Colleagues Brochure

1
By ARNOV SETT [[email protected]] I did this project from 13 th February 2014 to 20 th May 2014 in Colleagues Consultants Pvt. Ltd., Gurgaon (India). During this project I exercised my Project Management Skills, concepts from Fluid Mechanics, Heat transfer, Strength of Materials, Computational Fluid Dynamics and employed my software skill of CATIA, ANSYS and Microsoft Project 2013. The results of this research work were utilized to generate solutions, which would determine the design configurations of the Rotary Kiln and the positions of the cooling fans for the Kiln that has been installed in Cosmos Cement Plant, Nepal in July 2013. The cost of the research work was calculated using PM tool, which amounted to Rs.202,500.

Transcript of Colleagues Brochure

Page 1: Colleagues Brochure

By ARNOV SETT [[email protected]]

 

Ø I  did  this  project  from  13th  February  2014  to  20th  May  2014  in  Colleagues  Consultants  Pvt.  Ltd.,  Gurgaon  (India).  

Ø During   this   project   I   exercised  my   Project  Management   Skills,   concepts   from   Fluid  Mechanics,  Heat   transfer,   Strength   of  Materials,   Computational   Fluid  Dynamics   and  employed  my  software  skill  of  CATIA,  ANSYS  and  Microsoft  Project  2013.    

Ø The   results   of   this   research  work  were  utilized   to   generate   solutions,  which  would  determine   the   design   configurations   of   the   Rotary   Kiln   and   the   positions   of   the  cooling  fans  for  the  Kiln  that  has  been  installed  in  Cosmos  Cement  Plant,  Nepal  in  July  2013.    

Ø The   cost   of   the   research   work   was   calculated   using   PM   tool,   which   amounted   to  Rs.202,500.