Cloverleaf Presentation
-
Upload
markphilip-santos -
Category
Documents
-
view
50 -
download
1
Transcript of Cloverleaf Presentation
![Page 1: Cloverleaf Presentation](https://reader031.fdocuments.net/reader031/viewer/2022021422/58a029da1a28ab4e768b609b/html5/thumbnails/1.jpg)
![Page 2: Cloverleaf Presentation](https://reader031.fdocuments.net/reader031/viewer/2022021422/58a029da1a28ab4e768b609b/html5/thumbnails/2.jpg)
![Page 3: Cloverleaf Presentation](https://reader031.fdocuments.net/reader031/viewer/2022021422/58a029da1a28ab4e768b609b/html5/thumbnails/3.jpg)
EDSA EDSA
NLE
X
Bulacan, Central Luzon
Valenzuela
Malabon Navotas
Caloocan
Manila, Pasay
Makati via Skyway
Novaliches
Quezon City
San Juan, Pasig and Mandaluyong
![Page 4: Cloverleaf Presentation](https://reader031.fdocuments.net/reader031/viewer/2022021422/58a029da1a28ab4e768b609b/html5/thumbnails/4.jpg)
![Page 5: Cloverleaf Presentation](https://reader031.fdocuments.net/reader031/viewer/2022021422/58a029da1a28ab4e768b609b/html5/thumbnails/5.jpg)
![Page 6: Cloverleaf Presentation](https://reader031.fdocuments.net/reader031/viewer/2022021422/58a029da1a28ab4e768b609b/html5/thumbnails/6.jpg)
Metro Manila Skyway Stage 3 200m from off-ramp, 20min from
Makati
![Page 7: Cloverleaf Presentation](https://reader031.fdocuments.net/reader031/viewer/2022021422/58a029da1a28ab4e768b609b/html5/thumbnails/7.jpg)
![Page 8: Cloverleaf Presentation](https://reader031.fdocuments.net/reader031/viewer/2022021422/58a029da1a28ab4e768b609b/html5/thumbnails/8.jpg)
![Page 9: Cloverleaf Presentation](https://reader031.fdocuments.net/reader031/viewer/2022021422/58a029da1a28ab4e768b609b/html5/thumbnails/9.jpg)
First residential development in Cloverleaf
A three tower residential condominium development with an area of 14,214 sq.m.
![Page 10: Cloverleaf Presentation](https://reader031.fdocuments.net/reader031/viewer/2022021422/58a029da1a28ab4e768b609b/html5/thumbnails/10.jpg)
32
31
30
29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5 1st Residential Level & Amenity Area
4 3 Parking Levels (175 Parking Units)
3
2
1 Retail Area (6 Retail Units, 24 Retail Parking Units)
28 Residential Levels
744 Residential Units
![Page 11: Cloverleaf Presentation](https://reader031.fdocuments.net/reader031/viewer/2022021422/58a029da1a28ab4e768b609b/html5/thumbnails/11.jpg)
Retail Area
6 Retail Units 24 Commercial Parking Units
![Page 12: Cloverleaf Presentation](https://reader031.fdocuments.net/reader031/viewer/2022021422/58a029da1a28ab4e768b609b/html5/thumbnails/12.jpg)
Drop off Area
![Page 13: Cloverleaf Presentation](https://reader031.fdocuments.net/reader031/viewer/2022021422/58a029da1a28ab4e768b609b/html5/thumbnails/13.jpg)
Amenity Area
![Page 14: Cloverleaf Presentation](https://reader031.fdocuments.net/reader031/viewer/2022021422/58a029da1a28ab4e768b609b/html5/thumbnails/14.jpg)
Serenity North Garden
![Page 15: Cloverleaf Presentation](https://reader031.fdocuments.net/reader031/viewer/2022021422/58a029da1a28ab4e768b609b/html5/thumbnails/15.jpg)
Typical Floor Plan
![Page 16: Cloverleaf Presentation](https://reader031.fdocuments.net/reader031/viewer/2022021422/58a029da1a28ab4e768b609b/html5/thumbnails/16.jpg)
29th Floor Plan
![Page 17: Cloverleaf Presentation](https://reader031.fdocuments.net/reader031/viewer/2022021422/58a029da1a28ab4e768b609b/html5/thumbnails/17.jpg)
Studio Type
22.61 sq.m. – 24.42 sq.m.
![Page 18: Cloverleaf Presentation](https://reader031.fdocuments.net/reader031/viewer/2022021422/58a029da1a28ab4e768b609b/html5/thumbnails/18.jpg)
1 Bedroom Unit
30.75 sq.m. – 35.02 sq.m.
![Page 19: Cloverleaf Presentation](https://reader031.fdocuments.net/reader031/viewer/2022021422/58a029da1a28ab4e768b609b/html5/thumbnails/19.jpg)
2 Bedroom Unit
48.4 sq.m. – 49.44 sq.m.
![Page 20: Cloverleaf Presentation](https://reader031.fdocuments.net/reader031/viewer/2022021422/58a029da1a28ab4e768b609b/html5/thumbnails/20.jpg)
3 Bedroom Unit
56.97 sq.m.
![Page 21: Cloverleaf Presentation](https://reader031.fdocuments.net/reader031/viewer/2022021422/58a029da1a28ab4e768b609b/html5/thumbnails/21.jpg)
• Painted Walls and Ceiling
• Painted Interior Partitions
• 500 x 500 Ceramic Tiles
• Kitchen sink & Laminated Countertop
• Range Hood Outlet
•Grease Trap
•Under counter & overhead kitchen cabinets (wood laminate)
• Smoke Detector and Water Sprinkler
• Telephone/Cable Provisions
• Complete T&B with ventilation
![Page 22: Cloverleaf Presentation](https://reader031.fdocuments.net/reader031/viewer/2022021422/58a029da1a28ab4e768b609b/html5/thumbnails/22.jpg)
Tower Construction Completion
Turnover Date
Tower 1 SEPT 2019 4Q 2019
![Page 23: Cloverleaf Presentation](https://reader031.fdocuments.net/reader031/viewer/2022021422/58a029da1a28ab4e768b609b/html5/thumbnails/23.jpg)
Owner & Developer
The Developer
Ayala Land Inc.
Southgateway Development
Corp.
Avida Towers
Balintawak
Avida Land Corp.
Project Development & Marketing Manager
Owner Owner
Owner & Developer
![Page 24: Cloverleaf Presentation](https://reader031.fdocuments.net/reader031/viewer/2022021422/58a029da1a28ab4e768b609b/html5/thumbnails/24.jpg)
Southgateway Development Corp. is a
corporation that is duly organized and
existing under the laws of the Republic
of the Philippines.
Ayala Land Inc.
Southgateway Development
Corp.
Avida Towers
Balintawak
Avida Land Corp.
Project Development & Marketing Manager
Owner Owner
Owner & Developer
It is a wholly-owned subsidiary of Ayala
Land Inc.
Southgateway Development Corp. is
also the owner and developer of
Avida Towers Cloverleaf. Avida Land
Corp. will act as project development
and marketing manager, maintaining
the same quality standards of other
Avida Towers projects.
FAQs
4. Who is the developer of the project?
![Page 25: Cloverleaf Presentation](https://reader031.fdocuments.net/reader031/viewer/2022021422/58a029da1a28ab4e768b609b/html5/thumbnails/25.jpg)
FAQs
1. Does it flood in the vicinity? How will flooding be addressed?
Based on interviews, the property was submerged during Typhoon Ondoy and August 2012
Habagat. The property being currently lower than adjacent roads, serves as a detention
pond, with runoff coming from EDSA and Old Samson Road during heavy rains.
The property will be elevated by an average of 1.8m. The Cloverleaf will also provide a
detention tank to hold storm water and help mitigate flooding in the area.
2. What is the development’s impact on traffic and how will it be addressed?
Traffic in the area is expected to increase as any development comes in. However, the
potential traffic generated will be manageable due to the mixed land-use which have
different trip generation patterns and peak hours, which spread out generated vehicle trips.
The mixed-use development can limit personal trips within the development to minimize
effect to traffic outside.
Road networks within the area will be sufficient to accommodate traffic. Loading and
unloading areas will be designated. Pedestrian facilities and transport terminals will be
provided to promote walking and use of public transport.
![Page 26: Cloverleaf Presentation](https://reader031.fdocuments.net/reader031/viewer/2022021422/58a029da1a28ab4e768b609b/html5/thumbnails/26.jpg)
4. Will the development be secure?
We will have the standard security measures of any Ayala Land development: Security
guards both roving and at our entrances, CCTVs, coordination with LGU and the Police on
matters of security in the area. Additional security measures that are not standard will still
be determined by Ayala Property Management Corp. and Ayala Security Force.
FAQs
![Page 27: Cloverleaf Presentation](https://reader031.fdocuments.net/reader031/viewer/2022021422/58a029da1a28ab4e768b609b/html5/thumbnails/27.jpg)
![Page 28: Cloverleaf Presentation](https://reader031.fdocuments.net/reader031/viewer/2022021422/58a029da1a28ab4e768b609b/html5/thumbnails/28.jpg)