

26 Unit

10

9

3

14

13

8

12

2

N/A

N/A

N/A

16

7

6

5

4

FLOOR18

JobD

river

EXHIBIT A

Confid

entia

l

PREMIER MILLWORK PROGRESS CHART

4 4 4 4 4 4 4 4 3 4 4

4 4 4 4 4 4 4 4 3 4 4

5 5 5 5 5 5 5 5 4 5 5

5 5 5 5 5 5 5 5 4 5 5

D/H 7 7 3 4 4 3 3

D/H 7 7 3 4 4 3 3

6 6 D/H 7 6

6 6 D/H 7 6

3 9

3 9

4 D/H D/H D/H

4 D/H D/H D/H

4 13 4 9

4 13 4 9

6 6 6 6 6 6 6

6 6 6 6 6 6 6

8 6 6

8 6 6

D/H 7 7 4

D/H 7 7 4

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ance

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETE TO DATE 3/12/2012AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING WORK COMPLETE TO DATE 3/19/2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012 WORK COMPLETE TO DATE 3/26/2012WORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012 WORK COMPLETED TO DATE 4/2/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/9/2012

WORK COMPLETED TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/16/2012

11

N/A N/A

15

17

N/A

N/A

27 Unit

RUN DATE :

28 Unit

N/A

20 Unit 21 Unit 23 Unit22 Unit 25 Unit24 Unit

5/16/2019

26 Unit

10

9

3

14

13

8

12

2

N/A

N/A

N/A

16

7

6

5

4

FLOOR18

JobD

river

EXHIBIT A

Confid

entia

l

PREMIER MILLWORK PROGRESS CHART

5 5 5 5 5 5 5 5 4 5 5

5 5 5 5 5 5 5 5 4 5 5

6 6 6 6 6 6 6 6 5 6 6

6 6 6 6 6 6 6 6 5 6 6

D/H 8 8 3 5 5 4 4

D/H 8 8 3 5 5 4 4

7 7 D/H 8 7

7 7 D/H 8 7

4 9

4 10

5 D/H D/H D/H

5 D/H D/H D/H

5 14 5 10

5 14 5 10

7 7 7 7 7 7 7

7 7 7 7 7 7 7

9 7 7

9 7 7

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ance

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/23/2012AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING WORK COMPLETE TO DATE 3/19/2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012 WORK COMPLETE TO DATE 3/26/2012WORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012 WORK COMPLETED TO DATE 4/2/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/9/2012

WORK COMPLETED TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/16/2012

11

N/A N/A

15

17

N/A

N/A

27 Unit

RUN DATE :

28 Unit

N/A

20 Unit 21 Unit 23 Unit22 Unit 25 Unit24 Unit

5/16/2019

26 Unit

10

9

3

14

13

8

12

2

N/A

N/A

N/A

16

7

6

5

4

FLOOR18

JobD

river

EXHIBIT A

Confid

entia

l

PREMIER MILLWORK PROGRESS CHART

6 6 6 6 6 6 6 6 5 6 6

6 6 6 6 6 6 6 6 5 6 6

7 7 7 7 7 7 7 7 6 7 7

7 7 7 7 7 7 7 7 6 7 7

D/H 9 9 4 6 6 5 5

D/H 9 9 4 6 6 5 5

8 8 D/H 9 8

8 8 D/H 9 8

5 11

5 11

6 D/H D/H D/H

6 D/H D/H D/H

6 15 6 11

6 15 6 11

8 8 8 8

8 8 8 8

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Hal

lway

van

ity

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ance

Dou

ble

Vani

ty

Hal

lway

van

ity

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Hal

lway

van

ity

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/23/2012AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/30/2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012 WORK COMPLETE TO DATE 3/26/2012 CONTINUE WORKING ON THE 1ST FLOOR INSTALLING CABINETS, CEILINGS AND TRIMWORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012 WORK COMPLETED TO DATE 4/2/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/9/2012

WORK COMPLETED TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/16/2012

N/A

N/A

N/A N/A

N/A

N/A

N/A

2

16

7

6

5

4

FLOOR18

11

N/A

10

9

3

14

13

8

12

23 Unit22 Unit 25 Unit24 Unit

5/16/2019

26 Unit

15

17

N/A

N/A

27 Unit

RUN DATE :

28 Unit

N/A

20 Unit 21 Unit

JobD

river

EXHIBIT A

Confid

entia

l

PREMIER MILLWORK PROGRESS CHART

7 7 7 7 7 7 7 7 6 7 7

7 7 7 7 7 7 7 7 6 7 7

8 8 8 8 8 8 8 8 7 8 8

8 8 8 8 8 8 8 8 7 8 8

D/H 10 10 5 7 7 6 6

D/H 10 10 5 7 7 6 6

9 9 D/H 10 9

9 9 D/H 10 9

6 2 2 2 2 2 12 2 2 2 2

6 2 2 2 2 2 12 2 2 2 2

7 D/H D/H D/H

7 D/H D/H D/H

7 D/H 7 12

7 D/H 7 12

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Hal

lway

van

ity

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ance

Dou

ble

Vani

ty

Hal

lway

van

ity

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Hal

lway

van

ity

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/23/2012AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/30/2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012 WORK COMPLETE TO DATE 3/26/2012 CONTINUE WORKING ON THE 1ST FLOOR INSTALLING CABINETS, CEILINGS AND TRIMWORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/9/2012

WORK COMPLETED TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/16/2012

N/A

N/A

N/A N/A

N/A

N/A

N/A

2

16

7

6

5

4

FLOOR18

11

N/A

10

9

3

14

13

8

12

23 Unit22 Unit 25 Unit24 Unit

5/16/2019

26 Unit

15

17

N/A

N/A

27 Unit

RUN DATE :

28 Unit

N/A

20 Unit 21 Unit

JobD

river

EXHIBIT A

Confid

entia

l

PREMIER MILLWORK PROGRESS CHART

8 8 8 8 8 8 8 8 7 8 8

8 8 8 8 8 8 8 8 7 8 8

9 9 9 9 9 9 9 9 8 9 9

9 9 9 9 9 9 9 9 8 9 9

D/H 11 11 6 8 8 7 7

D/H 11 11 6 8 8 7 7

10 10 D/H 11 10

10 10 D/H 11 10

7 3 3 3 3 3 13 3 3 3 3

7 3 3 3 3 3 13 3 3 3 3

D/H D/H D/H

D/H D/H D/H

8 D/H 8 13

8 D/H 8 13

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Hal

lway

van

ity

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ance

Dou

ble

Vani

ty

Hal

lway

van

ity

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Hal

lway

van

ity

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/23/2012AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/30/2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012 WORK COMPLETE TO DATE 3/26/2012 CONTINUE WORKING ON THE 1ST FLOOR INSTALLING CABINETS, CEILINGS AND TRIMWORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012

WORK COMPLETED TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/16/2012

N/A

N/A

N/A N/A

N/A

N/A

N/A

2

16

7

6

5

4

FLOOR18

11

N/A

10

9

3

14

13

8

12

23 Unit22 Unit 25 Unit24 Unit

5/16/2019

26 Unit

15

17

N/A

N/A

27 Unit

RUN DATE :

28 Unit

N/A

20 Unit 21 Unit

JobD

river

EXHIBIT A

Confid

entia

l

PREMIER MILLWORK PROGRESS CHART

2 2 2 2 2

2 2 2 2 2

10 10 10 10 10 10 9 10 9 10 10

10 10 10 10 10 10 9 10 9 10 10

11 11 11 11 11 11 10 11 10 11 11

11 11 11 11 11 11 10 11 10 11 11

D/H 13 13 8 10 10 9 9

D/H 13 13 8 10 10 9 9

12 12 D/H 13 12

12 12 D/H 13 12

9 5 5 5 5 15 5

9 5 5 5 5 15 5

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Hal

lway

van

ity

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ance

Dou

ble

Vani

ty

Hal

lway

van

ity

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Hal

lway

van

ity

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 5/30/2012AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/30/2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012 WORK COMPLETE TO DATE 3/26/2012 CONTINUE WORKING ON THE 1ST FLOOR INSTALLING CABINETS, CEILINGS AND TRIMWORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012

WORK COMPLETED TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012/ Pool Area

15

17

N/A

N/A

27 Unit

RUN DATE :

28 Unit

N/A

20 Unit 21 Unit 23 Unit22 Unit 25 Unit24 Unit

5/16/2019

26 Unit

10

9

3

14

13

8

12

2

16

7

6

5

4

FLOOR18

11

N/A N/A

N/A

N/A N/A

N/A

N/A

N/AJobD

river

EXHIBIT A

Confid

entia

l

PREMIER MILLWORK PROGRESS CHART

3 3 3 3 3 2 2 2 2 2

3 3 3 3 3 2 2 2 2 2

11 11 11 11 11 11 10 11 10 11 11

11 11 11 11 11 11 10 11 10 11 11

12 12 12 12 12 12 11 12 11 12 12

12 12 12 12 12 12 11 12 11 12 12

D/H 14 14 9 11 11 10 10

D/H 14 14 9 11 11 10 10

13 13 2 2 2 D/H 14 2 2 13 2 2

13 13 2 2 2 D/H 14 2 2 13 2 2

10 6 6 6

10 6 6 6

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Hal

lway

van

ity

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ance

Dou

ble

Vani

ty

Hal

lway

van

ity

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Hal

lway

van

ity

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 5/30/2012AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE 6/4/2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012 WORK COMPLETE TO DATE 3/26/2012 CONTINUE WORKING ON THE 1ST FLOOR INSTALLING CABINETS, CEILINGS AND TRIMWORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012

WORK COMPLETED TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012/ Pool Area

N/A

N/A

N/A N/A

N/A

N/A

N/A

2

16

7

6

5

4

FLOOR18

11

N/A

10

9

3

14

13

8

12

23 Unit22 Unit 25 Unit24 Unit

5/16/2019

26 Unit

15

17

N/A

N/A

27 Unit

RUN DATE :

28 Unit

N/A

20 Unit 21 Unit

JobD

river

EXHIBIT A

Confid

entia

l

PREMIER MILLWORK PROGRESS CHART

2 2 2 2 2

2 2 2 2 2

4 4 4 4 4 3 3 3 3 3

4 4 4 4 4 3 3 3 3 3

12 12 12 12 12 12 11 12 11 12 12

12 12 12 12 12 12 11 12 11 12 12

13 13 13 13 13 13 12 13 12 13 13

13 13 13 13 13 13 12 13 12 13 13

D/H 15 15 10 2 2 2 2

D/H 15 15 10 2 2 2 2

D/H D/H D/H D/H 15 D/H 14 D/H

D/H D/H D/H D/H 15 D/H 14 D/H

11 2 D/H 2 7 2

11 2 D/H 2 7 2

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Hal

lway

van

ity

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ance

Dou

ble

Vani

ty

Hal

lway

van

ity

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Hal

lway

van

ity

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 6/1 WORK COMPLETED TO DATE 5/30/2012AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE 6/4/2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012 WORK COMPLETE TO DATE 3/26/2012 CONTINUE WORKING ON THE 1ST FLOOR INSTALLING CABINETS, CEILINGS AND TRIMWORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012

WORK COMPLETED TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012/ Pool Area

N/A

N/A

N/A N/A

N/A

N/A

N/A

2

16

7

6

5

4

FLOOR18

11

N/A

10

9

3

14

13

8

12

23 Unit22 Unit 25 Unit24 Unit

5/16/2019

26 Unit

15

17

N/A

N/A

27 Unit

RUN DATE :

28 Unit

N/A

20 Unit 21 Unit

JobD

river

EXHIBIT A

Confid

entia

l

PREMIER MILLWORK PROGRESS CHART

3 2 3 3 3 3

3 2 3 3 3 3

5 5 5 5 5 4 4 4 4 4

5 5 5 5 5 4 4 4 4 4

13 13 13 13 13 13 12 13 12 13 13

13 13 13 13 13 13 12 13 12 13 13

14 14 14 14 14 13 14 13 D/H

14 14 14 14 14 13 14 13 D/H

2 2 2 2 2 11 2 2 3 3 3 3

2 2 2 2 2 11 2 2 3 3 3 3

2 D/H

2 D/H

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Hal

lway

van

ity

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ance

Dou

ble

Vani

ty

Hal

lway

van

ity

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Hal

lway

van

ity

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 6/11/2012AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/30/2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012 WORK COMPLETE TO DATE 3/26/2012 CONTINUE WORKING ON THE 1ST FLOOR INSTALLING CABINETS, CEILINGS AND TRIMWORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012 WORK COMPLETED TO DATE 5/30/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012 WORK COMPLETED TO DATE 6/4/2012

WORK COMPLETED TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012/ Pool Area WORK COMPLETED TO DATE 6/18/2012

15

17

N/A

N/A

27 Unit

RUN DATE :

28 Unit

N/A

20 Unit 21 Unit 23 Unit22 Unit 25 Unit24 Unit

5/16/2019

26 Unit

10

9

3

14

13

8

12

2

16

7

6

5

4

FLOOR18

11

N/A N/A

N/A

N/A N/A

N/A

N/A

N/AJobD

river

EXHIBIT A

Confid

entia

l

PREMIER MILLWORK PROGRESS CHART

2 2 2 2 2 2 2 2

2 2 2 2 2 2 2 2

4 3 4 4 4 4

4 3 4 4 4 4

6 6 6 6 6 5 5 5 5 5

6 6 6 6 6 5 5 5 5 5

14 14 14 14 14 13 14 13 14 14

14 14 14 14 14 13 14 13 14 14

2 2 15 15 15 15 14

2 2 15 15 15 15 14

2 3 3 3 2 3 3 3 4 4 4 4

2 3 3 3 2 3 3 3 4 4 4 4

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Hal

lway

van

ity

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ance

Dou

ble

Vani

ty

Hal

lway

van

ity

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Hal

lway

van

ity

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 6/11/2012 WORK COMPLETED TO DATE AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012 WORK COMPLETE TO DATE 3/26/2012 CONTINUE WORKING ON THE 1ST FLOOR INSTALLING CABINETS, CEILINGS AND TRIMWORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012 WORK COMPLETED TO DATE 5/30/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012 WORK COMPLETED TO DATE 6/4/2012

WORK COMPLETED TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012/ Pool Area WORK COMPLETED TO DATE 6/18/2012

N/A

N/A

N/A N/A

N/A

N/A

N/A

2

16

7

6

5

4

FLOOR18

11

N/A

10

9

3

14

13

8

12

23 Unit22 Unit 25 Unit24 Unit

5/16/2019

26 Unit

15

17

N/A

N/A

27 Unit

RUN DATE :

28 Unit

N/A

20 Unit 21 Unit

JobD

river

EXHIBIT A

Confid

entia

l

PREMIER MILLWORK PROGRESS CHART

3 3 3 3 3 3 3 3

3 3 3 3 3 3 3 3

5 4 5 5 5 5

5 4 5 5 5 5

7 7 7 7 7 6 6 6 6 6

7 7 7 7 7 6 6 6 6 6

15 15 15 15 15 14 15 14 15 15

15 15 15 15 15 14 15 14 15 15

3 3 2 16 16 2 16 16 15 2 2 2 2 2 2 2

3 3 2 16 16 2 16 16 15 2 2 2 2 2 2 2

2

2

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Hal

lway

van

ity

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ance

Dou

ble

Vani

ty

Hal

lway

van

ity

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Hal

lway

van

ity

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 6/11/2012 WORK COMPLETED TO DATE AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012 WORK COMPLETE TO DATE 3/26/2012 CONTINUE WORKING ON THE 1ST FLOOR INSTALLING CABINETS, CEILINGS AND TRIM WORK COMPLETED TO DATE WORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012 WORK COMPLETED TO DATE 5/30/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012 WORK COMPLETED TO DATE 6/4/2012

WORK COMPLETED TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012/ Pool Area WORK COMPLETED TO DATE 6/18/2012

N/A

N/A

N/A N/A

N/A

N/A

N/A

2

16

7

6

5

4

FLOOR18

11

N/A

10

9

3

14

13

8

12

23 Unit22 Unit 25 Unit24 Unit

5/16/2019

26 Unit

15

17

N/A

N/A

27 Unit

RUN DATE :

28 Unit

7/6 Installing cabinets on the 2nd floor in meeting rooms

20 Unit 21 Unit

JobD

river

EXHIBIT A

Confid

entia

l

PREMIER MILLWORK PROGRESS CHART

5 5 5 5 5 5 5 4

5 5 5 5 5 5 5 4

7 6 7 7 7 6

7 6 7 7 7 6

9 9 9 9 9 8 8 8 8 7

9 9 9 9 9 8 8 8 8 7

D/H 2 2 2 17 D/H 2 2 2 2 D/H 2 2 D/H D/H 2 2 16

D/H 2 2 2 17 D/H 2 2 2 2 D/H 2 2 D/H D/H 2 2 16

D/H D/H

D/H D/H

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Hal

lway

van

ity

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ance

Dou

ble

Vani

ty

Hal

lway

van

ity

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Hal

lway

van

ity

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 6/11/2012 WORK COMPLETED TO DATE AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012 WORK COMPLETE TO DATE 3/26/2012 CONTINUE WORKING ON THE 1ST FLOOR INSTALLING CABINETS, CEILINGS AND TRIM WORK COMPLETED TO DATE WORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012 WORK COMPLETED TO DATE 6/4/2012

WORK COMPLETED TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012/ Pool Area WORK COMPLETED TO DATE 6/18/2012

N/A

N/A

N/A N/A

N/A

N/A

N/A

2

16

7

6

5

4

FLOOR18

11

N/A

10

9

3

14

13

8

12

23 Unit22 Unit 25 Unit24 Unit

5/16/2019

26 Unit

15

17

N/A

N/A

27 Unit

RUN DATE :

28 Unit

7/6 Installing cabinets on the 2nd floor in meeting rooms

20 Unit 21 Unit

JobD

river

EXHIBIT A

Confid

entia

l

PREMIER MILLWORK PROGRESS CHART

6 6 6 6 6 6 6 5

6 6 6 6 6 6 6 5

8 7 8 8 8 7

8 7 8 8 8 7

10 10 10 10 10 D/H D/H 9 D/H

10 10 10 10 10 D/H D/H 9 D/H

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Hal

lway

van

ity

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ance

Dou

ble

Vani

ty

Hal

lway

van

ity

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Hal

lway

van

ity

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 6/11/2012 WORK COMPLETED TO DATE AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012 WORK COMPLETE TO DATE 3/26/2012 CONTINUE WORKING ON THE 1ST FLOOR INSTALLING CABINETS, CEILINGS AND TRIM WORK COMPLETED TO DATE WORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012 WORK COMPLETED TO DATE 6/4/2012 WORK COMPLETED TO DATE

WORK COMPLETED TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012/ Pool Area WORK COMPLETED TO DATE 6/18/2012

N/A

N/A

N/A

N/A N/A

5

4

FLOOR18

11

N/A N/A

5/16/2019

26 Unit

10

9

3

14

13

8

12

2

27 Unit

RUN DATE :

28 Unit

7/6 Installing cabinets on the 2nd floor in meeting rooms

20 Unit 21 Unit 23 Unit22 Unit 25 Unit24 Unit

15

17

N/A

N/A

N/A

16

7

6 JobD

river

EXHIBIT A

Confid

entia

l

PREMIER MILLWORK PROGRESS CHART

6 6 6 6 6 6 6 5

6 6 6 6 6 6 6 5

8 7 8 8 8 7

8 7 8 8 8 7

10 10 10 10 10 D/H D/H 9 D/H

10 10 10 10 10 D/H D/H 9 D/H

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Hal

lway

van

ity

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ance

Dou

ble

Vani

ty

Hal

lway

van

ity

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Hal

lway

van

ity

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 6/11/2012 WORK COMPLETED TO DATE AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012 WORK COMPLETE TO DATE 3/26/2012 CONTINUE WORKING ON THE 1ST FLOOR INSTALLING CABINETS, CEILINGS AND TRIM WORK COMPLETED TO DATE WORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012 WORK COMPLETED TO DATE 6/4/2012 WORK COMPLETED TO DATE

WORK COMPLETED TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012/ Pool Area WORK COMPLETED TO DATE 6/18/2012

N/A

N/A

N/A

N/A N/A

5

4

FLOOR18

11

N/A N/A

5/16/2019

26 Unit

10

9

3

14

13

8

12

2

27 Unit

RUN DATE :

28 Unit

7/6 Installing cabinets on the 2nd floor in meeting rooms

20 Unit 21 Unit 23 Unit22 Unit 25 Unit24 Unit

15

17

N/A

N/A

N/A

16

7

6 JobD

river

EXHIBIT A

Confid

entia

l

PREMIER MILLWORK PROGRESS CHART

7 7 7 7 7 7 7 6

7 7 7 7 7 7 7 6

9 8 9 9 D/H D/H

9 8 9 9 D/H D/H

D/H D/H D/H

D/H D/H D/H

D/H D/H

D/H D/H

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Hal

lway

van

ity

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ance

Dou

ble

Vani

ty

Hal

lway

van

ity

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Hal

lway

van

ity

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 6/11/2012 WORK COMPLETED TO DATE 7/6/2012AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 7/9/2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012 WORK COMPLETE TO DATE 3/26/2012 CONTINUE WORKING ON THE 1ST FLOOR INSTALLING CABINETS, CEILINGS AND TRIM WORK COMPLETED TO DATE 7/16/201WORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012 WORK COMPLETED TO DATE 6/4/2012 WORK COMPLETED TO DATE 7/23/201WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012 WORK COMPLETED TO DATE 6/18/2012 WORK COMPLETED TO DATE 7/30/201

WORK COMPLETED TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012/ Pool Area WORK COMPLETED TO DATE 6/25/2012 WORK COMPLETED TO DATE 8/6/2012

15

17

N/A

N/A

N/A

16

7

6

27 Unit

RUN DATE :

28 Unit

7/6 Installing cabinets on the 2nd floor in meeting rooms

20 Unit 21 Unit 23 Unit22 Unit 25 Unit24 Unit

5/16/2019

26 Unit

10

9

3

14

13

8

12

2

5

4

FLOOR18

11

N/A N/A

N/A

N/A

N/A

N/A N/A

JobD

river

EXHIBIT A

Confid

entia

l

PREMIER MILLWORK PROGRESS CHART

8 8 8 8 D/H D/H D/H D/H

8 8 8 8 D/H D/H D/H D/H

10 D/H D/H D/H D/H 2 D/H

10 D/H D/H D/H D/H 2 D/H

D/H D/H D/H

D/H D/H D/H

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Hal

lway

van

ity

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ance

Dou

ble

Vani

ty

Hal

lway

van

ity

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Hal

lway

van

ity

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 6/11/2012 WORK COMPLETED TO DATE 7/6/2012AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 7/9/2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012 WORK COMPLETE TO DATE 3/26/2012 CONTINUE WORKING ON THE 1ST FLOOR INSTALLING CABINETS, CEILINGS AND TRIM WORK COMPLETED TO DATE 7/16/201WORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012 WORK COMPLETED TO DATE 6/4/2012 WORK COMPLETED TO DATE 7/23/201WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012 WORK COMPLETED TO DATE 6/18/2012 WORK COMPLETED TO DATE 7/30/201

WORK COMPLETED TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012/ Pool Area WORK COMPLETED TO DATE 6/25/2012 WORK COMPLETED TO DATE 8/6/2012

N/A

N/A

N/A

N/A N/A

5

4

FLOOR18

11

N/A N/A

5/16/2019

26 Unit

10

9

3

14

13

8

12

2

27 Unit

RUN DATE :

28 Unit

7/6 Installing cabinets on the 2nd floor in meeting rooms

20 Unit 21 Unit 23 Unit22 Unit 25 Unit24 Unit

15

17

N/A

N/A

N/A

16

7

6 JobD

river

EXHIBIT A

Confid

entia

l

PREMIER MILLWORK PROGRESS CHART

9 D/H 9 9 D/H D/H D/H 2 D/H

9 D/H 9 9 D/H D/H D/H 2 D/H

11 D/H 2 2 D/H 2 2 D/H D/H 3 D/H

11 D/H 2 2 D/H 2 2 D/H D/H 3 D/H

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Hal

lway

van

ity

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ance

Dou

ble

Vani

ty

Hal

lway

van

ity

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Hal

lway

van

ity

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 6/11/2012 WORK COMPLETED TO DATE 7/6/2012AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 7/9/2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012 WORK COMPLETE TO DATE 3/26/2012 CONTINUE WORKING ON THE 1ST FLOOR INSTALLING CABINETS, CEILINGS AND TRIM WORK COMPLETED TO DATE 7/16/201WORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012 WORK COMPLETED TO DATE 6/4/2012 WORK COMPLETED TO DATE 7/23/201WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012 WORK COMPLETED TO DATE 6/18/2012 WORK COMPLETED TO DATE 7/30/201

WORK COMPLETED TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012/ Pool Area WORK COMPLETED TO DATE 6/25/2012 WORK COMPLETED TO DATE 8/6/2012

15

17

N/A

N/A

N/A

16

7

6

27 Unit

RUN DATE :

28 Unit

7/6 Installing cabinets on the 2nd floor in meeting rooms

20 Unit 21 Unit 23 Unit22 Unit 25 Unit24 Unit

5/16/2019

26 Unit

10

9

3

14

13

8

12

2

5

4

FLOOR18

11

N/A N/A

N/A

N/A

N/A

N/A N/A

JobD

river

EXHIBIT A

Confid

entia

l

PREMIER MILLWORK PROGRESS CHART

10 D/H D/H 3

10 D/H D/H 3

D/H 3 3 D/H 3 3 D/H D/H 4 D/H

D/H 3 3 D/H 3 3 D/H D/H 4 D/H

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Hal

lway

van

ity

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ance

Dou

ble

Vani

ty

Hal

lway

van

ity

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Hal

lway

van

ity

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 6/11/2012 WORK COMPLETED TO DATE 7/6/2012AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 7/9/2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012 WORK COMPLETE TO DATE 3/26/2012 CONTINUE WORKING ON THE 1ST FLOOR INSTALLING CABINETS, CEILINGS AND TRIM WORK COMPLETED TO DATE 7/16/201WORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012 WORK COMPLETED TO DATE 6/4/2012 WORK COMPLETED TO DATE 7/23/201WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012 WORK COMPLETED TO DATE 6/18/2012 WORK COMPLETED TO DATE 7/30/201

WORK COMPLETED TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012/ Pool Area WORK COMPLETED TO DATE 6/25/2012 WORK COMPLETED TO DATE 8/6/2012

N/AN/A

15

17

N/A

N/A

N/A

16

7

6

27 Unit

RUN DATE :

28 Unit

7/6 Installing cabinets on the 2nd floor in meeting rooms

20 Unit 21 Unit 23 Unit22 Unit 25 Unit24 Unit

5/16/2019

26 Unit

10

9

3

14

13

8

12

2

5

4

FLOOR18

11

N/A N/A

N/A

N/A

N/A

N/A N/A

JobD

river

EXHIBIT A

Confid

entia

l

PREMIER MILLWORK PROGRESS CHART

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Hal

lway

van

ity

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETE TO DATE 3/12/2012AREAS AVAILABLE FOR YOU TO WORK D/H DOOR OR HARDWARE MISSING WORK COMPLETE TO DATE 3/19/2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012 WORK COMPLETE TO DATE 3/26/2012WORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012 WORK COMPLETED TO DATE 4/2/2012WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/9/2012

WORK COMPLETED TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/16/2012

N/A N/A

5

4

FLOOR18

11

5/16/2019

26 Unit

10

9

3

14

13

8

12

2

27 Unit

RUN DATE :

28 Unit

7/6 Installing c

25 Unit24 Unit

N/AN/A

15

17

N/A

N/A

N/A

16

7

6 JobD

river

EXHIBIT A

Confid

entia

l

PREMIER MILLWORK PROGRESS CHARTC

ount

erto

p fu

rring

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ance

Dou

ble

Vani

ty

Hal

lway

van

ity

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Hal

lway

van

ity

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 6/11/2012 WORK COMPLETED TO DATE 7/6/2012WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 7/9/2012

CONTINUE WORKING ON THE 1ST FLOOR INSTALLING CABINETS, CEILINGS AND TRIM WORK COMPLETED TO DATE 7/16/201WORK COMPLETED TO DATE 5/7/2012 WORK COMPLETED TO DATE 6/4/2012 WORK COMPLETED TO DATE 7/23/201WORK COMPLETED TO DATE 5/14/2012 WORK COMPLETED TO DATE 6/18/2012 WORK COMPLETED TO DATE 7/30/201WORK COMPLETED TO DATE 5/21/2012/ Pool Area WORK COMPLETED TO DATE 6/25/2012 WORK COMPLETED TO DATE 8/6/2012

N/A

N/A

N/A

N/A N/A

abinets on the 2nd floor in meeting rooms

20 Unit 21 Unit 23 Unit22 Unit

JobD

river

EXHIBIT A

Confid

entia

l

PREMIER MILLWORK PROGRESS CHART

PREMIER

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Hal

lway

van

ity

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ance

Dou

ble

Vani

ty

Hal

lway

van

ity

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Hal

lway

van

ity

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

Kitc

hen

Cab

inet

s

Cou

nter

top

furri

ng

Und

erca

bine

t lig

ht v

alen

ce

Win

dow

Val

ence

Dou

ble

Vani

ty

Sing

le V

anity

Lock

out K

itche

n

Livi

ng R

oom

Mirr

or

Knee

wal

l Woo

d Pa

nels

PREMIER PROGRESS CHARTWORK COMPLETE TO DATE 1/13/12 WORK COMPLETED 2/6/2012 WORK COMPLETE TO DATE 3/12/2012 WORK COMPLETED TO DATE 4/23/2012 WORK COMPLETED TO DATE 6/11/2012 WORK COMPLETED TO DATE 7/6/2012AREAS AVAILABLE FOR YOU TO WORK D/ DOOR OR HARDWARE MISSING WORK COMPLETE TO DATE 3/19/2012 WORK COMPLETED TO DATE 4/30/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 7/9/2012

# AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES WORK COMPLETED 2/13/2012 WORK COMPLETE TO DATE 3/26/2012 CONTINUE WORKING ON THE 1ST FLOOR INSTALLING CABINETS CEILINGS AND TRIM WORK COMPLETED TO DATE 7/16/201WORK COMPLETED TO DATE 1/23/2012 WORK COMPLETED 2/20/2012 WORK COMPLETED TO DATE 4/2/2012 WORK COMPLETED TO DATE 5/7/2012 WORK COMPLETED TO DATE 6/4/2012 WORK COMPLETED TO DATE 7/23/201WORK COMPLETE TO DATE 1/30/12 WORK COMPLETED TO DATE 2/27/2012 WORK COMPLETED TO DATE 4/9/2012 WORK COMPLETED TO DATE 5/14/2012 WORK COMPLETED TO DATE 6/18/2012 WORK COMPLETED TO DATE 7/30/201

WORK COMPLETED TO DATE 3/5/2012 WORK COMPLETED TO DATE 4/16/2012 WORK COMPLETED TO DATE 5/21/2012/ Pool Area WORK COMPLETED TO DATE 6/25/2012 WORK COMPLETED TO DATE 8/6/2012WORK COMPLETED TO DATE 8/13/2012 9/3/2012 LABOR DAYWORK COMPLETED TO DATE 8/20/2012 WORK COMPLETED TO DATE 9/10/2012 WORK COMPLETED TO DATE 9/24/2012WORK COMPLETED TO DATE 8/27/2012 WORK COMPLETED TO DATE 9/17/2012

N/AN/A

15

17

N/A

N/A

N/A

16

7

6

27 Unit

RUN DATE :

28 Unit

7/6 Installing cabinets on the 2nd floor in meeting rooms

20 Unit 21 Unit 23 Unit22 Unit 25 Unit24 Unit

5/16/2019

26 Unit

10

9

3

14

13

8

12

2

5

4

FLOOR18

11

N/A N/A

N/A

N/A

N/A

N/A N/A

JobD

river

EXHIBIT A

Confid

entia

l

BAY MECHANICAL PROGRESS CHART

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Lock

out S

ink

Lock

out F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Lock

out S

ink

Lock

out F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Lock

out S

ink

Lock

out F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Lock

out S

ink

Lock

out F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Lock

out S

ink

Lock

out F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

BAY MECHANICAL PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/13/12AREAS AVAILABLE FOR YOU TO WORK

* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES

15

27 Unit

6

5

4

12

16

7

11

10

9

3

2

FLOOR18

17

N/A

N/A

N/A14

13

8

RUN DATE : 5/16/2019

26 Unit 24 Unit28 Unit 20 Unit 21 Unit 23 Unit22 Unit 25 Unit

JobD

river

EXHIBIT A

Confid

entia

l

BAY MECHANICAL PROGRESS CHART

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Lock

out S

ink

Lock

out F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Lock

out S

ink

Lock

out F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Lock

out S

ink

Lock

out F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Lock

out S

ink

Lock

out F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Lock

out S

ink

Lock

out F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

BAY MECHANICAL PROGRESS CHART INCOMPLETE ITEMSWORK COMPLETE TO DATE 1/13/12AREAS AVAILABLE FOR YOU TO WORK

* AREAS OF WORK AVAILABLE FOR MULTIPLE UPDATES

20 Unit 21 Unit 23 Unit22 Unit 25 Unit

16

7

6

5

4

RUN DATE : 5/16/2019

26 Unit 24 Unit28 Unit 27 Unit

N/A

N/A

N/A

2

11

10

9

3

15

14

13

8

12

FLOOR18

17

JobD

river

EXHIBIT A

Confid

entia

l

BAY MECHANICAL PROGRESS CHART

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty F

auce

t

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

Fauc

et

Cau

lkin

g

Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 INCOMPLETE ITEMSAreas Available For You To Work

* Areas if Work Available For Multiple UpdatesWork Completed to Date 1/18/2012

1/13/2012

26 Unit

10

9

3

27 Unit 20 Unit 21 Unit 23 Unit22 Unit 25 Unit

RUN DATE :

13

8

12

24 Unit28 Unit

7

6

5

4

FLOOR18

17

N/A

N/A

N/A

2

11

15

14

16

JobD

river

EXHIBIT A

Confid

entia

l

BAY MECHANICAL PROGRESS CHART

* * * * * * * * * * * * * * *

* * * * * * * * * * * * * * *

* * * * * * * * * * * * * * *

* * * * * * * * * * * * * * *

* * * * * * * * * * * * * * *

* * * * * * * * * * * * * * *

* * * * * * * * * * * * * * *

* * * * * * * * * * * * * * *

* * * * * * * * * * * * * * * * * * * * * * * *

* * * * * * * * * * * * * * * * * * * * * * * *

* * * * * * * * * * * * * * * * * * * * * * * * * *

* * * * * * * * * * * * * * * * * * * * * * * * * *

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty F

auce

t

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

Fauc

et

Cau

lkin

g

Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 INCOMPLETE ITEMSAreas Available For You To Work

* Areas if Work Available For Multiple Updates * ROOM 327 TOILET WATER LINE NEEDS REPAIRWork Completed to Date 1/18/2012WORK COMPLETED TO DATE 1/25/2012

16

7

6

5

4

1/13/2012

26 Unit

10

9

3

27 Unit 20 Unit 21 Unit 23 Unit22 Unit 25 Unit

RUN DATE :

13

8

12

24 Unit28 Unit

FLOOR18

17

N/A

N/A

2

11

N/A N/A

15

14

JobD

river

EXHIBIT A

Confid

entia

l

BAY MECHANICAL PROGRESS CHART

2 2 2 5 2

2 2 2 5 2

2 5 5 2 5 5 2 5 5 2 5 5 2 5 5 2 5 2 5 2 2 5 2 2 2 5 2 5

2 5 5 2 5 5 2 5 5 2 5 5 2 5 5 2 5 2 5 2 2 5 2 2 2 5 2 5

2 5 5 2 5 5 2 5 5 2 5 5 2 5 5 2 5 2 5 2 5 2 5 5

2 5 5 2 5 5 2 5 5 2 5 5 2 5 5 2 5 2 5 2 5 2 5 5

5 2 5 5 5 5 5 5 2 5 2 5 2 2 5 2 5 2 2 5 5 5 2 5 2 2 5 2 2 5 5

5 2 5 5 5 5 5 5 2 5 2 5 2 2 5 2 5 2 2 5 5 5 2 5 2 2 5 2 2 5 5

2 5 2 5 2 2 2 4 4 4 4 4 4 4 4 4 4 4 4 4 2 4 2 4 2 4 4

2 5 2 5 2 2 2 4 4 4 4 4 4 4 4 4 4 4 4 4 2 4 2 4 2 4 4

4 4 4 4 4 4 4 4 4 4 4 4 4 4 5 5 5 5 5 2 4 4

4 4 4 4 4 4 4 4 4 4 4 4 4 4 5 5 5 5 5 2 4 4

5 5 5 5 5 2 5 6 5

5 5 5 5 5 2 5 6 5

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

l Van

ity F

auce

t

Hal

l W

C

Hal

l Tub

Fau

cet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty F

auce

t

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

Fauc

et

Cau

lkin

g

Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 2/8/2012 INCOMPLETE ITEMSAreas Available For You To Work S/H SHOWER HEAD MISSING

# Areas if Work Available For Multiple Updates WORK COMPLETED TO DATE 2/15/2012 ! 5TH FLOOR COULD NOT BE WALKED DUE TO PAINTING 2/15/2012Work Completed to Date 1/18/2012WORK COMPLETED TO DATE 1/25/2012

N/AN/A

N/A

N/A

N/A

2

10

3

4

N/A

16

7

6

5

12

9

11

N/A

8

15

14

FLOOR18

17

RUN DATE :

24 Unit28 Unit26 Unit

13

20 Unit 21 Unit 23 Unit22 Unit 25 Unit

2/1/2012

27 Unit

JobD

river

EXHIBIT A

Confid

entia

l

BAY MECHANICAL PROGRESS CHART

3 3 3 3 3 3 3 3 3 3 3 3 3 3 3

3 3 3 3 3 3 3 3 3 3 3 3 3 3 3

3 3 3 3 3 3 3 3 3 3 3 3 3 3 3

3 3 3 3 3 3 3 3 3 3 3 3 3 3 3

3 3 2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3

3 3 2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3

3 2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3

3 2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3

3 2 3 3 3 3 3 3 3 3 3 3 3 2 3 3 3 3 3 3 3 3 3 2 3 3 3 3 3 3 3 3 3

3 2 3 3 3 3 3 3 3 3 3 3 3 2 3 3 3 3 3 3 3 3 3 2 3 3 3 3 3 3 3 3 3

4 3 3 3 4 2 3 3 2 3 3 3 3 2 3 3 2 3 3 3 3 2 2 2 2 3 3 2 3 2 2 2 2 2 3 2 2 2 3 2 3 2 3 2 2 2 2 3 3 2 2 2 3 3 3 3 3 3 3 3 3 3 3 2 2 2 2

4 3 3 3 4 2 3 3 2 3 3 3 3 2 3 3 2 3 3 3 3 2 2 2 2 3 3 2 3 2 2 2 2 2 3 2 2 2 3 2 3 2 3 2 2 2 2 3 3 2 2 2 3 3 3 3 3 3 3 3 3 3 3 2 2 2 2

4 4 4 3 4 4 3 4 4 4 4 3 4 4 3 4 3 4 2 4 3 3 3 4 3 4 4 3 4 3 4 3 4 4 4 3 4 3

4 4 4 3 4 4 3 4 4 4 4 3 4 4 3 4 3 4 2 4 3 3 3 4 3 4 4 3 4 3 4 3 4 4 4 3 4 3

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty F

auce

t

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

Fauc

et

Cau

lkin

g

Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 1/25/2012 INCOMPLETE ITEMSAreas Available For You To Work WORK COMPLETED 2/1/2012 * ROOM 327 TOILET WATER LINE NEEDS REPAIR

# # of weeks work has been available to install REPAIR COMPLETEDWork Completed to Date 1/18/2012

20 Unit 21 Unit 23 Unit22 Unit 25 Unit

2/1/2012

27 Unit

N/A

15

14

FLOOR18

17

RUN DATE :

24 Unit28 Unit26 Unit

13

12

9

3

4

11

N/A

8

N/A

N/A

2

10

16

7

6

5

JobD

river

EXHIBIT A

Confid

entia

l

BAY MECHANICAL PROGRESS CHART

2 2 2 2 2 2 2

2 2 2 2 2 2 2

2 2 2 2 2 2 2 2

2 2 2 2 2 2 2 2

2 2 2 2 2 2 2

2 2 2 2 2 2 2

3 3 3 6 3

3 3 3 6 3

3 2 6 2 6 2 2 3 2 6 2 6 2 3 2 6 2 6 2 2 3 6 2 6 3 2 6 6 2 6 2 3 6 2 2 3 2 6 2 6 2 3 6 2 6 2 2

3 2 6 2 6 2 2 3 2 6 2 6 2 3 2 6 2 6 2 2 3 6 2 6 3 2 6 6 2 6 2 3 6 2 2 3 2 6 2 6 2 3 6 2 6 2 2

3 2 6 2 6 2 2 3 2 6 2 6 2 3 2 6 2 6 2 2 3 2 6 2 6 3 6 6 2 2 6 2 3 6 2 2 3 2 6 2 3 2 6 2 3 2 6 2 6 2 2

3 2 6 2 6 2 2 3 2 6 2 6 2 3 2 6 2 6 2 2 3 2 6 2 6 3 6 6 2 2 6 2 3 6 2 2 3 2 6 2 3 2 6 2 3 2 6 2 6 2 2

6 6 2 6 2 6 6 3 3 2 3 3 3 3

6 6 2 6 2 6 6 3 3 2 3 3 3 3

2 2 2 2

2 2 2 2

5 5 5 5 5 5 5 5 5 5 5 5 5 5 6 6 6 6 3 5 5

5 5 5 5 5 5 5 5 5 5 5 5 5 5 6 6 6 6 3 5 5

6 6 6 6 6 3 6 6

6 6 6 6 6 3 6 6

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

l Van

ity F

auce

t

Hal

l W

C

Hal

l Tub

Fau

cet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty F

auce

t

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty F

auce

t

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

Fauc

et

Cau

lkin

g

Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 2/8/2012 INCOMPLETE ITEMSAreas Available For You To Work S/H SHOWER HEAD MISSING

# Areas if Work Available For Multiple Updates WORK COMPLETED TO DATE 2/15/2012Work Completed to Date 1/18/2012 WORK COMPLETED TO DATE 2/22/2012WORK COMPLETED TO DATE 1/25/2012

N/A

8

N/AN/A

N/A

N/A

N/A

2

10

3

4

13

16

7

6

5

12

9

11

N/A

2/1/2012

27 Unit

15

14

FLOOR18

17

RUN DATE :

24 Unit28 Unit26 Unit

N/A

20 Unit 21 Unit 23 Unit22 Unit 25 Unit

JobD

river

EXHIBIT A

Confid

entia

l

BAY MECHANICAL PROGRESS CHART

4 4 4 4 4

4 4 4 4 4

4 4 4 4 4 4 4 4 4 4 4 4 4 4 4

4 4 4 4 4 4 4 4 4 4 4 4 4 4 4

4 4 4 4 4 4 4 4 4 4 4 4 4 4 4

4 4 4 4 4 4 4 4 4 4 4 4 4 4 4

4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4

4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4

4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 2 4 2 4 2 4 4

4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 2 4 2 4 2 4 4

4 S/H 4 S/H 3 4 4 3 4 S/H 4 S/H 3 4 4 3 4 S/H 4 S/H 3 3 3 3 4 S/H 3 S/H 3 3 3 3 3 S/H 3 3 3 3 S/H 3 S/H 3 3 3 3 4 S/H 3 3 3 4 4 S/H 4 4 4 S/H S/H 3 3

4 S/H 4 S/H 3 4 4 3 4 S/H 4 S/H 3 4 4 3 4 S/H 4 S/H 3 3 3 3 4 S/H 3 S/H 3 3 3 3 3 S/H 3 3 3 3 S/H 3 S/H 3 3 3 3 4 S/H 3 3 3 4 4 S/H 4 4 4 S/H S/H 3 3

4 4 4 5 4 3 4 4 4 4 4 5 4 4

4 4 4 5 4 3 4 4 4 4 4 5 4 4

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty F

auce

t

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

Fauc

et

Cau

lkin

g

Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 2/8/2012 INCOMPLETE ITEMSAreas Available For You To Work S/H SHOWER HEAD MISSING

# Areas if Work Available For Multiple UpdatesWork Completed to Date 1/18/2012WORK COMPLETED TO DATE 1/25/2012

20 Unit 21 Unit 23 Unit22 Unit 25 Unit

2/1/2012

27 Unit

N/A

15

14

FLOOR18

17

RUN DATE :

24 Unit28 Unit26 Unit

13

9

3

4

11

N/A

8

N/A

N/A

2

10

16

7

6

5

12

JobD

river

EXHIBIT A

Confid

entia

l

BAY MECHANICAL PROGRESS CHART

2 2 2

2 2 2

2 4 4 2 4 2 5 5 2 5 5 5 5

2 4 4 2 4 2 5 5 2 5 5 5 5

4 4 5 4 5 5 4 5 5 4 5 5

4 4 5 4 5 5 4 5 5 4 5 5

5 4 3 3 5 5 3 5 5

5 4 3 3 5 5 3 5 5

6 3 3 3 3 6 3 3 3 6 3 3 3 3 3 3 3 4 3 3 3 9 3 3 3 4 3 3 6 3 3 3 4 3 3 3 3 2 3

6 3 3 3 3 6 3 3 3 6 3 3 3 3 3 3 3 4 3 3 3 9 3 3 3 4 3 3 6 3 3 3 4 3 3 3 3 2 3

9 9

9 9

2 2 2 3 3 3 2 2

2 2 2 3 3 3 2 2

4 3 4 4 3 4 3 4 4 4

4 3 4 4 3 4 3 4 4 4

4

4

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

l Van

ity F

auce

t

Hal

l W

C

Hal

l Tub

Fau

cet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty F

auce

t

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty F

auce

t

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

Fauc

et

Cau

lkin

g

Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 2/8/2012 INCOMPLETE ITEMSAreas Available For You To Work WORK COMPLETED TO DATE 2/15/2012 Missing soap dispensor in kitchen in unit 726

# Areas if Work Available For Multiple Updates WORK COMPLETED TO DATE 2/22/2012 WORK COMPLETED TO DATE 3/7/2012Work Completed to Date 1/18/2012 WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETED TO DATE 3/14/2012WORK COMPLETED TO DATE 1/25/2012

N/A

8

N/AN/A

N/A

N/A

N/A

2

10

3

4

13

16

7

6

5

12

9

11

N/A

2/1/2012

27 Unit

15

14

FLOOR18

17

RUN DATE :

24 Unit28 Unit26 Unit

N/A

20 Unit 21 Unit 23 Unit22 Unit 25 Unit

JobD

river

EXHIBIT A

Confid

entia

l

BAY MECHANICAL PROGRESS CHART

2 2 2 2 2

2 2 2 2 2

2 2 2 2 2 3 2 2 3 2 2 3 2 2

2 2 2 2 2 3 2 2 3 2 2 3 2 2

3 5 5 3 5 3 6 6 3 6 6 2 6 6

3 5 5 3 5 3 6 6 3 6 6 2 6 6

2 5 5 2 6 5 2 6 6 5 6 6 5 6 6

2 5 5 2 6 5 2 6 6 5 6 6 5 6 6

2 6 5 4 4 6 6 4 6 6

2 6 5 4 4 6 6 4 6 6

7 4 4 4 4 7 4 4 4 7 4 4 4 4 4 5 2 10 5 7 5

7 4 4 4 4 7 4 4 4 7 4 4 4 4 4 5 2 10 5 7 5

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

3 3 3 4 4 2 2 4 3 3

3 3 3 4 4 2 2 4 3 3

5 4 5 5 4 5 4 5 5 5

5 4 5 5 4 5 4 5 5 5

5

5

2

2

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

l Van

ity F

auce

t

Hal

l W

C

Hal

l Tub

Fau

cet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty F

auce

t

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty F

auce

t

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

Fauc

et

Cau

lkin

g

Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 2/8/2012 INCOMPLETE ITEMSAreas Available For You To Work WORK COMPLETED TO DATE 2/15/2012 Missing soap dispensor in kitchen in unit 726

# Areas if Work Available For Multiple Updates WORK COMPLETED TO DATE 2/22/2012 WORK COMPLETED TO DATE 3/7/2012Work Completed to Date 1/18/2012 WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETED TO DATE 3/14/2012WORK COMPLETED TO DATE 1/25/2012 WORK COMPLETED TO DATE 3/21/2012

26 Unit

N/A

20 Unit 21 Unit 23 Unit22 Unit 25 Unit

N/A

2/1/2012

27 Unit

15

14

FLOOR18

17

RUN DATE :

24 Unit28 Unit

4

13

16

7

6

5

12

9

11

N/A

8

N/AN/A

N/A

N/A

N/A

2

10

3 JobD

river

EXHIBIT A

Confid

entia

l

BAY MECHANICAL PROGRESS CHART

3 3 4 4 4 4 4 4 4

3 3 4 4 4 4 4 4 4

3 3 4 4 4 4 3 4 4 3 4 4

3 3 4 4 4 4 3 4 4 3 4 4

4 4 2 2 4 4 2 4 4

4 4 2 2 4 4 2 4 4

5 2 2 2 2 5 2 2 2 5 2 2 2 2 2 2 2 3 2 2 2 8 2 2 2 3 2 2 5 2 2 2 3 2 2 2 2 2

5 2 2 2 2 5 2 2 2 5 2 2 2 2 2 2 2 3 2 2 2 8 2 2 2 3 2 2 5 2 2 2 3 2 2 2 2 2

4 8 4 8 4 4 3 8 4 8 4 3 4 8 4 8 4 4 3 8 4 8 3 3 8 8 4 3 8 4 5 8 4 4 4 8 4 3 8 4 8 4 4

4 8 4 8 4 4 3 8 4 8 4 3 4 8 4 8 4 4 3 8 4 8 3 3 8 8 4 3 8 4 5 8 4 4 4 8 4 3 8 4 8 4 4

5 2 2 5 2 2

5 2 2 5 2 2

3 8 2 5 3 3 2 3 2 3 3 3

3 8 2 5 3 3 2 3 2 3 3 3

3 3 3 3 3 3 3 3 3 3

3 3 3 3 3 3 3 3 3 3

7 7 8 8 5 7 7

7 7 8 8 5 7 7

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

l Van

ity F

auce

t

Hal

l W

C

Hal

l Tub

Fau

cet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty F

auce

t

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty F

auce

t

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

Fauc

et

Cau

lkin

g

Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 2/8/2012 INCOMPLETE ITEMSAreas Available For You To Work WORK COMPLETED TO DATE 2/15/2012 Missing soap dispensor in kitchen in unit 726

# Areas if Work Available For Multiple Updates WORK COMPLETED TO DATE 2/22/2012Work Completed to Date 1/18/2012 WORK COMPLETED TO DATE 2/29/2012WORK COMPLETED TO DATE 1/25/2012 WORK COMPLETED TO DATE 3/7/2012

26 Unit

N/A

20 Unit 21 Unit 23 Unit22 Unit 25 Unit

N/A

2/1/2012

27 Unit

15

14

FLOOR18

17

RUN DATE :

24 Unit28 Unit

4

13

16

7

6

5

12

9

11

N/A

8

N/AN/A

N/A

N/A

N/A

2

10

3 JobD

river

EXHIBIT A

Confid

entia

l

BAY MECHANICAL PROGRESS CHART

3 3 3 3 3

3 3 3 3 3

3 3 3 3 3 2 4 3 3 4 3 3 4 3 3

3 3 3 3 3 2 4 3 3 4 3 3 4 3 3

4 6 6 4 6 4 7 7 4 7 7 3 7 7

4 6 6 4 6 4 7 7 4 7 7 3 7 7

3 6 6 3 7 6 3 7 7 6 7 7 6 7 7

3 6 6 3 7 6 3 7 7 6 7 7 6 7 7

3 7 6 5 5 7 7 5 7 7

3 7 6 5 5 7 7 5 7 7

8 8 5 8 8 8 5 6 2 3 2 6 2 6 2 8 2 6 6 2

8 8 5 8 8 8 5 6 2 3 2 6 2 6 2 8 2 6 6 2

3 3 3 3 3 3 3 3 3 3 3 3

3 3 3 3 3 3 3 3 3 3 3 3

4 4 4 5 5 3 3 5 4 4

4 4 4 5 5 3 3 5 4 4

6 5 6 6 5 6 5 6 6 6

6 5 6 6 5 6 5 6 6 6

6

6

3

3

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

l Van

ity F

auce

t

Hal

l W

C

Hal

l Tub

Fau

cet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty F

auce

t

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte s

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty F

auce

t

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

Fauc

et

Cau

lkin

g

Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/7/2012Areas Available For You To Work WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 3/14/2012

# Areas if Work Available For Multiple Updates WORK COMPLETED TO DATE 2/22/2012 WORK COMPLETED TO DATE 3/21/2012Work Completed to Date 1/18/2012 WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETEED TO DATE 3/28/2012WORK COMPLETED TO DATE 1/25/2012

N/A

8

N/AN/A

N/A

N/A

N/A

2

10

3

4

13

16

7

6

5

12

9

11

N/A

2/1/2012

27 Unit

15

14

FLOOR18

17

RUN DATE :

24 Unit28 Unit26 Unit

N/A

20 Unit 21 Unit 23 Unit22 Unit 25 Unit

N/A

JobD

river

EXHIBIT A

Confid

entia

l

BAY MECHANICAL PROGRESS CHART

4 4

4 4

4 4 4 3 4 4

4 4 4 3 4 4

7 7 7 8 8

7 7 7 8 8

7 7 8 7 8 8

7 7 8 7 8 8

2 8 2 7 2 2 6 2

2 8 2 7 2 2 6 2

9 6 2 9 2 2 3 7 3

9 6 2 9 2 2 3 7 3

4 4 4 4 4 4 4 4 4

4 4 4 4 4 4 4 4 4

5 5

5 5

7

7

7

7

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

l Van

ity F

auce

t

Hal

l W

C

Hal

l Tub

Fau

cet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/4/2012Areas Available For You To Work WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 3/14/2012

# Areas if Work Available For Multiple Updates WORK COMPLETED TO DATE 2/22/2012 WORK COMPLETED TO DATE 3/21/2012Work Completed to Date 1/18/2012 WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETEED TO DATE 3/28/2012WORK COMPLETED TO DATE 1/25/2012

N/A

8

N/AN/A

N/A

N/A2

10

3

4

13

16

7

6

5

12

9

11

N/A

2/1/2012

27 Unit

15

14

FLOOR18

17

RUN DATE :

24 Unit28 Unit26 Unit 23 Unit22 Unit 25 Unit

JobD

river

EXHIBIT A

Confid

entia

l

BAY MECHANICAL PROGRESS CHART

4 4

4 4

4 4 4 4

4 4 4 4

8 8 8 8

8 8 8 8

8 8 8 8

8 8 8 8

8 8 2 2 8 8 2 2

8 8 2 2 8 8 2 2

3 3 7 3

3 3 7 3

4 4 4

4 4 4

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty F

auce

t

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte s

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty F

auce

t

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

Fauc

et

Cau

lkin

g

N/A

N/A

20 Unit 21 Unit

N/A JobD

river

EXHIBIT A

Confid

entia

l

BAY MECHANICAL PROGRESS CHART

2 2

2 2

2 2

2 2

3 3 3 3 3 3 3 3 3 3 3 3 3 3

3 3 3 3 3 3 3 3 3 3 3 3 3 3

3 3 3 3 3 3 6 3 3 3 6 3

3 3 3 3 3 3 6 3 3 3 6 3

3 6 6 3 6 5 3 6 6 3

3 6 6 3 6 5 3 6 6 3

2 3 9 9 3 2 9 3 10 10 3

2 3 9 9 3 2 9 3 10 10 3

2 3 9 9 3 10 9 3 10 10 3

2 3 9 9 3 10 9 3 10 10 3

4 2 3 3

4 2 3 3

11 8 3 4 11 3 4 4 5 9 5 5

11 8 3 4 11 3 4 4 5 9 5 5

6

6

7

7

9

9

9

9

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

l Van

ity F

auce

t

Hal

l W

C

Hal

l Tub

Fau

cet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/4/2012Areas Available For You To Work WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/11/2012

# Areas if Work Available For Multiple Updates WORK COMPLETED TO DATE 2/22/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/20/2012Work Completed to Date 1/18/2012 WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETEED TO DATE 3/28/2012WORK COMPLETED TO DATE 1/25/2012WORK COMPLETED TO DATE 2/1/2012

23 Unit22 Unit 25 Unit

2/1/2012

27 Unit

15

14

FLOOR18

17

RUN DATE :

24 Unit28 Unit26 Unit

16

7

6

5

12

9

11

N/A

N/A2

10

3

4

N/A

N/A

8

N/AN/A

N/A

13

JobD

river

EXHIBIT A

Confid

entia

l

BAY MECHANICAL PROGRESS CHART

2

2

2

2

3 3 3 2 3 3

3 3 3 2 3 3

3 3 6 2 3 3

3 3 6 2 3 3

6 6 2 6 6

6 6 2 6 6

10 10 2 10 10

10 10 2 10 10

10 10 2 10 10

10 10 2 10 10

4

4

5 9 5

5 9 5

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty F

auce

t

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte s

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty F

auce

t

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

Fauc

et

Cau

lkin

g

20 Unit 21 Unit

N/A

N/A

N/A JobD

river

EXHIBIT A

Confid

entia

l

BAY MECHANICAL PROGRESS CHART

4 2 5

4 2 5

6 6 6 6 6 6 6 6 6 6 6 6

6 6 6 6 6 6 6 6 6 6 6 6

6 6 6 6 6 6 9 6 6 6

6 6 6 6 6 6 9 6 6 6

6 9 9 6 8 8 6 9 9

6 9 9 6 8 8 6 9 9

5 6 12 12 6 4 12 6 13 13

5 6 12 12 6 4 12 6 13 13

5 6 2 2 12 2 12 6 2 12 12 6 2 13 2 13

5 6 2 2 12 2 12 6 2 12 12 6 2 13 2 13

7 4 4 6

7 4 4 6

12 8

12 8

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

l Van

ity F

auce

t

Hal

l W

C

Hal

l Tub

Fau

cet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

lway

van

ity fa

ucet

Hal

lway

van

ity W

C

H.w

ay v

anity

Tub

fauc

et

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE Areas Available For You To Work WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE

# Areas if Work Available For Multiple Updates WORK COMPLETED TO DATE 2/22/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/20/2012Work Completed to Date 1/18/2012 WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETEED TO DATE 3/28/2012 WORK COMPLETED TO DATE 4/25/2012WORK COMPLETED TO DATE 1/25/2012WORK COMPLETED TO DATE 2/1/2012

25 Unit24 Unit28 Unit

N/A

26 Unit 23 Unit22 Unit

11

N/A

N/A

N/A

2/1/2012

27 Unit

15

14

FLOOR18

17

RUN DATE :

N/A

N/A

13

16

7

6

5

12

9

2

10

3

4

N/A

8

JobD

river

EXHIBIT A

Confid

entia

l

BAY MECHANICAL PROGRESS CHART

5 5

5 5

6 6 6 6 6 5 6 6

6 6 6 6 6 5 6 6

9 6 6 6 9 5 6 6

9 6 6 6 9 5 6 6

6 9 9 5 9 9

6 9 9 5 9 9

6 13 13 5 13 13

6 13 13 5 13 13

6 2 13 2 13 5 2 13 2 13

6 2 13 2 13 5 2 13 2 13

7

7

8

8

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty F

auce

t

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

lway

van

ity fa

ucet

Hal

lway

van

ity W

C

H.w

ay v

anity

Tub

fauc

et

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte s

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty F

auce

t

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

Fauc

et

Cau

lkin

g

E 5/2/2012 E 5/9/2012

N/A

N/A

N/A

20 Unit 21 Unit

JobD

river

EXHIBIT A

Confid

entia

l

BAY MECHANICAL PROGRESS CHART

2 2

2 2

2

2

5 2 3 6

5 2 3 6

7 7 2 7 7 7 7 7 7 7 7 7

7 7 2 7 7 7 7 7 7 7 7 7

7 2 7 7 7 7 7 10 7 7 7

7 2 7 7 7 7 7 10 7 7 7

7 2 10 10 7 9 9 7 10 10

7 2 10 10 7 9 9 7 10 10

6 7 2 13 13 7 5 13 7 14 14

6 7 2 13 13 7 5 13 7 14 14

6 7 3 2 3 13 3 13 7 3 13 2 13 7 3 14 3 14

6 7 3 2 3 13 3 13 7 3 13 2 13 7 3 14 3 14

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

l Van

ity F

auce

t

Hal

l W

C

Hal

l Tub

Fau

cet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

lway

van

ity fa

ucet

Hal

lway

van

ity W

C

H.w

ay v

anity

Tub

fauc

et

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE Areas Available For You To Work WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE

# Areas if Work Available For Multiple Updates WORK COMPLETED TO DATE 2/22/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE Work Completed to Date 1/18/2012 WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETEED TO DATE 3/28/2012 WORK COMPLETED TO DATE 4/25/2012WORK COMPLETED TO DATE 1/25/2012WORK COMPLETED TO DATE 2/1/2012

2

10

3

4

N/A

8

16

7

6

5

12

9

2/1/2012

27 Unit

15

14

FLOOR18

17

RUN DATE :

N/A

N/A

13

26 Unit 23 Unit22 Unit

11

N/A

N/A

N/A

25 Unit24 Unit28 Unit

N/A

JobD

river

EXHIBIT A

Confid

entia

l

BAY MECHANICAL PROGRESS CHART

2

2

2

2

6 6

6 6

7 7 7 7 7 6 7 7

7 7 7 7 7 6 7 7

10 7 7 7 10 6 7 7

10 7 7 7 10 6 7 7

7 10 10 6 10 10

7 10 10 6 10 10

7 14 14 6 14 14

7 14 14 6 14 14

7 3 14 3 14 6 3 14 3 14

7 3 14 3 14 6 3 14 3 14

8

8

9

9

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty F

auce

t

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

lway

van

ity fa

ucet

Hal

lway

van

ity W

C

H.w

ay v

anity

Tub

fauc

et

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte s

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty F

auce

t

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

Fauc

et

Cau

lkin

g

E 5/2/2012 E 5/9/2012 E 5/16/2012

20 Unit 21 Unit

N/A

N/A

N/A JobD

river

EXHIBIT A

Confid

entia

l

BAY MECHANICAL PROGRESS CHART

3 3

3 3

3

3

6 3 4 7

6 3 4 7

8 8 3 8 8 8 8 8 8 8 8 8

8 8 3 8 8 8 8 8 8 8 8 8

8 3 8 8 8 8 8 11 8 8 8

8 3 8 8 8 8 8 11 8 8 8

8 3 11 11 8 10 10 8 11 11

8 3 11 11 8 10 10 8 11 11

7 8 3 14 14 8 6 14 8 15 15

7 8 3 14 14 8 6 14 8 15 15

7 4 3 4 14 4 14 4 14 3 14 4 15 4 15

7 4 3 4 14 4 14 4 14 3 14 4 15 4 15

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

l Van

ity F

auce

t

Hal

l W

C

Hal

l Tub

Fau

cet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

lway

van

ity fa

ucet

Hal

lway

van

ity W

C

H.w

ay v

anity

Tub

fauc

et

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE Areas Available For You To Work WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE

# Areas if Work Available For Multiple Updates WORK COMPLETED TO DATE 2/22/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE Work Completed to Date 1/18/2012 WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETEED TO DATE 3/28/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE WORK COMPLETED TO DATE 1/25/2012WORK COMPLETED TO DATE 2/1/2012

25 Unit24 Unit28 Unit

N/A

26 Unit 23 Unit22 Unit

11

N/A

N/A

N/A

2/1/2012

27 Unit

15

14

FLOOR18

17

RUN DATE :

N/A

N/A

13

16

7

6

5

12

9

2

10

3

4

N/A

8

JobD

river

EXHIBIT A

Confid

entia

l

BAY MECHANICAL PROGRESS CHART

3 2

3 2

3

3

7 7

7 7

8 8 8 8 8 7 8 8

8 8 8 8 8 7 8 8

11 8 8 8 11 7 8 8

11 8 8 8 11 7 8 8

8 11 11 7 11 11

8 11 11 7 11 11

8 15 15 7 15 15

8 15 15 7 15 15

4 15 15 4 15

4 15 15 4 15

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty F

auce

t

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

lway

van

ity fa

ucet

Hal

lway

van

ity W

C

H.w

ay v

anity

Tub

fauc

et

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte s

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty F

auce

t

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

Fauc

et

Cau

lkin

g

E 5/2/2012 E 5/9/2012 E 5/16/2012 E 5/23/2012

N/A

N/A

N/A

20 Unit 21 Unit

JobD

river

EXHIBIT A

Confid

entia

l

BAY MECHANICAL PROGRESS CHART

4 4

4 4

4

4

7 4 2 5 2 2 8 2 2

7 4 2 5 2 2 8 2 2

9 9 4 9 9 9 9 9 9 2 9 9 9

9 9 4 9 9 9 9 9 9 2 9 9 9

9 4 9 9 9 9 9 12 9 9 9

9 4 9 9 9 9 9 12 9 9 9

9 4 12 12 9 11 11 9 12 12

9 4 12 12 9 11 11 9 12 12

8 9 4 15 15 9 7 15 9 16 16

8 9 4 15 15 9 7 15 9 16 16

8 5 4 15 5 15 15 15 16 16

8 5 4 15 5 15 15 15 16 16

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

l Van

ity F

auce

t

Hal

l W

C

Hal

l Tub

Fau

cet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

lway

van

ity fa

ucet

Hal

lway

van

ity W

C

H.w

ay v

anity

Tub

fauc

et

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE Areas Available For You To Work WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE

# Areas if Work Available For Multiple Updates WORK COMPLETED TO DATE 2/22/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE Work Completed to Date 1/18/2012 WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETEED TO DATE 3/28/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE WORK COMPLETED TO DATE 1/25/2012WORK COMPLETED TO DATE 2/1/2012

25 Unit24 Unit28 Unit

N/A

26 Unit 23 Unit22 Unit

11

N/A

N/A

N/A

2/1/2012

27 Unit

15

14

FLOOR18

17

RUN DATE :

N/A

N/A

13

16

7

6

5

12

9

2

10

3

4

N/A

8

JobD

river

EXHIBIT A

Confid

entia

l

BAY MECHANICAL PROGRESS CHART

4 3

4 3

4 2

4 2

8 2 2 8 2

8 2 2 8 2

9 9 9 9 9 8 9 9

9 9 9 9 9 8 9 9

12 9 9 9 12 8 9 9

12 9 9 9 12 8 9 9

9 12 12 8 12 12

9 12 12 8 12 12

9 16 16 8 16 16

9 16 16 8 16 16

16 16 16

16 16 16

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty F

auce

t

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

lway

van

ity fa

ucet

Hal

lway

van

ity W

C

H.w

ay v

anity

Tub

fauc

et

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte s

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty F

auce

t

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

Fauc

et

Cau

lkin

g

E 5/2/2012 WORK COMPLETED TO DATE 5/30/2012 E 5/9/2012 E 5/16/2012 E 5/23/2012

N/A

N/A

N/A

20 Unit 21 Unit

JobD

river

EXHIBIT A

Confid

entia

l

BAY MECHANICAL PROGRESS CHART

5 5

5 5

5

5

8 5 3 6 3 3 9 3 3

8 5 3 6 3 3 9 3 3

10 10 5 10 10 10 10 10 10 3 10 10 10

10 10 5 10 10 10 10 10 10 3 10 10 10

10 5 10 10 10 10 10 13 10 10 10

10 5 10 10 10 10 10 13 10 10 10

10 5 13 13 10 12 12 10 13 13

10 5 13 13 10 12 12 10 13 13

9 5 16 16 8 2 16 2 17 2 17

9 5 16 16 8 2 16 2 17 2 17

9 5

9 5

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

l Van

ity F

auce

t

Hal

l W

C

Hal

l Tub

Fau

cet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

lway

van

ity fa

ucet

Hal

lway

van

ity W

C

H.w

ay v

anity

Tub

fauc

et

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE Areas Available For You To Work WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE

# Areas if Work Available For Multiple Updates WORK COMPLETED TO DATE 2/22/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE Work Completed to Date 1/18/2012 WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETEED TO DATE 3/28/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE WORK COMPLETED TO DATE 1/25/2012WORK COMPLETED TO DATE 2/1/2012

2

10

3

4

N/A

8

16

7

6

5

12

9

2/1/2012

27 Unit

15

14

FLOOR18

17

RUN DATE :

N/A

N/A

13

26 Unit 23 Unit22 Unit

11

N/A

N/A

N/A

25 Unit24 Unit28 Unit

N/A

JobD

river

EXHIBIT A

Confid

entia

l

BAY MECHANICAL PROGRESS CHART

5 4

5 4

5 3

5 3

9 3 3 9 3 2

9 3 3 9 3 2

10 10 10 10 10 9 10 10

10 10 10 10 10 9 10 10

13 10 10 10 13 9 10 10

13 10 10 10 13 9 10 10

10 13 13 9 13 13

10 13 13 9 13 13

2 17 2 17 2 17 17

2 17 2 17 2 17 17

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty F

auce

t

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

lway

van

ity fa

ucet

Hal

lway

van

ity W

C

H.w

ay v

anity

Tub

fauc

et

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte s

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty F

auce

t

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

Fauc

et

Cau

lkin

g

E 5/2/2012 WORK COMPLETED TO DATE 5/30/2012 E 5/9/2012 WORK COMPLETED TO DATE 6/6/2012 E 5/16/2012 WORK COMPLETED TO DATE 6/13/2012 E 5/23/2012

20 Unit 21 Unit

N/A

N/A

N/AN/A JobD

river

EXHIBIT A

Confid

entia

l

BAY MECHANICAL PROGRESS CHART

6 6

6 6

6

6

9 6 4 7 3 4 10 3 4

9 6 4 7 3 4 10 3 4

11 11 6 11 11 11 10 11 11 4 10 11 11

11 11 6 11 11 11 10 11 11 4 10 11 11

11 6 11 11 10 11 11 14 10 11 11

11 6 11 11 10 11 11 14 10 11 11

11 2 6 2 14 2 14 10 13 13 10 2 14 2 14

11 2 6 2 14 2 14 10 13 13 10 2 14 2 14

10 2 6 2 17 2 17 2 9 4 17 4 17 4 18

10 2 6 2 17 2 17 2 9 4 17 4 17 4 18

6

6

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

l Van

ity F

auce

t

Hal

l W

C

Hal

l Tub

Fau

cet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

lway

van

ity fa

ucet

Hal

lway

van

ity W

C

H.w

ay v

anity

Tub

fauc

et

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE Areas Available For You To Work WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE

# Areas if Work Available For Multiple Updates WORK COMPLETED TO DATE 2/22/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE Work Completed to Date 1/18/2012 WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETEED TO DATE 3/28/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE WORK COMPLETED TO DATE 1/25/2012WORK COMPLETED TO DATE 2/1/2012

25 Unit24 Unit28 Unit

N/A

26 Unit 23 Unit22 Unit

11

N/A

N/A

N/A

2/1/2012

27 Unit

15

14

FLOOR18

17

RUN DATE :

N/A

N/A

13

16

7

6

5

12

9

2

10

3

4

N/A

8

JobD

river

EXHIBIT A

Confid

entia

l

BAY MECHANICAL PROGRESS CHART

6 5

6 5

6 3 3 4 3 3

6 3 3 4 3 3

10 4 3 3 10 3 3

10 4 3 3 10 3 3

11 11 11 11 11 9 11 11

11 11 11 11 11 9 11 11

14 11 11 11 14 9 11 11

14 11 11 11 14 9 11 11

11 2 14 3 14 9 2 14 2 14

11 2 14 3 14 9 2 14 2 14

3 18 3 18 4 18 2 18

3 18 3 18 4 18 2 18

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty F

auce

t

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

lway

van

ity fa

ucet

Hal

lway

van

ity W

C

H.w

ay v

anity

Tub

fauc

et

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte s

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty F

auce

t

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

Fauc

et

Cau

lkin

g

E 5/2/2012 WORK COMPLETED TO DATE 5/30/2012 E 5/9/2012 WORK COMPLETED TO DATE 6/6/2012 E 5/16/2012 WORK COMPLETED TO DATE 6/13/2012 E 5/23/2012

N/A

N/A

N/AN/A

20 Unit 21 Unit

JobD

river

EXHIBIT A

Confid

entia

l

BAY MECHANICAL PROGRESS CHART

7 7

7 7

7

7

10 7 5 8 4 2 5 11 4 2 5

10 7 5 8 4 2 5 11 4 2 5

12 12 7 12 12 12 11 12 12 5 11 12 12

12 12 7 12 12 12 11 12 12 5 11 12 12

7 12 12 11 12 12 15 11 12 12

7 12 12 11 12 12 15 11 12 12

3 7 3 15 3 15 2 14 14 3 15 3 15

3 7 3 15 3 15 2 14 14 3 15 3 15

11 3 7 3 18 18 5

11 3 7 3 18 18 5

2 2

2 2

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

l Van

ity F

auce

t

Hal

l W

C

Hal

l Tub

Fau

cet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

lway

van

ity fa

ucet

Hal

lway

van

ity W

C

H.w

ay v

anity

Tub

fauc

et

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE Areas Available For You To Work WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE

# Areas if Work Available For Multiple Updates WORK COMPLETED TO DATE 2/22/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE Work Completed to Date 1/18/2012 WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETEED TO DATE 3/28/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE WORK COMPLETED TO DATE 1/25/2012WORK COMPLETED TO DATE 2/1/2012

25 Unit24 Unit28 Unit

N/A

26 Unit 23 Unit22 Unit

11

N/A

N/A

N/A

2/1/2012

27 Unit

15

14

FLOOR18

17

RUN DATE :

N/A

N/A

13

16

7

6

5

12

9

2

10

3

4

N/A

8

JobD

river

EXHIBIT A

Confid

entia

l

BAY MECHANICAL PROGRESS CHART

7 6

7 6

7 4 4 5 4 4

7 4 4 5 4 4

11 5 4 4 11 4 4

11 5 4 4 11 4 4

12 12 12 12 12 10 12 12

12 12 12 12 12 10 12 12

15 12 12 12 15 10 12 12

15 12 12 12 15 10 12 12

3 15 4 15 3 15 3 15

3 15 4 15 3 15 3 15

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty F

auce

t

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

lway

van

ity fa

ucet

Hal

lway

van

ity W

C

H.w

ay v

anity

Tub

fauc

et

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte s

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty F

auce

t

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

Fauc

et

Cau

lkin

g

E 5/2/2012 WORK COMPLETED TO DATE 5/30/2012 E 5/9/2012 WORK COMPLETED TO DATE 6/6/2012 E 5/16/2012 WORK COMPLETED TO DATE 6/13/2012 E 5/23/2012 WORK COMPLETED TO DATE 6/20/2012

N/A

N/A

N/AN/A

20 Unit 21 Unit

JobD

river

EXHIBIT A

Confid

entia

l

BAY MECHANICAL PROGRESS CHART

8 8

8 8

8

8

11 8 2 6 9 5 3 6 12 5 3 6

11 8 2 6 9 5 3 6 12 5 3 6

13 13 8 13 13 13 12 13 13 6 12 13 13

13 13 8 13 13 13 12 13 13 6 12 13 13

12 12 8 13 13 12 12 13 13 16 12 13 13

12 12 8 13 13 12 12 13 13 16 12 13 13

16 16

16 16

3 3

3 3

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

l Van

ity F

auce

t

Hal

l W

C

Hal

l Tub

Fau

cet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

lway

van

ity fa

ucet

Hal

lway

van

ity W

C

H.w

ay v

anity

Tub

fauc

et

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE Areas Available For You To Work WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE

# Areas if Work Available For Multiple Updates WORK COMPLETED TO DATE 2/22/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE Work Completed to Date 1/18/2012 WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETEED TO DATE 3/28/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE WORK COMPLETED TO DATE 1/25/2012WORK COMPLETED TO DATE 2/1/2012

25 Unit24 Unit28 Unit

N/A

26 Unit 23 Unit22 Unit

11

N/A

N/A

N/A

2/1/2012

27 Unit

15

14

FLOOR18

17

RUN DATE :

N/A

N/A

13

16

7

6

5

12

9

2

10

3

4

N/A

8

JobD

river

EXHIBIT A

Confid

entia

l

BAY MECHANICAL PROGRESS CHART

8 2 2 7 2 2

8 2 2 7 2 2

8 5 5 6 5 5

8 5 5 6 5 5

12 6 5 5 12 5 5

12 6 5 5 12 5 5

13 13 13 13 13 11 13 13

13 13 13 13 13 11 13 13

16 13 13 13 16 11 13 13

16 13 13 13 16 11 13 13

4 5 4 4

4 5 4 4

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty F

auce

t

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

lway

van

ity fa

ucet

Hal

lway

van

ity W

C

H.w

ay v

anity

Tub

fauc

et

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte s

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty F

auce

t

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

Fauc

et

Cau

lkin

g

E 5/2/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 6/27/2012 E 5/9/2012 WORK COMPLETED TO DATE 6/6/2012 E 5/16/2012 WORK COMPLETED TO DATE 6/13/2012 E 5/23/2012 WORK COMPLETED TO DATE 6/20/2012

N/A

N/A

N/AN/A

20 Unit 21 Unit

JobD

river

EXHIBIT A

Confid

entia

l

BAY MECHANICAL PROGRESS CHART

9 9

9 9

9

9

12 9 3 7 10 6 4 7 13 6 4 7

12 9 3 7 10 6 4 7 13 6 4 7

14 14 9 14 14 14 13 14 14 7 13 14 14

14 14 9 14 14 14 13 14 14 7 13 14 14

13 2 9 2 14 2 14 13 2 14 2 14 17 2 14 2 14

13 2 9 2 14 2 14 13 2 14 2 14 17 2 14 2 14

4 2 4 2

4 2 4 2

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

l Van

ity F

auce

t

Hal

l W

C

Hal

l Tub

Fau

cet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

lway

van

ity fa

ucet

Hal

lway

van

ity W

C

H.w

ay v

anity

Tub

fauc

et

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE Areas Available For You To Work WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE

# Areas if Work Available For Multiple Updates WORK COMPLETED TO DATE 2/22/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE Work Completed to Date 1/18/2012 WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETEED TO DATE 3/28/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE WORK COMPLETED TO DATE 1/25/2012WORK COMPLETED TO DATE 2/1/2012

25 Unit24 Unit28 Unit

N/A

26 Unit 23 Unit22 Unit

11

N/A

N/A

N/A

2/1/2012

27 Unit

15

14

FLOOR18

17

RUN DATE :

N/A

N/A

13

16

7

6

5

12

9

2

10

3

4

N/A

8

JobD

river

EXHIBIT A

Confid

entia

l

BAY MECHANICAL PROGRESS CHART

9 3 3 8 3 3

9 3 3 8 3 3

9 6 6 7 6 6

9 6 6 7 6 6

13 7 6 6 13 6 6

13 7 6 6 13 6 6

14 14 14 14 14 12 14 14

14 14 14 14 14 12 14 14

17 17

17 17

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty F

auce

t

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

lway

van

ity fa

ucet

Hal

lway

van

ity W

C

H.w

ay v

anity

Tub

fauc

et

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte s

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty F

auce

t

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

Fauc

et

Cau

lkin

g

E 5/2/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 6/27/2012 E 5/9/2012 WORK COMPLETED TO DATE 6/6/2012 WORK COMPLETED TO DATE 7/6/2012 E 5/16/2012 WORK COMPLETED TO DATE 6/13/2012 WORK COMPLETED TO DATE 7/9/2012 E 5/23/2012 WORK COMPLETED TO DATE 6/20/2012

N/A

N/A

N/AN/A

20 Unit 21 Unit

JobD

river

EXHIBIT A

Confid

entia

l

BAY MECHANICAL PROGRESS CHART

10 10

10 10

10

10

13 10 4 8 11 7 5 8 14 7 5 8

13 10 4 8 11 7 5 8 14 7 5 8

15 15 2 10 2 15 2 15 15 14 2 15 2 15 8 14 2 15 2 15

15 15 2 10 2 15 2 15 15 14 2 15 2 15 8 14 2 15 2 15

4 2 4 2

4 2 4 2

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

l Van

ity F

auce

t

Hal

l W

C

Hal

l Tub

Fau

cet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

lway

van

ity fa

ucet

Hal

lway

van

ity W

C

H.w

ay v

anity

Tub

fauc

et

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE Areas Available For You To Work WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE

# Areas if Work Available For Multiple Updates WORK COMPLETED TO DATE 2/22/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE Work Completed to Date 1/18/2012 WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETEED TO DATE 3/28/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE WORK COMPLETED TO DATE 1/25/2012WORK COMPLETED TO DATE 2/1/2012

2

10

3

4

N/A

8

16

7

6

5

12

9

2/1/2012

27 Unit

15

14

FLOOR18

17

RUN DATE :

N/A

N/A

13

26 Unit 23 Unit22 Unit

11

N/A

N/A

N/A

25 Unit24 Unit28 Unit

N/A

JobD

river

EXHIBIT A

Confid

entia

l

BAY MECHANICAL PROGRESS CHART

10 4 4 9 4 4

10 4 4 9 4 4

10 7 7 8 7 7

10 7 7 8 7 7

14 8 7 7 14 7 7

14 8 7 7 14 7 7

15 15 2 15 2 15 15 13 2 15 2 15

15 15 2 15 2 15 15 13 2 15 2 15

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty F

auce

t

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

lway

van

ity fa

ucet

Hal

lway

van

ity W

C

H.w

ay v

anity

Tub

fauc

et

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte s

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty F

auce

t

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

Fauc

et

Cau

lkin

g

E 5/2/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 6/27/2012 E 5/9/2012 WORK COMPLETED TO DATE 6/6/2012 WORK COMPLETED TO DATE 7/4/2012 E 5/16/2012 WORK COMPLETED TO DATE 6/13/2012 WORK COMPLETED TO DATE 7/11/2012 E 5/23/2012 WORK COMPLETED TO DATE 6/20/2012

20 Unit 21 Unit

N/A

N/A

N/AN/A JobD

river

EXHIBIT A

Confid

entia

l

BAY MECHANICAL PROGRESS CHART

11 11

11 11

11

11

14 11 5 5 12 8 6 9 15 8 6 9

14 11 5 5 12 8 6 9 15 8 6 9

16 16 3 11 3 16 3 16 16 15 3 16 3 16 9 15 3 16 3 16

16 16 3 11 3 16 3 16 16 15 3 16 3 16 9 15 3 16 3 16

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

l Van

ity F

auce

t

Hal

l W

C

Hal

l Tub

Fau

cet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

lway

van

ity fa

ucet

Hal

lway

van

ity W

C

H.w

ay v

anity

Tub

fauc

et

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE Areas Available For You To Work WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE

# Areas if Work Available For Multiple Updates WORK COMPLETED TO DATE 2/22/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE Work Completed to Date 1/18/2012 WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETEED TO DATE 3/28/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE WORK COMPLETED TO DATE 1/25/2012WORK COMPLETED TO DATE 2/1/2012

2

10

3

4

N/A

8

16

7

6

5

12

9

2/1/2012

27 Unit

15

14

FLOOR18

17

RUN DATE :

N/A

N/A

13

26 Unit 23 Unit22 Unit

11

N/A

N/A

N/A

25 Unit24 Unit28 Unit

N/A

JobD

river

EXHIBIT A

Confid

entia

l

BAY MECHANICAL PROGRESS CHART

11 5 5 10 5 5

11 5 5 10 5 5

11 8 8 9 8 8

11 8 8 9 8 8

15 9 8 8 15 8 8

15 9 8 8 15 8 8

16 16 3 16 3 16 16 14 3 16 3 16

16 16 3 16 3 16 16 14 3 16 3 16

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty F

auce

t

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

lway

van

ity fa

ucet

Hal

lway

van

ity W

C

H.w

ay v

anity

Tub

fauc

et

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte s

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty F

auce

t

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

Fauc

et

Cau

lkin

g

E 5/2/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 6/27/2012 E 5/9/2012 WORK COMPLETED TO DATE 6/6/2012 WORK COMPLETED TO DATE 7/4/2012 E 5/16/2012 WORK COMPLETED TO DATE 6/13/2012 WORK COMPLETED TO DATE 7/11/2012 E 5/23/2012 WORK COMPLETED TO DATE 6/20/2012 WORK COMPLETED TO DATE 7/18/2012

20 Unit 21 Unit

N/A

N/A

N/AN/A JobD

river

EXHIBIT A

Confid

entia

l

BAY MECHANICAL PROGRESS CHART

14 14

14 14

14 2

14 2

17 8 15 11 18 11

17 8 15 11 18 11

3 3 3 3

3 3 3 3

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

l Van

ity F

auce

t

Hal

l W

C

Hal

l Tub

Fau

cet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

lway

van

ity fa

ucet

Hal

lway

van

ity W

C

H.w

ay v

anity

Tub

fauc

et

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE Areas Available For You To Work WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE

# Areas if Work Available For Multiple Updates WORK COMPLETED TO DATE 2/22/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE Work Completed to Date 1/18/2012 WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETEED TO DATE 3/28/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE WORK COMPLETED TO DATE 1/25/2012WORK COMPLETED TO DATE 2/1/2012

25 Unit24 Unit28 Unit

N/A

26 Unit 23 Unit22 Unit

11

N/A

N/A

N/A

2/1/2012

27 Unit

15

14

FLOOR18

17

RUN DATE :

N/A

N/A

13

16

7

6

5

12

9

2

10

3

4

N/A

8

JobD

river

EXHIBIT A

Confid

entia

l

BAY MECHANICAL PROGRESS CHART

14 8 8 13 8 8

14 8 8 13 8 8

14 11 11 12 11 11

14 11 11 12 11 11

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty F

auce

t

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

lway

van

ity fa

ucet

Hal

lway

van

ity W

C

H.w

ay v

anity

Tub

fauc

et

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte s

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty F

auce

t

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

Fauc

et

Cau

lkin

g

E 5/2/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 6/27/2012 E 5/9/2012 WORK COMPLETED TO DATE 6/6/2012 WORK COMPLETED TO DATE 7/4/2012 E 5/16/2012 WORK COMPLETED TO DATE 6/13/2012 WORK COMPLETED TO DATE 7/11/2012 E 5/23/2012 WORK COMPLETED TO DATE 6/20/2012 WORK COMPLETED TO DATE 7/18/2012

WORK COMPLETED TO DATE 7/25/2012

N/A

N/A

N/AN/A

20 Unit 21 Unit

JobD

river

EXHIBIT A

Confid

entia

l

BAY MECHANICAL PROGRESS CHART

15 15

15 15

15 3

15 3

18 16 12 19 12

18 16 12 19 12

4 4 4 4

4 4 4 4

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

l Van

ity F

auce

t

Hal

l W

C

Hal

l Tub

Fau

cet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

lway

van

ity fa

ucet

Hal

lway

van

ity W

C

H.w

ay v

anity

Tub

fauc

et

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE Areas Available For You To Work WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE

# Areas if Work Available For Multiple Updates WORK COMPLETED TO DATE 2/22/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE Work Completed to Date 1/18/2012 WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETEED TO DATE 3/28/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE WORK COMPLETED TO DATE 1/25/2012WORK COMPLETED TO DATE 2/1/2012

2

10

3

4

N/A

8

N/A

16

7

6

5

12

9

2/1/2012

27 Unit

15

14

FLOOR18

17

RUN DATE :

N/A

N/A

13

26 Unit 23 Unit22 Unit

11

N/A

N/A

N/A

25 Unit24 Unit28 Unit

N/AN/A

JobD

river

EXHIBIT A

Confid

entia

l

BAY MECHANICAL PROGRESS CHART

15 9 9 14 9 9

15 9 9 14 9 9

15 12 12 13 12 12

15 12 12 13 12 12

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty F

auce

t

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

lway

van

ity fa

ucet

Hal

lway

van

ity W

C

H.w

ay v

anity

Tub

fauc

et

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte s

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty F

auce

t

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

Fauc

et

Cau

lkin

g

E 5/2/2012 WORK COMPLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 6/27/2012 WORK COMPLETED TO DATE 8/1/2012 E 5/9/2012 WORK COMPLETED TO DATE 6/6/2012 WORK COMPLETED TO DATE 7/4/2012 WORK COMPLETED TO DATE 8/8/2012 E 5/16/2012 WORK COMPLETED TO DATE 6/13/2012 WORK COMPLETED TO DATE 7/11/2012 WORK COMPLETED TO DATE 8/15/2012 E 5/23/2012 WORK COMPLETED TO DATE 6/20/2012 WORK COMPLETED TO DATE 7/18/2012

WORK COMPLETED TO DATE 7/25/2012

20 Unit 21 Unit

N/A

N/A

N/AN/A JobD

river

EXHIBIT A

Confid

entia

l

BAY MECHANICAL PROGRESS CHART

16 16

16 16

16 4

16 4

5 5 5 5

5 5 5 5

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

l Van

ity F

auce

t

Hal

l W

C

Hal

l Tub

Fau

cet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

lway

van

ity fa

ucet

Hal

lway

van

ity W

C

H.w

ay v

anity

Tub

fauc

et

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

lway

van

ity fa

ucet

Hal

lway

van

ity W

C

Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE 5/2/2012 WORK COMPLET Areas Available For You To Work WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE 5/9/2012 WORK COMPLET

# Areas if Work Available For Multiple Updates WORK COMPLETED TO DATE 2/22/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE 5/16/2012 WORK COMPLET Work Completed to Date 1/18/2012 WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETEED TO DATE 3/28/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE 5/23/2012 WORK COMPLET WORK COMPLETED TO DATE 1/25/2012WORK COMPLETED TO DATE 2/1/2012

2

10

3

4

N/A

8

N/A

16

7

6

5

12

9

N/A

2/1/2012

27 Unit

15

14

FLOOR18

17

RUN DATE :

N/A

N/A

13

26 Unit 23 Unit22 Unit

11

N/A

N/A

N/A

25 Unit24 Unit28 Unit

N/AN/A

JobD

river

EXHIBIT A

Confid

entia

l

BAY MECHANICAL PROGRESS CHART

16 10 10 15 10 10

16 10 10 15 10 10

16 13 13 14 13 13 2

16 13 13 14 13 13 2

H.w

ay v

anity

Tub

fauc

et

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty F

auce

t

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte s

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty F

auce

t

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

Fauc

et

Cau

lkin

g

TED TO DATE 5/30/2012 WORK COMPLETED TO DATE 6/27/2012 WORK COMPLETED TO DATE 8/1/2012 TED TO DATE 6/6/2012 WORK COMPLETED TO DATE 7/4/2012 WORK COMPLETED TO DATE 8/8/2012 TED TO DATE 6/13/2012 WORK COMPLETED TO DATE 7/11/2012 WORK COMPLETED TO DATE 8/15/2012 TED TO DATE 6/20/2012 WORK COMPLETED TO DATE 7/18/2012 WORK COMPLETED TO DATE 8/22/2012

WORK COMPLETED TO DATE 7/25/2012

20 Unit 21 Unit

N/A

N/A

N/AN/A JobD

river

EXHIBIT A

Confid

entia

l

BAY MECHANICAL PROGRESS CHART

2 2

2 2

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

l Van

ity F

auce

t

Hal

l W

C

Hal

l Tub

Fau

cet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

lway

van

ity fa

ucet

Hal

lway

van

ity W

C

H.w

ay v

anity

Tub

fauc

et

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

lway

van

ity fa

ucet

Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE 5/2/2012 WORK COMP Areas Available For You To Work WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE 5/9/2012 WORK COMP

# Areas if Work Available For Multiple Updates WORK COMPLETED TO DATE 2/22/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE 5/16/2012 WORK COMP Work Completed to Date 1/18/2012 WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETEED TO DATE 3/28/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE 5/23/2012 WORK COMP WORK COMPLETED TO DATE 1/25/2012WORK COMPLETED TO DATE 2/1/2012

25 Unit24 Unit28 Unit

N/AN/A

26 Unit 23 Unit22 Unit

11

N/A

N/A

N/A

2/1/2012

27 Unit

15

14

FLOOR18

17

RUN DATE :

N/A

N/A

13

16

7

6

5

12

9

N/A

2

10

3

4

N/A

8

N/A

JobD

river

EXHIBIT A

Confid

entia

l

BAY MECHANICAL PROGRESS CHART

2

2

Hal

lway

van

ity W

C

H.w

ay v

anity

Tub

fauc

et

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty F

auce

t

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte s

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty F

auce

t

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

Fauc

et

Cau

lkin

g

PLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 6/27/2012 WORK COMPLETED TO DATE 8/1/2012 PLETED TO DATE 6/6/2012 WORK COMPLETED TO DATE 7/4/2012 WORK COMPLETED TO DATE 8/8/2012 PLETED TO DATE 6/13/2012 WORK COMPLETED TO DATE 7/11/2012 WORK COMPLETED TO DATE 8/15/2012 PLETED TO DATE 6/20/2012 WORK COMPLETED TO DATE 7/18/2012 WORK COMPLETED TO DATE 8/22/2012

WORK COMPLETED TO DATE 7/25/2012 WORK COMPLETED TO DATE 8/29/2012

N/A

N/A

N/AN/A

20 Unit 21 Unit

JobD

river

EXHIBIT A

Confid

entia

l

BAY MECHANICAL PROGRESS CHART

2 2 2

2 2 2

5 5 5 5

5 5 5 5

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

l Van

ity F

auce

t

Hal

l W

C

Hal

l Tub

Fau

cet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

lway

van

ity fa

ucet

Hal

lway

van

ity W

C

H.w

ay v

anity

Tub

fauc

et

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

lway

van

ity fa

ucet

Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE 5/2/2012 WORK COMP Areas Available For You To Work WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE 5/9/2012 WORK COMP

# Areas if Work Available For Multiple Updates WORK COMPLETED TO DATE 2/22/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE 5/16/2012 WORK COMP Work Completed to Date 1/18/2012 WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETEED TO DATE 3/28/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE 5/23/2012 WORK COMP WORK COMPLETED TO DATE 1/25/2012WORK COMPLETED TO DATE 2/1/2012

25 Unit24 Unit28 Unit

N/AN/A

26 Unit 23 Unit22 Unit

11

N/A

N/A

N/A

2/1/2012

27 Unit

15

14

FLOOR18

17

RUN DATE :

N/A

N/A

13

16

7

6

5

12

9

N/A

2

10

3

4

N/A

8

N/A

JobD

river

EXHIBIT A

Confid

entia

l

BAY MECHANICAL PROGRESS CHART

12 12 12 12

12 12 12 12

Hal

lway

van

ity W

C

H.w

ay v

anity

Tub

fauc

et

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty F

auce

t

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte s

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty F

auce

t

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

Fauc

et

Cau

lkin

g

PLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 6/27/2012 WORK COMPLETED TO DATE 8/1/2012 PLETED TO DATE 6/6/2012 WORK COMPLETED TO DATE 7/4/2012 WORK COMPLETED TO DATE 8/8/2012 PLETED TO DATE 6/13/2012 WORK COMPLETED TO DATE 7/11/2012 WORK COMPLETED TO DATE 8/15/2012 PLETED TO DATE 6/20/2012 WORK COMPLETED TO DATE 7/18/2012 WORK COMPLETED TO DATE 8/22/2012

WORK COMPLETED TO DATE 7/25/2012 WORK COMPLETED TO DATE 8/29/2012

N/A

N/A

N/AN/A

20 Unit 21 Unit

JobD

river

EXHIBIT A

Confid

entia

l

BAY MECHANICAL PROGRESS CHART

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

l Van

ity F

auce

t

Hal

l W

C

Hal

l Tub

Fau

cet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

lway

van

ity fa

ucet

Hal

lway

van

ity W

C

H.w

ay v

anity

Tub

fauc

et

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty fa

ucet

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Hal

lway

van

ity fa

ucet

Bay Mechanical Progress Chart Work Completed to Date 1/13/2012 WORK COMPLETED TO DATE 2/8/2012 WORK COMPLETED TO DATE 3/7/2012 WORK COMPLETED TO DATE 4/4/2012 WORK COMPLETED TO DATE 5/2/2012 WORK COMP Areas Available For You To Work WORK COMPLETED TO DATE 2/15/2012 WORK COMPLETED TO DATE 3/14/2012 WORK COMPLETED TO DATE 4/11/2012 WORK COMPLETED TO DATE 5/9/2012 WORK COMP

# Areas if Work Available For Multiple Updates WORK COMPLETED TO DATE 2/22/2012 WORK COMPLETED TO DATE 3/21/2012 WORK COMPLETED TO DATE 4/20/2012 WORK COMPLETED TO DATE 5/16/2012 WORK COMP Work Completed to Date 1/18/2012 WORK COMPLETED TO DATE 2/29/2012 WORK COMPLETEED TO DATE 3/28/2012 WORK COMPLETED TO DATE 4/25/2012 WORK COMPLETED TO DATE 5/23/2012 WORK COMP WORK COMPLETED TO DATE 1/25/2012WORK COMPLETED TO DATE 2/1/2012

25 Unit24 Unit28 Unit

N/AN/A

26 Unit 23 Unit22 Unit

11

N/A

N/A

N/A

2/1/2012

27 Unit

15

14

FLOOR18

17

RUN DATE :

N/A

N/A

13

16

7

6

5

12

9

N/A

2

10

3

4

N/A

8

N/A

JobD

river

EXHIBIT A

Confid

entia

l

BAY MECHANICAL PROGRESS CHARTH

allw

ay v

anity

WC

H.w

ay v

anity

Tub

fauc

et

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty F

auce

t

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte s

ink

fauc

et

Cau

lkin

g

HVA

C G

rille

s, D

iffus

ers

VTAC

acc

ess

pane

l

DBL

Van

ity fa

ucet

s

DBL

Van

ity W

C

DBL

Van

ity T

ub fa

ucet

SGL

Vani

ty F

auce

t

SGL

Vani

ty W

C

SGL

Vani

ty T

ub F

auce

t

Trim

wor

k

Kitc

hen

Fauc

et &

Dis

pl

Kitc

hene

tte S

ink

Fauc

et

Cau

lkin

g

PLETED TO DATE 5/30/2012 WORK COMPLETED TO DATE 6/27/2012 WORK COMPLETED TO DATE 8/1/2012 PLETED TO DATE 6/6/2012 WORK COMPLETED TO DATE 7/4/2012 WORK COMPLETED TO DATE 8/8/2012 PLETED TO DATE 6/13/2012 WORK COMPLETED TO DATE 7/11/2012 WORK COMPLETED TO DATE 8/15/2012 PLETED TO DATE 6/20/2012 WORK COMPLETED TO DATE 7/18/2012 WORK COMPLETED TO DATE 8/22/2012

WORK COMPLETED TO DATE 7/25/2012 WORK COMPLETED TO DATE 8/29/2012

N/A

N/A

N/AN/A

20 Unit 21 Unit