    Coding System

    Standard

    Version Log

    Version Date Author Note

    F 1 16th March 2017 Celestin MWAMBUTSA

    F1 25-06-2018 M. Brouwer Added locations

    別添 9

  • 9.1 Coding System of WASAC

    1 Table of Contents 1 Introduction ..................................................................................................................................... 3

    2 Encoding .......................................................................................................................................... 3

    3 Functional decomposition ............................................................................................................... 3

    4 ANNEX I: Tables location-oriented code ......................................................................................... 6

    4.1 Branch number ........................................................................................................................ 6

    4.2 Location name ......................................................................................................................... 7

    5 ANNEX 2: Process groups ................................................................................................................ 9

    6 ANNEX 3: Process steps ................................................................................................................. 10

    7 ANNEX 3: Modules ........................................................................................................................ 11

    8 ANNEXES 4: Components .............................................................................................................. 11

  • 9.1 Coding System of WASAC

    1 Introduction Encoding is something like naming in the form of a code. It is not necessary, that the code also

    replaces the common designations in the parlance. WASAC has chosen to naming and coding as

    much as possible to distract from the functional denomination.

    The code must be applied to all relevant given as core parts of the plant and then forms the means of

    identification of the element and the key to all this available information. Because the encryption

    system is derived from the structure of treatment plants, in the most meaningful and simple way as

    possible. This document also describes the methodology of defining and clarifying the locations.

    Encryption is used on Piping and Instrumentation Diagrams (P&IDs), electrical and mechanical

    drawings, in controlling processes, and displaying process.

    2 Encoding The encoding conforms to the following principles:

    Unique design

    Assigning a code expires according to a tight structure

    Process oriented

    The code says something about the position within the production process of the indicated

    process part

    Functional decomposition of processes

    The encoding follows the Division of the process in functional parts.

    Applicable to all current and future processes on (drinking) water locations

    The structure is part of the process but gives no restrictions to the process.

    3 Functional decomposition In order to be able to describe the functioning of production sites, for example for the design of the

    process Automation, a breakdown structure is made of the process in functional parts (functional

    decomposition). This breakdown structure continues in P&ID, process descriptions and operating

    plans. By defining a functional decomposition can also clear the encoding be set up.

    For the method of decomposition is chosen for the standard "Batch control" part 1: Models and

    terminology (NEN-EN-IEC 61512-1), also known as "s88". Although this standard out of automating

    batch processes but this system of Division is no longer apply to the processes at WASAC.

    The breakdown of the process takes place in accordance with this standard in seven layers which a

    corresponding WASAC names, as shown in the following table.

  • 9.1 Coding System of WASAC

    Denomination

    in accordance

    with

    IEC 61512-1-

    NEN:

    WASAC

    naming:

    Area Location

    name

    Technical installation

    Process cell Process

    group Process name

    Unit Process

    step

    Equipment

    module

    Module

    Functional title Control

    module

    Component

    The location name provides information on the location of a production or distribution location

    within the organization. The location name and code is in whole WASAC unique and is sufficient to

    identify the location.

    The process name gives a main classification of the process. The process is divided into process

    groups and process steps

    A process step is an important contribution to the production process such as Raw water,

    treatments or distribution.

    For a good understanding, a distinction is made in primary and auxiliary (secondary) process steps. By

    primary steps runs the water of Raw water towards treatment. Here may be multiple steps in

    series. There may also be more steps of the same type are switched one after another, these are

    then numbered in the direction of the water flow. Supporting processes work for one or more steps

    in the same group. Per group are only the established steps possible. The functional title gives the

    function of a part of the process from that operation.

    A module is a part of a step as a filter, a pump (Group), and (between) reservoir to decoupling of

    process steps. Per step there may be different module be used. For a number of steps are specific

    module that can be used only in that step.

    As the last decomposition there are components that can be divided into valves, measurements and

    equipment. The distinction between the components is focused on the function, this is determined

    by the component and not by the location of the component in the process or the medium what the

    component is edited.

    The encoding follows the decomposition and is divided as follows:

  • 9.1 Coding System of WASAC

    aaaa aan aann

    a = alphabet letters

    n = numbers digits

    Location code/number

    Proces group

    Module + number

    Component + number

    Location oriented

    Process oriented

    a aa

    Proces step

    4 characters

    1 character

    2 + 1 characters

    2 + 2 characters

    2 characters

    Functional oriented

    nn

    Branche number 2 characters

  • 9.1 Coding System of WASAC

    4 ANNEX I: Tables location-oriented code

    4.1 Branch number Description code part: characters: Note:

    BUGESERA 16

    GICUMBI 09

    GIKONDO 23

    HUYE 06

    KACYIRU 20

    KANOMBE 25

    KARONGI 12

    MUHANGA 02

    MUSANZE 04

    NGOMA 08

    MUHIMA 24

    NYAGATARE 15

    NYAMAGABE 11

    NYAMIRAMBO 21

    NYANZA 07

    NYARUGENGE 26

    REMERA 22

    RUBAVU 03

    RUHANGO 17

    RUSIZI 05

    RWAMAGANA 10

  • 9.1 Coding System of WASAC

    4.2 Location name

    Description code part: characters: Note:

    Treatment plant Byimana TPBY Gikondo (23)

    Treatment plant Cyampirita TPCY Nyagatare (15)

    Treatment plant Cyondo TPCO Nyagatare (15)

    Treatment plant Cyunyu TPCU Rusizi (05)

    Treatment plant Gihengeri TPGI Nyagatare (15)

    Treatment plant Gihira TPGH Rubavu (03)

    Treatment plant Gihogwe TPGO Nyarugenge (26)

    Treatment plant Gihuma TPGU Muhunga (02)

    Treatment plant Jali TPJA Nyarugenge (26)

    Treatment plant Kadahokwa TPKA Huye (06)

    Treatment plant Kanwiriri TPKN Nyagatare (15)

    Treatment plant Kanyabusage TPKY Ngoma (08)

    Treatment plant Karenge TPKR Kanombe (25)

    Treatment plant Kimisagara TPKI Nyamirambo (21)

    Treatment plant Kizanye Mpazi TPKZ Nyarugenge (26)

    Treatment plant Mburabuturo TPMB Nyarugenge (26)

    Treatment plant Mpanga TPMP Nyanza (07)

    Treatment plant Muhazi TPMU Rwamagana (10)

    Treatment plant Mutobo TPMU Musanze (04)

    Treatment plant Ngenda TPNG Bugesera (16)

    Treatment plant Nyagatare TPNY Nyagatatre (15)

    Treatment plant Nyamabuye TPNA Gicumbi (09)

    Treatment plant Nzove TPNZ Nyarugenge (26)

    Treatment plant Rawasaburo TPRA Ngoma (08)

    Treatment plant Rwampara TPRW Nyamirambo (21)

    Treatment plant Rwasama TPRS Nyagatare (15)

    Treatment plant Rwabigeyo A TPRB Nyagatare (15)

    Treatment plant Rwabigeyo B TPRI Nyagatare (15)

  • 9.1 Coding System of WASAC

    Treatment plant Tovu TPTO Nyagatare (15)

    Treatment plant ?? TP??

    Booster pump station Kabindi BPKA Nyagatare (15)

    Booster pump station Rwimondo BPRW Nyagatare (15)

    Booster pump station ?? BP??

    Reservoir Ntora RSNT Kacyiru (20)

    Reservoir New Mt. Kigali Reservoir RSKR Nyamirambo (21)

    Reservoir ?? RS??

    District Meter Area (DMA) 0-99 DM01 Maximum is 99

    DMA Kibagabaga DM01 Remera (22)

    DMA Free Trade Zone / Masoro DM02 Remera (22)

    DMA Kinyinya DM03 Remera (22)

    DMA Bumbogo DM04 Remera (22)

    DMA Nyarutarama DM05 Remera (22)

    DMA Kimironko 1 DM06 Remera (22)

    DMA Kimironko 2 DM07 Remera (22)

    DMA Bibare DM08 Remera (22)

    DMA Amahoro Stadium DM09 Remera (22)

    DMA Nyakabanda DM10 Remera (22)

    DMA Rukiri DM11 Remera (22)

    DMA Nyabasindu DM12 Remera (22)

    DMA Ndera DM01 Kanombe (25)

    DMA Masaka & Rusheshe DM02 Kanombe (25)

    DMA Kabuga DM03 Kanombe (25)

    DMA Samaduha DM04 Kanombe (25)

    DMA Gasogi DM05 Kanombe (25)

    DMA Gishore DM06 Kanombe (25)

    DMA Gako & Ayabaraya DM07 Kanombe (25)

    DMA Kamashashi & Nyarugunga DM08 Kanombe (25)

    DMA Buanza DM09 Kanombe (25)

  • 9.1 Coding System of WASAC

    DMA Kabeza DM10 Kanombe (25)

    DMA Rwimbogo & Nonko DM11 Kanombe (25)

    DMA Muyumbu DM12 Kanombe (25)

    Location code:

    The location code consists of 6 letters and/or numbers, they are combined from the list with branch

    numbers and location names. This combination is unique.

    On the same site multiple processes are possible. Also it may be that there are different types are

    present in the same location (e.g. a water tower on a water treatment location) the location will then

    get the broadest indication (in the example, so water treatment).

    The numbering of the DMAs (District Meter Areas) are rising to a maximum of 99.

    5 ANNEX 2: Process groups Description code: characters: Note:

    Raw water R

    Boreholes B

    treatment T

    Distribution D

    Chemicals C

    General G

  • 9.1 Coding System of WASAC

    6 ANNEX 3: Process steps Description PROCESS STEP

    Procesgroup Raw water: ---

    Raw water transport RT

    River RV

    Raw water reservoir RR

    Water hammer tank WH

    Dam DM

    Procesgroup treatment: ---

    Disinfection DI

    Filtration FT

    Clarifier CF

    Treatment supporting ---

    Hypochlorite make HM

    Chlorine make CM

    Disinfection DS

    Backwashing BW

    Algae floc dosing1 AF

    Process Group Distribution: D ---

    Treated water transport TT

    Treated water reservoir TR

    Disinfection DS

    Meter chamber MC

    Water hammer tank WH

    General: G

    Common elements CE

  • 9.1 Coding System of WASAC

    Description PROCESS STEP

    Electrical supply ES

    7 ANNEX 3: Modules Description MODULE

    River RVx

    Raw water intake RIx

    Mixing chamber MCx

    Dosing DOx

    Clarifier CFx

    Lamella separator LMx

    Filter FLx

    Quality monitoring QMx

    Pipe PPx

    Pump group PGx

    Distribution group DGx

    Reservoir RSx Also Sump and tank

    Tank TKx

    Unit UNx Also: merged unit

    Lagoon LGx rinse water pond

    Water tower WTx

    Dam DMx

    Customer meters CMx

    Meter Chamber MCx

    8 ANNEXES 4: Components Name Component

    Valves:

  • 9.1 Coding System of WASAC

    Electrical operated valve EVxx

    Manuel operated valve MVxx

    Pneumatic operated valve PVxx

    Measurements:

    Pressure indicator PIxx

    Pressure transmitter PTxx

    Pressure switch PSxx

    Level indicator LIxx

    Level transmitter LTxx

    Level switch LSxx

    Ph-transmitter POxx

    Quality instrument QIxx

    Chlorine instrument CIxx

    Turbidity instrument TIxx

    TDS instrument DIxx

    Conductivity sensor GOxx

    Hardness sensor HOxx

    Oxygen sensor ZOxx

    Flow indicator FIxx

    Flow transmitter FTxx

    Flow meter pulse FQxx

    Flow switch FSxx

    Secondary:

    Energy monitoring EMxx

    Intrusion detector IBxx

    Current measurement IMxx

  • 9.1 Coding System of WASAC

    Power measurement PMxx

    Temperature measurement TMxx

    Voltage measurement UMxx

    Regulator XRxx

    UPS UPxx

    Data logger (RTU/PLC) DLxx

    Tools:

    Centrifuge CFxx

    Air compressor ACxx

    Pump PPxx

    Mixer MXxx

    Dosing pump DPxx

    Scraper SPxx

    Hypochlorite generator HGxx

    Secondary:

    Transformer TFxx

    UPS unit UPxx