Coca-Cola’s Atlanta Landfill Gas Cogeneration...
Transcript of Coca-Cola’s Atlanta Landfill Gas Cogeneration...
2
ENERGY & CLIMATE
SUSTAINABLE PACKAGING
WATER STEWARDSHIP
Where doe s Coca -Co l a focus
on Sus t a i nab i l i t y ?
F l e e t T r a n s p o r t a t i o n
P r o d u c t i o n E f f i c i e n c y
A l te rna t i ve Energy
P r o d u c t D e l i v e r y
Four Key Areas for Energy & Cl imate
Project Overview • Project Description
– 6.525 MW combined heat and power plant using landfill gas from Hickory Ridge landfill – Electric and thermal energy used by Coca-Cola’s Atlanta Plant – Project includes:
• Landfill gas processing • 6.0 mile dedicated pipeline • 3 Jenbacher J616 engines
• Heat recovery steam generators • Steam turbine chiller
• Project Schedule – Construction start – 12/2010 – Commercial operations – 3/2012
• Key Project Partners – Mas Energy – Republic Services
– Atlanta Gas Light
– GE Jenbacher
– Veolia Energy N.A.
– Crowder Construction
System Schematic
7 | Page
Appendix A
Cooling'&'Dehydra0on'
Siloxane'Removal'
Polishing'Bed'
'''Gas'Compressor'
2.175'MW'GenBset'
2.175'MW'GenBset'
2.175'MW'GenBset'
H'R'S'G'
H'R'S'G'
H'R'S'G'
1065'Ton'SteamBDriven'
Chiller'
Landfill'Gas'to'Exis0ng'Flare'
Siloxane'Bed'Regen'&'Destruc0on'Flare'
Steam'to'Process,'HVAC'
Chilled'Water'to'Process,'HVAC'
6.0'mile'Dedicated'LFG'pipeline'to'Trigenera0on'Plant'
11,400'lb/hour'of'125'psig'steam'
Electricity'to'CocaBCola'&'Ga'Power'