COLD STARTUP PROCEDURE~250 MW
-
Upload
pranay-patel -
Category
Documents
-
view
213 -
download
0
Transcript of COLD STARTUP PROCEDURE~250 MW
-
8/18/2019 COLD STARTUP PROCEDURE~250 MW
1/2
COLD STARTUP PROCEDURE250 MW - PFBC - COAL FIRED THERMAL POWER PLANT
SITUATION (INITIAL CONDITION): - AC POWER ON AND NO EQUIPMENT IS RUNNING
1.
START ACW PUMP - BACK CHARGE CONDENSER & CW PUMP DISCHARGE LINES. (FILLING
TIME 15-20 MIN FOR AIR REALEASE)
2. START CW PUMP.
3. START DMMU PUMP & FILL DMMU TANK
4.
START DMCW PUMP AFTER TANK LVL OK
5. START COMPRESSOR AS INSTRUMENTS & ACTUATORS WILL NOT WORK.
6. START BOILER FILL PUMP.
7.
START BOILER DRUM FILLING UPTO LIGHT UP LEVEL AND DEAERATOR STORAGE TANK &
HOTWELL UPTO NORMAL LEVEL.
8. START CEP AND KEEP IT RUNNING ON RECIRCULATION.
9.
START APH -->ID FAN —>FD FAN. (GD 1 & 2 MUST OPEN, FLUE GAS LINE-UP BEFORE ID FA
START. OPEN DISCHARGE GATE (GUILLOTINE TYPE). START CLEANING BLOWER).
10. ESTABLISH 30% TO 40% AIR FLOW MAINTAINING FURNACE PRESS (-5 TO -10 MM WC)
11. KEEP LFO PUMP RUNNING ON RECIRCULATION
12.
PURGE FURNACE.
13. KEEP ECO RECIRCULATION VALVE OPEN
14.
ESTABLISH GENERATOR SEAL OIL SYSTEM & FEED GAS.
15. PUT TURBINE ON BARRING GEAR.
16.
LIGHTUP BOILER WITH LDO 2 GUNS ( AB 1-3 )
17. AFTER 15 - 30 MIN TAKE OTHER PAIR (AB 2- 4).
18.
AT DRUM PRE @ 2 KSC CLOSE DRUM VENT.
19.
START ONE BFP & KEEP IT RUNNING ON RECIRCULATION
20. AT DRUM PRESS AT 6 – 8 KSC CLOSE STEAM SIDE DRAINS & VENTS EXCEPT START UP VEN
21. WARM UP MS LINE AND OPEN STOP VALVES.
22.
AT MAIN STEAM PRESSURE 25 KG/CM2, PUT SELF APRDS INTO SERVICE.
23. DEAERATOR INITIAL HEATING STEAM FROM UNIT SIDE.
24. CLOSE REHEAT VENT & DRAIN
25.
START VACUUM PULLING.26.
HP-LP BYPASS CHARGE & CLOSE START UP VENT.
27. START DEAERATOR PEGGING STEAM FROM APRDS AND STOP DEAERATOR INITIAL
HEATING.
PUT IN CD ELE, AND ACHIEVE MATCHING STEAM PARAMETER FOR TURBINE ROLLING (FOR
JPL, STEAM PRESS = 35KSC, TEMP. 3500 C. APPROX.)
28. START ROLLING AT 600 RPM- SOAK.
29.
SATRT PA FAN KEEP ONE MILL RUNNING WITHOUT FEEDER.
-
8/18/2019 COLD STARTUP PROCEDURE~250 MW
2/2
30.
THEN GO FOR 3000 RPM AFTER COMPLETION OF SOAKING.
31. SYNCHRONISE GENERATOR – LOAD WILL BE 5%
32.
START FEEDER & INCREASE COAL FEEDING. MO*-NITOR STM PRE & TEMP.
33.
CUT-IN 2ND MILL & RAISE FEEDING. MONITOR 72\M PRE & TEMP.
34. AT 20% LOAD IN MW:
• LPH SERVICE
• UNIT AUX TRANSFORMER SERVICE
• DEAERATER PEGGING FROM CRH STEAM
• CHECK HPLP BYPASS CLOSED.
• STOP ALL GUNS
• FCS FROM LOW TO HIGH RANGE VALVE
35. AT 40% OF LOAD IN MW:
• HPH IN SERVICE
• PUT EHG GOV LOAD TO PRE CONTROL ( TURBINE FOLLOW MODE )
• CHARGE DEA PEGGING STEAM FROM CRH TO EXTRN. LINE
• CUT-IN 3RD MILL & RAISE FEEDING. MONITOR STM PRE & TEMP.
36.
AT 50-55% LOAD IN MW:
• START 2ND BFP
• START 2ND. SET ID , FD & PA FAN
• TAKE 4TH MILL & GO FOR FULL LOAD
• OBSERVE TSE MARGINS CAREFULLY