    Victoria Station Upgrade

    Code of Construction Practice Part B

  • Page 2 of 54 London Underground Code of Construction Practice part B Victoria Station Upgrade Reference VBN-V047-1159-ENV-PLN-000142 Revision 5 22/06/2011

    Project: Victoria Station Upgrade

    Report Ref: VBN-V047-1159-ENV-PLN-000142

    Title: Code of Construction Practice Part B

    Issue Record

    Revision Status

    Revision Date Nature of Revision Prepared By

    0 25/11/10 First Draft Jon May

    1 8/12/10 Second Draft Jon May

    2 10/02/11 Third Draft (Following CLG Comments) Jon May

    3 10/03/11 Final Draft Jon May

    4 01/06/11 Amendments following CoW public

    consultation Jon May

    5 22/06/11 Amendments required by CoW Planning

    Committee; Inclusion of signed Terms of

    Reference for CLG

    Jon May

  • Page 3 of 54 London Underground Code of Construction Practice part B Victoria Station Upgrade Reference VBN-V047-1159-ENV-PLN-000142 Revision 5 22/06/2011

    Contents

    Contents ..................................................................................................................... 3

    Definitions .................................................................................................................. 4

    Abbreviations ............................................................................................................. 5

    1 Introduction ......................................................................................................... 6

    2 Area and Scope ................................................................................................ 11

    3 Temporary Construction Worksites ................................................................... 12

    4 Summary of the Main Works ............................................................................. 13

    4.1 Demolition Works ........................................................................................ 13

    4.1.1 North Site .............................................................................................. 13

    4.1.2 Central Zone ......................................................................................... 15

    4.1.3 South Zone ........................................................................................... 16

    4.2 Ground Treatment Works ............................................................................ 16

    4.3 Tunnelling Works ........................................................................................ 17

    4.4 North Ticket Hall Construction. .................................................................... 18

    4.5 South Ticket Hall Construction. ................................................................... 19

    5 Notification and Public Information .................................................................... 20

    6 Public Access and Highways ............................................................................ 21

    7 Water Resources .............................................................................................. 22

    7.1 Site Drainage .............................................................................................. 23

    7.2 Surface Water Pollution Control .................................................................. 23

    7.3 Groundwater Pollution Control .................................................................... 23

    8 Noise and Vibration ........................................................................................... 24

    8.1 Noise and Vibration Receptors.................................................................... 24

    8.2 Foreseeable Construction Method, Programme and Working Hours .......... 25

    8.3 Foreseeable Site Specific Noise and Vibration Mitigation ........................... 25

    8.4 Noise and Vibration Monitoring ................................................................... 29

    8.5 Pre-construction ambient noise survey ....................................................... 31

    9 Dust and Air Quality .......................................................................................... 33

    9.1 Dust Receptors ........................................................................................... 33

    9.2 Activities requiring specific consideration for dust mitigation measures ...... 34

    9.3 Dust Monitoring ........................................................................................... 35

  • Page 4 of 54 London Underground Code of Construction Practice part B Victoria Station Upgrade Reference VBN-V047-1159-ENV-PLN-000142 Revision 5 22/06/2011

    10 Asbestos ......................................................................................................... 37

    11 Contaminated Land ........................................................................................ 38

    12 Archaeology ................................................................................................... 39

    13 Listed Buildings and Conservation Areas ....................................................... 40

    Appendix 1 - Figures ................................................................................................ 41

    Appendix 2 Complaints Procedure ........................................................................ 44

    Appendix 3 CLG Terms of Reference ................................................................... 47

    Appendix 4 Worksite Locations ............................................................................. 53

    Definitions

    CoCP Part A sets out the general principles and requirements to be applied during construction for site operations. CoCP Part B sets out the details of how those principles and requirements are to be applied for each phase of the development on a site-specific basis.

  • Page 5 of 54 London Underground Code of Construction Practice part B Victoria Station Upgrade Reference VBN-V047-1159-ENV-PLN-000142 Revision 5 22/06/2011

    Abbreviations

    BPM Best Practicable Means BS British Standard CDM Construction (Design and Management) Regulations CLG Community Liaison Group CoPA Control of Pollution Act 1974 CoCP Code of Construction Practice CoW City of Westminster CPP Construction Phase Plan EA Environment Agency EH English Heritage EHO Environmental Health Officer ES Environmental Statement GLA Greater London Authority HSE Health and Safety Executive LFEPA London Fire and Emergency Planning Authority LU London Underground NTH North Ticket Hall PEA Project Evaluation Area SCLG Shadow Community Liaison Group SEMP Site Environmental Management Plan SES Supplementary Environmental Statement SI Site Investigation STH South Ticket Hall SWMP Site Waste Management Plan TCPA Town and Country Planning Act (s) TfL Transport for London TMP Traffic Management Plan TWA TWAO

    Transport and works Act Transport and Works Act Order

    VBN VIG

    VINCI BAM Nuttall Joint Venture Victoria Interchange Group

    VL Victoria Line VSU WSI

    Victoria Station Upgrade Written Scheme of Investigation

  • Page 6 of 54 London Underground Code of Construction Practice part B Victoria Station Upgrade Reference VBN-V047-1159-ENV-PLN-000142 Revision 5 22/06/2011

    1 Introduction

    The Code of Construction Practice Part (CoCP) A sets out general construction principles and requirements that will be applied in the construction of the Victoria Station Upgrade (VSU) Project. The CoCP Part B is a site specific document detailing how specified items in Part A are to be applied for each element of the works. Part B is not intended to be an exhaustive account of every element of the VSU works and their mitigation as their development is not complete at the time of writing and could not be covered adequately is such a limited document. Instead this document is focussed upon those issues with the potential to cause impacts outside of the worksites in order to inform stakeholders of the proposed approach and mitigation. It is important to stress that VBN will follow the measures specified within Part B in addition to those mitigation measures specified in the CoCP Part A. It is therefore important to have due cognisance of both documents when reviewing the works. The intended forum for communicating a more detailed and timely account of the works is the Community Liaison Group described in section 4 of the document with the terms of reference published in Appendix 3. This is a regular forum throughout the works which will facilitate a more informed discussion of the proposals once the works have been defined. A suggested content of the CoCP Part B is included in Appendix 1 of the CoCP Part A. The rational for the inclusion or omission of these elements is described below: Conditions imposed on planning permissions, and assurances given in relation to planning and other consents The process for discharge of the planning conditions is as follows:

    VSU submits the required information to the local authority (City of

    Westminster).

    This information is then made publically available via the CoW website1.

    Certain planning conditions, namely Condition 2 (Above Ground Structures)

    and as agreed between VSU and CoW, will be presented to the CLG prior to

    formal submission under the planning approval process.

    Details regarding the planning conditions are not included within the CoCP

    Part B due to them being publically available on the CoW website.

    Details of the 3rd party agreements made between London Underground