Sample Questions

Page 2: CMRP Practice Questions

Question No 1:

Return on Assets (ROA) is determined by:

A. Net income/Total assets

B. Gross income/Total assets

C. Revenue/Total assets

D. Net income/Maintenance costs

Answer: C

Question No 2:

As the maintenance manager at a new plant (facility) you are developing the maintenance

workforce strategy for start-up. Select the best workforce attributes for maximum

effectiveness, assuming that unit labor costs are equal

A. An annual bid and selection of a maintenance labor contractor is performed, using

unitcosting of tasks normally required.

B. A managing contractor is brought on site to handle all aspects and provision of

maintenance labor.

C. Multi skilled mechanical crafts (trades) and instrument electrical crafts (trades) are hired

and developed.

D. Operations performing minor maintenance and company multi-skilled technicians

performing complex maintenance tasks.

Answer: D

Question No 3:

Which of the following are leading tools or techniques to identify Maintenance and Reliability

process improvements?

1. Total Productive Maintenance

2. Reliability Centered Maintenance

3. Historical analysis of spending patterns

4. Process benchmarking with industry leaders

A. 2, 3, 4

B. 1, 3, 4

C. 1, 2, 4

D. 1, 2, 3

Answer: C

Page 3: CMRP Practice Questions

Question No 4:

For the oil in a pressurized lubrication system, oil samples for analysis and trending should be

taken from:

A. The center of flowing oil line upstream of the oil filter, to assure that the sample is

representative of the oil leaving the lubricated components.

B. The center of a flowing oil line downstream of the oil filter, to assure that the sample is

representative of the oil being supplied to the lubricated components.

C. A low point in the oil sump, to assure that the sample includes wear particles, water,

and other contaminants that may have settled out of the oil.

D. The oil sump at a point above the bottom, to assure that the sample does not include

wear particles, water, and other contaminants that may have settled out of the oil.

Answer: D

Question No 5:

What are the three most significant constraints when developing a Maintenance and

Reliability-organization?

A. Engineering/Human/Resources/Budget

B. Budget/Operations/People

C. Culture/People/Resources

D. Culture/Engineering/Budget

Answer: C

Question No 6:

The 'Karl Fischer Method' measures:

A. The count in parts per million (ppm), of coliform bacteria in a sample of cooling tower

water.

B. The viscosity of an oil sample based on its flow rate through a calibrated orifice.

C. The conductivity in micro-ohms, of a sample of cooling tower water.

D. The amount of water in a sample of oil, in ppm.

Answer: D

Page 4: CMRP Practice Questions

Question No 7:

When developing and presenting a new strategic plan to stakeholders, which of the following

is the most important?

A. Implementation timetable

B. Gaining the trust of stakeholders

C. Craft (trade) flexibility

D. Establishment of a common goal

Answer: B

Question No 8:

On Monday, the maintenance manager sent an e-mail memo to the production manager

saying that the date and time of the next planned outage would be on the third shift of the

coming Friday. When the maintenance manager arrived at the unit on Friday third shift, the

equipment was still operating at full capacity. The operator said he knew nothing of a

planned outage and he had to make up production on this shift. Which of the following is the

most likely reason the equipment was still running?

A. The maintenance manager did not know if the production manager had communicated

the plan to the shift leader.

B. The maintenance manager did not know if the production manager received his e-mail

communication.

C. The maintenance manager made a unilateral decision it was time to do the outage.

D. The maintenance manager did not know if the production schedule allowed for the

planned downtime.

Answer: C

Question No 9:

Reliability predictions are often expressed in terms of Mean Time Between Failures (MTBF) or

its reciprocal The reciprocal is known as the:

A. Failure Rate.

B. Failure Mode.

C. Mean Time To Failure.

D. Service Life.

Answer: A

Page 5: CMRP Practice Questions

Buy Complete Questions Answers File from 100% Exam Passing Guarantee & Money Back Assurance

WHY CHOOSE US? RAC-US exam Questions Answers

CERTS4YOU RAPS RAC-US PDF and Test Engine

RAPS RAC-US 100% accurate answers

Up-to-date Array RAPS Certified Examiner dumps

RAC-US has Multiple Choice, Hot-Spot and Drag Drop and all other type of

Exam Questions.

All RAPS RAC-US questions are verified by our expert’s engineers.

We offer Free RAPS RAC-US Demo. Please contact support to get it.