Collaborative Energy Planning at MCLB Albany

21
Tampa Convention Center Tampa, Florida Collaborative Energy Planning at MCLB Albany Integrated Energy Master Plan Hubert “Ski” Smigelski; Fred Broome U.S. Marine Corps August 15, 2017

Transcript of Collaborative Energy Planning at MCLB Albany

Page 1: Collaborative Energy Planning at MCLB Albany

Tampa Convention Center • Tampa, Florida

Collaborative Energy Planning at MCLB Albany

Integrated Energy Master Plan

Hubert “Ski” Smigelski; Fred BroomeU.S. Marine CorpsAugust 15, 2017

Page 2: Collaborative Energy Planning at MCLB Albany

Energy Exchange: Connect • Collaborate • Conserve

Marine Corps Logistics Base Albany (MCLBA) has received energy reduction accolades and millions in funding for several large scale renewable projects

2

Introduction

Secretary of the Navy Energy and Water

Management Award

Borehole ThermalEnergy Storage

Photovoltaic Power

Biomass Generation

Landfill Gas Generation

Page 3: Collaborative Energy Planning at MCLB Albany

Energy Exchange: Connect • Collaborate • Conserve

The awards and funding come despite several disadvantages

• Small, rural base• Low electric rate [$0.07/kWh]• Not ideal for typical renewables

3

Introduction

Page 4: Collaborative Energy Planning at MCLB Albany

Energy Exchange: Connect • Collaborate • Conserve

Key differences from typical approach

• Developing an Integrated Energy Master Plan is more than any single document

• Develop collaborative partnerships with firm(s) involved throughout the process instead of multiple consultants with multiple plans “thrown over fence”

4

Summary

Page 5: Collaborative Energy Planning at MCLB Albany

Energy Exchange: Connect • Collaborate • Conserve5

Process Flow

Energy Management Plan

Dynamic mechanism; review annually and update

Energy Project SelectionCollaborative discussions to select best program

Project Funding

Team effort to identify and pursue multiple funding avenues

Project Execution

Multiple options including alternatives to traditional design projects

Re-evaluation

Plan, Do, Check, Act

Phase 1 Phase 2 Phase 3 Phase 4 Phase 5

Preliminary: Installation Development Plan

Page 6: Collaborative Energy Planning at MCLB Albany

Energy Exchange: Connect • Collaborate • Conserve

Installation Development Plan

• Often times contracted out at agency level• Ensure plan is reviewed and accurately

captures direction of the installation• Key reference for development of Integrated

Energy Management Plan (IEMP)• Master planning is essential to evaluating

potential energy projects

6

Preliminary: Installation Development Plan

Page 7: Collaborative Energy Planning at MCLB Albany

Energy Exchange: Connect • Collaborate • Conserve

IEMP Goals

• Capture future energy direction of installation• Identify goals• Understand drivers and requirements• Understand trends and history• Understand installation mission (IDP)

7

Phase 1: Integrated Energy Management Plan

Page 8: Collaborative Energy Planning at MCLB Albany

Energy Exchange: Connect • Collaborate • Conserve

IEMP Action Plan

• More than graph showing progress• Target specific strategies• Prioritize technologies• Observe trends in how energy is used for

heating/cooling/process• Incorporate strategies into projected

consumption• Identify pitfalls• Identify funding mechanisms • IEMP is a dynamic mechanism, not a

static document; review annually and updated every ~3 years

8

Phase 1: Integrated Energy Management Plan

Page 9: Collaborative Energy Planning at MCLB Albany

Energy Exchange: Connect • Collaborate • Conserve

Net Zero Plan Development

• IEMP revealed tangible opportunity to achieve Net Zero

• Includes projected energy consumption from IEMP to set goal on renewable production

• Ensure partner understands future consumption and challenges from work on IEMP

9

Phase 1A: Net Zero Plan

Page 10: Collaborative Energy Planning at MCLB Albany

Energy Exchange: Connect • Collaborate • Conserve

Net Zero Plan Results

• Identified specific opportunities• Quantified energy production and implementation cost for each technology• To realize Net Zero, energy consumption must be reduced first• This laid the ground work for multiple projects

10

Phase 1A: Net Zero Plan

Page 11: Collaborative Energy Planning at MCLB Albany

Energy Exchange: Connect • Collaborate • Conserve

Energy Audits

• Concentrate on strategic buildings• Focus on identifying realistic ECMs

that will help meet goals (via collaborative partner)

• When awarding audits, include Design Build RFPs in the same task order so a design is ready at completion

• Seamless implementation of a project with a complete understanding of the goal and technical details

11

Phase 2: Energy Reduction Project Selection

Energy Conservation Measures Building Energy Audit, MCLB Albany

Project No.

Buildings Project Title/Description DD 1391 Investme

nt Cost Est.

Annual Savings Annual Cost

Savings

SPB (years)

Energy (MBtu)

Water (kGal)

ECM-01 Multiple Lighting and Controls Upgrade $565,030 2,031 -- $53,564 10.6

ECM-02 1428, 2201 Daylighting $1,427 7 -- $193 7.4

ECM-03 Multiple Water-Efficient Fixtures $22,959 140 456 $3,453 6.7

ECM-04 Multiple Retro-commissioning $188,818 1,201 -- $30,751 6.1

ECM-05 7450 Air Curtains Upgrade $9,788 27 -- $702 13.9

ECM-06 2235 Demand Controlled Ventilation $65,673 265 -- $6,985 9.4

ECM-07 2235, 7450 HVAC Scheduling and Setbacks $9,378 502 -- $10,993 0.9

ECM-08 1360, 2235 CHW Pump VFDs $55,663 89 -- $2,356 23.6

Total $918,736 4,262 456 $108,997 --

Page 12: Collaborative Energy Planning at MCLB Albany

Energy Exchange: Connect • Collaborate • Conserve

Projects Selection

• Develop potential project list to reduce energy consumption

• Collaborative discussions with installation engineers/planners to select best projects

• Energy projects for upcoming implementation

– Tornado recovery modernizations– GSHP (BTES) Phase II & III– Biomass power generation with P&G– RCx on 4 Buildings– Continued energy auditing

12

Phase 2: Energy Reduction Project Selection

Biomass Power Generation with P&G

Page 13: Collaborative Energy Planning at MCLB Albany

Energy Exchange: Connect • Collaborate • Conserve

Project Limitations

• Partner understands installation’s limitations, challenges, history, goals, and preferences

• Example: variable refrigerant flow (VRF) is a great technology but maintenance experience is lacking and contractor located hours away

• Must understand upcoming SRM projects• Throwing projects over fence doesn’t work

13

Phase 2: Energy Reduction Project Selection

Commissioning VRF system at Building 5501

Page 14: Collaborative Energy Planning at MCLB Albany

Energy Exchange: Connect • Collaborate • Conserve

Project Justification/Preparation

Establish repeatable documentation process with partner • Energy modeling for accurate savings• Detailed cost estimates• Capture all viable savings sources in

LCCAs• Develop 1391s with partner that

understands projects and goals• Highlight base energy goals in 1391• Plan for multiple 1391 and LCCA iterations

14

Phase 3: Project Funding

Building 1210 Fire Station Energy Model

Page 15: Collaborative Energy Planning at MCLB Albany

Energy Exchange: Connect • Collaborate • Conserve15

Phase 3: Project Funding

Project Funding Sources

• Identify funding avenues and pursue multipleRMe, ECIP, EIP, PPAs, EULs, Navy TechVal, ESPCs/UESCs (with coordination and oversight from team members)

• Regular meetings with installation engineers/planners

• Be flexible, funding is a moving target

• Have multiple projects on shelf ready to go

Page 16: Collaborative Energy Planning at MCLB Albany

Energy Exchange: Connect • Collaborate • Conserve

Project Execution Options

• Multiple options should be used• Design Bid Build, Design Build, Navy SPDB RFP, SOWs for shops/BOS• Not everything needs to be a full design

16

Phase 4: Project Execution

SPDB Street Lighting UpgradesBuilding 2265 HVAC Redesign

Page 17: Collaborative Energy Planning at MCLB Albany

Energy Exchange: Connect • Collaborate • Conserve17

Phase 4: Project ExecutionIntegrated

Energy Management

Focused Studies

Energy Audits

New Construction

O&M/Repair

Executed EnergyProjects

RCx

SOWs for Shops

SPDB RFPs HPSB, Energy Efficient Design Alternatives

Full DBB Plans/Spec

Page 18: Collaborative Energy Planning at MCLB Albany

Energy Exchange: Connect • Collaborate • Conserve

Sample RFP Language

18

Phase 4: Project Execution

Page 19: Collaborative Energy Planning at MCLB Albany

Energy Exchange: Connect • Collaborate • Conserve

Identify other opportunities

• Collaborative partnership can identify other opportunities

• RCx: Develop SOWs for shops and ensure contract includes time for RCx team to meet with shop personnel at facilities to review issues

• IWWTP, WTP, Electrical, water, and natural gas infrastructure upgrades

• Multiple building renovations designed with GSHP

19

Phase 4: Project Execution

Cx activities at Bldg 5501

Page 20: Collaborative Energy Planning at MCLB Albany

Energy Exchange: Connect • Collaborate • Conserve

Re-evaluate Energy Status

• As projects are implemented, rebaseline energy use• Update energy management plan• Use collaborative partnership to identify other opportunities• Similar to ISO 50001 Energy Management Standard: Plan, Do, Check, Act

20

Phase 5: Re-evaluate

ISO 50001 Process Diagram MCLBA Energy Management Approach

Page 21: Collaborative Energy Planning at MCLB Albany

Tampa Convention Center • Tampa, Florida21