Classroom Refresh Overview eTech is funding ongoing replacement of (and improvements to) classroom...
-
Upload
tracey-davis -
Category
Documents
-
view
212 -
download
0
Transcript of Classroom Refresh Overview eTech is funding ongoing replacement of (and improvements to) classroom...
Classroom Refresh Overview
• eTech is funding ongoing replacement of (and improvements to) classroom equipment
• Initial SmartClassroom renovations began in 2003, many original components are still relied upon for everyday use
• Replacement of virtually all components in 130+ rooms over a 5 year cycle, starting with the oldest rooms first
• Ongoing funds allow us to replace an aging inventory, replenish supplies of backup equipment, and stay current with new technology standards
2012 Refresh
25 rooms getting enhancements:• 20 small rooms in Humanities Hall• Small rooms HIB 110, HOB2 130• Lecture Halls SSLH 100, SSPA 1100• Lecture Halls ELH 100, HSLH 100A, and PSLH 100
get “trouble spot” audio & video improvements - between 9/4 and 9/21
Due 9/21
Due 8/3
2012 Refresh
• Feedback was gathered from student and faculty surveys, and one-on-one discussions with faculty and technical support staff
• Specific equipment changes were made to benefit Art History and Film & Media Studies in their priority classrooms.
• Long term administrative costs and management solutions also played a factor
Technology Changes• New computers w/ digital outputs, widescreen
monitors• 16:9 format screens and widescreen data
projectors• Extron touchpanels and controllers in place of
AMX devices• New switchers, distribution amplifiers, digital
video pathway• Blu-ray players in each room (VHS decks being
removed)
Technology Changes
• Software installed on all PCs to allow for playback of any region DVDs
• Digital and analog laptop cables• Stereo audio & external microphone inputs in
each room• Gooseneck mics in rooms >49 seats• Full HD projection in Art History and Film &
Media Studies rooms
Technology Changes
• Lectern adjustments to reduce monitor glare and customize monitor viewing angle
• SSLH & SSPA get HD document cameras & widescreen digitizing tablets
• Audio and video infrastructure improvements in all 5 lecture halls
Significant Points
OIT CTS is performing the majority of work in-house, including:
• Re-design and installation of entire system• Re-wiring all components• Programming of new Extron touchpanels &
controllers• Installation of new room management software &
server• Testing functionality of all equipment• Training faculty & staff on new systems