Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters...

73
www.clevehillsolar.com CLEVE HILL SOLAR PARK UPDATES TO APPLICATION DOCUMENTS OUTLINE CONSTRUCTION TRAFFIC MANAGEMENT PLAN (TRACKED) November 2019 Revision D Document Reference: 6.4.14.1 Submitted: Deadline 7

Transcript of Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters...

Page 1: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

www.clevehillsolar.com

CLEVE HILL SOLAR PARK UPDATES TO APPLICATION DOCUMENTS OUTLINE CONSTRUCTION TRAFFIC MANAGEMENT PLAN (TRACKED)

November 2019 Revision D

Document Reference: 6.4.14.1Submitted: Deadline 7

Page 2: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

Cleve Hill Solar Park

Outline Construction Traffic

Management Plan

Curtins Ref: TPLO/66705

Revision: 002003

Issue Date: 31 July 201912 November 2019

Client Name: Cleve Hill Solar Park Ltd

BIM Reference: 66705-CUR-00-XX-RP-TP-00001-V02_Outline Construction Management Plan

S

op

ho

s I

nte

rnati

on

al

Curtins

40 Compton Street

London, EC1V 0BD

Tel: 020 7324 2240

www.curtins.com

Imp

eri

al

We

st

CIVILS & STRUCTURES • TRANSPORT PLANNING • ENVIRONMENTAL • INFRASTRUCTURE • GEOTECHNICAL • CONSERVATION & HERITAGE • PRINCIPAL DESIGNER

Birmingham • Bristol • Cambridge • Cardiff • Douglas • Dublin • Edinburgh • Glasgow • Kendal • Leeds • Liverpool • London • Manchester • Nottingham

Page 3: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Construction Traffic Management Plan

Rev 002003 | Copyright © 2019 Curtins Consulting Ltd Page i

Author Signature Date

Caitlin Turley BEng (Hons) MCIHT Transport Planner

31/07/201912/11/2019

Reviewed Signature Date

Ben Dawson BSc (Hons) MICHT Associate – Transport Planning

12/11/201931/07/2019

Authorised Signature Date

Ben Dawson BSc (Hons) MICHT Associate – Transport Planning

12/11/201926/07/2019

Page 4: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Construction Traffic Management Plan

Rev 002003 | Copyright © 2019 Curtins Consulting Ltd Page ii

Table of contents 1.0 Introduction .............................................................................................................................................. 1

1.1 Introduction ....................................................................................................................................... 1

1.2 Purpose and Objectives ................................................................................................................... 1

1.3 Scope of Report and Consultation ................................................................................................... 2

2.0 Proposed Development ........................................................................................................................... 4

2.1 Introduction ....................................................................................................................................... 4

2.2 Proposals ......................................................................................................................................... 4

2.3 Vehicle Classification ....................................................................................................................... 6

2.4 Cars, Vans and LGVs ...................................................................................................................... 6

2.5 HGV Movements .............................................................................................................................. 7

2.6 Abnormal Indivisible Loads (AIL) ..................................................................................................... 7

2.7 Construction Traffic .......................................................................................................................... 8

3.0 Access ................................................................................................................................................... 10

3.1 Introduction ..................................................................................................................................... 10

3.2 Strategic and Local Road Network ................................................................................................. 10

3.3 Access Points ................................................................................................................................. 11

3.4 Internal Roads ................................................................................................................................ 11

4.0 Routeing Strategy .................................................................................................................................. 13

4.1 Introduction ..................................................................................................................................... 13

4.2 Route Assessment ......................................................................................................................... 13

4.3 Identified Constraints ................................................................................................................. 1514

5.0 Signing Strategy and Core Working Hours for Traffic Management During Construction Phase .... 1716

5.1 Access Route and Point Signing ................................................................................................ 1716

5.2 Internal Road Signing ................................................................................................................. 1716

5.3 Working Hours ............................................................................................................................ 1716

6.0 Mitigation Measures .......................................................................................................................... 1817

6.1 Introduction ................................................................................................................................. 1817

6.2 HGV and LGV Construction Vehicle Identification ..................................................................... 1817

6.3 Prescribed HGV and LGV Construction Routes ........................................................................ 1817

Page 5: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Construction Traffic Management Plan

Rev 002003 | Copyright © 2019 Curtins Consulting Ltd Page iii

6.4 HGV Traffic Movement Restrictions ........................................................................................... 1817

6.5 HGV Emissions .......................................................................................................................... 1817

6.6 Banksman or Presence of Qualified Personnel at Access ........................................................ 1817

6.7 Timings of HGV Movements ...................................................................................................... 1918

6.8 Routeing Staff ............................................................................................................................. 2019

6.9 Speed Limit Restrictions ............................................................................................................ 2119

6.10 Incident Management Plan ........................................................................................................ 2119

6.11 PRoW Management Plan ........................................................................................................... 2119

6.12 Cleaning of Vehicles .................................................................................................................. 2119

6.13 Highway Condition Surveys ....................................................................................................... 2119

6.14 Temporary Traffic Management Procedures (TTM) .................................................................. 2220

6.15 Travel Plan ................................................................................................................................. 2220

6.16 Delivery Management Systems (DMS) ...................................................................................... 2321

6.17 Information Packs and Communications ................................................................................... 2321

6.18 Abnormal Indivisible Loads ........................................................................................................ 2321

7.0 Management Structure ...................................................................................................................... 2422

7.1 Introduction ................................................................................................................................. 2422

7.2 Traffic Management Group ........................................................................................................ 2422

7.3 Monitoring and Review ............................................................................................................... 2523

7.4 Compliance ................................................................................................................................ 2523

7.5 Enforcement and Corrective Measures...................................................................................... 2524

7.6 Implementation of the CTMP ..................................................................................................... 2624

8.0 Appendices ........................................................................................................................................ 2725

Figures

Figure 2.1 – Construction Vehicle Generation Profile

Figure 2.2 – Construction Phasing

Figure 3.1 -Construction Access Hierarchy

Tables

Table 2.1 – Typical Construction Vehicle Classification

Table 4.1 – Identified Constraints

Page 6: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Construction Traffic Management Plan

Rev 002003 | Copyright © 2019 Curtins Consulting Ltd Page iv

Appendices

Appendix A – Site Location Plan

Appendix B – Proposed Internal Site Access Plan

Appendix C – Construction Vehicle Routeing

Appendix D – Route Assessment Drawings

Appendix E – Proposed Signage and Speed Restrictions

Appendix F – Outline Traffic Incident Management Plan

Appendix G – PRoW Management Plan

Appendix H – Travel Planning Statement

Page 7: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Construction Traffic Management Plan

Rev 002003 | Copyright © 2019 Curtins Consulting Ltd

1.0 Introduction

1.1 Introduction

1.1.1 Curtins has been appointed by Cleve Hill Solar Park Ltd (CHSP) to provide traffic and transportation

advice in relation to the development of Cleve Hill Solar Park (the "Proposed Development"). The

Development site is located on the north Kent coast, approximately two kilometres northeast of

Faversham and five kilometres west of Whitstable. The Site is situated on approximately 360 ha (890

acres) of land within the administrative boundaries of Swale Borough Council, Canterbury City Council

and Kent County Council .

1.1.2 The Proposed Development (described in more detail within Section 3) comprises the installation,

maintenance and decommissioning of photovoltaic (PV) modules, energy storage, and accompanying

electric cables, transformers, string inverters and associated access, environmental and construction

works.

1.1.3 The Proposed Development involves three main phases namely, construction; operation; and

decommissioning. Each phase has different characteristics, and therefore has different traffic and

transportation implications. This Outline Construction Traffic Management Plan (Outline CTMP) relates

only to the construction phase.

1.1.4 An Outline Decommissioning and Restoration Plan has been produced to accompany the

Environmental Statement (ES) and it is expected a Decommissioning Traffic Management Plan will be

produced and agreed with the relevant highways authorities prior to this stage of work commencing.

1.1.5 This Outline CTMP has been prepared to consider the methods by which materials, equipment and site

workers will arrive at the Site, and the availability and quality of transport infrastructure to identify a suite

of traffic management initiatives designed to mitigate and minimise any impacts.

1.1.6 Construction is anticipated to commence in spring 2021 and last up to 24 months.

1.2 Purpose and Objectives

Purpose

1.2.1 This Outline CTMP is provided to accompany the Environmental Statement in support of the DCO

application. If the DCO application is approved by the Secretary of State, the Outline CTMP would be a

certified document referred to in the Development Consent Order (DCO), and it is anticipated that the

final CTMP would be secured by a Requirement in the DCO and subject to the approval by the relevant

local planning authority. This document should be read in conjunction with the Access and Traffic

Chapter of the ES (Chapter 14).

Page 8: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Construction Traffic Management Plan

Rev 002003 | Copyright © 2019 Curtins Consulting Ltd

1.2.2 The purpose of this Outline CTMP is to provide a framework for the measures to be implemented under

a final CTMP which will provide mitigation for the traffic generated during the construction of the

Proposed Development. This will ensure that impact on existing users of the public highway network,

or those located close to it, is limited.

1.2.3 This Outline CTMP will inform Officers at Highway England (HE), Kent County Council (KCC), Swale

Borough Council (SBC), Canterbury City Council (CCC) and other relevant transport stakeholders with

regards to the suitability of the proposed construction traffic route and the highway access matters

associated with the Proposed Development.

Objective

1.2.4 The objectives of this Outline CTMP are outlined below:

• Ensure that movements of people and materials are achieved in a safe, efficient, timely and

sustainable manner;

• Keep freight and construction traffic to a minimum during network peaks to reduce the impact on

the highway network during busy periods;

• Minimise construction trips where possible and limit the impacts on the natural and built

environment; and

• Ensure the continued monitoring, review and subsequent improvement of the CTMP and

mitigation measures contained herein.

1.3 Scope of Report and Consultation

Scope

1.3.1 This report includes the following:

• A description of the Proposed Development;

• A description of the proposed access route to the Site;

• The proposed routeing strategy for the Site;

• Proposed signage strategy for the Site;

• Proposed mitigation measures; and

• Information regarding the management of deliveries;

Consultation

1.3.2 As part of the preparation of the final CTMP, the following transport stakeholders will be consulted

regarding the traffic and transport elements of the Proposed Development:

• Highways England;

• Kent County Council;

• Swale Borough Council;

Page 9: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Construction Traffic Management Plan

Rev 002003 | Copyright © 2019 Curtins Consulting Ltd

• Graveney Primary School;

• Graveney Parish Council; and

• Graveney Residents Environmental Action Team.

1.3.3 This is not a definitive list and as such, other stakeholders may be engaged as necessary throughout

the consultation process.

Page 10: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Construction Traffic Management Plan

Rev 002003 | Copyright © 2019 Curtins Consulting Ltd

2.0 Proposed Development

2.1 Introduction

2.1.1 This section of the Outline CTMP provides an overview of the development that has been proposed at

the Site, which is shown on the Site Location Plan at Appendix A. A full description is set out in Chapter

5 of the ES.

2.2 Proposals

2.2.1 The proposals involve the transportation and installation of PV modules and energy storage modules,

and accompanying mounting structures, electric cables, transformers, string inverters and associated

access, environmental and construction works.

Construction Phasing

2.2.2 The construction period is considered to be undertaken in at least two phases:

• Phase 1: construction of all aspects of the Proposed Development except the energy storage facility; and

• Phase 2: construction of the energy storage facility. This could be undertaken in multiple

phases to deliver smaller amounts of energy storage capacity.

Phase 1

2.2.3 Subject to the final development design and potential environmental constraints, phase 1 of the

development construction is anticipated to last 24 months. The indicative start date for construction is

likely to be spring 2021, dependent on when the DCO and other necessary consents are granted.

2.2.4 The indicative phase 1 construction activities are set out below:

• Site preparation and civils:

o Import of construction materials, plant and equipment to site;

o Establishment of the perimeter fence;

o The establishment of the main construction compound;

o Construction of the spine road; construction of new tracks;

o The upgrade or construction of crossing points (culverts) over drainage ditches; and

o Marking out the location of the Development infrastructure.

• Solar PV array construction:

o Import of components to site;

o Piling of module mount verticals;

o Erection of module mounting structures;

o Mounting of modules and inverters;

Page 11: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Construction Traffic Management Plan

Rev 002003 | Copyright © 2019 Curtins Consulting Ltd

o Trenching and installation of electric cabling;

o Transformer foundation excavation and construction; and

o Installation of transformers.

• Construction of onsite electrical infrastructure to facilitate the export of generated electricity.

o Construction of the flood protection bund;

o Site preparation and civils for the Development substation;

o Trenching and installation of electric cabling;

o Import of components to site; and

o Installation of the Development substation.

• Testing and commissioning; and

• Landscaping; and

• Habitat creation.

Phase 2

2.2.5 Phase 2 of the development construction will run for approximately 3 to 6 months, which is expected to

be contained within the overarching construction programme. This will, however, be dependent on any

potential additional phasing if the development design involves delivery of smaller energy storage

capacities.

2.2.6 The indicative phase 2 construction activities are set out below:

• Energy storage facility construction:

o Installation of electric cabling;

o Foundation construction;

o Import of components to site;

o Installation of transformers; and

o Installation of battery pack cabinets, inverters and controllers.

2.2.7 A summary of the proposed construction programme and phasing is included within Figure 2.1 below.

Page 12: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Construction Traffic Management Plan

Rev 002003 | Copyright © 2019 Curtins Consulting Ltd

Figure 2.1 – Development Programme/Phasing Summary

2.3 Vehicle Classification

2.3.1 Several vehicle types will be used during the construction phase of the Proposed Development. Table

2.1 below highlights those vehicles expected to be used during the construction period.

Table 2.1 – Typical Construction Vehicle Classification

Light (LGVs) Heavy (HGVs)

Car 40 tonne truck

Van (under 7.5t) Low Loader

4x4 pick-up Flat Bed

4x4 transit Truck (over 7.5t)

Mini-buses Crane

4 x 4 vehicle Excavator

Winch Tractor

Tractor and Trailer

Waste Collection

2.4 Cars, Vans and LGVs

2.4.1 It is anticipated a small proportion of visitors to the site will arrive by cars and small vans. Parking will

be provided on site for these vehicles. In addition, there will also be some small deliveries made by

LGVs.

2.4.2 A large proportion of the construction staff will stay in accommodation local to the site and travel to the

site together by mini-bus.

Site Access Road

Solar Access Track

Drainage

Import of Bund Material

Bund Construction

Compound Roads

Structural Concrete

Traffic Signs

CCTV

Temporary Compound

Solar Array Construction

Electrical Compound Installation

Tesla Option Concrete

Tesla cabinet delivery and installation

440KV Cable

Perimeter Fencing

Waste

Workers

CONSTRUCTION ACTIVITY22 2310 11 121 2 3 4 24

DURATION IN MONTHS

19 20 2113 14 15 16 17 187 8 95 6

Page 13: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Construction Traffic Management Plan

Rev 002003 | Copyright © 2019 Curtins Consulting Ltd

2.5 HGV Movements

2.5.1 Typically, HGV movements will comprise those associated with the delivery of building materials and

plant/equipment.

2.5.2 It is proposed that all of the excavated material generated by construction will be used within the site

for roads, landscaping, drainage, reinstatement and otherwise as required to deliver the Proposed

Development. This will also reduce the number of additional trip generation during the construction

phase.

2.6 Abnormal Indivisible Loads (AIL)

2.6.1 The Proposed Development will require the movement of Abnormal Indivisible Loads ("AILs") to

transport plant to the site.

2.6.2 The Road Vehicles (Authorisation of Special Types) General Order 2003 sets out the categories of AILs

with regard to weight, width and length. Depending on the size of the plant to be transported different

arrangements may be required in terms of temporary traffic management and the management and

timing of these movements. These movements will be required to meet the standards and guidelines

as set out in the Road Vehicles (Authorisation of Special Types) General Order 2003.

2.6.3 It is anticipated that any abnormal loads will be transported to the UK by sea and transported to the site

by road. An assessment of the route from the strategic road network to the site has been undertaken

by an abnormal load haulage specialist.

2.6.4 The size of the abnormal loads to be transported to the site will be similar in size and weight to the

abnormal loads that have previously been transported to the London Array substation. These loads

were up to 143te nett.

2.6.5 Once the loads have left the strategic road network, they will follow the identified construction traffic

route along Head Hill Road and Seasalter Road.

2.6.6 A key constraint is the road bridge over the railway at Graveney. Discussions have been undertaken

with Network Rail who own the structure and permission has been given to move the loads over the

railway bridge subject to a number of conditions. These include specific trailer configurations and also

the requirement to undertake pre and post movement surveys of the structure.

2.6.7 Abnormal loads will be transported to the site during off-peak periods (typically at night). As well as the

statutory obligations, agreement with relevant stakeholders will be sought prior to any abnormal load

movement being undertaken.

2.6.8 The final CTMP will detail the vehicle specification, proposed access arrangements from the port of

entry to the site including points of interest.

Page 14: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Construction Traffic Management Plan

Rev 002003 | Copyright © 2019 Curtins Consulting Ltd

2.7 Construction Traffic

2.7.1 The estimated volume and type of vehicles that would be generated throughout the construction phase

of development has been informed by the Applicant’s anticipated construction programme, which is

based on their extensive experience of delivering similar developments throughout the country.

2.7.2 On the basis of the information provided, the construction period is expected to be up to 24 months and

the rate of deliveries would fluctuate over this time.

2.7.3 If the energy storage facility were to not be constructed, or constructed at a later date, the average

number of vehicle movements would reduce significantly throughout the 24 month construction

programme. It is noted that if construction of the energy storage facility were to happen outside of the

proposed 24 month construction programme, construction traffic would be generated at a later date,

however, it is expected that the volume of construction traffic (including HGVs) would be less than that

discussed below. As the majority of the civils elements of the energy storage facility (creation of the

bund and associated earthworks), would occur within the main construction phase under either

scenario, it is expected that, if delayed to a separate phase 2, the final installation of batteries would

take up to six months to complete outside of the main 24 month construction window.

2.7.4 It is anticipated that, during the peak of construction, up to 80 two-way HGV movements (40 vehicles)

will be required per day. The peak is expected to last for four weeks starting around week 27 of

construction.

2.7.5 The on-site activities occurring during peak HGV movements include:

• On-site drainage;

• Import of bund material;

• Bund construction;

• Solar array construction;

• Compound roads;

• Import of material for construction concrete; and

• Waste removal.

2.7.6 To ensure a robust prediction of the number of construction vehicles, it has been assumed that all

vehicles arrive loaded and depart empty. In reality, exiting vehicles would remove waste/materials from

the site.

2.7.7 Of the 80 two-way HGV vehicle movements, 20 account for waste removal per day. Measures would

be taken to reduce these vehicle movements, as in reality, exiting vehicles would remove

waste/materials from the site.

Page 15: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Construction Traffic Management Plan

Rev 002003 | Copyright © 2019 Curtins Consulting Ltd

2.7.8 Peak daily total construction traffic is expected to occur in week 100 of the construction programme.

This comprises of 222 two-way vehicle movements (111 vehicles). This breaks down as 162 two-way

LGV movements (81 vehicles) and 60 two-way HGV movements (30 vehicles).

2.7.9 A graph showing the profile of expected construction traffic during the 24 month construction period is

included below as Figure 2.2.

Figure 2.2 – Construction Vehicle Profile

2.7.10 An average of 62 two-way HGV movements (31 vehicles) and 90 two-way LGV movements (45

vehicles) will generated per day throughout the 24 month construction period.

2.7.11 The number of LGV movements increases in the second half of the construction programme associated

with the more intricate electrical equipment installations.

2.7.12 At its peak it is anticipated that up to 400 construction staff will be based at the site.

2.7.13 The impact of these trips on both the Strategic Road Network (SRN) and Local Road Network (LRN)

are discussed in detail within Chapter 14 (Access and Traffic) of the ES.

0

50

100

150

200

250

Da

ily

2-W

ay

Tri

ps

Date

Cleve Hill Solar Park Construction Traffic Movements

Total Daily Two Way Vehicle

Movements

Daily HGV Two Way Vehicle

Movements

Daily LGV Two Way Vehicle

Movements

Page 16: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Construction Traffic Management Plan

Rev 002003 | Copyright © 2019 Curtins Consulting Ltd

3.0 Access

3.1 Introduction

3.1.1 To provide access to the Proposed Development, there are three levels of access roads outlined in

Figure 3.1 below:

Figure 3.1: Construction Access Hierarchy

3.2 Strategic and Local Road Network

Strategic Road Network (SRN)

3.2.1 The closest strategic road network to the site is the M2, accessed from Junction 7 approximately 1 km

south of the Whitstable Road/A299 Thanet Way junction.

3.2.2 The M2 continues westwards merging to become the A2 towards Central London and the M25. At

Junction 7of the M2 the A2 also provides a connection south towards Dover.

3.2.3 At Junction 5 of the M2, the A249 provides links north to the Port of Sheerness and south to the M20

north of Maidstone.

3.2.4 While not managed by Highways England (HE), the A299 Thanet Way is also considered to be of

strategic importance as a key distributor road across northern Kent and provides direct connections to

the Port of Ramsgate.

Level 1: Strategic Road Network

Comprises the motorway network which provides construction access Level 2: Local Road

Network

Comprises the local roads which provide construction access to the Proposed Development.

Level 3: Internal Site Connection

Internal vehicle routes that will link the LRN.

Page 17: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Construction Traffic Management Plan

Rev 002003 | Copyright © 2019 Curtins Consulting Ltd

Local Road Network (LRN)

3.2.5 The LRN consists of Whitstable Road, Staple Street, Staple Street Road, Head Hill Road and Seasalter

Road.

3.2.6 If approaching the site from the west on the A299, Staple Street and Staple Street Road will be used

for a small section to cross over the A299 and to access Whitstable Road.

3.2.7 Whitstable Road is approximately seven metres wide and follows an east-west alignment. It links Head

Hill Road/ Seasalter Road with the A299.

3.2.8 Head Hill Road/ Seasalter Road is formed of a single carriageway ranging in width between 4.5m and

7.5m taken from OS Mapping. It follows a north-south alignment and provides connectivity to the tarmac

road which provides access to the existing Cleve Hill Substation.

3.2.83.2.9 Widths of below 4.5m have been recorded by an Interest Party during the application

process and this is discussed further in Section 4.2.

3.2.93.2.10 To meet the objectives set out in Section 1.2 of this Outline CTMP, the roads which make

up the LRN will be subject to appropriate mitigation measures. Initial mitigation proposals are included

in Section 7, and it is expected these will be developed further following discussions with stakeholders.

3.2.103.2.11 The respective sensitivity of these roads has been discussed within the Access and Traffic

chapter of the ES (Chapter 14).

3.2.113.2.12 Key to the construction traffic management will be a prescribed routing strategy which is

discussed within Section 4 of this Outline CTMP. As part of the Outline CTMP control and monitoring

measures, deviation from the approved routes will result in enforcement procedures and penalties. The

mitigation, monitoring and enforcement are discussed in detail in Section 7 of this Outline CTMP.

3.3 Access Points

3.3.1 Vehicular access to the Site will be taken from Seasalter Road via the existing bellmouth to the London

Array Substation.

3.4 Internal Roads

3.4.1 The existing London Array substation access road will be used for vehicle access to the site. Rochdale

Envelope parameters for the Development have been considered with respect to the Outline CTMP,

and worst-case values/scenarios for this are captured by the candidate design, as set out in Chapter 5

of the Environmental Statement: Development Description.

3.4.2 Notably, this includes two alternative internal access road proposals:

Page 18: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Construction Traffic Management Plan

Rev 002003 | Copyright © 2019 Curtins Consulting Ltd

1.0.0 One option that branches from the main site access and follows a route to the north of the existing

London Array Substation; and

2.0.03.4.1 One access option utilising the existing London Array Substation access road.

3.4.33.4.2 A plan showing the proposed internal site access utilising the existing tarmac London Array

access road to the south of the facility is contained within Appendix B.

3.4.43.4.3 From the western end of the existing access road a new section of tarmac road

approximately 310m long is proposed to be constructed into the site.

3.4.53.4.4 The tarmac road will continue over the flood protection bund and into the compound while

an internal access track will be created providing access to the separate solar array parcels across the

site. The internal access track will be typically four metres wide and 2.1km long, and will be formed of

compacted stone.

3.4.63.4.5 Suitable passing places will be provided along all internal access track including the

existing London Array Substation access road.

Page 19: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Construction Traffic Management Plan

Rev 002003 | Copyright © 2019 Curtins Consulting Ltd

4.0 Routeing Strategy

4.1 Introduction

4.1.1 To provide safe and responsible construction vehicle access to the site and to help achieve the

objectives outlined in Section 1.2.4, proposed construction traffic routes have been assessed in Chapter

14 of the ES.

4.1.2 The origin of plant, machinery and materials is not known at this stage, however, contractors will be

required to use one of three primary routes to access the site. These include the A299 (if approaching

from the east), the M2 (if approaching from the west) and the A2 (if approaching from the south).

4.1.3 These will be followed by both LGVs and HGVs during the construction phase of the Proposed

Development.

4.1.4 From the A299 vehicles will be required to use Staple Street, Staple Street Road, Whitstable Road,

Head Hill Road and Seasalter Road to access the site. The proposed vehicle routes are shown within

Appendix C.

4.1.5 The following roads/areas are not to be used by construction traffic accessing the Proposed

Development, unless otherwise agreed with the relevant local planning authorities:

• Canterbury Road • Monkshill Road

• London Road • Cleve Hill

• Graveney Road • Seasalter Road (north of London Array Access)

• Sandbanks Lane • Faversham Road

4.2 Route Assessment

4.2.1 An initial assessment of Head Hill Road and Seasalter Road was undertaken using OS mapping to

identify the locations where the carriageway width is restricted, or where a corner or obstacle is present,

that means a large vehicles may have difficulty passing an oncoming vehicle.

4.2.2 In total four locations were identified whereby a large HGV and a large car may experience difficulty in

passing each other.

• Graveney Railway Bridge;

• Approximately 70m north of All Saints Church;

• Adjacent to the southern access to Denley Hall; and

• Approximately 30m south of the Cleve Hill junction.

4.2.3 In all instances, there is available carriageway width for a vehicle to wait to allow another to pass.

Furthermore, in all situations a good level of forward visibility is maintained meaning that vehicles have

early sight of approaching vehicles.

Page 20: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Construction Traffic Management Plan

Rev 002003 | Copyright © 2019 Curtins Consulting Ltd

4.2.4 Including the above, a further location approximately 350m north of Cleve Hill Junction has been

identified where two large HGVs may experience difficulty passing each other.

4.2.5 In order to ensure the assessment was accurate, KCC Highways requested that topographical surveys

were undertaken at these locations. In addition, two further locations were requested to be surveyed,

these include:

• North of St Bartholomew’s Church access road; and

• 350m north of Whitstable Road junction.

4.2.6 Swept path analysis has been undertaken using the topographical surveys and this has demonstrated

that the additional area north of St Bartholomew’s Church access road can accommodate a car and a

large HGV simultaneously. The location 350 north of the Whitstable Road junction can accommodate a

large car when a large rigid vehicle is travelling southbound, however there is section of road where this

is not possible travelling northbound.

4.2.7 Drawings SK008 and 009 illustrate swept path analysis where vehicles cannot pass simultaneously.

However, there is sufficient forward visibility to allow HGV drivers to give way to oncoming traffic.

4.2.8 The topographical surveys do not fundamentally change the conclusions found during the initial swept

path assessment.

4.2.9 In addition to the above, a number of unverified measurements along Head Hill Road and Seasalter

Road have been put forward by an Interested Party. These measurements range from 6.1m to 4.2m.

4.2.10 The exact location of the measurements recorded is unknown, however, the narrowest measurement

noted, 4.2m, is located north of the Seasalter Road/Cleve Hill junction.

4.2.11 In this area, approximately 350m to the north of the Seasalter Road/Cleve Hill junction, a 180m section

of Seasalter Road was included within the topographical survey undertaken. This identified widths

varying between 4.5m and 5.1m. This area has been previously identified as a point where two large

vehicles may have difficulty passing each other.

4.2.12 Along this section of Seasalter Road the road width varies, with space to allow a vehicle to give way to

oncoming traffic as well as good forward visibility.

4.2.13 The submission of the additional measurements is not considered to change the findings of this

assessment. It is acknowledged that there are locations where two HGVs will not be able to pass each

other along the construction traffic route, however, there are suitable places within the public highway

for a vehicle to give way to oncoming vehicles and good forward visibility. In addition, further measures

are proposed to mitigate against potential vehicle conflict in these areas. These are discussed in Section

6.

Page 21: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Construction Traffic Management Plan

Rev 002003 | Copyright © 2019 Curtins Consulting Ltd

4.2.84.2.14 It is noted that the proposed construction traffic route along Head Hill Road and Sesalter

Road is already used by large vehicles. Furthermore, it was the route used by HGV traffic in the

construction of the London Array substation.

4.2.94.2.15 Measures will be taken to minimise the potential for twoensure CHSP construction HGVs

do not to meet in opposite directions along Head Hill Road and Seasalter Road. This, along with further

mitigation is discussed in further detail in Section 6.7 of the CTMP.

4.2.104.2.16 On-site observations identified that on-street car parking also occurs along Head Hill Road

opposite The Freewheel Pub and also outside Graveney Primary School. There is also a bus stop

located adjacent to the pub.

4.2.114.2.17 While on-street parking and the bus stop limits the available width in these locations and

two-vehicles are not able to pass each other, the carriageway width in these areas is over 5.5m wide

and forward visibility is good.

4.2.124.2.18 Vehicles will be required to give way to each other in these locations as currently occurs.

4.3 Identified Constraints

4.3.1 The table below sets out the identified highways constraints along the proposed construction access

route and the proposed mitigation to be implemented. The mitigation measures are then discussed in

greater detail within Section 6 of this document.

Page 22: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Construction Traffic Management Plan

Rev 002003 | Copyright © 2019 Curtins Consulting Ltd

Table 4.1 – Identified Constraints.

No. Issue/Constraint Mitigated at Stage Mitigation

1

Sensitive, built up areas (villages, towns) to be avoided by temporary construction traffic due to congestion, reduction of safety and air and noise pollution

Construction route planning stage

Final construction routeing agreed with KCC.

2 Avoidance, if possible of urban areas Construction route planning stage

Final construction routeing agreed with KCC.

3 Access route width constraints Throughout all stages Contractor briefing, speed restrictions and signage.

4 Impacts on pedestrians, cyclists, equestrians and other non-motorised users.

Throughout all stages Contractor briefing, speed restrictions and signage.

5 Graveney Primary School Throughout all stages Delivery timing restrictions to avoid school start/finish times.

6 Highway surface condition Throughout all stages Detailed survey and remedial works strategy agreed with KCC.

Page 23: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Construction Traffic Management Plan

Rev 002003 | Copyright © 2019 Curtins Consulting Ltd

5.0 Signing Strategy and Core Working Hours for Traffic

Management During Construction Phase

5.1 Access Route and Point Signing

5.1.1 Temporary signage will be erected along construction traffic routes on the LRN to provide access and

routeing information. These will be placed to ensure that construction vehicles and staff are able to

travel directly to site from the SRN. Locations of the temporary signage will be agreed with KCC ahead

of installation.

5.1.2 Temporary signage will also be provided at key junctions within the vicinity of the site to provide warning

to other road users of the likely presence of construction vehicles. Temporary signage will be produced

and agreed with the KCC.

5.2 Internal Road Signing

5.2.1 Similar to the above access route, temporary signage will be erected along proposed construction haul

roads within the Site where necessary. The signage will provide drivers with information on distances

to destination, and warning (hazard) information relating to potential vehicle conflict areas (cross over

points).

5.3 Working Hours

Core Working Hours

5.3.1 Core working hours are proposed to be between 07.00 until 19.00, Monday to Friday and 07.00 until

13.00 on a Saturday (unless in exceptional circumstances where need arises to protect plant, personnel

or the environment).

5.3.2 To maximise productivity within the core hours, contractors would require a period of up to one hour

before and up to one hour after core working hours for start-up and closedown of activities. This would

include but not be limited to, movement to place of work, maintenance and general preparation works.

This would not include operation of plant or machinery likely to cause a disturbance. These periods

would not be considered an extension of core working hours.

5.3.3 As such, it is likely that staff would arrive at the development site before 07.00 and leave after 19.00

Monday to Friday and before 07.00 and after 13.00 on a Saturday.

5.3.4 Except in the case of emergency, any work required to be undertaken outside of core working hours

(not including repairs or maintenance) will be agreed with the relevant local planning authority prior to

undertaking the works. Any proposed changes to the core working hours set out above will be discussed

and agreed relevant stakeholders including KCC.

Page 24: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Construction Traffic Management Plan

Rev 002003 | Copyright © 2019 Curtins Consulting Ltd

6.0 Mitigation Measures

6.1 Introduction

6.1.1 Cleve Hill Solar Park Ltd will implement a number of embedded construction traffic mitigation measures

as set out below.

6.2 HGV and LGV Construction Vehicle Identification

6.2.1 It is anticipated that all HGV and LGV construction vehicles associated with the Proposed Development

will be clearly identifiable through the use of a vehicle marking scheme. The purpose of this is to assist

with the monitoring process of the construction vehicles over the SRN and LRN.

6.3 Prescribed HGV and LGV Construction Routes

6.3.1 Only those construction traffic routes and internal roads which have been agreed with the KCC and HE

will be used.

6.4 HGV Traffic Movement Restrictions

6.4.1 Where possible construction traffic movements will be scheduled to occur outside of highway network

peak times.

6.4.2 It is anticipated that HGV movements associated with the Proposed Development will not be permitted

on the LRN at the following times. Exact timings will be confirmed prior to construction and KCC and

relevant stakeholders informed:

• On Sundays or on public holidays;

• Between the hours of 19:00 and 07:00 (Monday to Friday); and

• Between 13:00 on Saturday and 07:00 on Monday.

6.4.3 The above restrictions do not apply to the movements of HGVs on the SRN or in relation to AILs.

6.4.4 In addition to the above, It is proposed that CHSP will not accept HGV deliveries to site or let HGVs

leave the site between the hours of 08.30 to 09.30 and 15.00 to 16.00 to avoid Graveney Primary School

start/finish times. CHSP will contract with its contractors accordingly.

6.5 HGV Emissions

6.5.1 All vehicles used in the construction of the Proposed Development will be to Euro standard IV class.

6.6 Banksman or Presence of Qualified Personnel at Access

6.6.1 Qualified personnel will be in place at the site access to: (a) guide construction traffic; and (b) record

arrivals and departure of vehicles against the deliveries schedule.

Page 25: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Construction Traffic Management Plan

Rev 002003 | Copyright © 2019 Curtins Consulting Ltd

6.76.6 Timings of Vehicle Movements

6.7.16.6.1 Vehicle movements, including staff transport and the delivery of goods and materials to

site, will occur between the hours 06.00 and 20.00 Monday to Friday and 06.00 and 14.00 on a

Saturday.

6.7.26.6.2 To maximise efficiency during the proposed core working hours, it is expected that most

staff movements to site will occur before 07.00 and that staff will leave after 19.00 Monday to Friday,

and before 07.00 and after 14.00 on a Saturday.

6.7.36.6.3 Due to the proposed vehicle movement timing restrictions around school start and finish

times, most HGV movements are expected between 09.30 and 15.00.

6.6.4 A booking system (Delivery Management System) will be used to ensure deliveries to the sites will be

spread across day where possible. This will minimise the impact of HGV traffic during the network peak

periods. This booking schedule will also form part of and inform the monitoring process of the CTMP.

6.6.5 As part of delivery management process, measures will be introduced to ensure that inbound/outbound

HGVs associated with the construction of the Solar Park will not meet along Head Hill Road and

Seasalter Road.

6.6.6 It is proposed that this is managed by the following measures:

• Predicting journey times from the port of entry (and other points of origin) to the site. This will be

through vehicle GPS monitoring and using real-time traffic information and journey planning tools;

• Having set times for vehicle arrivals and departures (e.g. This could be achieved by timing

deliveries to arrive within the first 45mins of an hour and releasing vehicles in the last 15mins);

• Holding vehicles internally within the site and releasing in a controlled manor; and

• Not permitting vehicles to leave the strategic road network (including the A299) if they know they

are going to miss a delivery window).

6.6.7 A further contingency measure will be introduced whereby inbound HGVs will use the laybys in proximity

of the site to call ahead, to ensure they will not meet outbound vehicles traveling along Head Hill Road

and Seasalter Road.

6.7.46.6.8

6.7.5 Delivery timings will be carefully managed to ensure (as much as possible) that the identified delivery

windows are not missed. The following strategy will be adopted and communicated throughout the

supply chain to ensure restrictions along the LRN are adhered to.

6.7.6 If close to the site before a timing restriction has ended, HGVs will be instructed not to leave the SRN

or the A299 to approach the site.

Page 26: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Construction Traffic Management Plan

Rev 002003 | Copyright © 2019 Curtins Consulting Ltd

6.7.76.6.9 There are laybys and services (suitable for HGVs) along the A2, A299 and M2. A vehicle

could wait in one of these areas until the LRN timing restriction has ended.

6.6.10 The closest laybys to the site are located on the A299, 400m south of its junction with Whitstable Road.

6.6.11 The delivery strategy will be adopted and communicated throughout the supply chain to ensure

restrictions along the LRN are adhered to.

6.7.9 Furthermore, HGVs will be held on-site and released in a controlled manor to reduce the potential for

two HGVs associated with construction of the Proposed Development to meet each other on either

Head Hill Road or Seasalter Road.

6.7.10 This could be achieved by timing deliveries to arrive within the first 45mins of an hour and releasing

vehicles in the last 15mins.

6.6.12 It is expected that at the peak of construction, taking account of the proposed HGV timing restrictions,

in the region of 10 two-way vehicle trips (five vehicles) an hour could be expected.

6.7 Presence of Banksperson/Traffic Marshals at Access and Call Forward

Positions

6.7.1 Qualified personnel will be positioned at the following locations along the construction delivery routes:

• Selected call forward layby positions;

• Access directly off the public highway; and

• Site access.

6.7.2 These personnel will speed up the calling forward of vehicles to the site, guide construction traffic where

required, record arrivals and departure of vehicles against the deliveries schedule and report any

observed incidents or highway conditions that may impact on construction vehicle access.

6.7.3 In addition, these personnel will be able to monitor vehicles leaving the site to ensure they have left

Head Hill Road and Seasalter Road before permitting any inbound construction vehicle movements.

6.8 Routeing Staff

6.8.1 Staff will be employed to travel on the construction routes and monitor LGV and HGV traffic using the

routes where all construction vehicles associated with the Proposed Development will be clearly

identifiable.

Page 27: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Construction Traffic Management Plan

Rev 002003 | Copyright © 2019 Curtins Consulting Ltd

6.8.2 Staff will be trained to conduct this monitoring process, collect and collate data and present the data for

the Transport Co-ordinator (TCO) and Traffic Management Group (TMG).

6.9 Speed Limit Restrictions

6.9.1 It is proposed that the speed of construction traffic along Head Hill Road and Seasalter Road is restricted

to 20mph in places.

6.9.2 The locations of the proposed construction traffic speed restrictions are shown in Drawing 007 in

Appendix E at the rear of this report.

6.10 Incident Management Plan

6.10.1 An initial Construction Traffic Incident Management Plan (TIMP) has been produced and included as

Appendix F of this document. This sets out the procedures to be taken if part of the LRN or SRN near

the Proposed Development is affected by an incident.

6.11 PRoW Management Plan

6.11.1 A PRoW Management Plan has been produced and included as Appendix G of this document. This

sets out how PRoW will be managed during the construction of the Proposed Development.

6.12 Cleaning of Vehicles

6.12.1 All vehicles exiting from the site access will pass over a wheel cleaning facility prior to using the public

highway.

6.12.2 Furthermore, all construction vehicles will travel on over a kilometre of tarmac road before reaching the

LRN. This will also ensure that mud or debris is not transferred from the site to local roads.

6.12.3 In the event that mud or debris is found on the public highway, a road cleaning contractor will be on call

throughout the construction programme.

6.13 Highway Condition Surveys

6.13.1 Highway condition surveys will be undertaken both before and after construction. The scope of these

surveys have been agreed with KCC.

6.13.2 The surveys cover the proposed construction traffic route from the strategic road network to the site.

The scope of the road condition surveys includes surveying the main carriageway surface, footways,

verges and adjoining access points.

6.13.3 The surveys will be undertaken by a specialist third party, that will undertake a high definition visual

survey of the proposed construction traffic routes from the SRN to the site.

Page 28: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Construction Traffic Management Plan

Rev 002003 | Copyright © 2019 Curtins Consulting Ltd

6.13.4 A preliminary road condition survey has been undertaken and the results have been shared with KCC.

The survey identified that the surface condition of Head Hill Road and Seasalter Road are poor in

places, with issues such as subsidence, cracking, fretting and potholes being identified.

6.13.5 To minimise the potential for noise and vibration from a poor road surface, further road condition surveys

will be undertaken prior to construction starting. Areas in poor condition, particularly those in proximity

to residential developments and other sensitive receptors will be improved.

6.13.6 Further to the remedial works prior to construction, it is proposed that the condition of the construction

route from the strategic network to the site is monitored throughout the construction period. Remedial

works will be undertaken as required to ensure the existing highway conditions are not exacerbated by

construction vehicles.

6.13.7 Once construction has been completed a final road condition survey will be undertaken. Any damage

to the road surface, footways, verges or adjacent accesses, attributable to the development will be

rectified to a standard at least equal to that observed prior to the route being used by the Proposed

Development construction traffic.

6.13.7 Discussions have been held with KCC with regards to the mechanism by which any works to the public

highway will be undertaken. It has been agreed that a S278 agreement will be drafted which gives

CHSP the powers to undertake the works. This includes powers to undertake remedial works at short

notice during construction.

6.14 Temporary Traffic Management Procedures (TTM)

6.14.1 TTM will be used where required to enhance safety conditions on the LRN and mitigate potential impacts

of the construction.

6.14.2 All TTM measures and implementation plans will need to be agreed with KCC.

6.15 Travel Plan

6.15.1 A Travel Plan will be implemented for the Proposed Development which sets out a number of travel

planning initiatives including:

• Travel planning awareness;

• Welfare van provision for staff from external locations to site;

• Public transport;

• Car sharing;

• Construction traffic management;

• Modal shift monitoring; and

Page 29: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Construction Traffic Management Plan

Rev 002003 | Copyright © 2019 Curtins Consulting Ltd

• Travel plan co-ordinator (TPC).

6.15.2 An Outline Travel Planning Statement has been produced and is included in this report as Appendix

H.

6.16 Delivery Management Systems (DMS)

6.16.1 Records will be kept of all deliveries. This will ensure the spacing of deliveries and allow the number of

vehicles accessing/egressing the site to be recorded.

6.17 Information Packs and Communications

6.17.1 Information packs will be provided to all contractors which will form part of the contractual agreement

between the contractors and CHSP. The information pack will contain the details of the following CTMP

requirements:

• Risk Analysis Management Systems (RAMS) guidance;

• HGV restrictions;

• Construction routes;

• DMS;

• Non-compliance guidance;

• Complaints procedure;

• CTMP protocols and indications required for all contractors including a Code of Good Practice;

• Guidance on standard communication procedures between contractors and site; and

• CTMP contacts (emergency and non-emergency).

6.18 Abnormal Indivisible Loads

6.18.1 The movement of AILs is controlled by The Motor Vehicles (Authorisation of Special Types) General

Order 2003 and subject to management and prior agreement with the Police and HE.

6.18.2 All AIL vehicles will be escorted by a pilot car and Police escort and be scheduled to travel during off-

peak hours where possible. This will ensure the safety of other road users and result in minimal

disruption.

6.18.3 The local communities affected by the delivery of the AILs will be contacted prior to any movements. It

is envisaged that this will include leaflet drops and publication in the local press advising of the AIL

movements.

Page 30: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Construction Traffic Management Plan

Rev 002003 | Copyright © 2019 Curtins Consulting Ltd

7.0 Management Structure

7.1 Introduction

7.1.1 This section reviews the management structure that will oversee the final CTMP. It is important that a

strong management structure is in place to ensure the Outline CTMP objectives are met, and that the

continued monitoring and reviewing of the final CTMP is maintained.

7.1.2 A Traffic Management Group (TMG) and a Transport Co-ordination Officer (TCO) will be appointed to

achieve this.

7.1.3 The TCO will be employed prior to commencement of works and will have the following transport-related

responsibilities:

• Monitor the final CTMP;

• Report to the TMG about mitigation and any remedial measures if required;

• Update the final CTMP as required; and

• Resolve issues and problems through liaison with relevant stakeholders.

7.2 Traffic Management Group

7.2.1 A TMG will be established prior to construction to implement and monitor the final CTMP.

7.2.2 The TMG will include representatives from CHSP, the TCO and the following organisations will also be

asked to provide representatives:

• Highways England;

• Kent County Council;

• Swale Borough Council;

• Graveney Primary School;

• Graveney Parish Council; and

• Graveney Residents Environmental Action Team, or similar organisation representing local

residents.

7.2.3 The TMG will meet to discuss and review the traffic and transportation elements of the construction

phase of the Proposed Development. The meetings will be scheduled twice per year, unless specific

issues which need to be addressed are brought to the attention of the TCO. In such cases, additional

meetings or discussions will be co-ordinated by the TCO as and when required.

7.2.4 The primary role of the TMG meetings will be to review the following information:

• Implementation and effectiveness of mitigation measures;

• Contractor obligations with regard to the CTMP; and

Page 31: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Construction Traffic Management Plan

Rev 002003 | Copyright © 2019 Curtins Consulting Ltd

• Suitable changes to the final CTMP based on the success of the mitigation measures seeking to

enhance the efficiency and effectiveness of the final CTMP.

<

7.2.5 Discussion in the scheduled meetings will be aided by a monitoring report produced by the TCO.

Discussions will also relate to the Outline CTMP objectives outlined in Section 1.2.4.

7.3 Monitoring and Review

Monitoring Strategy

7.3.1 The TMG will be established and a TCO will be appointed prior to construction as part of the final CTMP,

to oversee the implementation and monitoring of the final CTMP in line with the agreed requirements.

7.3.2 The contractor will undertake monitoring as necessary to ensure compliance with the requirements of

the final CTMP, and which will include the maintenance of records and traffic management measures.

Review

7.3.3 The TMG will monitor and review the final CTMP. These reviews are required to ensure that the final

CTMP delivers on the commitments and achieves the goals agreed as set out in the document.

7.4 Compliance

7.4.1 As part of the final CTMP a series of mechanisms will be established to provide all parties with a clear

understanding of the enforcement procedures that will be applied if the requirements contained within

this Outline CTMP are not achieved. It is anticipated that these mechanisms will be determined at a

later stage and will include:

• RAMS procedures – CHSP will implement the final CTMP and adhere to the requirements and

meet the goals through management practices. This will include site inductions for contractors,

briefing on the obligations of CHSP standards, induction and adherence to risk assessments and

method statements (RAMS procedures), delivery management system (DMS) briefing, driver

inductions and compliance guidance;

• Contractual conditions – to be employed as part of this Outline CTMP compliance methodology

and will be built into the contractor’s contract. This will be subject to performance review by CHSP;

and

• Actions – to be employed if the commitments of this Outline CTMP are breached.

7.4.2 CHSP will agree with appropriate stakeholders to ensure that a complaints management procedure is

in place prior to the start of construction.

7.5 Enforcement and Corrective Measures

7.5.1 The CTMP will form part of the contractual agreements between those contractors working at the site

and CHSP.

Page 32: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Construction Traffic Management Plan

Rev 002003 | Copyright © 2019 Curtins Consulting Ltd

7.5.2 CHSP will ensure that appropriate measures are taken to ensure that contractor behaviour and

performance is monitored. Where appropriate corrective measures will be implemented to resolve,

address and enhance service performance which may be in breach of the standards within the CTMP.

7.5.3 This could result in contractor contracts being terminated.

7.5.1 CHSP will ensure that appropriate measures are taken to ensure that contractor behaviour and

performance is monitored. Where appropriate corrective measures will be implemented to resolve,

address and enhance service performance which may be in breach of the standards within the CTMP.

7.6 Implementation of the CTMP

7.6.1 CHSP is committed to continued dialogue with the relevant stakeholders, KCC and HE to agree, finalise

this CTMP up to and during construction of the Proposed Development.

Page 33: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Construction Traffic Management Plan

Rev 002003 | Copyright © 2019 Curtins Consulting Ltd

8.0 Appendices

Appendix A – Site Location Plan

Page 34: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

Scale @ A3

Date: 12/09/2018

P:\Projects\Environment\Environment EIA\2238 Cleve Hill.aprx\2238-PUB-033 Site Boundary

1:20,000

Repr

oduc

ed fr

om O

rdna

nce

Surv

ey d

igita

l map

dat

a ©

Cro

wn

copy

right

201

8. A

ll rig

hts

rese

rved

. Lice

nse

num

ber 1

0004

8606

#NORTH

Cleve Hill Solar Park

Site Boundary

Ref: 2238-PUB-033Produced By: SC

Checked By: MB

0 0.5 1 km

Site Boundary

1665

0016

6000

1655

0016

5000

1645

0016

4000

1635

0016

3000

1625

0016

2000

1615

00

1665

0016

6000

1655

0016

5000

1645

0016

4000

1635

0016

3000

1625

0016

2000

1615

00

606500606000605500605000604500604000603500603000602500602000601500601000

606500606000605500605000604500604000603500603000602500602000601500601000

Page 35: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Construction Traffic Management Plan

Rev 002003 | Copyright © 2019 Curtins Consulting Ltd

Appendix B – Proposed Internal Site Access Plan

Page 36: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

1.56

1.55

1.52

1.42

1.44

1.50

1.45

1.48

1.39

1.51

1.48

1.55

1.52

1.49

1.49

1.39

1.36

1.48

1.49

1.67

1.63

1.44

1.61

1.75

1.42

1.46

1.50

1.53

1.40

1.58

1.57

1.59

1.49

1.55

1.44

1.60

1.61

1.52

1.65

1.66

1.59

1.61

1.66

1.47

1.55

1.57

1.66

1.60

1.54

1.57

1.65

1.62

1.82

1.82

1.59

1.66

1.63

1.63

1.37

1.57

1.50

1.50

1.51

1.48

1.39

1.72

1.82

1.55

1.60

1.44

1.58

1.61

1.49

1.49

1.56

1.42

1.43

1.41

1.78

1.76

1.74

1.73

1.70

1.37

1.55

1.64

1.48

1.65

1.50

1.50

1.81

1.86

1.57

1.63

1.61

1.62

1.64

1.70

1.50

1.71

1.60

1.49

1.75

2.06

1.64

1.55

1.77

1.68

1.67

1.62

1.72

1.89

1.53

1.36

1.85

1.59

1.58

1.88

1.65

1.81

1.53

1.64

1.89

1.51

0.87

1.50

1.50

1.69

1.35

1.74

1.47

1.56

1.66

1.87

1.55

1.79

1.44

1.70

1.55

1.62

1.55

1.41

1.54

1.70

1.88

1.76

1.70

1.65

1.37

1.50

1.88

1.71

1.84

1.78

1.82

1.81

1.82

1.63

1.38

1.62

1.68

1.53

1.77

1.75

1.88

1.64

1.26

1.55

1.57

2.93

1.47

1.64

1.66

1.72

1.82

1.78

1.74

1.80

1.61

1.35

1.35

1.46

1.42

1.61

1.45

1.51

1.74

1.74

1.63

1.78

1.68

1.59

1.57

1.69

1.67

1.70

1.73

1.72

1.64

1.81

1.76

1.55

1.47

1.82

1.66

1.69

1.65

1.67

1.68

1.80

1.48

1.70

1.74

1.81

1.61

1.69

1.58

1.78

1.80

1.90

1.64

1.63

1.55

1.65

1.77

1.83

1.86

1.93

1.76

1.97

1.74

1.70

1.58

1.64

1.69

1.78

1.88

1.61

1.50

1.75

1.76

1.65

1.73

1.51

1.59

1.57

1.52

1.86

1.94

2.00

1.87

1.79

1.76

1.47

1.56

1.70

1.79

1.97

2.03

1.70

1.64

1.87

1.87

1.80

1.73

1.81

1.70

1.25

1.86

1.87

1.75

1.82

1.81

1.55

1.79

1.70

1.71

1.79

1.83

1.78

1.83

1.84

1.64

1.65

1.87

1.89

1.91

1.94

1.76

1.61

1.69

1.87

1.88

1.86

1.94

1.59

1.77

1.71

1.96

1.81

1.85

1.92

1.93

1.53

1.75

1.83

1.77

1.65

2.04

2.08

1.72

2.04

2.23

2.11

1.67

2.05

1.95

2.01

1.82

1.80

2.17

1.99

1.98

2.02 1.97 1.95

1.80

2.00

1.94

1.89

1.88

1.87

1.93

1.82

1.80

1.79

1.85

1.82

2.33

1.85

1.86

2.13

1.88

2.13

2.14

2.30

1.83

1.97

2.04

1.98

1.86

1.95

2.16

2.04

2.12

2.12

2.17

2.27

2.96

3.47

3.70

3.61

3.62

3.36

3.19

3.25

2.34

2.60

2.87

1.772.01

2.47

2.78

2.75

2.73

3.03

3.71

3.39

3.07 3.03 3.04 3.05 3.18 3.14 3.103.19

3.17

3.20

3.54

3.76

3.79

4.05 4.34

4.59

4.76

2.96

3.07

2.71

2.73

2.89

2.79

2.70

2.68

2.70

2.78

2.86

2.86

2.75

2.83

2.84

2.86

2.72

2.83

2.84

2.89

3.74

4.06

3.72

3.15 3.09 3.10 3.07 3.40 3.313.24

3.243.26 3.31

3.53

3.71

3.84

3.93

3.64

3.61

3.33

2.81

2.60

2.33

2.27

2.20

2.12

2.141.95

1.97

1.94

1.92

1.96

2.07

2.04

2.18

2.15

2.06

2.18

2.03

2.05

2.15

2.01

2.14

2.11

2.21

2.20

2.17

2.09

2.01

2.13

2.05

2.09

2.00

1.95

2.08

2.12

2.19

2.21

2.39

3.61

4.56

4.15

3.78

3.27

2.82

2.50

2.28

2.13

2.09

2.01

2.05

2.01

1.98

1.96

2.00

2.04

2.00

2.14

2.11

2.09

2.00

1.95

2.13

2.15

2.07

2.13

2.18

2.22

2.21

2.23

2.11

2.12

2.09

2.07

2.11

1.97

1.93

2.01

2.09

2.17

2.21

2.43

2.76

3.57

3.81

2.91

2.90

2.84

2.78

2.78

2.86

2.75

2.69

2.73

2.75

2.78

2.83

2.65

2.74

2.79

2.84

2.89

2.81

2.85

2.87

3.15

3.66

3.69

3.00

2.85

2.77

1.67

1.96

1.95

2.53

1.47

1.80

1.37

1.51

3.00

3.06

3.22

3.13

3.01

3.07

2.76

2.71

2.88

3.06

3.01

2.95

2.97

2.92

2.87

2.78

1.33

1.50

1.68

1.56

1.59

1.61

1.68

1.53

1.47

1.65

1.65

1.54

1.44

1.63

1.67

1.60

1.75

1.50

1.751.78

1.84

1.681.74

1.771.72

1.68

1.771.76

1.781.84

1.93

2.292.57

2.82

2.14

1.53

2.15

2.14

1.891.88

1.88

1.631.61

1.59

1.54

1.57

1.49

1.55

1.87

1.801.91

1.60

1.70

1.742.07

2.16

1.711.72

1.84

1.75

1.75

1.89

0.28

0.39

0.13

0.19

0.25

0.24

0.40

0.57

0.34

0.20

0.29

0.37

0.24

0.21

0.17

0.38

0.59

0.80

0.28

0.39

0.13

0.19

0.25

0.24

0.40

0.57

0.34

0.20

0.29

0.37

0.24

0.21

0.17

0.38

0.59

0.80

0.56

0.78

0.56

0.56

0.78

0.56

1.94

1.64

1.34

1.04

0.74

0.71

0.69

0.66

0.63

0.67

0.72

1.02

0.91

0.80

0.69

0.69

2.41

3.60

2.95

2.86

2.86

2.74

2.72

2.80

2.882.93

2.993.04

2.93

2.82

2.83

2.80

0.50

0.50

0.50

0.50

0.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

2.50

2.50

2.50

2.50

2.50

2.50

2.50

2.50

2.50

3.50

3.50

4.50

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

3.00

3.00

3.00

3.00

3.00

3.00

3.00

3.00

3.00

4.00

4.00

CONDUCTOR HT. 19.6m

CONDUCTOR HT. 24.3m

WATERCOURSE

CROSSING 1 (INFILL

AS REQUIRED)

WATERCOURSE

CROSSINGS 2

G

4.000m

4.000m

16.500m

7.30

0m

12

5.65

0m (

EX

TG

)

5.600m (EXTG)

7.300m

7.50

0m

16.5

00m

7.50

0m

7.500m

NO TOPO DATA EAST

OF THIS POINT

1 IN 3 BATTER

TIE IN TO EXISTING LEVELS

1 IN 3 BATTER

TIE IN TO EXISTING LEVELS

1 IN 3 BATTER

TIE IN TO EXISTING LEVELS 1 IN 3 BATTER

TIE IN TO EXISTING LEVELS

1:40 FALL 1:40 FALL 1:40 FALL

TYPICAL 4.0m CARRIAGEWAY CROSS SECTIONSCALE 1:50

TYPICAL 7.3m CARRIAGEWAY CROSS SECTIONSCALE 1:50

7.300m4.000m

0.99

1.07

1.11

1.20

1.41

1.80

1.86

1.69

1.55

1.45

1.62

0.94

1.03

1.22

1.24

1.41

1.83

1.82

1.46

1.44

1.50

1.59

1.02

1.00

1.09

1.21

1.34

1.75

1.53

1.50

1.40

1.58

1.60

1.11

1.09

1.21

1.21

1.38

1.76

1.43

1.42

1.55

1.53

1.60

1.13

1.12

1.20

1.17

1.45

1.55

1.56

1.57

1.63

1.64

1.69

1.19

1.12

1.21

1.24

1.48

1.44

1.44

1.61

1.68

1.71

1.67

1.10

1.21

1.20

1.35

1.44

1.56

1.51

1.69

1.72

1.68

1.65

1.15

1.24

1.40

1.38

1.35

1.35

1.48

1.67

1.65

1.70

1.76

1.20

1.33

1.61

1.45

1.57

1.65

1.52

1.73

1.71

1.68

1.71

1.30

1.60

1.71

1.42

1.44

1.65

1.69

1.73

1.68

1.66

1.73

1.33

1.73

1.51

1.53

1.61

1.60

1.74

1.67

1.65

1.77

1.75

1.51

1.61

1.37

1.39

1.73

1.53

1.52

1.69

1.67

1.71

1.73

1.36

1.26

1.43

1.61

1.62

1.43

1.50

1.50

1.26

1.62

1.58

1.72

1.73

1.41

1.41

1.50

1.39

1.30

1.70

1.77

1.67

1.74

1.72

1.78

1.76

1.42

1.50

1.43

1.36

1.76

1.75

1.81

1.76

1.71

1.65

1.74

1.32

1.30

1.47

1.84

1.88

1.68

1.69

1.59

1.75

1.79

1.55

1.40

1.54

1.68

1.82

1.79

1.57

1.66

1.77

1.78

1.77

1.43

1.48

1.69

1.66

1.89

1.67

1.62

1.71

1.71

1.77

1.77

1.47

1.62

1.64

1.78

1.72

1.55

1.61

1.72

1.73

1.71

1.63

1.47

1.43

1.45

1.67

1.69

1.57

1.64

1.77

1.73

1.66

1.63

1.43

1.49

1.35

1.67

1.63

1.66

1.56

1.61

1.65

1.64

1.75

1.31

1.40

1.51

1.67

1.73

1.77

1.69

1.64

1.68

1.68

1.73

1.58

1.72

1.72

1.57

1.66

1.65

1.46

1.41

1.46

1.52

1.50

1.56

1.66

1.84

1.82

1.78

1.61

1.67

1.80

1.65

1.66

1.43

1.75

1.60

1.60

1.52

1.58

1.41

1.38

1.78

1.68

1.66

1.62

1.89

1.64

1.63

1.74

1.70

1.70

1.58

1.69

1.85

1.78

1.78

1.77

1.91

1.85

1.83

1.92

1.88

1.85

1.75

1.89

1.70

1.70

1.64

1.87

1.70

1.76

1.81

1.81

1.76

1.55

1.79

1.68

1.70

1.62

1.79

1.74

1.73

1.85

1.87

1.80

1.64

1.83

1.82

1.69

1.59

1.81

1.68

1.65

1.67

1.69

1.69

1.56

1.69

1.74

1.64

1.65

1.74

1.64

1.69

1.63

1.70

1.64

1.60

1.63

1.59

1.49

1.64

1.64

1.58

1.62

1.53

1.59

1.63

1.47

1.51

1.57

1.48

1.73

1.68

1.60

1.36

1.62

1.62

1.51

1.33

1.45

1.55

1.52

1.64

1.58

1.42

1.30

1.40

1.54

1.68

1.43

1.41

1.59

1.44

1.62

1.66

1.67

1.67

1.75

1.76

1.65

1.57

1.55

1.61

1.62

1.65

1.62

1.68

1.57

1.65

1.63

1.64

1.61

1.40

1.62

1.66

1.74

1.71

1.76

1.78

1.69

1.75

1.67

1.64

1.24

1.55

1.58

1.57

1.63

1.68

1.66

1.78

1.75

1.64

1.68

1.27

1.53

1.60

1.78

1.68

1.69

1.70

1.81

1.78

1.70

1.59

1.30

1.58

1.59

1.69

1.79

1.71

1.79

1.76

1.72

1.87

1.73

1.36

1.58

1.58

1.46

1.71

1.75

1.72

1.75

1.66

1.83

1.58

1.64

1.77

1.54

1.50

1.59

1.41

1.73

1.57

1.53

1.63

1.58

1.59

1.81

1.96

1.59

1.66

1.70

1.58

1.87

1.53

1.91

1.82

2.02

2.00

1.79

1.96

1.69

1.49

1.37

1.61

1.70

1.83

1.84

1.88

1.86

1.74

1.48

1.59

1.53

1.60

1.43

1.23

1.72

1.60

1.60

1.72

1.54

1.56

1.49

1.52

1.51

1.50

1.59

1.50

1.52

1.44

1.48

1.50

1.54

1.26

1.58

1.58

1.48

1.48

1.66

1.58

1.60

1.45

1.55

1.47

1.43

1.51

1.38

1.52

1.55

1.69

1.64

1.45

1.51

1.53

1.59

1.45

1.48

1.39

1.51

1.48

1.55

1.52

1.40

1.78

1.72

1.51

1.52

1.36

1.30

1.32

1.34

1.331.35

1.32

1.16

1.10

1.33

1.51

1.70

1.47

1.21

1.28

1.86

1.61

1.77

1.68

1.501.60

1.47

1.68

1.60

1.47

1.18

1.41

1.82

1.53

1.51

1.411.28

1.471.32

1.67

1.53

1.65

1.60

1.49

1.61

1.63

1.68

1.74

1.76

1.76

1.70

1.63

1.70

1.70

1.70

1.72

1.69

1.97

2.14

2.16

2.09

2.07

2.15

2.23

1.92

2.11

1.95

1.95

1.96

1.59

1.81

1.71

1.40

1.91

1.95

1.88

1.51

1.73

1.57

1.561.95

1.61

1.46

1.48

1.46

1.50

1.57

1.49

1.37

1.46

1.41

1.37

1.36

1.43

1.54

1.39

1.32

1.39

1.58

1.63

1.57

1.79

1.36

1.39

1.42

1.61

1.53

1.59

1.92

1.84

2.01

1.93

0.24

0.20

0.19

0.20

0.17

0.17

0.13

0.16

0.14

0.15

0.13

0.11

0.12

0.10

0.09

0.50

0.21

0.19

0.14

0.20

0.20

0.20

0.19

0.17

0.18

0.16

0.14

0.15

0.18

0.07

0.50

0.08

0.12

0.08

0.44

0.50

0.51

0.51

0.50

0.53

0.52

0.55

0.52

0.57

0.56

0.55

0.56

0.55

0.61

0.59

0.56

0.54

0.53

0.38

0.46

0.46

0.49

0.52

0.41

0.40

0.39

0.290.23

0.25

0.62

1.00

1.37

0.50

0.50

0.50

0.50

0.50

0.50

0.50

0.50

0.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.501.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.501.

50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.00

1.00

1.001.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

2.00

2.00

2.00

2.00

2.00

CONDUCTOR HT. 29.2m

CONDUCTOR HT. 28.0m

CONDUCTOR HT. 25.3m

WATERCOURSE

CROSSING 3

WATERCOURSE

CROSSING 4

WATERCOURSE

CROSSING 5

P

4.000m

4.000m

16.500m

16.500m

2.00

0m

2.00

0m

12

23

1.99

2.01

1.98

1.89

1.81

1.78

1.73

1.71

2.10

1.71

1.78

1.96

1.95

1.89

1.82

1.81

1.73

1.77

1.63

2.04

1.73

1.57

1.85

1.88

1.91

1.87

1.78

1.78

1.73

1.68

2.05

1.82

1.56

1.78

1.71

1.83

1.73

1.74

1.78

1.83

2.18

1.88

1.53

1.68

1.79

1.80

1.74

1.68

1.78

1.71

2.00

1.85

1.55

1.72

1.81

1.77

1.82

1.78

1.70

1.90

1.88

1.58

1.55

1.83

1.72

1.82

1.84

1.67

1.88

2.05

1.71

1.83

1.79

1.87

1.91

1.82

1.92

2.13

2.18

2.06

1.81

1.85

1.93

1.85

1.87

2.10

2.09

2.07

1.97

1.91

2.12

2.08

2.16

2.31

2.01

2.11

1.25

1.53

1.68

1.89

1.94

2.08

1.46

1.45

1.99

1.91

1.96

2.09

2.05

2.38

1.34

1.39

1.88

2.03

2.08

2.08

2.08

2.11

1.36

1.36

1.68

2.08

2.10

2.04

2.09

2.06

2.27

1.27

1.39

1.74

2.01

2.01

1.99

2.05

2.14

2.12

2.60

1.26

1.40

1.70

1.89

1.99

2.02

2.04

2.12

1.99

2.43

2.91

1.20

1.26

1.46

2.02

2.12

2.13

2.11

2.17

2.20

2.12

2.57

1.31

1.29

1.51

2.17

2.20

2.14

2.21

2.20

2.12

2.09

2.42

1.34

1.38

1.54

2.08

2.14

2.28

2.20

2.26

2.13

2.05

2.23

1.38

1.41

1.58

1.91

2.17

2.20

2.20

2.32

2.02

2.07

2.08

1.41

1.43

1.54

1.95

2.14

2.20

2.17

2.34

1.88

1.94

2.13

1.39

1.42

1.55

2.06

2.22

2.09

2.23

2.23

2.00

2.02

2.12

1.35

1.36

1.58

2.18

2.27

2.23

2.29

2.14

1.86

1.99

2.04

1.39

1.36

1.68

2.20

2.25

2.23

2.30

2.05

1.98

2.25

2.09

1.40

1.46

1.58

2.18

2.25

2.25

2.32

2.04

2.00

2.19

2.16

1.37

1.40

1.57

1.95

2.23

2.20

2.19

2.09

2.03

1.96

2.06

1.35

1.45

1.70

1.61

2.20

2.30

2.11

1.97

2.01

2.02

2.06

1.38

1.36

1.57

1.45

1.71

2.14

1.93

1.91

2.04

1.90

1.97

1.31

1.30

1.46

1.42

1.75

2.12

1.90

1.88

2.02

1.97

1.95

1.23

1.32

1.38

1.37

1.71

1.96

1.92

1.95

1.95

1.87

1.99

1.31

1.24

1.21

1.41

1.77

1.96

1.84

1.94

1.89

1.78

1.88

1.16

1.31

1.77

1.83

1.78

1.85

1.63

1.78

1.79

1.76

1.17

1.16

1.46

1.70

1.57

1.56

1.49

1.60

1.60

1.12

1.11

1.23

1.45

1.44

1.42

1.55

1.70

1.47

1.10

1.26

1.19

1.34

1.46

1.66

1.66

1.63

1.61

1.73

1.01

1.17

1.53

1.22

1.50

1.63

1.68

1.58

1.65

0.98

0.97

1.26

1.35

1.64

1.76

1.75

1.60

1.51

1.55

0.91

1.07

1.10

1.36

1.59

1.71

1.59

1.51

1.50

1.00

1.04

1.19

1.47

1.57

1.70

1.72

1.59

1.59

1.41

1.03

1.15

1.12

2.77

0.66

0.88

0.84

1.46

1.14

1.14

1.19

1.26

1.32

1.83

1.92

2.03

0.43

1.72

1.74

1.75

1.12

1.39

1.24

1.42

1.98

1.93

2.01

2.04

0.28

1.77

1.71

1.03

1.15

1.08

1.68

1.95

1.98

2.03

1.95

2.56

1.66

1.80

1.16

1.35

1.24

1.89

1.83

2.01

1.99

1.95

2.47

1.67

1.65

1.30

1.31

1.51

1.97

1.94

1.98

2.12

1.89

0.94

2.18

1.70

1.11

1.37

1.54

2.06

1.93

2.01

2.03

1.73

1.71

2.05

1.20

1.27

1.84

2.00

2.06

1.99

1.78

1.49

1.71

1.80

1.23

1.52

1.99

1.91

1.98

1.93

1.69

1.53

1.77

1.80

1.69

1.15

1.31

1.83

1.83

1.93

1.71

1.66

1.64

1.68

1.72

1.74

1.20

1.41

1.80

1.86

1.69

1.55

1.45

1.62

1.65

1.69

1.68

2.65

2.71

2.85

3.21

5.11

2.39

2.42

2.40

2.36

2.36

1.86

1.86

2.00

2.09

2.26

2.43

2.54

2.44

2.55

2.59

2.63

2.77

2.75

2.97

2.882.61

2.902.90

2.80

2.34

2.24

1.94

1.83

1.75

1.72

1.75

1.78

1.59

1.62

1.66

1.69

1.74

1.95

2.25

2.33

2.47

2.732.79

2.94 2.94

2.92

2.63

2.66

2.59

2.47

2.35

2.46

2.48

2.25

2.17

2.08

1.72

2.09

1.76

2.30

2.36

2.50

2.40

2.47

2.35

2.50

2.38

2.23

2.10

1.96

1.94

1.92

2.09

1.74

1.86

1.71

1.55

1.74

1.76

1.97

2.11

2.12

2.26

2.18

2.44

0.61

0.77

0.71

1.05

1.39

1.89

1.94

1.85

1.65

1.11 1.37

1.88

1.82

1.07

1.15

1.301.71

1.83

2.01

1.94

1.56

2.12

2.10

2.09

2.35

2.53

2.53

2.42

2.32

2.60

2.81

2.58

2.642.76

3.03

3.03

2.95

2.19

1.81

1.751.85

1.62

1.59

1.49

1.681.66

1.50

1.65

1.62

1.59

1.56

1.63

1.70

1.32

1.35

1.44

1.16

1.10

1.29

1.11

1.86

1.44

1.84

2.02

2.16

2.29

2.50

2.37

2.31

2.55

2.79

2.56

2.35

2.76

2.812.49

3.032.71

2.35

2.58

2.18

2.17

1.94

1.58

1.77

1.66

1.54

1.23

1.31

1.40

1.61

1.97

1.981.99

1.831.95

1.63 1.63

1.62

1.73

1.56

1.39

1.74

1.77

1.80

1.85

1.18

1.26

1.36

1.45

1.37

0.93

1.24

5.12

5.115.28

5.46

5.64

5.77

5.77

5.64

5.61

5.39

5.43

5.425.45

5.17

2.57

2.65

2.41

2.53

2.85

1.88

1.88

2.05

1.64

1.70

1.68

0.45

-0.03

0.04

0.10

0.18

0.25

0.33

0.33

0.34

0.34

0.31

0.29

0.26

0.16

0.210.21

0.43

0.64

0.55

0.45

0.36

0.20

0.03

0.09

0.45

-0.03

0.04

0.10

0.18

0.25

0.33

0.33

0.34

0.34

0.31

0.29

0.26

0.16

0.210.21

0.43

0.64

0.55

0.45

0.36

0.20

0.03

0.09

-0.16

-0.18

-0.07

-0.16

-0.18

-0.07

0.35

-0.13

0.04

0.21

0.12

0.04

-0.05

0.03

0.10

0.08

0.05

0.20

0.34

0.29

0.24

0.45

0.56

0.67

0.53

0.35

-0.13

0.04

0.21

0.12

0.04

-0.05

0.10

0.08

0.05

0.20

0.34

0.29

0.24

0.45

0.56

0.67

0.53

0.19

0.20

0.22

0.24

0.41

0.58

0.76

0.93

1.19

1.13

1.03

1.28

0.90

0.96

0.48

0.49

0.51

0.48

0.43

2.59

2.38

2.17

2.10

1.82

1.79

1.90

1.77

1.69

1.58

1.55

1.52

1.57

1.62

1.58

3.27

3.25

3.20

3.09

2.80

2.78

2.72

3.05

0.50

0.50

0.50

0.50

0.50

0.50

0.50

0.50

0.50

0.50

0.50

0.50

0.50

0.50

0.50

0.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.501.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

1.50

2.50

2.50

2.50

2.50

2.50

2.50

2.50

2.50

2.50

2.50

2.50

2.50

3.50

4.50

5.50

-0.0

0

0.00

0.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

3.00

3.00

3.00

4.00

5.00

CONDUCTOR HT. 29.2m

CONDUCTOR HT. 29.1m

CONDUCTOR HT. 28.2m

WATERCOURSE

CROSSING 6

K

L

4.000m

4.00

0m

16.500m 2.00

0m

2.000m

16.500m

WATERCOURSE

CROSSING 5 (IF

REQUIRED)

ADDITIONAL LENGTH OF HAUL ROAD

REQUIRED IF PARCEL OF PANELS IS

MAINTAINED IN DESIGN

23

Max Legal Length (UK) Articulated Vehicle (16.5m)

Max Legal Length (UK) Articulated Vehicle (16.5m)

Max Legal Length (UK) Articulated Vehicle (16.5m)

13.66.53

Max 90° HorizMax 10° Vert

6.4 1.4 1.4 2.52

4.781.37 3 1.4

Max Legal Length (UK) Articulated Vehicle (16.5m)Overall Length 16.500mOverall Width 2.550mOverall Body Height 3.681mMin Body Ground Clearance 0.411mMax Track Width 2.500mLock to lock time 6.00sKerb to Kerb Turning Radius 6.530m

27.5

00m

8.000m

Status:

Project:

Drg Title:

Originator: Zone: Level: Rev:Discipline: Category / Number:Type:

Size: Date: Drawn By: Designed By: Checked By:

Project No:

Rev: Description: Date: By: Chkd:

Scale:

A0

- - - - -- -

Civils & Structures • Transport Planning • Environmental • Infrastructure • Geotechnical • Conservation & Heritage • Principal DesignerBirmingham • Bristol • Cambridge • Cardiff • Douglas • Dublin • Edinburgh • Glasgow • Kendal • Leeds • Liverpool • London • Manchester • Nottingham

Merchant Exchange, 17-19 Whitworth Street, West Manchester M1 5WG0161 236 [email protected]

P01 FIRST ISSUE 18.05.18 ZG AD

CLEVE HILL SOLAR PARK

PROPOSED HIGHWAY

GENERAL ARRANGEMENT

066705 CUR 00 XX DR C 90004 P12

1:1000

18.05.18ZG JB AD

\\maf

s02\

Pro

ject

s\06

6001

- 0

6700

0\06

6705

- C

leve

Hill

Sol

ar P

ark\

QM

S 4

Pro

duct

ion\

4B M

odel

s &

Dra

win

gs\_

Civ

il-C

\CA

D\

NOTES:1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT

ARCHITECTS AND ENGINEERS DRAWINGS AND SPECIFICATIONS.

2. DO NOT SCALE THIS DRAWING. ANY AMBIGUITIES, OMISSIONS AND

ERRORS ON DRAWINGS SHALL BE BROUGHT TO THE ENGINEERS

ATTENTION IMMEDIATELY. ALL DIMENSIONS MUST BE

CHECKED / VERIFIED ON SITE.

3. ALL DIMENSIONS ARE IN METRES UNLESS NOTED OTHERWISE.

4. ALL LEVELS ARE IN METRES ABOVE ORDNANCE DATUM UNLESS NOTED

OTHERWISE.

KEY

COMPOUND / ACCESS ROAD BOUNDARY

PROPOSED BLACKTOP ACCESS ROAD

PROPOSED BATTERED LANDSCAPE TIE IN TO EXISTING

LEVELS

PROPOSED STONE HAUL ROAD

LOCATION OF ROAD CROSSING WATERCOURSE (CULVERT

REQUIRED)

ISSUED FOR CO-ORDINATION S1

P02 UPDATED TO SUIT BOUNDARY (S0) 23/05/18 JDB AD

P03 ISSUED FOR CO-ORDINATION (S1) 02/07/18 JDB AD

P04 TRACK LAYOUT UPDATED (S1) 09/07/18 JDB AD

P05 TRACKING TURNING HEAD UPDATED (S1) 30/08/18 JDB AR

P06 UPDATED TO SUIT PANEL LAYOUT (S1) 03/09/18 JDB AR

P07 UPDATED TO SUIT ACCESS REQUIREMENTS (S1) 17/09/18 JDB AR

P08 NEW PANEL LAYOUT (S1) 19/09/18 JDB AR

P09 LAYOUT FREEZE - ACCESS OPTION 3 (S1) 25/09/18 JDB AR

P10 PASSING PLACES UPDATED (S1) 05/10/18 JDB AR

P11 ROAD ALIGNMENT AMENDED (S1) 08/10/18 JDB AR

P12 WATERCOURSE CROSSING 2 UPDATED (S1) 10/10/18 JDB AR

Page 37: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Construction Traffic Management Plan

Rev 002003 | Copyright © 2019 Curtins Consulting Ltd

Appendix C – Construction Vehicle Routeing

Page 38: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

Scale @ A3

Date: 17/10/2018

P:\Projects\Engineering\Engineering EIA\2238 Cleve Hill.aprx\2238-REP-224 Fig14.1 Construction Traffic Routeing

1:100,000

Repr

oduc

ed fr

om O

rdna

nce

Surv

ey d

igita

l map

dat

a ©

Cro

wn

copy

right

201

8. A

ll rig

hts

rese

rved

. Lice

nse

num

ber 1

0004

8606

#NORTH

Cleve Hill Solar ParkEnvironmental Statement

Construction Traffic RouteingFigure 14.1

Ref: 2238-REP-224Produced By: SC

Checked By: PP

0 2 4 km

DCO Application Site Boundary

Construction Vehicle Routes

Head Hill Road /Seasalter Road

A2

A299

A249

M2

Ordnance Survey data © Crown copyright and database right 2018. OS 100030994

1780

0017

6000

1740

0017

2000

1700

0016

8000

1660

0016

4000

1620

0016

0000

1580

0015

6000

1540

0015

2000

1780

0017

6000

1740

0017

2000

1700

0016

8000

1660

0016

4000

1620

0016

0000

1580

0015

6000

1540

0015

2000

614000612000610000608000606000604000602000600000598000596000594000592000590000588000586000

614000612000610000608000606000604000602000600000598000596000594000592000590000588000586000

Page 39: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Construction Traffic Management Plan

Rev 002003 | Copyright © 2019 Curtins Consulting Ltd

Appendix D – Route Assessment Drawings

Page 40: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

13.66.53

Max 90° HorizMax 10° Vert

6.4 1.4 1.4 2.52

4.781.37 3 1.4

Max Legal Length (UK) Articulated Vehicle (16.5m)Overall Length 16.500mOverall Width 2.550mOverall Body Height 3.681mMin Body Ground Clearance 0.411mMax Track Width 2.500mLock to lock time 6.00sKerb to Kerb Turning Radius 6.530m

5.079

Large Car (

2006)

11m

Articulated Vehicle with Twin Steered Tractor

Large Car (

2006)

20m

Articulated V

ehicle with T

win Steered

Tractor

Large Car (

2006)

29m

Articulated

Vehicle with

Twin Steere

d Tractor

Large Car (2

006)

8m

Articulated Vehicle w

ith Twin Steered Tractor

35m

Articulated V

ehicle with T

win Steered

Tractor

Status:

Project:

Drg Title:

Size: Date: Drawn By: Designed By: Checked By:

Rev: Description: Date: By: Chkd:

Scale:

A3

GENERAL NOTES:

Civils & Structures • Transport Planning • Environmental • Infrastructure • Geotechnical • Conservation & Heritage • Principal DesignerBirmingham • Bristol • Cambridge • Cardiff • Douglas • Dublin • Edinburgh • Glasgow • Kendal • Leeds • Liverpool • London • Manchester • Nottingham

Originator: Volume: Level: Rev:Role: Category / Number:Type:Project No:

- - - - -- -

FOR INFORMATION

Cleve Hil Solar Park

Articulated vehicle traveling northboundand large car traveling southboundTopographical Survey

66705 CUR 00 00 DR TP 0008 -

NTS24/07/19

CT BD BD

\\lofs0

3\Pro

jects\

TP Lo

ndon

\TP

Proje

cts\1.

VIS

ION\

6670

5 - C

leve H

ill So

lar P

ark\J

- Dr

awing

s\Wor

king\

1 Country View Park

4 Graveney Railway Bridge

5 350m North of Whitstable Road Junction

4

3

2

1

2 Denley Hall

KEY

Forward Visibility

Area where two vehicles may struggle to pass

Site Access

Graveney RailwayBridge

Graveney School

Country View Park

Denley Hall

All Saints Church

Monkshill Road

3 North of All Saints Church

5

60m forward visibility

50m forward visibility 50m forward visibility

50m forward visibility

45m forward visibility

Page 41: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

13.66.53

Max 90° HorizMax 10° Vert

6.4 1.4 1.4 2.52

4.781.37 3 1.4

Max Legal Length (UK) Articulated Vehicle (16.5m)Overall Length 16.500mOverall Width 2.550mOverall Body Height 3.681mMin Body Ground Clearance 0.411mMax Track Width 2.500mLock to lock time 6.00sKerb to Kerb Turning Radius 6.530m

5.079

11m

Articulated V

ehicle with Tw

in Steered Tra

ctor

Large Car (

2006)

Large Car (

2006)

23m

Articulated

Vehicle with

Twin Steer

ed Tractor

Status:

Project:

Drg Title:

Size: Date: Drawn By: Designed By: Checked By:

Rev: Description: Date: By: Chkd:

Scale:

A3

GENERAL NOTES:

Civils & Structures • Transport Planning • Environmental • Infrastructure • Geotechnical • Conservation & Heritage • Principal DesignerBirmingham • Bristol • Cambridge • Cardiff • Douglas • Dublin • Edinburgh • Glasgow • Kendal • Leeds • Liverpool • London • Manchester • Nottingham

Originator: Volume: Level: Rev:Role: Category / Number:Type:Project No:

- - - - -- -

FOR INFORMATION

Cleve Hil Solar Park

Articulated vehicle traveling northboundand large car traveling southbound

66705 CUR 00 00 DR TP 0009 -

NTS24/07/19

CT BD BD

\\lofs0

3\Pro

jects\

TP Lo

ndon

\TP

Proje

cts\1.

VIS

ION\

6670

5 - C

leve H

ill So

lar P

ark\J

- Dr

awing

s\Wor

king\

3 Graveney Railway Bridge1 Denley Hall

KEY

Forward Visibility

Area where two vehicles may struggle to pass

2 North of All Saints Church

3

2

1

Site Access

Graveney RailwayBridge

Graveney School

Country View Park

Denley Hall

All Saints Church

Monkshill Road

60m forward visibility

43m forward visibility

50m forward visibility

Page 42: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Construction Traffic Management Plan

Rev 002003 | Copyright © 2019 Curtins Consulting Ltd

Appendix E – Proposed Signage and Speed Restrictions

Page 43: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

Status:

Project:

Drg Title:

Size: Date: Drawn By: Designed By: Checked By:

Rev: Description: Date: By: Chkd:

Scale:

A3

GENERAL NOTES:

Civils & Structures • Transport Planning • Environmental • Infrastructure • Geotechnical • Conservation & Heritage • Principal DesignerBirmingham • Bristol • Cambridge • Cardiff • Douglas • Dublin • Edinburgh • Glasgow • Kendal • Leeds • Liverpool • London • Manchester • Nottingham

Originator: Volume: Level: Rev:Role: Category / Number:Type:Project No:

- - - - -- -

FOR INFORMATION

Cleve Hil Solar Park

Indicative Traffic Signage Strategy

66705 CUR 00 00 DR TP 0007 01

NTS24/07/2019

CT BD BD

\\lofs0

3\Pro

jects\

TP Lo

ndon

\TP

Proje

cts\1.

VIS

ION\

6670

5 - C

leve H

ill So

lar P

ark\J

- Dr

awing

s\Wor

king\

Site Access

Graveney Primary School

All Saints Church

Railway Bridge

1. Drawing shows existing (greyed out) andproposed signage

2. Construction traffic signage (type andlocation) is to be agreed with KCC priorto installation

Page 44: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Construction Traffic Management Plan

Rev 002003 | Copyright © 2019 Curtins Consulting Ltd

Appendix F – Outline Traffic Incident Management Plan

Page 45: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

Cleve Hill Solar Park

Outline Construction Traffic

Incident Management Plan

Curtins Ref: TPLO/66705

Revision: 003

Issue Date: 12 October 2018

Client Name: Cleve Hill Solar Park Ltd

BIM Reference: 66705-CUR-00-XX-RP-TP-00001-V01_Framework Traffic Incident Management

Plan

S

op

ho

s I

nte

rnati

on

al

Curtins

40 Compton Street

London, EC1V 0BD

Tel: 020 7324 2240

www.curtins.com

Imp

eri

al

We

st

CIVILS & STRUCTURES • TRANSPORT PLANNING • ENVIRONMENTAL • INFRASTRUCTURE • GEOTECHNICAL • CONSERVATION & HERITAGE • PRINCIPAL DESIGNER

Birmingham • Bristol • Cambridge • Cardiff • Douglas • Dublin • Edinburgh • Glasgow • Kendal • Leeds • Liverpool • London • Manchester • Nottingham

Page 46: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Construction Traffic Incident Management Plan

Rev 003 | Copyright © 2019 Curtins Consulting Ltd Page i

Author Signature Date

Caitlin Turley BEng (Hons) MCIHT Transport Planner

12/10/2018

Reviewed Signature Date

Ben Dawson BSc (Hons) MICHT Associate – Transport Planning

12/10/2018

Authorised Signature Date

Ben Dawson BSc (Hons) MICHT Associate – Transport Planning

12/10/2018

Page 47: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Construction Traffic Incident Management Plan

Rev 003 | Copyright © 2019 Curtins Consulting Ltd Page ii

Table of contents 1.0 Introduction .............................................................................................................................................. 1

2.0 Construction Traffic Routes ..................................................................................................................... 2

3.0 Incident Training ...................................................................................................................................... 3

4.0 Incident Detection .................................................................................................................................... 3

5.0 Incident Verification ................................................................................................................................. 3

6.0 Response to Incident ............................................................................................................................... 3

7.0 Response to Incident – Communications ................................................................................................ 4

8.0 Traffic Management – Diversion Routes ................................................................................................. 4

9.0 Incident Clearance................................................................................................................................... 4

10.0 Scenario Testing ...................................................................................................................................... 4

Page 48: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Construction Traffic Incident Management Plan

Rev 003 | Copyright © 2019 Curtins Consulting Ltd

1.0 Introduction

1.1.1 Curtins has been appointed by Cleve Hill Solar Park Ltd (CHSP) to provide traffic and transportation

advice in relation to the development of Cleve Hill Solar Park (the "Proposed Development"). The

Development site is located on the north Kent coast, approximately two kilometres northeast of

Faversham and five kilometres west of Whitstable (the "Site"). The Site is situated on approximately

360 ha (890 acres) of land within the administrative boundaries of Swale Borough Council (SBC),

Canterbury City Council (CCC) and Kent County Council (KCC).

1.1.2 This Outline Construction Traffic Incident Management Plan (Outline TIMP) has been prepared to

accompany the Development Consent Order (DCO) application for the Proposed Development and

sets out a Framework for the control of Proposed Development construction traffic movements in the

event of an incident on the strategic and local road network leading to the site.

1.1.3 The document aims to set out the relationships between CHSP, the Emergency Services and

Highways Authorities and details the communication, management and response procedures which

will be undertaken to ensure the operational safety of the employees and the and the general public

should an incident occur.

1.1.4 The Outline TIMP identifies CHSP’s ongoing roles and responsibilities with regards to construction

traffic in the event of an incident. These will be adhered to throughout the duration of the Proposed

Development construction programme.

1.1.5 It is proposed that this Outline TIMP is further developed once a contractor(s) have been appointed.

1.1.6 The strategies contained within the Outline TIMP will be based on the existing procedures undertaken

by KCC, Emergency Services and Highways England (HE). The key elements of the Outline TIMP will

be the provision of planning, strategy and contingencies for the following elements of incident

management:

• Incident Management Area (IMA).

• HGV/Construction vehicle routeing.

• Incident Detection.

• Incident Verification.

• Incident Response.

• Traveller Information.

• Site Management.

• Traffic Management.

• Site Clearance.

• Monitoring.

Page 49: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Construction Traffic Incident Management Plan

Rev 003 | Copyright © 2019 Curtins Consulting Ltd

1.1.7 The Outline TIMP will set out the strategies and contingencies that CHSP will put in place to control

the movement of construction vehicles to the various sites over the construction route network in the

event of an accident within the IMA.

1.1.8 The information provided herein sets out the key principles of the Outline TIMP.

2.0 Construction Traffic Routes

2.1.1 This document should be read in conjunction with the Outline Construction Traffic Management Plan

(Outline CTMP) produced to support the DCO application for the scheme.

2.1.2 The construction traffic routes detailed in this Outline TIMP have been agreed with KCC and are

discussed in detail within the Outline CTMP.

HGV Movements

2.1.3 If the Proposed Development is consented, CHSP in partnership with the appointed contractor(s) will

observe, manage and restrict construction vehicle movements to and from the development site.

2.1.4 Adherence to the restrictions and mitigation proposed within the Outline CTMP will be verified through

the agreed monitoring process.

Exceptional Circumstances

2.1.5 There may be exceptional circumstances when traffic movements on the SRN or LRN are

compromised which will impact on construction vehicles being able to use the agreed construction

traffic routes, for example road traffic accidents, road closures and extreme weather conditions.

2.1.6 In the event of these exceptional circumstances resulting in construction vehicles, particularly HGVs,

not being able to arrive at or depart from a site, the following impacts need to be considered with

regard to highways and construction of the Proposed Development:

• Incidents on the highway network of vehicles not being able to access the site resulting in

stoppage (at agreed locations) or rescheduling of delivery;

• Incidents on the highway network causing delays, resulting in construction vehicles travelling

through restricted junctions in the peak period; and

• Impacts of delivery not being made with specific regard to construction works on site, specifically

health and safety issue due to lack of equipment of material or stop to construction works and

delays to construction programme.

Page 50: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Construction Traffic Incident Management Plan

Rev 003 | Copyright © 2019 Curtins Consulting Ltd

Incident Management Area

2.1.7 The Incident Management Area (IMA) has been determined using a 45 minute drive time catchment

from the Proposed Development site.

2.1.8 Therefore, it is proposed the IMA will encompass the following parts of the local highway network:

• The A2/M2 from Dartford to Junction 7 of the M2 where it becomes the A299;

• The A299 Thanet Way at Junction 7 with the M2 to Ramsgate Docks;

• The A2 at Junction 7 with the M2 to Dover Docks;

• Staple Street/Staple Street Road/Whitstable Road; and

• Head Hill Road and Seasalter Road.

2.1.9 As the document is finalised the IMA will be discussed and amended where necessary through

discussions with KCC and HE.

3.0 Incident Training

3.1.1 CHSP will ensure that suitable training is provided to ensure that all suppliers are made aware of the

control measures which will need to be implements in the event of any of the above incidents

occurring.

4.0 Incident Detection

4.1.1 The Outline CTMP sets out the construction traffic monitoring strategy which will be in place for the

duration of the construction programme and the management of construction vehicles accessing the

site of the Proposed Development. CHSP and its appointed contractors will have the responsibility of

notifying all suppliers (those listed on the Delivery Management Systems (DMS) for that day) of the

occurrence of an incident after it has been notified by the Emergency Services, KCC or HE.

Therefore, on notification of an incident on the road network, CHSP’s responsibility is to implement the

Outline TIMP as appropriate (depending on location and severity).

5.0 Incident Verification

5.1.1 CHSP will have no direct role in the verification process of an incident unless it directly involves its

operations, i.e., at the site or involving a vehicle relating to construction of the Proposed Development.

6.0 Response to Incident

6.1.1 Once informed of an incident, CHSP will reduce or stop any additional HGVs (construction vehicles)

entering the incident area within the IMA where necessary.

6.1.2 Given the scale of the IMA it is anticipated that some vehicles within the IMA may not be travelling in

the vicinity of the incident or an area impacted by the incident. Subject to location and impacts on the

Page 51: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Construction Traffic Incident Management Plan

Rev 003 | Copyright © 2019 Curtins Consulting Ltd

road network further afield, advice would be sought by CHSP from the Police and Highways

Authorities.

7.0 Response to Incident – Communications

7.1.1 The following means of communication will be utilised to notify appropriate parties of an incident:

• CHSP will be notified of an incident by the Emergency Services, KCC or HE;

• CHSP will notify suppliers by telephone;

• Suppliers will notify their drivers by appropriate means, i.e. pagers and radio (subject to H&S

best practice);

• Suppliers will notify CHSP of the action taken by supplier’s drivers (this will be relative to their

location on the road network). This action may be to hold up at pre-designated and agreed

positions on/off the road network, diversion routes as directed by the Emergencies Services or

the Highways Authorities will be followed which may be different to the construction traffic routes

set out within the Outline CTMP.

8.0 Traffic Management – Diversion Routes

8.1.1 In the event of an incident on the road network, the Police may implement diversions routes for all

traffic. Under these circumstances, Proposed Development construction vehicles will utilise the

diversion route as directed by the Police.

9.0 Incident Clearance

9.1.1 CHSP will not have a direct role in incident clearance with the exception of a CHSP (or supplier)

vehicle breaking down on the road network. CHSP and their suppliers will implement measures to

recover any such vehicle.

9.1.2 Once the incident has been cleared, normal procedures relating to construction vehicle movements

will continue.

10.0 Scenario Testing

10.1.1 It is considered that there is the potential for two scenarios which may arise and affect the operation of

the road network, the construction of the Proposed Development and the movement of construction

traffic. These are:

• A traffic incident involving a CHSP construction vehicle; and

• Traffic congestion as a result of an incident on the road network.

10.1.2 Subject to the location of construction vehicles, the following recommended measures are considered

applicable in the event of the above incidents occurring:

Page 52: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Construction Traffic Incident Management Plan

Rev 003 | Copyright © 2019 Curtins Consulting Ltd

• CHSP to implement measures set out within the Outline TIMP;

• All construction vehicles stopped from entering the IMA/incident area;

• Construction vehicles inside the area would move to a safe location or, subject to geographical

location, this may include continuing with the designated journey; and

• Suppliers contacted to cancel/postpone deliveries (as appropriate).

Page 53: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

Curtins Consulting Ltd registered in England and Wales No: 2054159 Registered office: 51-55 Tithebarn Street, Liverpool, L2 2SB

Page 54: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Construction Traffic Management Plan

Rev 002003 | Copyright © 2019 Curtins Consulting Ltd

Appendix G – PRoW Management Plan

Page 55: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

Cleve Hill Solar Park

Outline Public Rights of Way

Management Plan

Curtins Ref: TPLO/66705

Revision: 004

Issue Date: 13 November 2019

Client Name: Cleve Hill Solar Park Ltd

BIM Reference: 66705-CUR-00-XX-RP-TP-00001-V04_Public Right of Way Management Plan

S

op

ho

s I

nte

rnati

on

al

Curtins

40 Compton Street

London, EC1V 0BD

Tel: 020 7324 2240

www.curtins.com

Imp

eri

al

We

st

CIVILS & STRUCTURES • TRANSPORT PLANNING • ENVIRONMENTAL • INFRASTRUCTURE • GEOTECHNICAL • CONSERVATION & HERITAGE • PRINCIPAL DESIGNER

Birmingham • Bristol • Cambridge • Cardiff • Douglas • Dublin • Edinburgh • Glasgow • Kendal • Leeds • Liverpool • London • Manchester • Nottingham

Page 56: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Public Rights of Way Management Plan

Rev 004 | Copyright © 2019 Curtins Consulting Ltd Page i

Author Signature Date

Caitlin Turley Beng (Hons) MCIHT Transport Planner

13/11/2019

Reviewed Signature Date

Ben Dawson BSc (Hons) MICHT Associate – Transport Planning

23/08/2019

Authorised Signature Date

Ben Dawson BSc (Hons) MICHT Associate – Transport Planning

23/08/2019

Page 57: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Public Rights of Way Management Plan

Rev 004 | Copyright © 2019 Curtins Consulting Ltd Page ii

Table of contents 1.0 Introduction .............................................................................................................................................. 1

2.0 Purpose of this Report ............................................................................................................................. 1

3.0 PRoW Management ................................................................................................................................ 3

Appendices Appendix A – Figure 13.1 Recreational Receptor and Study Areas

Page 58: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Public Rights of Way Management Plan

Rev 004 | Copyright © 2019 Curtins Consulting Ltd

1.0 Introduction

1.1.1 Curtins has been appointed by Cleve Hill Solar Park Ltd (CHSP) to provide traffic and transportation

advice in relation to the development of Cleve Hill Solar Park (the "Proposed Development"). The

Development site is located on the north Kent coast, approximately two kilometres northeast of

Faversham and five kilometres west of Whitstable (the "Site"). The Site is situated on approximately

360 ha (890 acres) of land within the administrative boundaries of Swale Borough Council (SBC),

Canterbury City Council (CCC) and Kent County Council (KCC).

1.1.2 An application has been made for a Development Consent Order (DCO) for the Proposed

Development. That is accompanied by an Environmental Statement (ES). The Proposed Development

(described in more detail in Chapter 5 of the ES) comprises the installation, maintenance and

decommissioning of photovoltaic (PV) modules, energy storage, and accompanying electric cables,

transformers, string inverters and associated access, environmental and construction works.

2.0 Purpose of this Report

2.1.1 This Outline Public Rights of Way (PRoW) Management Plan (Outline PRoW Management Plan) has

been prepared in order to manage the PRoWs potentially physically affected by the construction

Proposed Development. It is intended that this document may be amended before and during

construction of the Proposed Development in consultation with the relevant local planning authorities.

2.1.2 The following PRoWs have been identified as passing through the Site.

• PRoW – ZR485;

• PRoW – ZR488; and

• PRoW – ZR692

2.1.3 The PRoW routes are shown in Figure 1 below.

Page 59: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Public Rights of Way Management Plan

Rev 004 | Copyright © 2019 Curtins Consulting Ltd

Figure 1 – Public Rights of Way

(Source Open Street Map)

2.1.4 PRoW – ZR485 crosses on an approximate north to south alignment through the site providing a link

between Sandbanks Road to the south of the Site and the Saxon Shore Way to the north. It is

approximately 1.5km long and is within the development site for its entire length.

2.1.5 PRoW – ZR488 is located to the south east of the Site. It passes within the site for approximately

400m, however, no construction works are proposed in this area (only habitat management).

2.1.6 PRoW – ZR692 crosses the existing London Array site access (which is proposed to be used as the

vehicle access route for the Proposed Development) close to Seasalter Road. The length of the

PRoW within the red line boundary of the Site is approximately 14m.

2.1.7 A number of surveys were undertaken to identify the usage of the PRoW identified above. These were

undertaken in July and August 2018 (both in and out of the school holidays). The results are shown

within Chapter 14 (Access and Traffic) of the ES.

2.1.8 This Outline PRoW Management Plan describes where the PRoW will be affected by the Proposed

Development and how the PRoW will be managed to ensure they are safe to use and the disruption to

the users of the PRoW is minimised.

Page 60: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Public Rights of Way Management Plan

Rev 004 | Copyright © 2019 Curtins Consulting Ltd

3.0 PRoW Management

3.1.1 This section of the PRoW Management Plan describes how the PRoW that cross the development

site will be managed.

3.1.2 It is CHSP’s intention to keep all of the identified PRoW open during construction of the Proposed

Development, where practicable and safe to do so.

3.1.3 Where a PRoW is affected by construction work, efforts will be made to minimise the impact on users

following a simple decision-making process which sets out a hierarchy of actions. These include:

• 1) Providing signage and information - If a PRoW is in proximity of construction work it is

proposed to have appropriate signage which will advise of dates and hours of working. The

signage will be developed in consultation with Kent County Council (KCC) PRoW Officers.

• 2) Managed closure of a PRoW – where construction activity requires PRoW users to be held for

a short periods (a few minutes) while vehicles pass or while construction activities are undertaken.

• 3) Full closure of PRoW – this would only be used if a managed closer was not considered

possible. This would involve temporarily closing the PRoW for a period of time and providing a

signed diversion route. Any closure would be agreed with KCC PRoW along with the diversion

route.

3.1.4 As highlighted above, PRoW ZR485 crosses through the Site. This route will be maintained

throughout construction. In line with the requests ofKCC PRoW officers, two metre high fencing will be

placed between the PRoW and Proposed Development equipment and infrastructure, and CCTV will

not directly cover any PRoW.

3.1.5 It is proposed that PRoWs within the site remain unsurfaced, however, users of ZR485 will be

required to cross the Proposed Development’s spine road which follows an approximate east to west

alignment across the middle of the site.

3.1.6 At this location, priority will be given to users of the PRoW and construction vehicles will be held until it

is safe to cross. During the use of the central access track in this location the PRoW crossing will be

manned by a traffic marshal.

3.1.7 Gates will be provided across the spine road (either side of the PRoW) to secure the development site

when not in use.

3.1.8 Waymarkers and existing gates/fence treatments connecting PRoW ZR485 to the Saxon Shore Way

in the north and Sandbanks Road to the south will be maintained.

3.1.9 Only limited construction works are proposed in the vicinity of PRoW ZR488. It is proposed that the

PRoW remain open throughout the construction/operation of the Proposed Development.

Page 61: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Public Rights of Way Management Plan

Rev 004 | Copyright © 2019 Curtins Consulting Ltd

3.1.10 Where the PRoW borders or crosses areas containing Proposed Development equipment and

infrastructure, two metre high fencing will be provided between the PRoW and the equipment or

infrastructure.

3.1.11 PRoW ZR692 crosses the access road to the Proposed Development close to Seasalter Road. Traffic

volumes using the access road are expected to increase during the 24 month construction

programme.

3.1.12 The existing gates provided either side of the access road will be maintained and additional signage

provided to warn PRoW users of the crossing point and to advise them to only cross when it safe to

do so.

3.1.13 Furthermore, drivers of construction vehicles accessing the site will be briefed with regards to the

location of the PRoW and potential for pedestrians crossing the access road.

3.1.14 All points where PRoWs cross the Proposed Development will have appropriate signage, which will

advise of dates and hours of working. The location of signs providing information will be discussed

with Kent County Council PRoW officers.

3.1.15 While not expected, if it transpires that a short, temporary closure, of a PRoW was needed this would

be discussed and agreed with KCC PRoW officers and the appropriate procedure for its closure

followed.

3.1.16 No furniture, fence, barrier or other structure will be erected on or across a PRoW without consultation

and agreement with KCC.

3.1.17 Information will be provided to the public about where construction is taking place within the site, and

this will be updated on a month to month basis. Subject to the agreement of relevant landowners and

rights holders, information notices will be placed at either end of the stretch of the Saxon Shore

Way/ZR484/CW55 that passes the Development site, on the Cleve Hill Solar Park website and at

Faversham Tourist Information Centre. Specific locations for which permission has been or will be

granted will be agreed with Kent County Council prior to the commencement of construction. The

notices will also highlight other paths in the area that recreational users might consider as alternatives.

3.1.18 The Applicant will undertake a photographic survey of the PRoW within the Development site prior to

the start of construction to assess the condition of the existing PRoW through the site and enable the

surface of the PRoW to be repaired to a standard that is the same, or better, than the condition

recorded before the construction works began.

Page 62: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Construction Traffic Management Plan

Rev 002003 | Copyright © 2019 Curtins Consulting Ltd

Appendix H – Travel Planning Statement

Page 63: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

Cleve Hill Solar Park

Outline Travel Planning

Statement

Curtins Ref: TPLO/66705

Revision: 003

Issue Date: 12 October 2018

Client Name: Cleve Hill Solar Park Ltd

BIM Reference: 66705-CUR-00-XX-RP-TP-00001-V02_Travel Planning Statement

S

op

ho

s I

nte

rnati

on

al

Curtins

40 Compton Street

London, EC1V 0BD

Tel: 020 7324 2240

www.curtins.com

Imp

eri

al

We

st

CIVILS & STRUCTURES • TRANSPORT PLANNING • ENVIRONMENTAL • INFRASTRUCTURE • GEOTECHNICAL • CONSERVATION & HERITAGE • PRINCIPAL DESIGNER

Birmingham • Bristol • Cambridge • Cardiff • Douglas • Dublin • Edinburgh • Glasgow • Kendal • Leeds • Liverpool • London • Manchester • Nottingham

Page 64: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Travel Planning Statement

Rev 003 | Copyright © 2019 Curtins Consulting Ltd Page i

Author Signature Date

Caitlin Turley Beng (Hons) MCIHT Transport Planner

12/10/2018

Reviewed Signature Date

Ben Dawson BSc (Hons) MICHT Associate – Transport Planning

12/10/2018

Authorised Signature Date

Ben Dawson BSc (Hons) MICHT Associate – Transport Planning

12/10/2018

Page 65: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Travel Planning Statement

Rev 003 | Copyright © 2019 Curtins Consulting Ltd Page ii

Table of contents 1.0 Introduction .............................................................................................................................................. 1

1.1 Introduction ....................................................................................................................................... 1

1.2 Purpose of this Report ..................................................................................................................... 1

1.3 Background to Travel Plans ............................................................................................................. 1

1.4 The Aims and Objectives of the Travel Plan .................................................................................... 1

2.0 Staff and Transport Characteristics ......................................................................................................... 3

2.2 Non-local Staff Accommodation ....................................................................................................... 3

2.3 Staff – Transportation ....................................................................................................................... 3

2.4 Staff – Core Working Hours ............................................................................................................. 3

3.0 Travel Plan Measures and Initiatives ...................................................................................................... 5

3.2 Travel Planning Awareness ............................................................................................................. 5

3.3 Staff Transport Services ................................................................................................................... 5

3.4 Public Transport ............................................................................................................................... 6

3.5 Car Sharing ...................................................................................................................................... 6

3.6 Construction Traffic Management .................................................................................................... 6

3.7 Travel Plan Co-ordinator (TPC) ....................................................................................................... 6

Page 66: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Travel Planning Statement

Rev 003 | Copyright © 2019 Curtins Consulting Ltd

1.0 Introduction

1.1 Introduction

1.1.1 This Outline Travel Planning Statement (Outline TPS) accompanies an application by Cleve Hill Solar

Park Ltd (CHSP) for DCO to seek powers to install photovoltaic (PV) modules, energy storage

modules and accompanying electric cables, transformers, string inverters and associated access,

environmental and construction works (Proposed Development).

1.1.2 The Development site is located on the north Kent coast, approximately two kilometres northeast of

Faversham and five kilometres west of Whitstable (the "Site"). The Site is situated on approximately

360 ha (890 acres) of land within the administrative boundaries of Swale Borough Council (SBC),

Canterbury City Council and Kent County Council (KCC).

1.2 Purpose of this Report

1.2.1 This report is intended to demonstrate a commitment to sustainable transport by CHSP and to

indicate the necessary measures that will be undertaken to meet these sustainable transport

ambitions. It should be read in conjunction with the Outline CTMP and Outline TIMP submitted with

the DCO application. It is intended that this Outline TPS be an iterative document that can be

amended before and during the construction of the Proposed Development, in consultation with the

relevant local planning authorities.

1.2.2 It should be noted that it is not practical to permit people to enter the construction site on-foot or by

bicycle.

1.3 Background to Travel Plans

1.3.1 In essence, a Travel Plan is intended to encourage people to choose alternative transport modes over

single occupancy car use and where possible, reduce the need to travel at all. Such a plan should

include a range of measures designed to achieve this goal.

1.3.2 The revised National Planning Policy Framework (NPPF) adopted in July 2018 outlines the potential

benefits and requirements for the production of Travel Plans.

1.4 The Aims and Objectives of the Travel Plan

1.4.1 CHSP has prepared this Outline TPS to:

• Show its commitment to addressing the access needs of employees, contributors and visitors

alike;

• Respond to congestion issues which may affect operational and local traffic and thereby reduce

business performance;

Page 67: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Travel Planning Statement

Rev 003 | Copyright © 2019 Curtins Consulting Ltd

• Support the Government’s environmental and sustainable development initiatives;

• Demonstrate its environmental responsibilities amongst its peers and neighbouring

communities;

• Ensure that a formal monitoring process is in place for vehicle generation; and

• Maximise the efficiency of the construction traffic associated with the Proposed Development.

Page 68: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Travel Planning Statement

Rev 003 | Copyright © 2019 Curtins Consulting Ltd

2.0 Staff and Transport Characteristics

2.1 Introduction

2.1.1 It is anticipated that during peak construction activity up to 400 members of staff could be working on

site. The workforce for the Proposed Development would be made up of local and non-local

personnel.

2.2 Non-local Staff Accommodation

2.2.1 From experience, CHSP anticipates that non-local staff required during construction of the works

would make use of the following accommodation:

• Caravan and camping accommodation sourced independently of CHSP;

• Short term let properties;

• Serviced accommodation (B&Bs, hotels); and

• A small proportion would travel to the site from their home.

2.3 Staff – Transportation

2.3.1 As part of the Proposed Development, it is expected that staff would be transported to the site in multi-

occupancy vehicles. These vehicles, typically mini-buses, would pick up/drop off from varying pre-

organised locations close to the temporary accommodation and transport them to the development

site.

2.3.2 The pickup/drop off point locations will be at accessible locations for all staff. It is anticipated that

these locations would be close to key local locations, town centres, hotels, residential areas or public

transport interchanges.

2.3.3 The provision of staff travel in the form of welfare vans ensures that there will be no impact from staff

parking on the local road network.

2.3.4 The use of these services to transport staff will also form a key Travel Planning measure for the

development.

2.4 Staff – Core Working Hours

2.4.1 Core working hours are proposed to be between 07.00 until 19.00, Monday to Friday and 07.00 until

13.00 on a Saturday (unless in exceptional circumstances where need arises to protect plant,

personnel or the environment).

2.4.2 To maximise productivity within core hours, CHSP contractors would require a period of up to one

hour before and up to one hour after core working hours for start-up and closedown of activities. This

would include but not be limited to, movement to place of work, maintenance and general preparation

Page 69: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Travel Planning Statement

Rev 003 | Copyright © 2019 Curtins Consulting Ltd

works. This would not include operation of plant or machinery likely to cause a disturbance. These

periods would not be considered an extension of core working hours.

2.4.3 As such it is likely that staff would arrive at the development site before 07.00 and leave after 19.00

Monday to Friday and before 07.00 and after 13.00 on a Saturday.

Page 70: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Travel Planning Statement

Rev 003 | Copyright © 2019 Curtins Consulting Ltd

3.0 Travel Plan Measures and Initiatives

3.1 Introduction

3.1.1 It is envisaged that any contractor working on-site would work sustainably and encourage sustainable

travel initiatives.

3.1.2 As such a number of travel planning initiatives have been identified below which fall under the

following headings:

• Travel planning awareness;

• Mini-bus provision for staff from external locations to site;

• Public transport;

• Car sharing;

• Construction traffic management; and

• Appointment of a Travel Plan Co-ordinator (TPC).

3.2 Travel Planning Awareness

3.2.1 A key initiative of a TP will be the distribution of travel planning material. All employees would receive

an introductory pack before starting work and such packs can be critical in influencing travel patterns.

The contents of the packs would include, but not necessarily be limited to:

• Introduction to TPs;

• Website produced with up to date information on Proposed Development transport services,

locations and timings;

• Maps showing local pick up and drop off points for mini-buses;

• Details of public transport services, including timetables and routes; and

• Details of the TPC.

3.3 Staff Transport Services

3.3.1 Mini-bus services will be provided to allow staff to gain access to and from external locations to the

site.

3.3.2 These services will be arranged and co-ordinated according to designated shift patterns and staff

accommodation and will allow staff to be picked up and dropped off at key locations, i.e. central town

locations/residential locations.

3.3.3 The provision of these services will ensure that the staff travel profile will be sustainable.

Page 71: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

TPLO/66705 Cleve Hill Solar Park

Outline Travel Planning Statement

Rev 003 | Copyright © 2019 Curtins Consulting Ltd

3.4 Public Transport

3.4.1 It is anticipated that there may be some members of staff who may choose to use public transport to

access a mini-bus up location, as such, public transport information including timetables would be

provided in Introductory Packs, and on staff notice boards.

3.5 Car Sharing

3.5.1 A car sharing database would be created to identify those members of construction staff that live in

the same area so that they could travel to the local accommodation together.

3.6 Construction Traffic Management

3.6.1 Sustainable movement of plant and materials will be adopted. This will include ensuring vehicles

arrive and exit the site loaded where practical.

3.6.2 In addition, plant and materials will be sourced locally where possible.

3.7 Travel Plan Co-ordinator (TPC)

3.7.1 The primary support and leadership for implementing a TP should come from an individual with a

specific remit for delivering the measures proposed within the TP. This person is appointed as the

TPC.

3.7.2 The TPC would assume overall responsibility of the CTMP once adopted. The roles and

responsibilities of the TPC are as follows:

• Co-ordinate and attend and TRG meetings;

• Prepare annual monitoring report to present to TRG;

• Be the first point of contact in case of any problems or information relating to the CTMP/TP; and

• Ensure that the CTMP/TP is meeting the objectives set out above.

Page 72: Cleve Hill Solar Park - Planning Inspectorate...o Installation of battery pack cabinets, inverters and controllers. 2.2.7 A summary of the proposed construction programme and phasing

Curtins Consulting Ltd registered in England and Wales No: 2054159 Registered office: 51-55 Tithebarn Street, Liverpool, L2 2SB