CMA CGM Log - Rail services - Silk Road

2
RAIL SERVICES A NEW TRANSPORT DYNAMIC · 16 000 km corridor · 60 countries involved · 1/3 of the world total economy · 2,5 billion inhabitants concerned BACKGROUND The One Belt One Road project (OBOR), initiated by the Chinese government, is presented as the new Silk Road. This plan aims at further developing a comprehensive range of port and logistics infrastructures to secure the most efficient solutions for imports and exports between Asia and Europe. Through these strategic corridors, European and Asian continents are becoming more easily accessible and goods can transit in record time. CMA CGM LOG In its comprehensive rail logistics portfolio, CMA CGM LOG is one of the key players on this One Belt One Road corridors, with notably advanced door-to-door train solutions connecting China with Europe in 15 days. KEY FIGURES Hamburg Stockholm Warsaw Praha Chengdu Zhengzhou Harbin Manzhouli Zabaikalsk Suzhou Yiwu Wuhan Ningbo Shanghai Xiamen Changsha Chongping Bratislava Beograd Milano Vienna Nurnberg Duisburg London Paris Lyon Madrid Dostyk Khorgos Alashankou Moscow Istanbul Poti Dalian Busan Qingdao Tianjin Shenzhen Kumming

Transcript of CMA CGM Log - Rail services - Silk Road

Page 1: CMA CGM Log - Rail services - Silk Road

RAIL seRvIces

A NEW tRANSPORt DYNAMIC

· 16 000 km corridor

· 60 countries involved

· 1/3 of the world total economy

· 2,5 billion inhabitants concerned

BACKGROUND

The One Belt One Road project (OBOR), initiated by the Chinese government, is presented as the new Silk Road. This plan aims at further developing a comprehensive range of port and logistics infrastructures to secure the most efficient solutions for imports and exports between Asia and Europe.

Through these strategic corridors, European and Asian continents are becoming more easily accessible and goods can transit in record time.

CMA CGM LOGIn its comprehensive rail logistics portfolio, CMA CGM LOG is one of the key players on this One Belt One Road corridors, with notably advanced door-to-door train solutions connecting China with Europe in 15 days.

KEY FIGURES

Hamburg

Stockholm

WarsawPraha

Chengdu

Zhengzhou

Harbin

ManzhouliZabaikalsk

Suzhou

YiwuWuhan

NingboShanghai

Xiamen

Changsha

Chongping

Bratislava

BeogradMilano

Vienna

Nurnberg

DuisburgLondon

Paris

Lyon

Madrid

Dostyk

Khorgos

Alashankou

Moscow

IstanbulPoti

Dalian BusanQingdao

Tianjin

ShenzhenKumming

Tokyo

Page 2: CMA CGM Log - Rail services - Silk Road

AN EFFECtIVE SERVICE

FOR tHE tRANSPORt SAFEtY

Safest mode of transport with no weather impact and no delays.

Proven experience of the rail mode with thousands of containers carried yearly on the OBOR corridors IMPROVED ECOLOGICAL FOOtPRINt

Significant ecological advantage compared to Air freight

Advantage on other modes in non methane hydrocarbon and sulfur dioxide

FASt, FLEXIBLE, RELIABLE

Fast solution on a true door-to-door basis supporting tight supply chain schedules (average 20 days),

Multiple weekly connections to offer a large flexibility, CMA CGM LOG network offers almost daily departures by combining existing services

Reliability for supply chains stability with rail as most time-accurate transport mode

CMA CGM LOG YOUR PREFERED SOLUtION PROVIDER

INtEGRAtED SERVICES

Comprehensive intermodal services with our proposals made to/from rail or barge stations at the closest of customers premises

Fully integrated to our supply-chain products, such as advanced hub, cross-docking and warehousing at both ends

Available from LCL shipments up to complete block trains

HIGH LEVEL SERVICE QUALItY

Dedicated intermodal teams for Sales and Operations

State of the art Track & Trace system ensuring transparent shipment status

Active member of the GETO (Association of Transsiberian Freight Forwarders)

tRAIN SERVICESSTARTING DESTINATION FREQUENCY TRAIN LEAD TIME MARITIME LEAD TIME

Chongqing Lyon, France 3 trains/week 17 days 52 days

Suzhou Warsaw, Poland weekly 15 days 30 days

Wuhan Duisburg, Germany weekly 14 days 28 days

Yiwu Madrid, Spain weekly 20 days 40 days