CLEVE HILL SOLAR PARK UPDATES TO APPLICATION DOCUMENTS OUTLINE CONSTRUCTION TRAFFIC MANAGEMENT PLAN (TRACKED)
November 2019 Revision D
Document Reference: 6.4.14.1Submitted: Deadline 7
Cleve Hill Solar Park
Outline Construction Traffic
Management Plan
Curtins Ref: TPLO/66705
Revision: 002003
Issue Date: 31 July 201912 November 2019
Client Name: Cleve Hill Solar Park Ltd
BIM Reference: 66705-CUR-00-XX-RP-TP-00001-V02_Outline Construction Management Plan
S
op
ho
s I
nte
rnati
on
al
Curtins
40 Compton Street
London, EC1V 0BD
Tel: 020 7324 2240
www.curtins.com
Imp
eri
al
We
st
CIVILS & STRUCTURES • TRANSPORT PLANNING • ENVIRONMENTAL • INFRASTRUCTURE • GEOTECHNICAL • CONSERVATION & HERITAGE • PRINCIPAL DESIGNER
Birmingham • Bristol • Cambridge • Cardiff • Douglas • Dublin • Edinburgh • Glasgow • Kendal • Leeds • Liverpool • London • Manchester • Nottingham
TPLO/66705 Cleve Hill Solar Park
Outline Construction Traffic Management Plan
Rev 002003 | Copyright © 2019 Curtins Consulting Ltd Page i
Author Signature Date
Caitlin Turley BEng (Hons) MCIHT Transport Planner
31/07/201912/11/2019
Reviewed Signature Date
Ben Dawson BSc (Hons) MICHT Associate – Transport Planning
12/11/201931/07/2019
Authorised Signature Date
Ben Dawson BSc (Hons) MICHT Associate – Transport Planning
12/11/201926/07/2019
TPLO/66705 Cleve Hill Solar Park
Outline Construction Traffic Management Plan
Rev 002003 | Copyright © 2019 Curtins Consulting Ltd Page ii
Table of contents 1.0 Introduction .............................................................................................................................................. 1
1.1 Introduction ....................................................................................................................................... 1
1.2 Purpose and Objectives ................................................................................................................... 1
1.3 Scope of Report and Consultation ................................................................................................... 2
2.0 Proposed Development ........................................................................................................................... 4
2.1 Introduction ....................................................................................................................................... 4
2.2 Proposals ......................................................................................................................................... 4
2.3 Vehicle Classification ....................................................................................................................... 6
2.4 Cars, Vans and LGVs ...................................................................................................................... 6
2.5 HGV Movements .............................................................................................................................. 7
2.6 Abnormal Indivisible Loads (AIL) ..................................................................................................... 7
2.7 Construction Traffic .......................................................................................................................... 8
3.0 Access ................................................................................................................................................... 10
3.1 Introduction ..................................................................................................................................... 10
3.2 Strategic and Local Road Network ................................................................................................. 10
3.3 Access Points ................................................................................................................................. 11
3.4 Internal Roads ................................................................................................................................ 11
4.0 Routeing Strategy .................................................................................................................................. 13
4.1 Introduction ..................................................................................................................................... 13
4.2 Route Assessment ......................................................................................................................... 13
4.3 Identified Constraints ................................................................................................................. 1514
5.0 Signing Strategy and Core Working Hours for Traffic Management During Construction Phase .... 1716
5.1 Access Route and Point Signing ................................................................................................ 1716
5.2 Internal Road Signing ................................................................................................................. 1716
5.3 Working Hours ............................................................................................................................ 1716
6.0 Mitigation Measures .......................................................................................................................... 1817
6.1 Introduction ................................................................................................................................. 1817
6.2 HGV and LGV Construction Vehicle Identification ..................................................................... 1817
6.3 Prescribed HGV and LGV Construction Routes ........................................................................ 1817
TPLO/66705 Cleve Hill Solar Park
Outline Construction Traffic Management Plan
Rev 002003 | Copyright © 2019 Curtins Consulting Ltd Page iii
6.4 HGV Traffic Movement Restrictions ........................................................................................... 1817
6.5 HGV Emissions .......................................................................................................................... 1817
6.6 Banksman or Presence of Qualified Personnel at Access ........................................................ 1817
6.7 Timings of HGV Movements ...................................................................................................... 1918
6.8 Routeing Staff ............................................................................................................................. 2019
6.9 Speed Limit Restrictions ............................................................................................................ 2119
6.10 Incident Management Plan ........................................................................................................ 2119
6.11 PRoW Management Plan ........................................................................................................... 2119
6.12 Cleaning of Vehicles .................................................................................................................. 2119
6.13 Highway Condition Surveys ....................................................................................................... 2119
6.14 Temporary Traffic Management Procedures (TTM) .................................................................. 2220
6.15 Travel Plan ................................................................................................................................. 2220
6.16 Delivery Management Systems (DMS) ...................................................................................... 2321
6.17 Information Packs and Communications ................................................................................... 2321
6.18 Abnormal Indivisible Loads ........................................................................................................ 2321
7.0 Management Structure ...................................................................................................................... 2422
7.1 Introduction ................................................................................................................................. 2422
7.2 Traffic Management Group ........................................................................................................ 2422
7.3 Monitoring and Review ............................................................................................................... 2523
7.4 Compliance ................................................................................................................................ 2523
7.5 Enforcement and Corrective Measures...................................................................................... 2524
7.6 Implementation of the CTMP ..................................................................................................... 2624
8.0 Appendices ........................................................................................................................................ 2725
Figures
Figure 2.1 – Construction Vehicle Generation Profile
Figure 2.2 – Construction Phasing
Figure 3.1 -Construction Access Hierarchy
Tables
Table 2.1 – Typical Construction Vehicle Classification
Table 4.1 – Identified Constraints
TPLO/66705 Cleve Hill Solar Park
Outline Construction Traffic Management Plan
Rev 002003 | Copyright © 2019 Curtins Consulting Ltd Page iv
Appendices
Appendix A – Site Location Plan
Appendix B – Proposed Internal Site Access Plan
Appendix C – Construction Vehicle Routeing
Appendix D – Route Assessment Drawings
Appendix E – Proposed Signage and Speed Restrictions
Appendix F – Outline Traffic Incident Management Plan
Appendix G – PRoW Management Plan
Appendix H – Travel Planning Statement
TPLO/66705 Cleve Hill Solar Park
Outline Construction Traffic Management Plan
Rev 002003 | Copyright © 2019 Curtins Consulting Ltd
1.0 Introduction
1.1 Introduction
1.1.1 Curtins has been appointed by Cleve Hill Solar Park Ltd (CHSP) to provide traffic and transportation
advice in relation to the development of Cleve Hill Solar Park (the "Proposed Development"). The
Development site is located on the north Kent coast, approximately two kilometres northeast of
Faversham and five kilometres west of Whitstable. The Site is situated on approximately 360 ha (890
acres) of land within the administrative boundaries of Swale Borough Council, Canterbury City Council
and Kent County Council .
1.1.2 The Proposed Development (described in more detail within Section 3) comprises the installation,
maintenance and decommissioning of photovoltaic (PV) modules, energy storage, and accompanying
electric cables, transformers, string inverters and associated access, environmental and construction
works.
1.1.3 The Proposed Development involves three main phases namely, construction; operation; and
decommissioning. Each phase has different characteristics, and therefore has different traffic and
transportation implications. This Outline Construction Traffic Management Plan (Outline CTMP) relates
only to the construction phase.
1.1.4 An Outline Decommissioning and Restoration Plan has been produced to accompany the
Environmental Statement (ES) and it is expected a Decommissioning Traffic Management Plan will be
produced and agreed with the relevant highways authorities prior to this stage of work commencing.
1.1.5 This Outline CTMP has been prepared to consider the methods by which materials, equipment and site
workers will arrive at the Site, and the availability and quality of transport infrastructure to identify a suite
of traffic management initiatives designed to mitigate and minimise any impacts.
1.1.6 Construction is anticipated to commence in spring 2021 and last up to 24 months.
1.2 Purpose and Objectives
Purpose
1.2.1 This Outline CTMP is provided to accompany the Environmental Statement in support of the DCO
application. If the DCO application is approved by the Secretary of State, the Outline CTMP would be a
certified document referred to in the Development Consent Order (DCO), and it is anticipated that the
final CTMP would be secured by a Requirement in the DCO and subject to the approval by the relevant
local planning authority. This document should be read in conjunction with the Access and Traffic
Chapter of the ES (Chapter 14).
TPLO/66705 Cleve Hill Solar Park
Outline Construction Traffic Management Plan
Rev 002003 | Copyright © 2019 Curtins Consulting Ltd
1.2.2 The purpose of this Outline CTMP is to provide a framework for the measures to be implemented under
a final CTMP which will provide mitigation for the traffic generated during the construction of the
Proposed Development. This will ensure that impact on existing users of the public highway network,
or those located close to it, is limited.
1.2.3 This Outline CTMP will inform Officers at Highway England (HE), Kent County Council (KCC), Swale
Borough Council (SBC), Canterbury City Council (CCC) and other relevant transport stakeholders with
regards to the suitability of the proposed construction traffic route and the highway access matters
associated with the Proposed Development.
Objective
1.2.4 The objectives of this Outline CTMP are outlined below:
• Ensure that movements of people and materials are achieved in a safe, efficient, timely and
sustainable manner;
• Keep freight and construction traffic to a minimum during network peaks to reduce the impact on
the highway network during busy periods;
• Minimise construction trips where possible and limit the impacts on the natural and built
environment; and
• Ensure the continued monitoring, review and subsequent improvement of the CTMP and
mitigation measures contained herein.
1.3 Scope of Report and Consultation
Scope
1.3.1 This report includes the following:
• A description of the Proposed Development;
• A description of the proposed access route to the Site;
• The proposed routeing strategy for the Site;
• Proposed signage strategy for the Site;
• Proposed mitigation measures; and
• Information regarding the management of deliveries;
Consultation
1.3.2 As part of the preparation of the final CTMP, the following transport stakeholders will be consulted
regarding the traffic and transport elements of the Proposed Development:
• Highways England;
• Kent County Council;
• Swale Borough Council;
TPLO/66705 Cleve Hill Solar Park
Outline Construction Traffic Management Plan
Rev 002003 | Copyright © 2019 Curtins Consulting Ltd
• Graveney Primary School;
• Graveney Parish Council; and
• Graveney Residents Environmental Action Team.
1.3.3 This is not a definitive list and as such, other stakeholders may be engaged as necessary throughout
the consultation process.
TPLO/66705 Cleve Hill Solar Park
Outline Construction Traffic Management Plan
Rev 002003 | Copyright © 2019 Curtins Consulting Ltd
2.0 Proposed Development
2.1 Introduction
2.1.1 This section of the Outline CTMP provides an overview of the development that has been proposed at
the Site, which is shown on the Site Location Plan at Appendix A. A full description is set out in Chapter
5 of the ES.
2.2 Proposals
2.2.1 The proposals involve the transportation and installation of PV modules and energy storage modules,
and accompanying mounting structures, electric cables, transformers, string inverters and associated
access, environmental and construction works.
Construction Phasing
2.2.2 The construction period is considered to be undertaken in at least two phases:
• Phase 1: construction of all aspects of the Proposed Development except the energy storage facility; and
• Phase 2: construction of the energy storage facility. This could be undertaken in multiple
phases to deliver smaller amounts of energy storage capacity.
Phase 1
2.2.3 Subject to the final development design and potential environmental constraints, phase 1 of the
development construction is anticipated to last 24 months. The indicative start date for construction is
likely to be spring 2021, dependent on when the DCO and other necessary consents are granted.
2.2.4 The indicative phase 1 construction activities are set out below:
• Site preparation and civils:
o Import of construction materials, plant and equipment to site;
o Establishment of the perimeter fence;
o The establishment of the main construction compound;
o Construction of the spine road; construction of new tracks;
o The upgrade or construction of crossing points (culverts) over drainage ditches; and
o Marking out the location of the Development infrastructure.
• Solar PV array construction:
o Import of components to site;
o Piling of module mount verticals;
o Erection of module mounting structures;
o Mounting of modules and inverters;
TPLO/66705 Cleve Hill Solar Park
Outline Construction Traffic Management Plan
Rev 002003 | Copyright © 2019 Curtins Consulting Ltd
o Trenching and installation of electric cabling;
o Transformer foundation excavation and construction; and
o Installation of transformers.
• Construction of onsite electrical infrastructure to facilitate the export of generated electricity.
o Construction of the flood protection bund;
o Site preparation and civils for the Development substation;
o Trenching and installation of electric cabling;
o Import of components to site; and
o Installation of the Development substation.
• Testing and commissioning; and
• Landscaping; and
• Habitat creation.
Phase 2
2.2.5 Phase 2 of the development construction will run for approximately 3 to 6 months, which is expected to
be contained within the overarching construction programme. This will, however, be dependent on any
potential additional phasing if the development design involves delivery of smaller energy storage
capacities.
2.2.6 The indicative phase 2 construction activities are set out below:
• Energy storage facility construction:
o Installation of electric cabling;
o Foundation construction;
o Import of components to site;
o Installation of transformers; and
o Installation of battery pack cabinets, inverters and controllers.
2.2.7 A summary of the proposed construction programme and phasing is included within Figure 2.1 below.
TPLO/66705 Cleve Hill Solar Park
Outline Construction Traffic Management Plan
Rev 002003 | Copyright © 2019 Curtins Consulting Ltd
Figure 2.1 – Development Programme/Phasing Summary
2.3 Vehicle Classification
2.3.1 Several vehicle types will be used during the construction phase of the Proposed Development. Table
2.1 below highlights those vehicles expected to be used during the construction period.
Table 2.1 – Typical Construction Vehicle Classification
Light (LGVs) Heavy (HGVs)
Car 40 tonne truck
Van (under 7.5t) Low Loader
4x4 pick-up Flat Bed
4x4 transit Truck (over 7.5t)
Mini-buses Crane
4 x 4 vehicle Excavator
Winch Tractor
Tractor and Trailer
Waste Collection
2.4 Cars, Vans and LGVs
2.4.1 It is anticipated a small proportion of visitors to the site will arrive by cars and small vans. Parking will
be provided on site for these vehicles. In addition, there will also be some small deliveries made by
LGVs.
2.4.2 A large proportion of the construction staff will stay in accommodation local to the site and travel to the
site together by mini-bus.
Site Access Road
Solar Access Track
Drainage
Import of Bund Material
Bund Construction
Compound Roads
Structural Concrete
Traffic Signs
CCTV
Temporary Compound
Solar Array Construction
Electrical Compound Installation
Tesla Option Concrete
Tesla cabinet delivery and installation
440KV Cable
Perimeter Fencing
Waste
Workers
CONSTRUCTION ACTIVITY22 2310 11 121 2 3 4 24
DURATION IN MONTHS
19 20 2113 14 15 16 17 187 8 95 6
TPLO/66705 Cleve Hill Solar Park
Outline Construction Traffic Management Plan
Rev 002003 | Copyright © 2019 Curtins Consulting Ltd
2.5 HGV Movements
2.5.1 Typically, HGV movements will comprise those associated with the delivery of building materials and
plant/equipment.
2.5.2 It is proposed that all of the excavated material generated by construction will be used within the site
for roads, landscaping, drainage, reinstatement and otherwise as required to deliver the Proposed
Development. This will also reduce the number of additional trip generation during the construction
phase.
2.6 Abnormal Indivisible Loads (AIL)
2.6.1 The Proposed Development will require the movement of Abnormal Indivisible Loads ("AILs") to
transport plant to the site.
2.6.2 The Road Vehicles (Authorisation of Special Types) General Order 2003 sets out the categories of AILs
with regard to weight, width and length. Depending on the size of the plant to be transported different
arrangements may be required in terms of temporary traffic management and the management and
timing of these movements. These movements will be required to meet the standards and guidelines
as set out in the Road Vehicles (Authorisation of Special Types) General Order 2003.
2.6.3 It is anticipated that any abnormal loads will be transported to the UK by sea and transported to the site
by road. An assessment of the route from the strategic road network to the site has been undertaken
by an abnormal load haulage specialist.
2.6.4 The size of the abnormal loads to be transported to the site will be similar in size and weight to the
abnormal loads that have previously been transported to the London Array substation. These loads
were up to 143te nett.
2.6.5 Once the loads have left the strategic road network, they will follow the identified construction traffic
route along Head Hill Road and Seasalter Road.
2.6.6 A key constraint is the road bridge over the railway at Graveney. Discussions have been undertaken
with Network Rail who own the structure and permission has been given to move the loads over the
railway bridge subject to a number of conditions. These include specific trailer configurations and also
the requirement to undertake pre and post movement surveys of the structure.
2.6.7 Abnormal loads will be transported to the site during off-peak periods (typically at night). As well as the
statutory obligations, agreement with relevant stakeholders will be sought prior to any abnormal load
movement being undertaken.
2.6.8 The final CTMP will detail the vehicle specification, proposed access arrangements from the port of
entry to the site including points of interest.
TPLO/66705 Cleve Hill Solar Park
Outline Construction Traffic Management Plan
Rev 002003 | Copyright © 2019 Curtins Consulting Ltd
2.7 Construction Traffic
2.7.1 The estimated volume and type of vehicles that would be generated throughout the construction phase
of development has been informed by the Applicant’s anticipated construction programme, which is
based on their extensive experience of delivering similar developments throughout the country.
2.7.2 On the basis of the information provided, the construction period is expected to be up to 24 months and
the rate of deliveries would fluctuate over this time.
2.7.3 If the energy storage facility were to not be constructed, or constructed at a later date, the average
number of vehicle movements would reduce significantly throughout the 24 month construction
programme. It is noted that if construction of the energy storage facility were to happen outside of the
proposed 24 month construction programme, construction traffic would be generated at a later date,
however, it is expected that the volume of construction traffic (including HGVs) would be less than that
discussed below. As the majority of the civils elements of the energy storage facility (creation of the
bund and associated earthworks), would occur within the main construction phase under either
scenario, it is expected that, if delayed to a separate phase 2, the final installation of batteries would
take up to six months to complete outside of the main 24 month construction window.
2.7.4 It is anticipated that, during the peak of construction, up to 80 two-way HGV movements (40 vehicles)
will be required per day. The peak is expected to last for four weeks starting around week 27 of
construction.
2.7.5 The on-site activities occurring during peak HGV movements include:
• On-site drainage;
• Import of bund material;
• Bund construction;
• Solar array construction;
• Compound roads;
• Import of material for construction concrete; and
• Waste removal.
2.7.6 To ensure a robust prediction of the number of construction vehicles, it has been assumed that all
vehicles arrive loaded and depart empty. In reality, exiting vehicles would remove waste/materials from
the site.
2.7.7 Of the 80 two-way HGV vehicle movements, 20 account for waste removal per day. Measures would
be taken to reduce these vehicle movements, as in reality, exiting vehicles would remove
waste/materials from the site.
TPLO/66705 Cleve Hill Solar Park
Outline Construction Traffic Management Plan
Rev 002003 | Copyright © 2019 Curtins Consulting Ltd
2.7.8 Peak daily total construction traffic is expected to occur in week 100 of the construction programme.
This comprises of 222 two-way vehicle movements (111 vehicles). This breaks down as 162 two-way
LGV movements (81 vehicles) and 60 two-way HGV movements (30 vehicles).
2.7.9 A graph showing the profile of expected construction traffic during the 24 month construction period is
included below as Figure 2.2.
Figure 2.2 – Construction Vehicle Profile
2.7.10 An average of 62 two-way HGV movements (31 vehicles) and 90 two-way LGV movements (45
vehicles) will generated per day throughout the 24 month construction period.
2.7.11 The number of LGV movements increases in the second half of the construction programme associated
with the more intricate electrical equipment installations.
2.7.12 At its peak it is anticipated that up to 400 construction staff will be based at the site.
2.7.13 The impact of these trips on both the Strategic Road Network (SRN) and Local Road Network (LRN)
are discussed in detail within Chapter 14 (Access and Traffic) of the ES.
0
50
100
150
200
250
Da
ily
2-W
ay
Tri
ps
Date
Cleve Hill Solar Park Construction Traffic Movements
Total Daily Two Way Vehicle
Movements
Daily HGV Two Way Vehicle
Movements
Daily LGV Two Way Vehicle
Movements
TPLO/66705 Cleve Hill Solar Park
Outline Construction Traffic Management Plan
Rev 002003 | Copyright © 2019 Curtins Consulting Ltd
3.0 Access
3.1 Introduction
3.1.1 To provide access to the Proposed Development, there are three levels of access roads outlined in
Figure 3.1 below:
Figure 3.1: Construction Access Hierarchy
3.2 Strategic and Local Road Network
Strategic Road Network (SRN)
3.2.1 The closest strategic road network to the site is the M2, accessed from Junction 7 approximately 1 km
south of the Whitstable Road/A299 Thanet Way junction.
3.2.2 The M2 continues westwards merging to become the A2 towards Central London and the M25. At
Junction 7of the M2 the A2 also provides a connection south towards Dover.
3.2.3 At Junction 5 of the M2, the A249 provides links north to the Port of Sheerness and south to the M20
north of Maidstone.
3.2.4 While not managed by Highways England (HE), the A299 Thanet Way is also considered to be of
strategic importance as a key distributor road across northern Kent and provides direct connections to
the Port of Ramsgate.
Level 1: Strategic Road Network
Comprises the motorway network which provides construction access Level 2: Local Road
Network
Comprises the local roads which provide construction access to the Proposed Development.
Level 3: Internal Site Connection
Internal vehicle routes that will link the LRN.
TPLO/66705 Cleve Hill Solar Park
Outline Construction Traffic Management Plan
Rev 002003 | Copyright © 2019 Curtins Consulting Ltd
Local Road Network (LRN)
3.2.5 The LRN consists of Whitstable Road, Staple Street, Staple Street Road, Head Hill Road and Seasalter
Road.
3.2.6 If approaching the site from the west on the A299, Staple Street and Staple Street Road will be used
for a small section to cross over the A299 and to access Whitstable Road.
3.2.7 Whitstable Road is approximately seven metres wide and follows an east-west alignment. It links Head
Hill Road/ Seasalter Road with the A299.
3.2.8 Head Hill Road/ Seasalter Road is formed of a single carriageway ranging in width between 4.5m and
7.5m taken from OS Mapping. It follows a north-south alignment and provides connectivity to the tarmac
road which provides access to the existing Cleve Hill Substation.
3.2.83.2.9 Widths of below 4.5m have been recorded by an Interest Party during the application
process and this is discussed further in Section 4.2.
3.2.93.2.10 To meet the objectives set out in Section 1.2 of this Outline CTMP, the roads which make
up the LRN will be subject to appropriate mitigation measures. Initial mitigation proposals are included
in Section 7, and it is expected these will be developed further following discussions with stakeholders.
3.2.103.2.11 The respective sensitivity of these roads has been discussed within the Access and Traffic
chapter of the ES (Chapter 14).
3.2.113.2.12 Key to the construction traffic management will be a prescribed routing strategy which is
discussed within Section 4 of this Outline CTMP. As part of the Outline CTMP control and monitoring
measures, deviation from the approved routes will result in enforcement procedures and penalties. The
mitigation, monitoring and enforcement are discussed in detail in Section 7 of this Outline CTMP.
3.3 Access Points
3.3.1 Vehicular access to the Site will be taken from Seasalter Road via the existing bellmouth to the London
Array Substation.
3.4 Internal Roads
3.4.1 The existing London Array substation access road will be used for vehicle access to the site. Rochdale
Envelope parameters for the Development have been considered with respect to the Outline CTMP,
and worst-case values/scenarios for this are captured by the candidate design, as set out in Chapter 5
of the Environmental Statement: Development Description.
3.4.2 Notably, this includes two alternative internal access road proposals:
TPLO/66705 Cleve Hill Solar Park
Outline Construction Traffic Management Plan
Rev 002003 | Copyright © 2019 Curtins Consulting Ltd
1.0.0 One option that branches from the main site access and follows a route to the north of the existing
London Array Substation; and
2.0.03.4.1 One access option utilising the existing London Array Substation access road.
3.4.33.4.2 A plan showing the proposed internal site access utilising the existing tarmac London Array
access road to the south of the facility is contained within Appendix B.
3.4.43.4.3 From the western end of the existing access road a new section of tarmac road
approximately 310m long is proposed to be constructed into the site.
3.4.53.4.4 The tarmac road will continue over the flood protection bund and into the compound while
an internal access track will be created providing access to the separate solar array parcels across the
site. The internal access track will be typically four metres wide and 2.1km long, and will be formed of
compacted stone.
3.4.63.4.5 Suitable passing places will be provided along all internal access track including the
existing London Array Substation access road.
TPLO/66705 Cleve Hill Solar Park
Outline Construction Traffic Management Plan
Rev 002003 | Copyright © 2019 Curtins Consulting Ltd
4.0 Routeing Strategy
4.1 Introduction
4.1.1 To provide safe and responsible construction vehicle access to the site and to help achieve the
objectives outlined in Section 1.2.4, proposed construction traffic routes have been assessed in Chapter
14 of the ES.
4.1.2 The origin of plant, machinery and materials is not known at this stage, however, contractors will be
required to use one of three primary routes to access the site. These include the A299 (if approaching
from the east), the M2 (if approaching from the west) and the A2 (if approaching from the south).
4.1.3 These will be followed by both LGVs and HGVs during the construction phase of the Proposed
Development.
4.1.4 From the A299 vehicles will be required to use Staple Street, Staple Street Road, Whitstable Road,
Head Hill Road and Seasalter Road to access the site. The proposed vehicle routes are shown within
Appendix C.
4.1.5 The following roads/areas are not to be used by construction traffic accessing the Proposed
Development, unless otherwise agreed with the relevant local planning authorities:
• Canterbury Road • Monkshill Road
• London Road • Cleve Hill
• Graveney Road • Seasalter Road (north of London Array Access)
• Sandbanks Lane • Faversham Road
4.2 Route Assessment
4.2.1 An initial assessment of Head Hill Road and Seasalter Road was undertaken using OS mapping to
identify the locations where the carriageway width is restricted, or where a corner or obstacle is present,
that means a large vehicles may have difficulty passing an oncoming vehicle.
4.2.2 In total four locations were identified whereby a large HGV and a large car may experience difficulty in
passing each other.
• Graveney Railway Bridge;
• Approximately 70m north of All Saints Church;
• Adjacent to the southern access to Denley Hall; and
• Approximately 30m south of the Cleve Hill junction.
4.2.3 In all instances, there is available carriageway width for a vehicle to wait to allow another to pass.
Furthermore, in all situations a good level of forward visibility is maintained meaning that vehicles have
early sight of approaching vehicles.
TPLO/66705 Cleve Hill Solar Park
Outline Construction Traffic Management Plan
Rev 002003 | Copyright © 2019 Curtins Consulting Ltd
4.2.4 Including the above, a further location approximately 350m north of Cleve Hill Junction has been
identified where two large HGVs may experience difficulty passing each other.
4.2.5 In order to ensure the assessment was accurate, KCC Highways requested that topographical surveys
were undertaken at these locations. In addition, two further locations were requested to be surveyed,
these include:
• North of St Bartholomew’s Church access road; and
• 350m north of Whitstable Road junction.
4.2.6 Swept path analysis has been undertaken using the topographical surveys and this has demonstrated
that the additional area north of St Bartholomew’s Church access road can accommodate a car and a
large HGV simultaneously. The location 350 north of the Whitstable Road junction can accommodate a
large car when a large rigid vehicle is travelling southbound, however there is section of road where this
is not possible travelling northbound.
4.2.7 Drawings SK008 and 009 illustrate swept path analysis where vehicles cannot pass simultaneously.
However, there is sufficient forward visibility to allow HGV drivers to give way to oncoming traffic.
4.2.8 The topographical surveys do not fundamentally change the conclusions found during the initial swept
path assessment.
4.2.9 In addition to the above, a number of unverified measurements along Head Hill Road and Seasalter
Road have been put forward by an Interested Party. These measurements range from 6.1m to 4.2m.
4.2.10 The exact location of the measurements recorded is unknown, however, the narrowest measurement
noted, 4.2m, is located north of the Seasalter Road/Cleve Hill junction.
4.2.11 In this area, approximately 350m to the north of the Seasalter Road/Cleve Hill junction, a 180m section
of Seasalter Road was included within the topographical survey undertaken. This identified widths
varying between 4.5m and 5.1m. This area has been previously identified as a point where two large
vehicles may have difficulty passing each other.
4.2.12 Along this section of Seasalter Road the road width varies, with space to allow a vehicle to give way to
oncoming traffic as well as good forward visibility.
4.2.13 The submission of the additional measurements is not considered to change the findings of this
assessment. It is acknowledged that there are locations where two HGVs will not be able to pass each
other along the construction traffic route, however, there are suitable places within the public highway
for a vehicle to give way to oncoming vehicles and good forward visibility. In addition, further measures
are proposed to mitigate against potential vehicle conflict in these areas. These are discussed in Section
6.
TPLO/66705 Cleve Hill Solar Park
Outline Construction Traffic Management Plan
Rev 002003 | Copyright © 2019 Curtins Consulting Ltd
4.2.84.2.14 It is noted that the proposed construction traffic route along Head Hill Road and Sesalter
Road is already used by large vehicles. Furthermore, it was the route used by HGV traffic in the
construction of the London Array substation.
4.2.94.2.15 Measures will be taken to minimise the potential for twoensure CHSP construction HGVs
do not to meet in opposite directions along Head Hill Road and Seasalter Road. This, along with further
mitigation is discussed in further detail in Section 6.7 of the CTMP.
4.2.104.2.16 On-site observations identified that on-street car parking also occurs along Head Hill Road
opposite The Freewheel Pub and also outside Graveney Primary School. There is also a bus stop
located adjacent to the pub.
4.2.114.2.17 While on-street parking and the bus stop limits the available width in these locations and
two-vehicles are not able to pass each other, the carriageway width in these areas is over 5.5m wide
and forward visibility is good.
4.2.124.2.18 Vehicles will be required to give way to each other in these locations as currently occurs.
4.3 Identified Constraints
4.3.1 The table below sets out the identified highways constraints along the proposed construction access
route and the proposed mitigation to be implemented. The mitigation measures are then discussed in
greater detail within Section 6 of this document.
TPLO/66705 Cleve Hill Solar Park
Outline Construction Traffic Management Plan
Rev 002003 | Copyright © 2019 Curtins Consulting Ltd
Table 4.1 – Identified Constraints.
No. Issue/Constraint Mitigated at Stage Mitigation
1
Sensitive, built up areas (villages, towns) to be avoided by temporary construction traffic due to congestion, reduction of safety and air and noise pollution
Construction route planning stage
Final construction routeing agreed with KCC.
2 Avoidance, if possible of urban areas Construction route planning stage
Final construction routeing agreed with KCC.
3 Access route width constraints Throughout all stages Contractor briefing, speed restrictions and signage.
4 Impacts on pedestrians, cyclists, equestrians and other non-motorised users.
Throughout all stages Contractor briefing, speed restrictions and signage.
5 Graveney Primary School Throughout all stages Delivery timing restrictions to avoid school start/finish times.
6 Highway surface condition Throughout all stages Detailed survey and remedial works strategy agreed with KCC.
TPLO/66705 Cleve Hill Solar Park
Outline Construction Traffic Management Plan
Rev 002003 | Copyright © 2019 Curtins Consulting Ltd
5.0 Signing Strategy and Core Working Hours for Traffic
Management During Construction Phase
5.1 Access Route and Point Signing
5.1.1 Temporary signage will be erected along construction traffic routes on the LRN to provide access and
routeing information. These will be placed to ensure that construction vehicles and staff are able to
travel directly to site from the SRN. Locations of the temporary signage will be agreed with KCC ahead
of installation.
5.1.2 Temporary signage will also be provided at key junctions within the vicinity of the site to provide warning
to other road users of the likely presence of construction vehicles. Temporary signage will be produced
and agreed with the KCC.
5.2 Internal Road Signing
5.2.1 Similar to the above access route, temporary signage will be erected along proposed construction haul
roads within the Site where necessary. The signage will provide drivers with information on distances
to destination, and warning (hazard) information relating to potential vehicle conflict areas (cross over
points).
5.3 Working Hours
Core Working Hours
5.3.1 Core working hours are proposed to be between 07.00 until 19.00, Monday to Friday and 07.00 until
13.00 on a Saturday (unless in exceptional circumstances where need arises to protect plant, personnel
or the environment).
5.3.2 To maximise productivity within the core hours, contractors would require a period of up to one hour
before and up to one hour after core working hours for start-up and closedown of activities. This would
include but not be limited to, movement to place of work, maintenance and general preparation works.
This would not include operation of plant or machinery likely to cause a disturbance. These periods
would not be considered an extension of core working hours.
5.3.3 As such, it is likely that staff would arrive at the development site before 07.00 and leave after 19.00
Monday to Friday and before 07.00 and after 13.00 on a Saturday.
5.3.4 Except in the case of emergency, any work required to be undertaken outside of core working hours
(not including repairs or maintenance) will be agreed with the relevant local planning authority prior to
undertaking the works. Any proposed changes to the core working hours set out above will be discussed
and agreed relevant stakeholders including KCC.
TPLO/66705 Cleve Hill Solar Park
Outline Construction Traffic Management Plan
Rev 002003 | Copyright © 2019 Curtins Consulting Ltd
6.0 Mitigation Measures
6.1 Introduction
6.1.1 Cleve Hill Solar Park Ltd will implement a number of embedded construction traffic mitigation measures
as set out below.
6.2 HGV and LGV Construction Vehicle Identification
6.2.1 It is anticipated that all HGV and LGV construction vehicles associated with the Proposed Development
will be clearly identifiable through the use of a vehicle marking scheme. The purpose of this is to assist
with the monitoring process of the construction vehicles over the SRN and LRN.
6.3 Prescribed HGV and LGV Construction Routes
6.3.1 Only those construction traffic routes and internal roads which have been agreed with the KCC and HE
will be used.
6.4 HGV Traffic Movement Restrictions
6.4.1 Where possible construction traffic movements will be scheduled to occur outside of highway network
peak times.
6.4.2 It is anticipated that HGV movements associated with the Proposed Development will not be permitted
on the LRN at the following times. Exact timings will be confirmed prior to construction and KCC and
relevant stakeholders informed:
• On Sundays or on public holidays;
• Between the hours of 19:00 and 07:00 (Monday to Friday); and
• Between 13:00 on Saturday and 07:00 on Monday.
6.4.3 The above restrictions do not apply to the movements of HGVs on the SRN or in relation to AILs.
6.4.4 In addition to the above, It is proposed that CHSP will not accept HGV deliveries to site or let HGVs
leave the site between the hours of 08.30 to 09.30 and 15.00 to 16.00 to avoid Graveney Primary School
start/finish times. CHSP will contract with its contractors accordingly.
6.5 HGV Emissions
6.5.1 All vehicles used in the construction of the Proposed Development will be to Euro standard IV class.
6.6 Banksman or Presence of Qualified Personnel at Access
6.6.1 Qualified personnel will be in place at the site access to: (a) guide construction traffic; and (b) record
arrivals and departure of vehicles against the deliveries schedule.
TPLO/66705 Cleve Hill Solar Park
Outline Construction Traffic Management Plan
Rev 002003 | Copyright © 2019 Curtins Consulting Ltd
6.76.6 Timings of Vehicle Movements
6.7.16.6.1 Vehicle movements, including staff transport and the delivery of goods and materials to
site, will occur between the hours 06.00 and 20.00 Monday to Friday and 06.00 and 14.00 on a
Saturday.
6.7.26.6.2 To maximise efficiency during the proposed core working hours, it is expected that most
staff movements to site will occur before 07.00 and that staff will leave after 19.00 Monday to Friday,
and before 07.00 and after 14.00 on a Saturday.
6.7.36.6.3 Due to the proposed vehicle movement timing restrictions around school start and finish
times, most HGV movements are expected between 09.30 and 15.00.
6.6.4 A booking system (Delivery Management System) will be used to ensure deliveries to the sites will be
spread across day where possible. This will minimise the impact of HGV traffic during the network peak
periods. This booking schedule will also form part of and inform the monitoring process of the CTMP.
6.6.5 As part of delivery management process, measures will be introduced to ensure that inbound/outbound
HGVs associated with the construction of the Solar Park will not meet along Head Hill Road and
Seasalter Road.
6.6.6 It is proposed that this is managed by the following measures:
• Predicting journey times from the port of entry (and other points of origin) to the site. This will be
through vehicle GPS monitoring and using real-time traffic information and journey planning tools;
• Having set times for vehicle arrivals and departures (e.g. This could be achieved by timing
deliveries to arrive within the first 45mins of an hour and releasing vehicles in the last 15mins);
• Holding vehicles internally within the site and releasing in a controlled manor; and
• Not permitting vehicles to leave the strategic road network (including the A299) if they know they
are going to miss a delivery window).
6.6.7 A further contingency measure will be introduced whereby inbound HGVs will use the laybys in proximity
of the site to call ahead, to ensure they will not meet outbound vehicles traveling along Head Hill Road
and Seasalter Road.
6.7.46.6.8
6.7.5 Delivery timings will be carefully managed to ensure (as much as possible) that the identified delivery
windows are not missed. The following strategy will be adopted and communicated throughout the
supply chain to ensure restrictions along the LRN are adhered to.
6.7.6 If close to the site before a timing restriction has ended, HGVs will be instructed not to leave the SRN
or the A299 to approach the site.
TPLO/66705 Cleve Hill Solar Park
Outline Construction Traffic Management Plan
Rev 002003 | Copyright © 2019 Curtins Consulting Ltd
6.7.76.6.9 There are laybys and services (suitable for HGVs) along the A2, A299 and M2. A vehicle
could wait in one of these areas until the LRN timing restriction has ended.
6.6.10 The closest laybys to the site are located on the A299, 400m south of its junction with Whitstable Road.
6.6.11 The delivery strategy will be adopted and communicated throughout the supply chain to ensure
restrictions along the LRN are adhered to.
6.7.9 Furthermore, HGVs will be held on-site and released in a controlled manor to reduce the potential for
two HGVs associated with construction of the Proposed Development to meet each other on either
Head Hill Road or Seasalter Road.
6.7.10 This could be achieved by timing deliveries to arrive within the first 45mins of an hour and releasing
vehicles in the last 15mins.
6.6.12 It is expected that at the peak of construction, taking account of the proposed HGV timing restrictions,
in the region of 10 two-way vehicle trips (five vehicles) an hour could be expected.
6.7 Presence of Banksperson/Traffic Marshals at Access and Call Forward
Positions
6.7.1 Qualified personnel will be positioned at the following locations along the construction delivery routes:
• Selected call forward layby positions;
• Access directly off the public highway; and
• Site access.
6.7.2 These personnel will speed up the calling forward of vehicles to the site, guide construction traffic where
required, record arrivals and departure of vehicles against the deliveries schedule and report any
observed incidents or highway conditions that may impact on construction vehicle access.
6.7.3 In addition, these personnel will be able to monitor vehicles leaving the site to ensure they have left
Head Hill Road and Seasalter Road before permitting any inbound construction vehicle movements.
6.8 Routeing Staff
6.8.1 Staff will be employed to travel on the construction routes and monitor LGV and HGV traffic using the
routes where all construction vehicles associated with the Proposed Development will be clearly
identifiable.
TPLO/66705 Cleve Hill Solar Park
Outline Construction Traffic Management Plan
Rev 002003 | Copyright © 2019 Curtins Consulting Ltd
6.8.2 Staff will be trained to conduct this monitoring process, collect and collate data and present the data for
the Transport Co-ordinator (TCO) and Traffic Management Group (TMG).
6.9 Speed Limit Restrictions
6.9.1 It is proposed that the speed of construction traffic along Head Hill Road and Seasalter Road is restricted
to 20mph in places.
6.9.2 The locations of the proposed construction traffic speed restrictions are shown in Drawing 007 in
Appendix E at the rear of this report.
6.10 Incident Management Plan
6.10.1 An initial Construction Traffic Incident Management Plan (TIMP) has been produced and included as
Appendix F of this document. This sets out the procedures to be taken if part of the LRN or SRN near
the Proposed Development is affected by an incident.
6.11 PRoW Management Plan
6.11.1 A PRoW Management Plan has been produced and included as Appendix G of this document. This
sets out how PRoW will be managed during the construction of the Proposed Development.
6.12 Cleaning of Vehicles
6.12.1 All vehicles exiting from the site access will pass over a wheel cleaning facility prior to using the public
highway.
6.12.2 Furthermore, all construction vehicles will travel on over a kilometre of tarmac road before reaching the
LRN. This will also ensure that mud or debris is not transferred from the site to local roads.
6.12.3 In the event that mud or debris is found on the public highway, a road cleaning contractor will be on call
throughout the construction programme.
6.13 Highway Condition Surveys
6.13.1 Highway condition surveys will be undertaken both before and after construction. The scope of these
surveys have been agreed with KCC.
6.13.2 The surveys cover the proposed construction traffic route from the strategic road network to the site.
The scope of the road condition surveys includes surveying the main carriageway surface, footways,
verges and adjoining access points.
6.13.3 The surveys will be undertaken by a specialist third party, that will undertake a high definition visual
survey of the proposed construction traffic routes from the SRN to the site.
TPLO/66705 Cleve Hill Solar Park
Outline Construction Traffic Management Plan
Rev 002003 | Copyright © 2019 Curtins Consulting Ltd
6.13.4 A preliminary road condition survey has been undertaken and the results have been shared with KCC.
The survey identified that the surface condition of Head Hill Road and Seasalter Road are poor in
places, with issues such as subsidence, cracking, fretting and potholes being identified.
6.13.5 To minimise the potential for noise and vibration from a poor road surface, further road condition surveys
will be undertaken prior to construction starting. Areas in poor condition, particularly those in proximity
to residential developments and other sensitive receptors will be improved.
6.13.6 Further to the remedial works prior to construction, it is proposed that the condition of the construction
route from the strategic network to the site is monitored throughout the construction period. Remedial
works will be undertaken as required to ensure the existing highway conditions are not exacerbated by
construction vehicles.
6.13.7 Once construction has been completed a final road condition survey will be undertaken. Any damage
to the road surface, footways, verges or adjacent accesses, attributable to the development will be
rectified to a standard at least equal to that observed prior to the route being used by the Proposed
Development construction traffic.
6.13.7 Discussions have been held with KCC with regards to the mechanism by which any works to the public
highway will be undertaken. It has been agreed that a S278 agreement will be drafted which gives
CHSP the powers to undertake the works. This includes powers to undertake remedial works at short
notice during construction.
6.14 Temporary Traffic Management Procedures (TTM)
6.14.1 TTM will be used where required to enhance safety conditions on the LRN and mitigate potential impacts
of the construction.
6.14.2 All TTM measures and implementation plans will need to be agreed with KCC.
6.15 Travel Plan
6.15.1 A Travel Plan will be implemented for the Proposed Development which sets out a number of travel
planning initiatives including:
• Travel planning awareness;
• Welfare van provision for staff from external locations to site;
• Public transport;
• Car sharing;
• Construction traffic management;
• Modal shift monitoring; and
TPLO/66705 Cleve Hill Solar Park
Outline Construction Traffic Management Plan
Rev 002003 | Copyright © 2019 Curtins Consulting Ltd
• Travel plan co-ordinator (TPC).
6.15.2 An Outline Travel Planning Statement has been produced and is included in this report as Appendix
H.
6.16 Delivery Management Systems (DMS)
6.16.1 Records will be kept of all deliveries. This will ensure the spacing of deliveries and allow the number of
vehicles accessing/egressing the site to be recorded.
6.17 Information Packs and Communications
6.17.1 Information packs will be provided to all contractors which will form part of the contractual agreement
between the contractors and CHSP. The information pack will contain the details of the following CTMP
requirements:
• Risk Analysis Management Systems (RAMS) guidance;
• HGV restrictions;
• Construction routes;
• DMS;
• Non-compliance guidance;
• Complaints procedure;
• CTMP protocols and indications required for all contractors including a Code of Good Practice;
• Guidance on standard communication procedures between contractors and site; and
• CTMP contacts (emergency and non-emergency).
6.18 Abnormal Indivisible Loads
6.18.1 The movement of AILs is controlled by The Motor Vehicles (Authorisation of Special Types) General
Order 2003 and subject to management and prior agreement with the Police and HE.
6.18.2 All AIL vehicles will be escorted by a pilot car and Police escort and be scheduled to travel during off-
peak hours where possible. This will ensure the safety of other road users and result in minimal
disruption.
6.18.3 The local communities affected by the delivery of the AILs will be contacted prior to any movements. It
is envisaged that this will include leaflet drops and publication in the local press advising of the AIL
movements.
TPLO/66705 Cleve Hill Solar Park
Outline Construction Traffic Management Plan
Rev 002003 | Copyright © 2019 Curtins Consulting Ltd
7.0 Management Structure
7.1 Introduction
7.1.1 This section reviews the management structure that will oversee the final CTMP. It is important that a
strong management structure is in place to ensure the Outline CTMP objectives are met, and that the
continued monitoring and reviewing of the final CTMP is maintained.
7.1.2 A Traffic Management Group (TMG) and a Transport Co-ordination Officer (TCO) will be appointed to
achieve this.
7.1.3 The TCO will be employed prior to commencement of works and will have the following transport-related
responsibilities:
• Monitor the final CTMP;
• Report to the TMG about mitigation and any remedial measures if required;
• Update the final CTMP as required; and
• Resolve issues and problems through liaison with relevant stakeholders.
7.2 Traffic Management Group
7.2.1 A TMG will be established prior to construction to implement and monitor the final CTMP.
7.2.2 The TMG will include representatives from CHSP, the TCO and the following organisations will also be
asked to provide representatives:
• Highways England;
• Kent County Council;
• Swale Borough Council;
• Graveney Primary School;
• Graveney Parish Council; and
• Graveney Residents Environmental Action Team, or similar organisation representing local
residents.
7.2.3 The TMG will meet to discuss and review the traffic and transportation elements of the construction
phase of the Proposed Development. The meetings will be scheduled twice per year, unless specific
issues which need to be addressed are brought to the attention of the TCO. In such cases, additional
meetings or discussions will be co-ordinated by the TCO as and when required.
7.2.4 The primary role of the TMG meetings will be to review the following information:
• Implementation and effectiveness of mitigation measures;
• Contractor obligations with regard to the CTMP; and
TPLO/66705 Cleve Hill Solar Park
Outline Construction Traffic Management Plan
Rev 002003 | Copyright © 2019 Curtins Consulting Ltd
• Suitable changes to the final CTMP based on the success of the mitigation measures seeking to
enhance the efficiency and effectiveness of the final CTMP.
<
7.2.5 Discussion in the scheduled meetings will be aided by a monitoring report produced by the TCO.
Discussions will also relate to the Outline CTMP objectives outlined in Section 1.2.4.
7.3 Monitoring and Review
Monitoring Strategy
7.3.1 The TMG will be established and a TCO will be appointed prior to construction as part of the final CTMP,
to oversee the implementation and monitoring of the final CTMP in line with the agreed requirements.
7.3.2 The contractor will undertake monitoring as necessary to ensure compliance with the requirements of
the final CTMP, and which will include the maintenance of records and traffic management measures.
Review
7.3.3 The TMG will monitor and review the final CTMP. These reviews are required to ensure that the final
CTMP delivers on the commitments and achieves the goals agreed as set out in the document.
7.4 Compliance
7.4.1 As part of the final CTMP a series of mechanisms will be established to provide all parties with a clear
understanding of the enforcement procedures that will be applied if the requirements contained within
this Outline CTMP are not achieved. It is anticipated that these mechanisms will be determined at a
later stage and will include:
• RAMS procedures – CHSP will implement the final CTMP and adhere to the requirements and
meet the goals through management practices. This will include site inductions for contractors,
briefing on the obligations of CHSP standards, induction and adherence to risk assessments and
method statements (RAMS procedures), delivery management system (DMS) briefing, driver
inductions and compliance guidance;
• Contractual conditions – to be employed as part of this Outline CTMP compliance methodology
and will be built into the contractor’s contract. This will be subject to performance review by CHSP;
and
• Actions – to be employed if the commitments of this Outline CTMP are breached.
7.4.2 CHSP will agree with appropriate stakeholders to ensure that a complaints management procedure is
in place prior to the start of construction.
7.5 Enforcement and Corrective Measures
7.5.1 The CTMP will form part of the contractual agreements between those contractors working at the site
and CHSP.
TPLO/66705 Cleve Hill Solar Park
Outline Construction Traffic Management Plan
Rev 002003 | Copyright © 2019 Curtins Consulting Ltd
7.5.2 CHSP will ensure that appropriate measures are taken to ensure that contractor behaviour and
performance is monitored. Where appropriate corrective measures will be implemented to resolve,
address and enhance service performance which may be in breach of the standards within the CTMP.
7.5.3 This could result in contractor contracts being terminated.
7.5.1 CHSP will ensure that appropriate measures are taken to ensure that contractor behaviour and
performance is monitored. Where appropriate corrective measures will be implemented to resolve,
address and enhance service performance which may be in breach of the standards within the CTMP.
7.6 Implementation of the CTMP
7.6.1 CHSP is committed to continued dialogue with the relevant stakeholders, KCC and HE to agree, finalise
this CTMP up to and during construction of the Proposed Development.
TPLO/66705 Cleve Hill Solar Park
Outline Construction Traffic Management Plan
Rev 002003 | Copyright © 2019 Curtins Consulting Ltd
8.0 Appendices
Appendix A – Site Location Plan
Scale @ A3
Date: 12/09/2018
P:\Projects\Environment\Environment EIA\2238 Cleve Hill.aprx\2238-PUB-033 Site Boundary
1:20,000
Repr
oduc
ed fr
om O
rdna
nce
Surv
ey d
igita
l map
dat
a ©
Cro
wn
copy
right
201
8. A
ll rig
hts
rese
rved
. Lice
nse
num
ber 1
0004
8606
#NORTH
Cleve Hill Solar Park
Site Boundary
Ref: 2238-PUB-033Produced By: SC
Checked By: MB
0 0.5 1 km
Site Boundary
1665
0016
6000
1655
0016
5000
1645
0016
4000
1635
0016
3000
1625
0016
2000
1615
00
1665
0016
6000
1655
0016
5000
1645
0016
4000
1635
0016
3000
1625
0016
2000
1615
00
606500606000605500605000604500604000603500603000602500602000601500601000
606500606000605500605000604500604000603500603000602500602000601500601000
TPLO/66705 Cleve Hill Solar Park
Outline Construction Traffic Management Plan
Rev 002003 | Copyright © 2019 Curtins Consulting Ltd
Appendix B – Proposed Internal Site Access Plan
1.56
1.55
1.52
1.42
1.44
1.50
1.45
1.48
1.39
1.51
1.48
1.55
1.52
1.49
1.49
1.39
1.36
1.48
1.49
1.67
1.63
1.44
1.61
1.75
1.42
1.46
1.50
1.53
1.40
1.58
1.57
1.59
1.49
1.55
1.44
1.60
1.61
1.52
1.65
1.66
1.59
1.61
1.66
1.47
1.55
1.57
1.66
1.60
1.54
1.57
1.65
1.62
1.82
1.82
1.59
1.66
1.63
1.63
1.37
1.57
1.50
1.50
1.51
1.48
1.39
1.72
1.82
1.55
1.60
1.44
1.58
1.61
1.49
1.49
1.56
1.42
1.43
1.41
1.78
1.76
1.74
1.73
1.70
1.37
1.55
1.64
1.48
1.65
1.50
1.50
1.81
1.86
1.57
1.63
1.61
1.62
1.64
1.70
1.50
1.71
1.60
1.49
1.75
2.06
1.64
1.55
1.77
1.68
1.67
1.62
1.72
1.89
1.53
1.36
1.85
1.59
1.58
1.88
1.65
1.81
1.53
1.64
1.89
1.51
0.87
1.50
1.50
1.69
1.35
1.74
1.47
1.56
1.66
1.87
1.55
1.79
1.44
1.70
1.55
1.62
1.55
1.41
1.54
1.70
1.88
1.76
1.70
1.65
1.37
1.50
1.88
1.71
1.84
1.78
1.82
1.81
1.82
1.63
1.38
1.62
1.68
1.53
1.77
1.75
1.88
1.64
1.26
1.55
1.57
2.93
1.47
1.64
1.66
1.72
1.82
1.78
1.74
1.80
1.61
1.35
1.35
1.46
1.42
1.61
1.45
1.51
1.74
1.74
1.63
1.78
1.68
1.59
1.57
1.69
1.67
1.70
1.73
1.72
1.64
1.81
1.76
1.55
1.47
1.82
1.66
1.69
1.65
1.67
1.68
1.80
1.48
1.70
1.74
1.81
1.61
1.69
1.58
1.78
1.80
1.90
1.64
1.63
1.55
1.65
1.77
1.83
1.86
1.93
1.76
1.97
1.74
1.70
1.58
1.64
1.69
1.78
1.88
1.61
1.50
1.75
1.76
1.65
1.73
1.51
1.59
1.57
1.52
1.86
1.94
2.00
1.87
1.79
1.76
1.47
1.56
1.70
1.79
1.97
2.03
1.70
1.64
1.87
1.87
1.80
1.73
1.81
1.70
1.25
1.86
1.87
1.75
1.82
1.81
1.55
1.79
1.70
1.71
1.79
1.83
1.78
1.83
1.84
1.64
1.65
1.87
1.89
1.91
1.94
1.76
1.61
1.69
1.87
1.88
1.86
1.94
1.59
1.77
1.71
1.96
1.81
1.85
1.92
1.93
1.53
1.75
1.83
1.77
1.65
2.04
2.08
1.72
2.04
2.23
2.11
1.67
2.05
1.95
2.01
1.82
1.80
2.17
1.99
1.98
2.02 1.97 1.95
1.80
2.00
1.94
1.89
1.88
1.87
1.93
1.82
1.80
1.79
1.85
1.82
2.33
1.85
1.86
2.13
1.88
2.13
2.14
2.30
1.83
1.97
2.04
1.98
1.86
1.95
2.16
2.04
2.12
2.12
2.17
2.27
2.96
3.47
3.70
3.61
3.62
3.36
3.19
3.25
2.34
2.60
2.87
1.772.01
2.47
2.78
2.75
2.73
3.03
3.71
3.39
3.07 3.03 3.04 3.05 3.18 3.14 3.103.19
3.17
3.20
3.54
3.76
3.79
4.05 4.34
4.59
4.76
2.96
3.07
2.71
2.73
2.89
2.79
2.70
2.68
2.70
2.78
2.86
2.86
2.75
2.83
2.84
2.86
2.72
2.83
2.84
2.89
3.74
4.06
3.72
3.15 3.09 3.10 3.07 3.40 3.313.24
3.243.26 3.31
3.53
3.71
3.84
3.93
3.64
3.61
3.33
2.81
2.60
2.33
2.27
2.20
2.12
2.141.95
1.97
1.94
1.92
1.96
2.07
2.04
2.18
2.15
2.06
2.18
2.03
2.05
2.15
2.01
2.14
2.11
2.21
2.20
2.17
2.09
2.01
2.13
2.05
2.09
2.00
1.95
2.08
2.12
2.19
2.21
2.39
3.61
4.56
4.15
3.78
3.27
2.82
2.50
2.28
2.13
2.09
2.01
2.05
2.01
1.98
1.96
2.00
2.04
2.00
2.14
2.11
2.09
2.00
1.95
2.13
2.15
2.07
2.13
2.18
2.22
2.21
2.23
2.11
2.12
2.09
2.07
2.11
1.97
1.93
2.01
2.09
2.17
2.21
2.43
2.76
3.57
3.81
2.91
2.90
2.84
2.78
2.78
2.86
2.75
2.69
2.73
2.75
2.78
2.83
2.65
2.74
2.79
2.84
2.89
2.81
2.85
2.87
3.15
3.66
3.69
3.00
2.85
2.77
1.67
1.96
1.95
2.53
1.47
1.80
1.37
1.51
3.00
3.06
3.22
3.13
3.01
3.07
2.76
2.71
2.88
3.06
3.01
2.95
2.97
2.92
2.87
2.78
1.33
1.50
1.68
1.56
1.59
1.61
1.68
1.53
1.47
1.65
1.65
1.54
1.44
1.63
1.67
1.60
1.75
1.50
1.751.78
1.84
1.681.74
1.771.72
1.68
1.771.76
1.781.84
1.93
2.292.57
2.82
2.14
1.53
2.15
2.14
1.891.88
1.88
1.631.61
1.59
1.54
1.57
1.49
1.55
1.87
1.801.91
1.60
1.70
1.742.07
2.16
1.711.72
1.84
1.75
1.75
1.89
0.28
0.39
0.13
0.19
0.25
0.24
0.40
0.57
0.34
0.20
0.29
0.37
0.24
0.21
0.17
0.38
0.59
0.80
0.28
0.39
0.13
0.19
0.25
0.24
0.40
0.57
0.34
0.20
0.29
0.37
0.24
0.21
0.17
0.38
0.59
0.80
0.56
0.78
0.56
0.56
0.78
0.56
1.94
1.64
1.34
1.04
0.74
0.71
0.69
0.66
0.63
0.67
0.72
1.02
0.91
0.80
0.69
0.69
2.41
3.60
2.95
2.86
2.86
2.74
2.72
2.80
2.882.93
2.993.04
2.93
2.82
2.83
2.80
0.50
0.50
0.50
0.50
0.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
3.50
3.50
4.50
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
4.00
4.00
CONDUCTOR HT. 19.6m
CONDUCTOR HT. 24.3m
WATERCOURSE
CROSSING 1 (INFILL
AS REQUIRED)
WATERCOURSE
CROSSINGS 2
G
4.000m
4.000m
16.500m
7.30
0m
12
5.65
0m (
EX
TG
)
5.600m (EXTG)
7.300m
7.50
0m
16.5
00m
7.50
0m
7.500m
NO TOPO DATA EAST
OF THIS POINT
1 IN 3 BATTER
TIE IN TO EXISTING LEVELS
1 IN 3 BATTER
TIE IN TO EXISTING LEVELS
1 IN 3 BATTER
TIE IN TO EXISTING LEVELS 1 IN 3 BATTER
TIE IN TO EXISTING LEVELS
1:40 FALL 1:40 FALL 1:40 FALL
TYPICAL 4.0m CARRIAGEWAY CROSS SECTIONSCALE 1:50
TYPICAL 7.3m CARRIAGEWAY CROSS SECTIONSCALE 1:50
7.300m4.000m
0.99
1.07
1.11
1.20
1.41
1.80
1.86
1.69
1.55
1.45
1.62
0.94
1.03
1.22
1.24
1.41
1.83
1.82
1.46
1.44
1.50
1.59
1.02
1.00
1.09
1.21
1.34
1.75
1.53
1.50
1.40
1.58
1.60
1.11
1.09
1.21
1.21
1.38
1.76
1.43
1.42
1.55
1.53
1.60
1.13
1.12
1.20
1.17
1.45
1.55
1.56
1.57
1.63
1.64
1.69
1.19
1.12
1.21
1.24
1.48
1.44
1.44
1.61
1.68
1.71
1.67
1.10
1.21
1.20
1.35
1.44
1.56
1.51
1.69
1.72
1.68
1.65
1.15
1.24
1.40
1.38
1.35
1.35
1.48
1.67
1.65
1.70
1.76
1.20
1.33
1.61
1.45
1.57
1.65
1.52
1.73
1.71
1.68
1.71
1.30
1.60
1.71
1.42
1.44
1.65
1.69
1.73
1.68
1.66
1.73
1.33
1.73
1.51
1.53
1.61
1.60
1.74
1.67
1.65
1.77
1.75
1.51
1.61
1.37
1.39
1.73
1.53
1.52
1.69
1.67
1.71
1.73
1.36
1.26
1.43
1.61
1.62
1.43
1.50
1.50
1.26
1.62
1.58
1.72
1.73
1.41
1.41
1.50
1.39
1.30
1.70
1.77
1.67
1.74
1.72
1.78
1.76
1.42
1.50
1.43
1.36
1.76
1.75
1.81
1.76
1.71
1.65
1.74
1.32
1.30
1.47
1.84
1.88
1.68
1.69
1.59
1.75
1.79
1.55
1.40
1.54
1.68
1.82
1.79
1.57
1.66
1.77
1.78
1.77
1.43
1.48
1.69
1.66
1.89
1.67
1.62
1.71
1.71
1.77
1.77
1.47
1.62
1.64
1.78
1.72
1.55
1.61
1.72
1.73
1.71
1.63
1.47
1.43
1.45
1.67
1.69
1.57
1.64
1.77
1.73
1.66
1.63
1.43
1.49
1.35
1.67
1.63
1.66
1.56
1.61
1.65
1.64
1.75
1.31
1.40
1.51
1.67
1.73
1.77
1.69
1.64
1.68
1.68
1.73
1.58
1.72
1.72
1.57
1.66
1.65
1.46
1.41
1.46
1.52
1.50
1.56
1.66
1.84
1.82
1.78
1.61
1.67
1.80
1.65
1.66
1.43
1.75
1.60
1.60
1.52
1.58
1.41
1.38
1.78
1.68
1.66
1.62
1.89
1.64
1.63
1.74
1.70
1.70
1.58
1.69
1.85
1.78
1.78
1.77
1.91
1.85
1.83
1.92
1.88
1.85
1.75
1.89
1.70
1.70
1.64
1.87
1.70
1.76
1.81
1.81
1.76
1.55
1.79
1.68
1.70
1.62
1.79
1.74
1.73
1.85
1.87
1.80
1.64
1.83
1.82
1.69
1.59
1.81
1.68
1.65
1.67
1.69
1.69
1.56
1.69
1.74
1.64
1.65
1.74
1.64
1.69
1.63
1.70
1.64
1.60
1.63
1.59
1.49
1.64
1.64
1.58
1.62
1.53
1.59
1.63
1.47
1.51
1.57
1.48
1.73
1.68
1.60
1.36
1.62
1.62
1.51
1.33
1.45
1.55
1.52
1.64
1.58
1.42
1.30
1.40
1.54
1.68
1.43
1.41
1.59
1.44
1.62
1.66
1.67
1.67
1.75
1.76
1.65
1.57
1.55
1.61
1.62
1.65
1.62
1.68
1.57
1.65
1.63
1.64
1.61
1.40
1.62
1.66
1.74
1.71
1.76
1.78
1.69
1.75
1.67
1.64
1.24
1.55
1.58
1.57
1.63
1.68
1.66
1.78
1.75
1.64
1.68
1.27
1.53
1.60
1.78
1.68
1.69
1.70
1.81
1.78
1.70
1.59
1.30
1.58
1.59
1.69
1.79
1.71
1.79
1.76
1.72
1.87
1.73
1.36
1.58
1.58
1.46
1.71
1.75
1.72
1.75
1.66
1.83
1.58
1.64
1.77
1.54
1.50
1.59
1.41
1.73
1.57
1.53
1.63
1.58
1.59
1.81
1.96
1.59
1.66
1.70
1.58
1.87
1.53
1.91
1.82
2.02
2.00
1.79
1.96
1.69
1.49
1.37
1.61
1.70
1.83
1.84
1.88
1.86
1.74
1.48
1.59
1.53
1.60
1.43
1.23
1.72
1.60
1.60
1.72
1.54
1.56
1.49
1.52
1.51
1.50
1.59
1.50
1.52
1.44
1.48
1.50
1.54
1.26
1.58
1.58
1.48
1.48
1.66
1.58
1.60
1.45
1.55
1.47
1.43
1.51
1.38
1.52
1.55
1.69
1.64
1.45
1.51
1.53
1.59
1.45
1.48
1.39
1.51
1.48
1.55
1.52
1.40
1.78
1.72
1.51
1.52
1.36
1.30
1.32
1.34
1.331.35
1.32
1.16
1.10
1.33
1.51
1.70
1.47
1.21
1.28
1.86
1.61
1.77
1.68
1.501.60
1.47
1.68
1.60
1.47
1.18
1.41
1.82
1.53
1.51
1.411.28
1.471.32
1.67
1.53
1.65
1.60
1.49
1.61
1.63
1.68
1.74
1.76
1.76
1.70
1.63
1.70
1.70
1.70
1.72
1.69
1.97
2.14
2.16
2.09
2.07
2.15
2.23
1.92
2.11
1.95
1.95
1.96
1.59
1.81
1.71
1.40
1.91
1.95
1.88
1.51
1.73
1.57
1.561.95
1.61
1.46
1.48
1.46
1.50
1.57
1.49
1.37
1.46
1.41
1.37
1.36
1.43
1.54
1.39
1.32
1.39
1.58
1.63
1.57
1.79
1.36
1.39
1.42
1.61
1.53
1.59
1.92
1.84
2.01
1.93
0.24
0.20
0.19
0.20
0.17
0.17
0.13
0.16
0.14
0.15
0.13
0.11
0.12
0.10
0.09
0.50
0.21
0.19
0.14
0.20
0.20
0.20
0.19
0.17
0.18
0.16
0.14
0.15
0.18
0.07
0.50
0.08
0.12
0.08
0.44
0.50
0.51
0.51
0.50
0.53
0.52
0.55
0.52
0.57
0.56
0.55
0.56
0.55
0.61
0.59
0.56
0.54
0.53
0.38
0.46
0.46
0.49
0.52
0.41
0.40
0.39
0.290.23
0.25
0.62
1.00
1.37
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.501.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.501.
50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.00
1.00
1.001.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00
2.00
2.00
2.00
CONDUCTOR HT. 29.2m
CONDUCTOR HT. 28.0m
CONDUCTOR HT. 25.3m
WATERCOURSE
CROSSING 3
WATERCOURSE
CROSSING 4
WATERCOURSE
CROSSING 5
P
4.000m
4.000m
16.500m
16.500m
2.00
0m
2.00
0m
12
23
1.99
2.01
1.98
1.89
1.81
1.78
1.73
1.71
2.10
1.71
1.78
1.96
1.95
1.89
1.82
1.81
1.73
1.77
1.63
2.04
1.73
1.57
1.85
1.88
1.91
1.87
1.78
1.78
1.73
1.68
2.05
1.82
1.56
1.78
1.71
1.83
1.73
1.74
1.78
1.83
2.18
1.88
1.53
1.68
1.79
1.80
1.74
1.68
1.78
1.71
2.00
1.85
1.55
1.72
1.81
1.77
1.82
1.78
1.70
1.90
1.88
1.58
1.55
1.83
1.72
1.82
1.84
1.67
1.88
2.05
1.71
1.83
1.79
1.87
1.91
1.82
1.92
2.13
2.18
2.06
1.81
1.85
1.93
1.85
1.87
2.10
2.09
2.07
1.97
1.91
2.12
2.08
2.16
2.31
2.01
2.11
1.25
1.53
1.68
1.89
1.94
2.08
1.46
1.45
1.99
1.91
1.96
2.09
2.05
2.38
1.34
1.39
1.88
2.03
2.08
2.08
2.08
2.11
1.36
1.36
1.68
2.08
2.10
2.04
2.09
2.06
2.27
1.27
1.39
1.74
2.01
2.01
1.99
2.05
2.14
2.12
2.60
1.26
1.40
1.70
1.89
1.99
2.02
2.04
2.12
1.99
2.43
2.91
1.20
1.26
1.46
2.02
2.12
2.13
2.11
2.17
2.20
2.12
2.57
1.31
1.29
1.51
2.17
2.20
2.14
2.21
2.20
2.12
2.09
2.42
1.34
1.38
1.54
2.08
2.14
2.28
2.20
2.26
2.13
2.05
2.23
1.38
1.41
1.58
1.91
2.17
2.20
2.20
2.32
2.02
2.07
2.08
1.41
1.43
1.54
1.95
2.14
2.20
2.17
2.34
1.88
1.94
2.13
1.39
1.42
1.55
2.06
2.22
2.09
2.23
2.23
2.00
2.02
2.12
1.35
1.36
1.58
2.18
2.27
2.23
2.29
2.14
1.86
1.99
2.04
1.39
1.36
1.68
2.20
2.25
2.23
2.30
2.05
1.98
2.25
2.09
1.40
1.46
1.58
2.18
2.25
2.25
2.32
2.04
2.00
2.19
2.16
1.37
1.40
1.57
1.95
2.23
2.20
2.19
2.09
2.03
1.96
2.06
1.35
1.45
1.70
1.61
2.20
2.30
2.11
1.97
2.01
2.02
2.06
1.38
1.36
1.57
1.45
1.71
2.14
1.93
1.91
2.04
1.90
1.97
1.31
1.30
1.46
1.42
1.75
2.12
1.90
1.88
2.02
1.97
1.95
1.23
1.32
1.38
1.37
1.71
1.96
1.92
1.95
1.95
1.87
1.99
1.31
1.24
1.21
1.41
1.77
1.96
1.84
1.94
1.89
1.78
1.88
1.16
1.31
1.77
1.83
1.78
1.85
1.63
1.78
1.79
1.76
1.17
1.16
1.46
1.70
1.57
1.56
1.49
1.60
1.60
1.12
1.11
1.23
1.45
1.44
1.42
1.55
1.70
1.47
1.10
1.26
1.19
1.34
1.46
1.66
1.66
1.63
1.61
1.73
1.01
1.17
1.53
1.22
1.50
1.63
1.68
1.58
1.65
0.98
0.97
1.26
1.35
1.64
1.76
1.75
1.60
1.51
1.55
0.91
1.07
1.10
1.36
1.59
1.71
1.59
1.51
1.50
1.00
1.04
1.19
1.47
1.57
1.70
1.72
1.59
1.59
1.41
1.03
1.15
1.12
2.77
0.66
0.88
0.84
1.46
1.14
1.14
1.19
1.26
1.32
1.83
1.92
2.03
0.43
1.72
1.74
1.75
1.12
1.39
1.24
1.42
1.98
1.93
2.01
2.04
0.28
1.77
1.71
1.03
1.15
1.08
1.68
1.95
1.98
2.03
1.95
2.56
1.66
1.80
1.16
1.35
1.24
1.89
1.83
2.01
1.99
1.95
2.47
1.67
1.65
1.30
1.31
1.51
1.97
1.94
1.98
2.12
1.89
0.94
2.18
1.70
1.11
1.37
1.54
2.06
1.93
2.01
2.03
1.73
1.71
2.05
1.20
1.27
1.84
2.00
2.06
1.99
1.78
1.49
1.71
1.80
1.23
1.52
1.99
1.91
1.98
1.93
1.69
1.53
1.77
1.80
1.69
1.15
1.31
1.83
1.83
1.93
1.71
1.66
1.64
1.68
1.72
1.74
1.20
1.41
1.80
1.86
1.69
1.55
1.45
1.62
1.65
1.69
1.68
2.65
2.71
2.85
3.21
5.11
2.39
2.42
2.40
2.36
2.36
1.86
1.86
2.00
2.09
2.26
2.43
2.54
2.44
2.55
2.59
2.63
2.77
2.75
2.97
2.882.61
2.902.90
2.80
2.34
2.24
1.94
1.83
1.75
1.72
1.75
1.78
1.59
1.62
1.66
1.69
1.74
1.95
2.25
2.33
2.47
2.732.79
2.94 2.94
2.92
2.63
2.66
2.59
2.47
2.35
2.46
2.48
2.25
2.17
2.08
1.72
2.09
1.76
2.30
2.36
2.50
2.40
2.47
2.35
2.50
2.38
2.23
2.10
1.96
1.94
1.92
2.09
1.74
1.86
1.71
1.55
1.74
1.76
1.97
2.11
2.12
2.26
2.18
2.44
0.61
0.77
0.71
1.05
1.39
1.89
1.94
1.85
1.65
1.11 1.37
1.88
1.82
1.07
1.15
1.301.71
1.83
2.01
1.94
1.56
2.12
2.10
2.09
2.35
2.53
2.53
2.42
2.32
2.60
2.81
2.58
2.642.76
3.03
3.03
2.95
2.19
1.81
1.751.85
1.62
1.59
1.49
1.681.66
1.50
1.65
1.62
1.59
1.56
1.63
1.70
1.32
1.35
1.44
1.16
1.10
1.29
1.11
1.86
1.44
1.84
2.02
2.16
2.29
2.50
2.37
2.31
2.55
2.79
2.56
2.35
2.76
2.812.49
3.032.71
2.35
2.58
2.18
2.17
1.94
1.58
1.77
1.66
1.54
1.23
1.31
1.40
1.61
1.97
1.981.99
1.831.95
1.63 1.63
1.62
1.73
1.56
1.39
1.74
1.77
1.80
1.85
1.18
1.26
1.36
1.45
1.37
0.93
1.24
5.12
5.115.28
5.46
5.64
5.77
5.77
5.64
5.61
5.39
5.43
5.425.45
5.17
2.57
2.65
2.41
2.53
2.85
1.88
1.88
2.05
1.64
1.70
1.68
0.45
-0.03
0.04
0.10
0.18
0.25
0.33
0.33
0.34
0.34
0.31
0.29
0.26
0.16
0.210.21
0.43
0.64
0.55
0.45
0.36
0.20
0.03
0.09
0.45
-0.03
0.04
0.10
0.18
0.25
0.33
0.33
0.34
0.34
0.31
0.29
0.26
0.16
0.210.21
0.43
0.64
0.55
0.45
0.36
0.20
0.03
0.09
-0.16
-0.18
-0.07
-0.16
-0.18
-0.07
0.35
-0.13
0.04
0.21
0.12
0.04
-0.05
0.03
0.10
0.08
0.05
0.20
0.34
0.29
0.24
0.45
0.56
0.67
0.53
0.35
-0.13
0.04
0.21
0.12
0.04
-0.05
0.10
0.08
0.05
0.20
0.34
0.29
0.24
0.45
0.56
0.67
0.53
0.19
0.20
0.22
0.24
0.41
0.58
0.76
0.93
1.19
1.13
1.03
1.28
0.90
0.96
0.48
0.49
0.51
0.48
0.43
2.59
2.38
2.17
2.10
1.82
1.79
1.90
1.77
1.69
1.58
1.55
1.52
1.57
1.62
1.58
3.27
3.25
3.20
3.09
2.80
2.78
2.72
3.05
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.501.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
2.50
3.50
4.50
5.50
-0.0
0
0.00
0.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
3.00
3.00
3.00
4.00
5.00
CONDUCTOR HT. 29.2m
CONDUCTOR HT. 29.1m
CONDUCTOR HT. 28.2m
WATERCOURSE
CROSSING 6
K
L
4.000m
4.00
0m
16.500m 2.00
0m
2.000m
16.500m
WATERCOURSE
CROSSING 5 (IF
REQUIRED)
ADDITIONAL LENGTH OF HAUL ROAD
REQUIRED IF PARCEL OF PANELS IS
MAINTAINED IN DESIGN
23
Max Legal Length (UK) Articulated Vehicle (16.5m)
Max Legal Length (UK) Articulated Vehicle (16.5m)
Max Legal Length (UK) Articulated Vehicle (16.5m)
13.66.53
Max 90° HorizMax 10° Vert
6.4 1.4 1.4 2.52
4.781.37 3 1.4
Max Legal Length (UK) Articulated Vehicle (16.5m)Overall Length 16.500mOverall Width 2.550mOverall Body Height 3.681mMin Body Ground Clearance 0.411mMax Track Width 2.500mLock to lock time 6.00sKerb to Kerb Turning Radius 6.530m
27.5
00m
8.000m
Status:
Project:
Drg Title:
Originator: Zone: Level: Rev:Discipline: Category / Number:Type:
Size: Date: Drawn By: Designed By: Checked By:
Project No:
Rev: Description: Date: By: Chkd:
Scale:
A0
- - - - -- -
Civils & Structures • Transport Planning • Environmental • Infrastructure • Geotechnical • Conservation & Heritage • Principal DesignerBirmingham • Bristol • Cambridge • Cardiff • Douglas • Dublin • Edinburgh • Glasgow • Kendal • Leeds • Liverpool • London • Manchester • Nottingham
Merchant Exchange, 17-19 Whitworth Street, West Manchester M1 5WG0161 236 [email protected]
P01 FIRST ISSUE 18.05.18 ZG AD
CLEVE HILL SOLAR PARK
PROPOSED HIGHWAY
GENERAL ARRANGEMENT
066705 CUR 00 XX DR C 90004 P12
1:1000
18.05.18ZG JB AD
\\maf
s02\
Pro
ject
s\06
6001
- 0
6700
0\06
6705
- C
leve
Hill
Sol
ar P
ark\
QM
S 4
Pro
duct
ion\
4B M
odel
s &
Dra
win
gs\_
Civ
il-C
\CA
D\
NOTES:1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT
ARCHITECTS AND ENGINEERS DRAWINGS AND SPECIFICATIONS.
2. DO NOT SCALE THIS DRAWING. ANY AMBIGUITIES, OMISSIONS AND
ERRORS ON DRAWINGS SHALL BE BROUGHT TO THE ENGINEERS
ATTENTION IMMEDIATELY. ALL DIMENSIONS MUST BE
CHECKED / VERIFIED ON SITE.
3. ALL DIMENSIONS ARE IN METRES UNLESS NOTED OTHERWISE.
4. ALL LEVELS ARE IN METRES ABOVE ORDNANCE DATUM UNLESS NOTED
OTHERWISE.
KEY
COMPOUND / ACCESS ROAD BOUNDARY
PROPOSED BLACKTOP ACCESS ROAD
PROPOSED BATTERED LANDSCAPE TIE IN TO EXISTING
LEVELS
PROPOSED STONE HAUL ROAD
LOCATION OF ROAD CROSSING WATERCOURSE (CULVERT
REQUIRED)
ISSUED FOR CO-ORDINATION S1
P02 UPDATED TO SUIT BOUNDARY (S0) 23/05/18 JDB AD
P03 ISSUED FOR CO-ORDINATION (S1) 02/07/18 JDB AD
P04 TRACK LAYOUT UPDATED (S1) 09/07/18 JDB AD
P05 TRACKING TURNING HEAD UPDATED (S1) 30/08/18 JDB AR
P06 UPDATED TO SUIT PANEL LAYOUT (S1) 03/09/18 JDB AR
P07 UPDATED TO SUIT ACCESS REQUIREMENTS (S1) 17/09/18 JDB AR
P08 NEW PANEL LAYOUT (S1) 19/09/18 JDB AR
P09 LAYOUT FREEZE - ACCESS OPTION 3 (S1) 25/09/18 JDB AR
P10 PASSING PLACES UPDATED (S1) 05/10/18 JDB AR
P11 ROAD ALIGNMENT AMENDED (S1) 08/10/18 JDB AR
P12 WATERCOURSE CROSSING 2 UPDATED (S1) 10/10/18 JDB AR
TPLO/66705 Cleve Hill Solar Park
Outline Construction Traffic Management Plan
Rev 002003 | Copyright © 2019 Curtins Consulting Ltd
Appendix C – Construction Vehicle Routeing
Scale @ A3
Date: 17/10/2018
P:\Projects\Engineering\Engineering EIA\2238 Cleve Hill.aprx\2238-REP-224 Fig14.1 Construction Traffic Routeing
1:100,000
Repr
oduc
ed fr
om O
rdna
nce
Surv
ey d
igita
l map
dat
a ©
Cro
wn
copy
right
201
8. A
ll rig
hts
rese
rved
. Lice
nse
num
ber 1
0004
8606
#NORTH
Cleve Hill Solar ParkEnvironmental Statement
Construction Traffic RouteingFigure 14.1
Ref: 2238-REP-224Produced By: SC
Checked By: PP
0 2 4 km
DCO Application Site Boundary
Construction Vehicle Routes
Head Hill Road /Seasalter Road
A2
A299
A249
M2
Ordnance Survey data © Crown copyright and database right 2018. OS 100030994
1780
0017
6000
1740
0017
2000
1700
0016
8000
1660
0016
4000
1620
0016
0000
1580
0015
6000
1540
0015
2000
1780
0017
6000
1740
0017
2000
1700
0016
8000
1660
0016
4000
1620
0016
0000
1580
0015
6000
1540
0015
2000
614000612000610000608000606000604000602000600000598000596000594000592000590000588000586000
614000612000610000608000606000604000602000600000598000596000594000592000590000588000586000
TPLO/66705 Cleve Hill Solar Park
Outline Construction Traffic Management Plan
Rev 002003 | Copyright © 2019 Curtins Consulting Ltd
Appendix D – Route Assessment Drawings
13.66.53
Max 90° HorizMax 10° Vert
6.4 1.4 1.4 2.52
4.781.37 3 1.4
Max Legal Length (UK) Articulated Vehicle (16.5m)Overall Length 16.500mOverall Width 2.550mOverall Body Height 3.681mMin Body Ground Clearance 0.411mMax Track Width 2.500mLock to lock time 6.00sKerb to Kerb Turning Radius 6.530m
5.079
Large Car (
2006)
11m
Articulated Vehicle with Twin Steered Tractor
Large Car (
2006)
20m
Articulated V
ehicle with T
win Steered
Tractor
Large Car (
2006)
29m
Articulated
Vehicle with
Twin Steere
d Tractor
Large Car (2
006)
8m
Articulated Vehicle w
ith Twin Steered Tractor
35m
Articulated V
ehicle with T
win Steered
Tractor
Status:
Project:
Drg Title:
Size: Date: Drawn By: Designed By: Checked By:
Rev: Description: Date: By: Chkd:
Scale:
A3
GENERAL NOTES:
Civils & Structures • Transport Planning • Environmental • Infrastructure • Geotechnical • Conservation & Heritage • Principal DesignerBirmingham • Bristol • Cambridge • Cardiff • Douglas • Dublin • Edinburgh • Glasgow • Kendal • Leeds • Liverpool • London • Manchester • Nottingham
Originator: Volume: Level: Rev:Role: Category / Number:Type:Project No:
- - - - -- -
FOR INFORMATION
Cleve Hil Solar Park
Articulated vehicle traveling northboundand large car traveling southboundTopographical Survey
66705 CUR 00 00 DR TP 0008 -
NTS24/07/19
CT BD BD
\\lofs0
3\Pro
jects\
TP Lo
ndon
\TP
Proje
cts\1.
VIS
ION\
6670
5 - C
leve H
ill So
lar P
ark\J
- Dr
awing
s\Wor
king\
1 Country View Park
4 Graveney Railway Bridge
5 350m North of Whitstable Road Junction
4
3
2
1
2 Denley Hall
KEY
Forward Visibility
Area where two vehicles may struggle to pass
Site Access
Graveney RailwayBridge
Graveney School
Country View Park
Denley Hall
All Saints Church
Monkshill Road
3 North of All Saints Church
5
60m forward visibility
50m forward visibility 50m forward visibility
50m forward visibility
45m forward visibility
13.66.53
Max 90° HorizMax 10° Vert
6.4 1.4 1.4 2.52
4.781.37 3 1.4
Max Legal Length (UK) Articulated Vehicle (16.5m)Overall Length 16.500mOverall Width 2.550mOverall Body Height 3.681mMin Body Ground Clearance 0.411mMax Track Width 2.500mLock to lock time 6.00sKerb to Kerb Turning Radius 6.530m
5.079
11m
Articulated V
ehicle with Tw
in Steered Tra
ctor
Large Car (
2006)
Large Car (
2006)
23m
Articulated
Vehicle with
Twin Steer
ed Tractor
Status:
Project:
Drg Title:
Size: Date: Drawn By: Designed By: Checked By:
Rev: Description: Date: By: Chkd:
Scale:
A3
GENERAL NOTES:
Civils & Structures • Transport Planning • Environmental • Infrastructure • Geotechnical • Conservation & Heritage • Principal DesignerBirmingham • Bristol • Cambridge • Cardiff • Douglas • Dublin • Edinburgh • Glasgow • Kendal • Leeds • Liverpool • London • Manchester • Nottingham
Originator: Volume: Level: Rev:Role: Category / Number:Type:Project No:
- - - - -- -
FOR INFORMATION
Cleve Hil Solar Park
Articulated vehicle traveling northboundand large car traveling southbound
66705 CUR 00 00 DR TP 0009 -
NTS24/07/19
CT BD BD
\\lofs0
3\Pro
jects\
TP Lo
ndon
\TP
Proje
cts\1.
VIS
ION\
6670
5 - C
leve H
ill So
lar P
ark\J
- Dr
awing
s\Wor
king\
3 Graveney Railway Bridge1 Denley Hall
KEY
Forward Visibility
Area where two vehicles may struggle to pass
2 North of All Saints Church
3
2
1
Site Access
Graveney RailwayBridge
Graveney School
Country View Park
Denley Hall
All Saints Church
Monkshill Road
60m forward visibility
43m forward visibility
50m forward visibility
TPLO/66705 Cleve Hill Solar Park
Outline Construction Traffic Management Plan
Rev 002003 | Copyright © 2019 Curtins Consulting Ltd
Appendix E – Proposed Signage and Speed Restrictions
Status:
Project:
Drg Title:
Size: Date: Drawn By: Designed By: Checked By:
Rev: Description: Date: By: Chkd:
Scale:
A3
GENERAL NOTES:
Civils & Structures • Transport Planning • Environmental • Infrastructure • Geotechnical • Conservation & Heritage • Principal DesignerBirmingham • Bristol • Cambridge • Cardiff • Douglas • Dublin • Edinburgh • Glasgow • Kendal • Leeds • Liverpool • London • Manchester • Nottingham
Originator: Volume: Level: Rev:Role: Category / Number:Type:Project No:
- - - - -- -
FOR INFORMATION
Cleve Hil Solar Park
Indicative Traffic Signage Strategy
66705 CUR 00 00 DR TP 0007 01
NTS24/07/2019
CT BD BD
\\lofs0
3\Pro
jects\
TP Lo
ndon
\TP
Proje
cts\1.
VIS
ION\
6670
5 - C
leve H
ill So
lar P
ark\J
- Dr
awing
s\Wor
king\
Site Access
Graveney Primary School
All Saints Church
Railway Bridge
1. Drawing shows existing (greyed out) andproposed signage
2. Construction traffic signage (type andlocation) is to be agreed with KCC priorto installation
TPLO/66705 Cleve Hill Solar Park
Outline Construction Traffic Management Plan
Rev 002003 | Copyright © 2019 Curtins Consulting Ltd
Appendix F – Outline Traffic Incident Management Plan
Cleve Hill Solar Park
Outline Construction Traffic
Incident Management Plan
Curtins Ref: TPLO/66705
Revision: 003
Issue Date: 12 October 2018
Client Name: Cleve Hill Solar Park Ltd
BIM Reference: 66705-CUR-00-XX-RP-TP-00001-V01_Framework Traffic Incident Management
Plan
S
op
ho
s I
nte
rnati
on
al
Curtins
40 Compton Street
London, EC1V 0BD
Tel: 020 7324 2240
www.curtins.com
Imp
eri
al
We
st
CIVILS & STRUCTURES • TRANSPORT PLANNING • ENVIRONMENTAL • INFRASTRUCTURE • GEOTECHNICAL • CONSERVATION & HERITAGE • PRINCIPAL DESIGNER
Birmingham • Bristol • Cambridge • Cardiff • Douglas • Dublin • Edinburgh • Glasgow • Kendal • Leeds • Liverpool • London • Manchester • Nottingham
TPLO/66705 Cleve Hill Solar Park
Outline Construction Traffic Incident Management Plan
Rev 003 | Copyright © 2019 Curtins Consulting Ltd Page i
Author Signature Date
Caitlin Turley BEng (Hons) MCIHT Transport Planner
12/10/2018
Reviewed Signature Date
Ben Dawson BSc (Hons) MICHT Associate – Transport Planning
12/10/2018
Authorised Signature Date
Ben Dawson BSc (Hons) MICHT Associate – Transport Planning
12/10/2018
TPLO/66705 Cleve Hill Solar Park
Outline Construction Traffic Incident Management Plan
Rev 003 | Copyright © 2019 Curtins Consulting Ltd Page ii
Table of contents 1.0 Introduction .............................................................................................................................................. 1
2.0 Construction Traffic Routes ..................................................................................................................... 2
3.0 Incident Training ...................................................................................................................................... 3
4.0 Incident Detection .................................................................................................................................... 3
5.0 Incident Verification ................................................................................................................................. 3
6.0 Response to Incident ............................................................................................................................... 3
7.0 Response to Incident – Communications ................................................................................................ 4
8.0 Traffic Management – Diversion Routes ................................................................................................. 4
9.0 Incident Clearance................................................................................................................................... 4
10.0 Scenario Testing ...................................................................................................................................... 4
TPLO/66705 Cleve Hill Solar Park
Outline Construction Traffic Incident Management Plan
Rev 003 | Copyright © 2019 Curtins Consulting Ltd
1.0 Introduction
1.1.1 Curtins has been appointed by Cleve Hill Solar Park Ltd (CHSP) to provide traffic and transportation
advice in relation to the development of Cleve Hill Solar Park (the "Proposed Development"). The
Development site is located on the north Kent coast, approximately two kilometres northeast of
Faversham and five kilometres west of Whitstable (the "Site"). The Site is situated on approximately
360 ha (890 acres) of land within the administrative boundaries of Swale Borough Council (SBC),
Canterbury City Council (CCC) and Kent County Council (KCC).
1.1.2 This Outline Construction Traffic Incident Management Plan (Outline TIMP) has been prepared to
accompany the Development Consent Order (DCO) application for the Proposed Development and
sets out a Framework for the control of Proposed Development construction traffic movements in the
event of an incident on the strategic and local road network leading to the site.
1.1.3 The document aims to set out the relationships between CHSP, the Emergency Services and
Highways Authorities and details the communication, management and response procedures which
will be undertaken to ensure the operational safety of the employees and the and the general public
should an incident occur.
1.1.4 The Outline TIMP identifies CHSP’s ongoing roles and responsibilities with regards to construction
traffic in the event of an incident. These will be adhered to throughout the duration of the Proposed
Development construction programme.
1.1.5 It is proposed that this Outline TIMP is further developed once a contractor(s) have been appointed.
1.1.6 The strategies contained within the Outline TIMP will be based on the existing procedures undertaken
by KCC, Emergency Services and Highways England (HE). The key elements of the Outline TIMP will
be the provision of planning, strategy and contingencies for the following elements of incident
management:
• Incident Management Area (IMA).
• HGV/Construction vehicle routeing.
• Incident Detection.
• Incident Verification.
• Incident Response.
• Traveller Information.
• Site Management.
• Traffic Management.
• Site Clearance.
• Monitoring.
TPLO/66705 Cleve Hill Solar Park
Outline Construction Traffic Incident Management Plan
Rev 003 | Copyright © 2019 Curtins Consulting Ltd
1.1.7 The Outline TIMP will set out the strategies and contingencies that CHSP will put in place to control
the movement of construction vehicles to the various sites over the construction route network in the
event of an accident within the IMA.
1.1.8 The information provided herein sets out the key principles of the Outline TIMP.
2.0 Construction Traffic Routes
2.1.1 This document should be read in conjunction with the Outline Construction Traffic Management Plan
(Outline CTMP) produced to support the DCO application for the scheme.
2.1.2 The construction traffic routes detailed in this Outline TIMP have been agreed with KCC and are
discussed in detail within the Outline CTMP.
HGV Movements
2.1.3 If the Proposed Development is consented, CHSP in partnership with the appointed contractor(s) will
observe, manage and restrict construction vehicle movements to and from the development site.
2.1.4 Adherence to the restrictions and mitigation proposed within the Outline CTMP will be verified through
the agreed monitoring process.
Exceptional Circumstances
2.1.5 There may be exceptional circumstances when traffic movements on the SRN or LRN are
compromised which will impact on construction vehicles being able to use the agreed construction
traffic routes, for example road traffic accidents, road closures and extreme weather conditions.
2.1.6 In the event of these exceptional circumstances resulting in construction vehicles, particularly HGVs,
not being able to arrive at or depart from a site, the following impacts need to be considered with
regard to highways and construction of the Proposed Development:
• Incidents on the highway network of vehicles not being able to access the site resulting in
stoppage (at agreed locations) or rescheduling of delivery;
• Incidents on the highway network causing delays, resulting in construction vehicles travelling
through restricted junctions in the peak period; and
• Impacts of delivery not being made with specific regard to construction works on site, specifically
health and safety issue due to lack of equipment of material or stop to construction works and
delays to construction programme.
TPLO/66705 Cleve Hill Solar Park
Outline Construction Traffic Incident Management Plan
Rev 003 | Copyright © 2019 Curtins Consulting Ltd
Incident Management Area
2.1.7 The Incident Management Area (IMA) has been determined using a 45 minute drive time catchment
from the Proposed Development site.
2.1.8 Therefore, it is proposed the IMA will encompass the following parts of the local highway network:
• The A2/M2 from Dartford to Junction 7 of the M2 where it becomes the A299;
• The A299 Thanet Way at Junction 7 with the M2 to Ramsgate Docks;
• The A2 at Junction 7 with the M2 to Dover Docks;
• Staple Street/Staple Street Road/Whitstable Road; and
• Head Hill Road and Seasalter Road.
2.1.9 As the document is finalised the IMA will be discussed and amended where necessary through
discussions with KCC and HE.
3.0 Incident Training
3.1.1 CHSP will ensure that suitable training is provided to ensure that all suppliers are made aware of the
control measures which will need to be implements in the event of any of the above incidents
occurring.
4.0 Incident Detection
4.1.1 The Outline CTMP sets out the construction traffic monitoring strategy which will be in place for the
duration of the construction programme and the management of construction vehicles accessing the
site of the Proposed Development. CHSP and its appointed contractors will have the responsibility of
notifying all suppliers (those listed on the Delivery Management Systems (DMS) for that day) of the
occurrence of an incident after it has been notified by the Emergency Services, KCC or HE.
Therefore, on notification of an incident on the road network, CHSP’s responsibility is to implement the
Outline TIMP as appropriate (depending on location and severity).
5.0 Incident Verification
5.1.1 CHSP will have no direct role in the verification process of an incident unless it directly involves its
operations, i.e., at the site or involving a vehicle relating to construction of the Proposed Development.
6.0 Response to Incident
6.1.1 Once informed of an incident, CHSP will reduce or stop any additional HGVs (construction vehicles)
entering the incident area within the IMA where necessary.
6.1.2 Given the scale of the IMA it is anticipated that some vehicles within the IMA may not be travelling in
the vicinity of the incident or an area impacted by the incident. Subject to location and impacts on the
TPLO/66705 Cleve Hill Solar Park
Outline Construction Traffic Incident Management Plan
Rev 003 | Copyright © 2019 Curtins Consulting Ltd
road network further afield, advice would be sought by CHSP from the Police and Highways
Authorities.
7.0 Response to Incident – Communications
7.1.1 The following means of communication will be utilised to notify appropriate parties of an incident:
• CHSP will be notified of an incident by the Emergency Services, KCC or HE;
• CHSP will notify suppliers by telephone;
• Suppliers will notify their drivers by appropriate means, i.e. pagers and radio (subject to H&S
best practice);
• Suppliers will notify CHSP of the action taken by supplier’s drivers (this will be relative to their
location on the road network). This action may be to hold up at pre-designated and agreed
positions on/off the road network, diversion routes as directed by the Emergencies Services or
the Highways Authorities will be followed which may be different to the construction traffic routes
set out within the Outline CTMP.
8.0 Traffic Management – Diversion Routes
8.1.1 In the event of an incident on the road network, the Police may implement diversions routes for all
traffic. Under these circumstances, Proposed Development construction vehicles will utilise the
diversion route as directed by the Police.
9.0 Incident Clearance
9.1.1 CHSP will not have a direct role in incident clearance with the exception of a CHSP (or supplier)
vehicle breaking down on the road network. CHSP and their suppliers will implement measures to
recover any such vehicle.
9.1.2 Once the incident has been cleared, normal procedures relating to construction vehicle movements
will continue.
10.0 Scenario Testing
10.1.1 It is considered that there is the potential for two scenarios which may arise and affect the operation of
the road network, the construction of the Proposed Development and the movement of construction
traffic. These are:
• A traffic incident involving a CHSP construction vehicle; and
• Traffic congestion as a result of an incident on the road network.
10.1.2 Subject to the location of construction vehicles, the following recommended measures are considered
applicable in the event of the above incidents occurring:
TPLO/66705 Cleve Hill Solar Park
Outline Construction Traffic Incident Management Plan
Rev 003 | Copyright © 2019 Curtins Consulting Ltd
• CHSP to implement measures set out within the Outline TIMP;
• All construction vehicles stopped from entering the IMA/incident area;
• Construction vehicles inside the area would move to a safe location or, subject to geographical
location, this may include continuing with the designated journey; and
• Suppliers contacted to cancel/postpone deliveries (as appropriate).
Curtins Consulting Ltd registered in England and Wales No: 2054159 Registered office: 51-55 Tithebarn Street, Liverpool, L2 2SB
TPLO/66705 Cleve Hill Solar Park
Outline Construction Traffic Management Plan
Rev 002003 | Copyright © 2019 Curtins Consulting Ltd
Appendix G – PRoW Management Plan
Cleve Hill Solar Park
Outline Public Rights of Way
Management Plan
Curtins Ref: TPLO/66705
Revision: 004
Issue Date: 13 November 2019
Client Name: Cleve Hill Solar Park Ltd
BIM Reference: 66705-CUR-00-XX-RP-TP-00001-V04_Public Right of Way Management Plan
S
op
ho
s I
nte
rnati
on
al
Curtins
40 Compton Street
London, EC1V 0BD
Tel: 020 7324 2240
www.curtins.com
Imp
eri
al
We
st
CIVILS & STRUCTURES • TRANSPORT PLANNING • ENVIRONMENTAL • INFRASTRUCTURE • GEOTECHNICAL • CONSERVATION & HERITAGE • PRINCIPAL DESIGNER
Birmingham • Bristol • Cambridge • Cardiff • Douglas • Dublin • Edinburgh • Glasgow • Kendal • Leeds • Liverpool • London • Manchester • Nottingham
TPLO/66705 Cleve Hill Solar Park
Outline Public Rights of Way Management Plan
Rev 004 | Copyright © 2019 Curtins Consulting Ltd Page i
Author Signature Date
Caitlin Turley Beng (Hons) MCIHT Transport Planner
13/11/2019
Reviewed Signature Date
Ben Dawson BSc (Hons) MICHT Associate – Transport Planning
23/08/2019
Authorised Signature Date
Ben Dawson BSc (Hons) MICHT Associate – Transport Planning
23/08/2019
TPLO/66705 Cleve Hill Solar Park
Outline Public Rights of Way Management Plan
Rev 004 | Copyright © 2019 Curtins Consulting Ltd Page ii
Table of contents 1.0 Introduction .............................................................................................................................................. 1
2.0 Purpose of this Report ............................................................................................................................. 1
3.0 PRoW Management ................................................................................................................................ 3
Appendices Appendix A – Figure 13.1 Recreational Receptor and Study Areas
TPLO/66705 Cleve Hill Solar Park
Outline Public Rights of Way Management Plan
Rev 004 | Copyright © 2019 Curtins Consulting Ltd
1.0 Introduction
1.1.1 Curtins has been appointed by Cleve Hill Solar Park Ltd (CHSP) to provide traffic and transportation
advice in relation to the development of Cleve Hill Solar Park (the "Proposed Development"). The
Development site is located on the north Kent coast, approximately two kilometres northeast of
Faversham and five kilometres west of Whitstable (the "Site"). The Site is situated on approximately
360 ha (890 acres) of land within the administrative boundaries of Swale Borough Council (SBC),
Canterbury City Council (CCC) and Kent County Council (KCC).
1.1.2 An application has been made for a Development Consent Order (DCO) for the Proposed
Development. That is accompanied by an Environmental Statement (ES). The Proposed Development
(described in more detail in Chapter 5 of the ES) comprises the installation, maintenance and
decommissioning of photovoltaic (PV) modules, energy storage, and accompanying electric cables,
transformers, string inverters and associated access, environmental and construction works.
2.0 Purpose of this Report
2.1.1 This Outline Public Rights of Way (PRoW) Management Plan (Outline PRoW Management Plan) has
been prepared in order to manage the PRoWs potentially physically affected by the construction
Proposed Development. It is intended that this document may be amended before and during
construction of the Proposed Development in consultation with the relevant local planning authorities.
2.1.2 The following PRoWs have been identified as passing through the Site.
• PRoW – ZR485;
• PRoW – ZR488; and
• PRoW – ZR692
2.1.3 The PRoW routes are shown in Figure 1 below.
TPLO/66705 Cleve Hill Solar Park
Outline Public Rights of Way Management Plan
Rev 004 | Copyright © 2019 Curtins Consulting Ltd
Figure 1 – Public Rights of Way
(Source Open Street Map)
2.1.4 PRoW – ZR485 crosses on an approximate north to south alignment through the site providing a link
between Sandbanks Road to the south of the Site and the Saxon Shore Way to the north. It is
approximately 1.5km long and is within the development site for its entire length.
2.1.5 PRoW – ZR488 is located to the south east of the Site. It passes within the site for approximately
400m, however, no construction works are proposed in this area (only habitat management).
2.1.6 PRoW – ZR692 crosses the existing London Array site access (which is proposed to be used as the
vehicle access route for the Proposed Development) close to Seasalter Road. The length of the
PRoW within the red line boundary of the Site is approximately 14m.
2.1.7 A number of surveys were undertaken to identify the usage of the PRoW identified above. These were
undertaken in July and August 2018 (both in and out of the school holidays). The results are shown
within Chapter 14 (Access and Traffic) of the ES.
2.1.8 This Outline PRoW Management Plan describes where the PRoW will be affected by the Proposed
Development and how the PRoW will be managed to ensure they are safe to use and the disruption to
the users of the PRoW is minimised.
TPLO/66705 Cleve Hill Solar Park
Outline Public Rights of Way Management Plan
Rev 004 | Copyright © 2019 Curtins Consulting Ltd
3.0 PRoW Management
3.1.1 This section of the PRoW Management Plan describes how the PRoW that cross the development
site will be managed.
3.1.2 It is CHSP’s intention to keep all of the identified PRoW open during construction of the Proposed
Development, where practicable and safe to do so.
3.1.3 Where a PRoW is affected by construction work, efforts will be made to minimise the impact on users
following a simple decision-making process which sets out a hierarchy of actions. These include:
• 1) Providing signage and information - If a PRoW is in proximity of construction work it is
proposed to have appropriate signage which will advise of dates and hours of working. The
signage will be developed in consultation with Kent County Council (KCC) PRoW Officers.
• 2) Managed closure of a PRoW – where construction activity requires PRoW users to be held for
a short periods (a few minutes) while vehicles pass or while construction activities are undertaken.
• 3) Full closure of PRoW – this would only be used if a managed closer was not considered
possible. This would involve temporarily closing the PRoW for a period of time and providing a
signed diversion route. Any closure would be agreed with KCC PRoW along with the diversion
route.
3.1.4 As highlighted above, PRoW ZR485 crosses through the Site. This route will be maintained
throughout construction. In line with the requests ofKCC PRoW officers, two metre high fencing will be
placed between the PRoW and Proposed Development equipment and infrastructure, and CCTV will
not directly cover any PRoW.
3.1.5 It is proposed that PRoWs within the site remain unsurfaced, however, users of ZR485 will be
required to cross the Proposed Development’s spine road which follows an approximate east to west
alignment across the middle of the site.
3.1.6 At this location, priority will be given to users of the PRoW and construction vehicles will be held until it
is safe to cross. During the use of the central access track in this location the PRoW crossing will be
manned by a traffic marshal.
3.1.7 Gates will be provided across the spine road (either side of the PRoW) to secure the development site
when not in use.
3.1.8 Waymarkers and existing gates/fence treatments connecting PRoW ZR485 to the Saxon Shore Way
in the north and Sandbanks Road to the south will be maintained.
3.1.9 Only limited construction works are proposed in the vicinity of PRoW ZR488. It is proposed that the
PRoW remain open throughout the construction/operation of the Proposed Development.
TPLO/66705 Cleve Hill Solar Park
Outline Public Rights of Way Management Plan
Rev 004 | Copyright © 2019 Curtins Consulting Ltd
3.1.10 Where the PRoW borders or crosses areas containing Proposed Development equipment and
infrastructure, two metre high fencing will be provided between the PRoW and the equipment or
infrastructure.
3.1.11 PRoW ZR692 crosses the access road to the Proposed Development close to Seasalter Road. Traffic
volumes using the access road are expected to increase during the 24 month construction
programme.
3.1.12 The existing gates provided either side of the access road will be maintained and additional signage
provided to warn PRoW users of the crossing point and to advise them to only cross when it safe to
do so.
3.1.13 Furthermore, drivers of construction vehicles accessing the site will be briefed with regards to the
location of the PRoW and potential for pedestrians crossing the access road.
3.1.14 All points where PRoWs cross the Proposed Development will have appropriate signage, which will
advise of dates and hours of working. The location of signs providing information will be discussed
with Kent County Council PRoW officers.
3.1.15 While not expected, if it transpires that a short, temporary closure, of a PRoW was needed this would
be discussed and agreed with KCC PRoW officers and the appropriate procedure for its closure
followed.
3.1.16 No furniture, fence, barrier or other structure will be erected on or across a PRoW without consultation
and agreement with KCC.
3.1.17 Information will be provided to the public about where construction is taking place within the site, and
this will be updated on a month to month basis. Subject to the agreement of relevant landowners and
rights holders, information notices will be placed at either end of the stretch of the Saxon Shore
Way/ZR484/CW55 that passes the Development site, on the Cleve Hill Solar Park website and at
Faversham Tourist Information Centre. Specific locations for which permission has been or will be
granted will be agreed with Kent County Council prior to the commencement of construction. The
notices will also highlight other paths in the area that recreational users might consider as alternatives.
3.1.18 The Applicant will undertake a photographic survey of the PRoW within the Development site prior to
the start of construction to assess the condition of the existing PRoW through the site and enable the
surface of the PRoW to be repaired to a standard that is the same, or better, than the condition
recorded before the construction works began.
TPLO/66705 Cleve Hill Solar Park
Outline Construction Traffic Management Plan
Rev 002003 | Copyright © 2019 Curtins Consulting Ltd
Appendix H – Travel Planning Statement
Cleve Hill Solar Park
Outline Travel Planning
Statement
Curtins Ref: TPLO/66705
Revision: 003
Issue Date: 12 October 2018
Client Name: Cleve Hill Solar Park Ltd
BIM Reference: 66705-CUR-00-XX-RP-TP-00001-V02_Travel Planning Statement
S
op
ho
s I
nte
rnati
on
al
Curtins
40 Compton Street
London, EC1V 0BD
Tel: 020 7324 2240
www.curtins.com
Imp
eri
al
We
st
CIVILS & STRUCTURES • TRANSPORT PLANNING • ENVIRONMENTAL • INFRASTRUCTURE • GEOTECHNICAL • CONSERVATION & HERITAGE • PRINCIPAL DESIGNER
Birmingham • Bristol • Cambridge • Cardiff • Douglas • Dublin • Edinburgh • Glasgow • Kendal • Leeds • Liverpool • London • Manchester • Nottingham
TPLO/66705 Cleve Hill Solar Park
Outline Travel Planning Statement
Rev 003 | Copyright © 2019 Curtins Consulting Ltd Page i
Author Signature Date
Caitlin Turley Beng (Hons) MCIHT Transport Planner
12/10/2018
Reviewed Signature Date
Ben Dawson BSc (Hons) MICHT Associate – Transport Planning
12/10/2018
Authorised Signature Date
Ben Dawson BSc (Hons) MICHT Associate – Transport Planning
12/10/2018
TPLO/66705 Cleve Hill Solar Park
Outline Travel Planning Statement
Rev 003 | Copyright © 2019 Curtins Consulting Ltd Page ii
Table of contents 1.0 Introduction .............................................................................................................................................. 1
1.1 Introduction ....................................................................................................................................... 1
1.2 Purpose of this Report ..................................................................................................................... 1
1.3 Background to Travel Plans ............................................................................................................. 1
1.4 The Aims and Objectives of the Travel Plan .................................................................................... 1
2.0 Staff and Transport Characteristics ......................................................................................................... 3
2.2 Non-local Staff Accommodation ....................................................................................................... 3
2.3 Staff – Transportation ....................................................................................................................... 3
2.4 Staff – Core Working Hours ............................................................................................................. 3
3.0 Travel Plan Measures and Initiatives ...................................................................................................... 5
3.2 Travel Planning Awareness ............................................................................................................. 5
3.3 Staff Transport Services ................................................................................................................... 5
3.4 Public Transport ............................................................................................................................... 6
3.5 Car Sharing ...................................................................................................................................... 6
3.6 Construction Traffic Management .................................................................................................... 6
3.7 Travel Plan Co-ordinator (TPC) ....................................................................................................... 6
TPLO/66705 Cleve Hill Solar Park
Outline Travel Planning Statement
Rev 003 | Copyright © 2019 Curtins Consulting Ltd
1.0 Introduction
1.1 Introduction
1.1.1 This Outline Travel Planning Statement (Outline TPS) accompanies an application by Cleve Hill Solar
Park Ltd (CHSP) for DCO to seek powers to install photovoltaic (PV) modules, energy storage
modules and accompanying electric cables, transformers, string inverters and associated access,
environmental and construction works (Proposed Development).
1.1.2 The Development site is located on the north Kent coast, approximately two kilometres northeast of
Faversham and five kilometres west of Whitstable (the "Site"). The Site is situated on approximately
360 ha (890 acres) of land within the administrative boundaries of Swale Borough Council (SBC),
Canterbury City Council and Kent County Council (KCC).
1.2 Purpose of this Report
1.2.1 This report is intended to demonstrate a commitment to sustainable transport by CHSP and to
indicate the necessary measures that will be undertaken to meet these sustainable transport
ambitions. It should be read in conjunction with the Outline CTMP and Outline TIMP submitted with
the DCO application. It is intended that this Outline TPS be an iterative document that can be
amended before and during the construction of the Proposed Development, in consultation with the
relevant local planning authorities.
1.2.2 It should be noted that it is not practical to permit people to enter the construction site on-foot or by
bicycle.
1.3 Background to Travel Plans
1.3.1 In essence, a Travel Plan is intended to encourage people to choose alternative transport modes over
single occupancy car use and where possible, reduce the need to travel at all. Such a plan should
include a range of measures designed to achieve this goal.
1.3.2 The revised National Planning Policy Framework (NPPF) adopted in July 2018 outlines the potential
benefits and requirements for the production of Travel Plans.
1.4 The Aims and Objectives of the Travel Plan
1.4.1 CHSP has prepared this Outline TPS to:
• Show its commitment to addressing the access needs of employees, contributors and visitors
alike;
• Respond to congestion issues which may affect operational and local traffic and thereby reduce
business performance;
TPLO/66705 Cleve Hill Solar Park
Outline Travel Planning Statement
Rev 003 | Copyright © 2019 Curtins Consulting Ltd
• Support the Government’s environmental and sustainable development initiatives;
• Demonstrate its environmental responsibilities amongst its peers and neighbouring
communities;
• Ensure that a formal monitoring process is in place for vehicle generation; and
• Maximise the efficiency of the construction traffic associated with the Proposed Development.
TPLO/66705 Cleve Hill Solar Park
Outline Travel Planning Statement
Rev 003 | Copyright © 2019 Curtins Consulting Ltd
2.0 Staff and Transport Characteristics
2.1 Introduction
2.1.1 It is anticipated that during peak construction activity up to 400 members of staff could be working on
site. The workforce for the Proposed Development would be made up of local and non-local
personnel.
2.2 Non-local Staff Accommodation
2.2.1 From experience, CHSP anticipates that non-local staff required during construction of the works
would make use of the following accommodation:
• Caravan and camping accommodation sourced independently of CHSP;
• Short term let properties;
• Serviced accommodation (B&Bs, hotels); and
• A small proportion would travel to the site from their home.
2.3 Staff – Transportation
2.3.1 As part of the Proposed Development, it is expected that staff would be transported to the site in multi-
occupancy vehicles. These vehicles, typically mini-buses, would pick up/drop off from varying pre-
organised locations close to the temporary accommodation and transport them to the development
site.
2.3.2 The pickup/drop off point locations will be at accessible locations for all staff. It is anticipated that
these locations would be close to key local locations, town centres, hotels, residential areas or public
transport interchanges.
2.3.3 The provision of staff travel in the form of welfare vans ensures that there will be no impact from staff
parking on the local road network.
2.3.4 The use of these services to transport staff will also form a key Travel Planning measure for the
development.
2.4 Staff – Core Working Hours
2.4.1 Core working hours are proposed to be between 07.00 until 19.00, Monday to Friday and 07.00 until
13.00 on a Saturday (unless in exceptional circumstances where need arises to protect plant,
personnel or the environment).
2.4.2 To maximise productivity within core hours, CHSP contractors would require a period of up to one
hour before and up to one hour after core working hours for start-up and closedown of activities. This
would include but not be limited to, movement to place of work, maintenance and general preparation
TPLO/66705 Cleve Hill Solar Park
Outline Travel Planning Statement
Rev 003 | Copyright © 2019 Curtins Consulting Ltd
works. This would not include operation of plant or machinery likely to cause a disturbance. These
periods would not be considered an extension of core working hours.
2.4.3 As such it is likely that staff would arrive at the development site before 07.00 and leave after 19.00
Monday to Friday and before 07.00 and after 13.00 on a Saturday.
TPLO/66705 Cleve Hill Solar Park
Outline Travel Planning Statement
Rev 003 | Copyright © 2019 Curtins Consulting Ltd
3.0 Travel Plan Measures and Initiatives
3.1 Introduction
3.1.1 It is envisaged that any contractor working on-site would work sustainably and encourage sustainable
travel initiatives.
3.1.2 As such a number of travel planning initiatives have been identified below which fall under the
following headings:
• Travel planning awareness;
• Mini-bus provision for staff from external locations to site;
• Public transport;
• Car sharing;
• Construction traffic management; and
• Appointment of a Travel Plan Co-ordinator (TPC).
3.2 Travel Planning Awareness
3.2.1 A key initiative of a TP will be the distribution of travel planning material. All employees would receive
an introductory pack before starting work and such packs can be critical in influencing travel patterns.
The contents of the packs would include, but not necessarily be limited to:
• Introduction to TPs;
• Website produced with up to date information on Proposed Development transport services,
locations and timings;
• Maps showing local pick up and drop off points for mini-buses;
• Details of public transport services, including timetables and routes; and
• Details of the TPC.
3.3 Staff Transport Services
3.3.1 Mini-bus services will be provided to allow staff to gain access to and from external locations to the
site.
3.3.2 These services will be arranged and co-ordinated according to designated shift patterns and staff
accommodation and will allow staff to be picked up and dropped off at key locations, i.e. central town
locations/residential locations.
3.3.3 The provision of these services will ensure that the staff travel profile will be sustainable.
TPLO/66705 Cleve Hill Solar Park
Outline Travel Planning Statement
Rev 003 | Copyright © 2019 Curtins Consulting Ltd
3.4 Public Transport
3.4.1 It is anticipated that there may be some members of staff who may choose to use public transport to
access a mini-bus up location, as such, public transport information including timetables would be
provided in Introductory Packs, and on staff notice boards.
3.5 Car Sharing
3.5.1 A car sharing database would be created to identify those members of construction staff that live in
the same area so that they could travel to the local accommodation together.
3.6 Construction Traffic Management
3.6.1 Sustainable movement of plant and materials will be adopted. This will include ensuring vehicles
arrive and exit the site loaded where practical.
3.6.2 In addition, plant and materials will be sourced locally where possible.
3.7 Travel Plan Co-ordinator (TPC)
3.7.1 The primary support and leadership for implementing a TP should come from an individual with a
specific remit for delivering the measures proposed within the TP. This person is appointed as the
TPC.
3.7.2 The TPC would assume overall responsibility of the CTMP once adopted. The roles and
responsibilities of the TPC are as follows:
• Co-ordinate and attend and TRG meetings;
• Prepare annual monitoring report to present to TRG;
• Be the first point of contact in case of any problems or information relating to the CTMP/TP; and
• Ensure that the CTMP/TP is meeting the objectives set out above.