CNES program status CNES program status E. Thouvenot, CNES March 2007.

10
CNES program status CNES program status E. Thouvenot, CNES March 2007

Transcript of CNES program status CNES program status E. Thouvenot, CNES March 2007.

CNES program statusCNES program status

E. Thouvenot, CNES

March 2007

CNES program status – OST-ST meeting - Hobart - March, 2007 2

CNES Strategy in OceanographyCNES Strategy in Oceanography

• Contribute to operational outcome of altimetry :  TOPEX/POSEIDON => JASON1 => JASON2/OSTM =>JASON3 ERS 1 & 2 => ENVISAT => SENTINEL3 + CORIOLIS, MERCATOR/COO/ECOMF, ...

• Continue research activities for future altimetry missions/instruments (AltiKa, WSOA, Water,…)

• Contribute to space measurements of other ocean physical parameters : - salinity : SMOS, CNES contribution to ESA project - directional wave spectrum (SWIM/CFOSAT) - ocean colour (SSO or GEO)

• Prepare ocean applications of ORFEO (Cosmo SkyMed/Pleiades) : mainly coastal applications

CNES program status – OST-ST meeting - Hobart - March, 2007 3

TOPEX/POSEIDON (CNES/NASA)

LauncherDORIS & POSEIDON

Mission Center

Reference missionOcean Large scale

Earth reference system

SPOT2 (CNES)DORIS

SPOT3 (CNES)DORIS

SPOT4 (CNES)DORIS

SPOT5 (CNES)DORIS

1990

2000

Jason-1 (CNES/NASA)Satellite bus

DORIS & POSEIDONControl & Mission Center

ERS-1 (ESA) Altimeter algorithm

ENVISAT (ESA)DORIS

Altimeter ProcessingArchive & distrib.

ERS-2 (ESA)

experiment

operational

CRYOSAT2 (ESA)DORIS

Jason-2 / OSTM (CNES/NASA/EUMETSAT/NOAA)

Satellite busDORIS & POSEIDON

Control & Mission Center

ALTIKA/SARAL(CNES/ISRO)

Altimeter, radiometer, DORIS, Lra

Process, archive & distrib.

SALP : Altimetry and precise positioning service

MERCATOR : assimilation, forecastCNES / SHOM / METEOFRANCE / IFREMER / CNRS / IRD

PLEIADES (CNES)DORIS

2005CRYOSAT (ESA)DORIS

2010

HY-2 (CNSA)DORIS ?

CNES involvment in altimetryCNES involvment in altimetry

Complementing missionmesoscale, ice

CNES program status – OST-ST meeting - Hobart - March, 2007 4

Status of altimetry missions/activitiesStatus of altimetry missions/activities

■ TOPEX/POSEIDON : Stopped after more than 13 years of ocean observations

■ Jason1/TOPEX tandem mission : success !■ ENVISAT

excellent synergy with Jason1 (T/P and ERS complementarity further improved)

■ DORIS 5 DORIS receivers simultaneously in flight : earth reference system strengthened

■ MERCATOR inter Agency structure for the implementation of an oceanographic forecasting center in Europe in the mid term

(GMES Marine Core Service)

■ AltiKa : Implementation phase approved. Launch possible from end-2009.■ SALP/SSALTO/AVISO : multi-mission ground segment■ Next Step : possible contribution(s) to HY-2A/Water/SENTINEL3/JASON3 (TBD)

■ Important notice to OST-ST members : new Research Announcement for the next 4-years : NASA AO : see ROSES. CNES/EUMETSAT AO : see AVISO website

New team in place early 2008 (before Jason2/OSTM launch)

CNES program status – OST-ST meeting - Hobart - March, 2007 5

AVISO Data user teamsAVISO Data user teams

CNES program status – OST-ST meeting - Hobart - March, 2007 6

Jason1Jason1

■ Qualified in orbit

■ Operational mission underway

■ Products distributed routinely

■ CNES operations funded through SALP

■ Required lifetime : 3 years (achieved in december, 2004)

■ Extended mission: 5 years (achieved in december, 2006)

■ Extension agreement for 5 more years of operation signed between CNES & NASA on december, 2006

CNES program status – OST-ST meeting - Hobart - March, 2007 7

Jason2/OSTM European sideJason2/OSTM European side

■ Cooperative Framework between NOAA/NASA/EUMETSAT/CNES

basic mission, continuation of Jason1 (Core Mission) Technological passengers to enhance DORIS performance

(CARMEN2/LPT, T2L2) 4-party MOU signed LPT CNES/JAXA MOU signed

■ CNES program approved in April, 2004

■ EUMETSAT program approved in June, 2003 CNES/EUMETSAT agreement signed

Launch date : june 15, 2008

CNES program status – OST-ST meeting - Hobart - March, 2007 8

SARAL/AltiKaSARAL/AltiKa

■ Program approved on december, 2005 Altimetric Gap filler between ENVISAT & SENTINEL3 Research oriented mission :

- new, higher frequency, greater performance- potential new applications on ice, land, coast areas

…but with a consolidated architecture : conventional altimeter

■ Cooperative framework : CNES/ISRO Initially, AltiKa wa supposed to be embarked on OCEANSAT3 mission (with other

ocean-dedicated sensors…) However, delay on OCEANSAT3 schedule May/June 2006 : CNES&ISRO proposition to embark AltiKa payload with Argos3, on

a new platform, named SSB (Small Satellite Bus), which is presently being developed by ISRO.

July2006/November2006 : CNES&ISRO technical studies to assess the feasibility : ok

Confirmation of CNES&ISRO cooperation on this new baseline obtained on December 2006 : SARAL mission (Satellite with ARgos & ALtika)

CNES/ISRO MOUs signed in february, 2007 Tentative launch date : end-2009/early-2010

■ Data policy : ~ the same as JASON missions (through CNES/ISRO RAs)

CNES program status – OST-ST meeting - Hobart - March, 2007 9

Status of altimetry programsStatus of altimetry programs

91 92 93 94 95 96 97 98 99 00 01 02 03 04 05

RA/ERS-1

ERS/GFO

05 06 07 08 09 10 11 12 13 14 15 16 17 18 19

On going mission EUM managed mission pending approval

Post-EPS-1

AltiKa/SARAL

Envisat

Approved mission GMES mission pending approval

Jason-3

Pending Jason follow-on IPO managed mission pending approval

66° inclination

High inclination

Jason-1

Sentinel 3

NPOESS

Jason-2

HY-2A

CRYOSAT2

CNES program status – OST-ST meeting - Hobart - March, 2007 10

DORIS

Next StepsNext Steps

■ HY-2A : CNESHY-2A : CNES/CNSA discussions underway/CNSA discussions underway Payload : Dual frequency altimeter, nadir 3-frequency radiometer, 5-frequency

scanning radiometer, scanning scatterometer, +DORIS/GPS/LRA Orbit : SSO 6am-6pm, 14 days (after 1-year geodetic mission) Launch : 2009

■ JASON3 : (see dedicated presentation) NOAA/EUMETSAT cooperation with EC, CNES & NASA (TBC) contributions CNES in-kind contribution : Proteus platform and project team equivalent to

JASON/OSTM (i.e. about one third of European part of the program) Launch : end-2012

■ WATER (or SWOT) : CNES/NASA discussions underway Ku/C nadir altimeter (SRAL) + Ka-band wide-swath SAR-altimeter Phase 0 in 2007 (CNES/JPL) Cooperation scheme TBD Launch : 2013-2016 timeframe

■ and contributions to ESA/EC missions : Cryosat2, Sentinel3 (TBD) : see dedicated presentation