Collaboration, Trust and Knowledge Sharing in Information Technology Intensive Projects

36
Collaboration, Trust and Knowledge Sharing in Information Technology Intensive Projects Luis Luna October, 2002

description

Collaboration, Trust and Knowledge Sharing in Information Technology Intensive Projects. Luis Luna October, 2002. My Objective for Today. Show you the first iteration of a formal dissertation proposal - PowerPoint PPT Presentation

Transcript of Collaboration, Trust and Knowledge Sharing in Information Technology Intensive Projects

Page 1: Collaboration, Trust and Knowledge Sharing in Information Technology Intensive Projects

Collaboration, Trust and Knowledge Sharing in Information Technology Intensive Projects

Luis Luna

October, 2002

Page 2: Collaboration, Trust and Knowledge Sharing in Information Technology Intensive Projects

My Objective for Today

• Show you the first iteration of a formal dissertation proposal– Involves 2 cases, 4 literature streams, two

models to be developed in 3 phases, multiple research methods

• What to trim and what to grow stronger

• Help with the proposal boundary (Focus in the way the parts fit together, not the detail)

Page 3: Collaboration, Trust and Knowledge Sharing in Information Technology Intensive Projects

Homeless Information Management System

State (BHS)Providers

CTG

HIMS project

Page 4: Collaboration, Trust and Knowledge Sharing in Information Technology Intensive Projects

Elicitated in a GMB session with staff from the CTG on April 13, 2001

Reference Modes

tasks

t

Project definition

Cummulative progress

Page 5: Collaboration, Trust and Knowledge Sharing in Information Technology Intensive Projects

Reference Modes

Engagement

t

Full engagement

Moderate engagement

Low engagement

HIMS Case Elicitated in a GMB session with staff from the CTG on April 13, 2001

Page 6: Collaboration, Trust and Knowledge Sharing in Information Technology Intensive Projects

Reference Modes

Knowledge

t

Full knowledge

Moderate knowledge

Low knowledge

Providers knowledge

State knowledge

Built from the GMB session with staff from the CTG on May 10, 2002

Page 7: Collaboration, Trust and Knowledge Sharing in Information Technology Intensive Projects

Reference Modes

Trust

t

Trust

Distrust

HIMS

Built from archival data on the case and the literature (“very difficult to break distrust once the pattern of spiral reinforcement of distrust is formed”)

Page 8: Collaboration, Trust and Knowledge Sharing in Information Technology Intensive Projects

Initial Conceptualization(Black, 2002)

Page 9: Collaboration, Trust and Knowledge Sharing in Information Technology Intensive Projects

Actor A Actor B

Project across

boundaries

Facilitator

Initial Conceptualization

Knowledge about A’s role

Knowledge about B’s role

Trust on B

Knowledge about A’s role

Knowledge about B’s role

Trust on B

Page 10: Collaboration, Trust and Knowledge Sharing in Information Technology Intensive Projects

Purpose

• The purpose of this research is to develop a grounded theory about the role of an external intervener (facilitator) in the design of a shared space, which promotes the development of trust and knowledge sharing in the context of complex technology-intensive projects.

Page 11: Collaboration, Trust and Knowledge Sharing in Information Technology Intensive Projects

Grounded theory (Strauss & Corbin, 1990)

• Grounded theory consists in a set of techniques to identify themes or concepts across texts, and link them to generate meaningful theories.

• It is possible to use any kind of text– Promotional ads

– Transcriptions of interviews

– Memoranda

– Meeting minutes

– Any kind of textual data.

Page 12: Collaboration, Trust and Knowledge Sharing in Information Technology Intensive Projects

Grounded theory (Strauss & Corbin, 1990)

• In one of the alternatives in the application of the technique, the researcher develops a set of categories or concepts that emerge across the texts.

• In the particular case of system dynamics, these themes can be variables, dynamic behaviors or policy related topics. Every theme is “grounded” in a set of quotes or exemplars across the database of texts.

Page 13: Collaboration, Trust and Knowledge Sharing in Information Technology Intensive Projects

The origin of the idea(Luna & Andersen, 2002)

Page 14: Collaboration, Trust and Knowledge Sharing in Information Technology Intensive Projects

The origin of the idea(Luna & Andersen, 2002)

SR

C

?

Page 15: Collaboration, Trust and Knowledge Sharing in Information Technology Intensive Projects

Shared Space(Schrage, 1999)

• The place where teams work in the creation of ideas around innovative models, simulations and prototypes:– Stakeholder analysis, Process models, Strategic

frameworks, System Dynamics models, software prototypes

• “Who got to play with the model, and when, become a mission-critical management issue”

Page 16: Collaboration, Trust and Knowledge Sharing in Information Technology Intensive Projects

Effective Designof the Shared Space(Carlile, 2002)

• Three main approaches to knowledge boundaries (also in Saracevic, 1999):– Syntactic approach

– Semantic approach

– Pragmatic approach

• Characteristics of effective boundary objects:– Representativness

– Concretness

– Transformable

Page 17: Collaboration, Trust and Knowledge Sharing in Information Technology Intensive Projects

Trust

• In this kind of setting (projects like HIMS), trust can become a major governance mechanism

• Common themes: vulnerability, risk, interdependence, positive expectation.

• “Trust is a psychological state comprising the intention to accept vulnerability based upon positive expectations of the intentions or behavior of another” (Rousseau et al., 1998)

Page 18: Collaboration, Trust and Knowledge Sharing in Information Technology Intensive Projects

Trust

• Three forms of trust relevant to this project– Calculus-based trust.- based on information and

rational choice. Depends on the ability to assess trustworthiness and on the trustee’s propensity to trust

– Identity-based trust.- based on emotional or personal attachment formed by long-term reciprocal interaction.

– Institutional-based trust.- based on organizational culture, societal norms and legal systems that mitigate risk and support trust development.

Page 19: Collaboration, Trust and Knowledge Sharing in Information Technology Intensive Projects

Trust(Rousseau et al.,1998)

t

Institutional-based Trust

Calculus-based TrustIdentity-based Trust

Page 20: Collaboration, Trust and Knowledge Sharing in Information Technology Intensive Projects

Knowledge Sharing

• Lots of research in Knowledge Management pointing to 4 basic kinds of knowledge:– Tacit/Explicit– Individual/Group

• Most of these views stress knowledge as an individuals’ “possession”

Page 21: Collaboration, Trust and Knowledge Sharing in Information Technology Intensive Projects

Knowledge Sharing

• Knowledge “resides on teams of individuals sharing common experiences” (Gherardi & Nicolini, 2000)

• “The source of new knowledge and knowing lies in the use of knowledge as a tool of knowing within situated interaction with the social and physical world” (Cook, 1999)

• “Knowledge is localized, embedded , and invested in the particular objects and ends of a given function” (Carlile, 2002)

Page 22: Collaboration, Trust and Knowledge Sharing in Information Technology Intensive Projects

Knowledge Sharing(Carlile, 2002)

• Knowledge transfer is a difficult task.

• There is a conflict between the knowledge created by a community of practice and the knowledge needed to promote collaboration between communities.

• Knowledge is a barrier and a source of innovation.

Page 23: Collaboration, Trust and Knowledge Sharing in Information Technology Intensive Projects

Knowledge Sharing and Trust(Cresswell et al., Forthcoming)

• Trust appears to be an important factor in Information and Knowledge Sharing.

• What is missing is a way of framing a wider range of possible ways in which knowledge sharing and trust can interact in a collaborative process.

Page 24: Collaboration, Trust and Knowledge Sharing in Information Technology Intensive Projects

Complex Technology- Intensive Project

• Long Tradition in System Dynamics Modeling:– R&D projects (Roberts, 1978; Richardson and Pugh,

1981)

– Ship building projects (Cooper, 1980)

– Software project management (Abdel-Hammid and Madnik, 1991)

– Interactions among allocation of resources when more than one project is under way (Repenning, 2000)

Page 25: Collaboration, Trust and Knowledge Sharing in Information Technology Intensive Projects

Complex Technology- Intensive Project

Scale-up

Scale-up

Scale-up

Relationships

Specifications

Prototyping

Production

A F

B

Knowledge from the problemCultural ImmersionInteraction during next stage

A BF

D

Knowledge from the problemSpecifications

AB

F

DKnowledge from the problemPrototype

AB

F

D Knowledge from the problemSystem

Page 26: Collaboration, Trust and Knowledge Sharing in Information Technology Intensive Projects

Trust ofActor A

on Actor B

Actor AEngagement

Collaborativelydoing work

+

Knowledge ofActor A aboutActor A rolein Project

+

+

A Perception ofResults from work

Noise

Actor APerception of

Risk-

+

Actor A propensityto Trust

+

+

Learning

Effectiveness ofdesign

+

+

Accuracy from Apoint of view

+

+

Knowledge ofActor A

about Actor Brole inProject

Actor A willingnessto change

Assessment ofActor B

Trustworthiness

-

-

+

+

Facilitatorinputs

Error

-

-R

Getting engagedor enraged

R

PerceptionBias

R

Learning byDoing

+

R

Learning to workwith you

RActor A influence on

the shared spacedesign

BDiscovering riskassociated with

project

Accuracy from Bpoint of view

Trust ofActor B onActor A

+

Actor B willingness to changeAssessment of Actor A

Trustworthiness

-

Knowledge ofActor B

about ActorA role inProject

-

+

+

R

Getting to know each otheror reciprocally withholding

information

invisiblemarker1

invisiblemarker1 0

Page 27: Collaboration, Trust and Knowledge Sharing in Information Technology Intensive Projects

Trust ofActor A

on Actor B

Actor AEngagement

Collaborativelydoing work

+

Knowledge ofActor A aboutActor A rolein Project

+

+

A Perception ofResults from work

Noise

Actor APerception of

Risk-

+

Actor A propensityto Trust

+

+

Learning

Effectiveness ofdesign

+

+

Accuracy from Apoint of view

+

+

Knowledge ofActor A

about Actor Brole inProject

Actor A willingnessto change

Assessment ofActor B

Trustworthiness

-

-

+

+

Facilitatorinputs

Error

-

-R

Getting engagedor enraged

R

PerceptionBias

R

Learning byDoing

+

R

Learning to workwith you

RActor A influence on

the shared spacedesign

BDiscovering riskassociated with

project

Accuracy from Bpoint of view

Trust ofActor B onActor A

+

Actor B willingness to changeAssessment of Actor A

Trustworthiness

-

Knowledge ofActor B

about ActorA role inProject

-

+

+

R

Getting to know each otheror reciprocally withholding

information

invisiblemarker1

invisiblemarker1 0

Page 28: Collaboration, Trust and Knowledge Sharing in Information Technology Intensive Projects

Trust ofActor A

on Actor B

Actor AEngagement

Collaborativelydoing work

+

Knowledge ofActor A aboutActor A rolein Project

+

+

A Perception ofResults from work

Noise

Actor APerception of

Risk-

+

Actor A propensityto Trust

+

+

Learning

Effectiveness ofdesign

+

+

Accuracy from Apoint of view

+

+

Knowledge ofActor A

about Actor Brole inProject

Actor A willingnessto change

Assessment ofActor B

Trustworthiness

-

-

+

+

Facilitatorinputs

Error

-

-R

Getting engagedor enraged

R

PerceptionBias

R

Learning byDoing

+

R

Learning to workwith you

RActor A influence on

the shared spacedesign

BDiscovering riskassociated with

project

Accuracy from Bpoint of view

Trust ofActor B onActor A

+

Actor B willingness to changeAssessment of Actor A

Trustworthiness

-

Knowledge ofActor B

about ActorA role inProject

-

+

+

R

Getting to know each otheror reciprocally withholding

information

invisiblemarker1

invisiblemarker1 0

Page 29: Collaboration, Trust and Knowledge Sharing in Information Technology Intensive Projects

Trust ofActor A

on Actor B

Actor AEngagement

Collaborativelydoing work

+

Knowledge ofActor A aboutActor A rolein Project

+

+

A Perception ofResults from work

Noise

Actor APerception of

Risk-

+

Actor A propensityto Trust

+

+

Learning

Effectiveness ofdesign

+

+

Accuracy from Apoint of view

+

+

Knowledge ofActor A

about Actor Brole inProject

Actor A willingnessto change

Assessment ofActor B

Trustworthiness

-

-

+

+

Facilitatorinputs

Error

-

-R

Getting engagedor enraged

R

PerceptionBias

R

Learning byDoing

+

R

Learning to workwith you

RActor A influence on

the shared spacedesign

BDiscovering riskassociated with

project

Accuracy from Bpoint of view

Trust ofActor B onActor A

+

Actor B willingness to changeAssessment of Actor A

Trustworthiness

-

Knowledge ofActor B

about ActorA role inProject

-

+

+

R

Getting to know each otheror reciprocally withholding

information

invisiblemarker1

invisiblemarker1 0

Page 30: Collaboration, Trust and Knowledge Sharing in Information Technology Intensive Projects

Trust ofActor A

on Actor B

Actor AEngagement

Collaborativelydoing work

+

Knowledge ofActor A aboutActor A rolein Project

+

+

A Perception ofResults from work

Noise

Actor APerception of

Risk-

+

Actor A propensityto Trust

+

+

Learning

Effectiveness ofdesign

+

+

Accuracy from Apoint of view

+

+

Knowledge ofActor A

about Actor Brole inProject

Actor A willingnessto change

Assessment ofActor B

Trustworthiness

-

-

+

+

Facilitatorinputs

Error

-

-R

Getting engagedor enraged

R

PerceptionBias

R

Learning byDoing

+

R

Learning to workwith you

RActor A influence on

the shared spacedesign

BDiscovering riskassociated with

project

Accuracy from Bpoint of view

Trust ofActor B onActor A

+

Actor B willingness to changeAssessment of Actor A

Trustworthiness

-

Knowledge ofActor B

about ActorA role inProject

-

+

+

R

Getting to know each otheror reciprocally withholding

information

invisiblemarker1

invisiblemarker1 0

Page 31: Collaboration, Trust and Knowledge Sharing in Information Technology Intensive Projects

Trust ofActor A

on Actor B

Actor AEngagement

Collaborativelydoing work

+

Knowledge ofActor A aboutActor A rolein Project

+

+

A Perception ofResults from work

Noise

Actor APerception of

Risk-

+

Actor A propensityto Trust

+

+

Learning

Effectiveness ofdesign

+

+

Accuracy from Apoint of view

+

+

Knowledge ofActor A

about Actor Brole inProject

Actor A willingnessto change

Assessment ofActor B

Trustworthiness

-

-

+

+

Facilitatorinputs

Error

-

-R

Getting engagedor enraged

R

PerceptionBias

R

Learning byDoing

+

R

Learning to workwith you

RActor A influence on

the shared spacedesign

BDiscovering riskassociated with

project

Accuracy from Bpoint of view

Trust ofActor B onActor A

+

Actor B willingness to changeAssessment of Actor A

Trustworthiness

-

Knowledge ofActor B

about ActorA role inProject

-

+

+

R

Getting to know each otheror reciprocally withholding

information

invisiblemarker1

invisiblemarker1 0

Page 32: Collaboration, Trust and Knowledge Sharing in Information Technology Intensive Projects

Trust ofActor A

on Actor B

Actor AEngagement

Collaborativelydoing work

+

Knowledge ofActor A aboutActor A rolein Project

+

+

A Perception ofResults from work

Noise

Actor APerception of

Risk-

+

Actor A propensityto Trust

+

+

Learning

Effectiveness ofdesign

+

+

Accuracy from Apoint of view

+

+

Knowledge ofActor A

about Actor Brole inProject

Actor A willingnessto change

Assessment ofActor B

Trustworthiness

-

-

+

+

Facilitatorinputs

Error

-

-R

Getting engagedor enraged

R

PerceptionBias

R

Learning byDoing

+

R

Learning to workwith you

RActor A influence on

the shared spacedesign

BDiscovering riskassociated with

project

Accuracy from Bpoint of view

Trust ofActor B onActor A

+

Actor B willingness to changeAssessment of Actor A

Trustworthiness

-

Knowledge ofActor B

about ActorA role inProject

-

+

+

R

Getting to know each otheror reciprocally withholding

information

invisiblemarker1

invisiblemarker1 0

Page 33: Collaboration, Trust and Knowledge Sharing in Information Technology Intensive Projects

The Modeling Strategy

Actor A Actor B

Project across

boundaries

Facilitator

Knowledge about A’s role

Knowledge about B’s role

Trust on B

Knowledge about A’s role

Knowledge about B’s role

Trust on B

Page 34: Collaboration, Trust and Knowledge Sharing in Information Technology Intensive Projects

The Modeling StrategyPhase 1

Actor A Actor B

Project across

boundaries

Knowledge about A’s role

Knowledge about B’s role

Trust on B

Knowledge about A’s role

Knowledge about B’s role

Trust on B

Facilitator

• HIMS Model (Based on Group Model Building and Archival Data)

• Finish the modeling work

• Develop and test policies

Page 35: Collaboration, Trust and Knowledge Sharing in Information Technology Intensive Projects

The Modeling StrategyPhase 2

Actor AB

Project across

boundaries

Facilitator

Knowledge about Design

Knowledge about Problem

Trust on Facilitator

Knowledge about Design

Knowledge about Problem

Trust on AB

• DOJ (Ver. 1) Model (Based on interviews and direct observation)

• Develop and test policies

Page 36: Collaboration, Trust and Knowledge Sharing in Information Technology Intensive Projects

The Modeling StrategyPhase 3

• DOJ (Ver 2) Model (Based on interviews and direct observation)

• Test Policies developed and tested in phases 1 and 2

Actor A Actor B

Project across

boundaries

Facilitator

Knowledge about A’s role

Knowledge about B’s role

Trust on B

Knowledge about A’s role

Knowledge about B’s role

Trust on B