Class II Well Inspections · 2019-08-09 · Slimhole Class II Injection Well Completion. Dual...

42
Class II Well Inspections Class II well classification Class II well construction requirements Types of inspections Operating and Monitoring requirements

Transcript of Class II Well Inspections · 2019-08-09 · Slimhole Class II Injection Well Completion. Dual...

Page 1: Class II Well Inspections · 2019-08-09 · Slimhole Class II Injection Well Completion. Dual Completion Class II Injection Well Completions. Types of Inspections • Routine or operational

Class II Well InspectionsClass II well classificationClass II well construction requirementsTypes of inspectionsOperating and Monitoring requirements

Page 2: Class II Well Inspections · 2019-08-09 · Slimhole Class II Injection Well Completion. Dual Completion Class II Injection Well Completions. Types of Inspections • Routine or operational

Class II Well Classification

IIR – Enhanced recovery wells

• Used for the secondary or tertiary recovery of oil and gas and for the maintenance of reservoir pressure

Page 3: Class II Well Inspections · 2019-08-09 · Slimhole Class II Injection Well Completion. Dual Completion Class II Injection Well Completions. Types of Inspections • Routine or operational

Class II Well Classification

IID – Salt water disposal wells

• Disposal of salt water (brine) produced from oil and gas production wells

• Disposal of other waste streams associated with oil and gas production

Page 4: Class II Well Inspections · 2019-08-09 · Slimhole Class II Injection Well Completion. Dual Completion Class II Injection Well Completions. Types of Inspections • Routine or operational

Class II Well Classification

IIH – Hydrocarbon storage wells

• Inject hydrocarbons that are liquid at standard temperature and pressure.

Page 5: Class II Well Inspections · 2019-08-09 · Slimhole Class II Injection Well Completion. Dual Completion Class II Injection Well Completions. Types of Inspections • Routine or operational

IID - Bevill Amendment

Page 6: Class II Well Inspections · 2019-08-09 · Slimhole Class II Injection Well Completion. Dual Completion Class II Injection Well Completions. Types of Inspections • Routine or operational

• New Class II wells inject into a formation separated from any USDW by confining zones free of faults and fractures.

• All Class II wells are cased and cemented to prevent movement of fluids into or between USDWs.

• Casing and cement for newly drilled wells shall be designed for the life expectancy of the well.

• Casing and cement programs shall consider factors such as: location of USDWs, pressures, formation fluids, lithology.

Class II WellConstruction Requirements

Page 7: Class II Well Inspections · 2019-08-09 · Slimhole Class II Injection Well Completion. Dual Completion Class II Injection Well Completions. Types of Inspections • Routine or operational

Well Construction Technology1st Step: Surface Casing

Page 8: Class II Well Inspections · 2019-08-09 · Slimhole Class II Injection Well Completion. Dual Completion Class II Injection Well Completions. Types of Inspections • Routine or operational

2nd Step: Intermediate or Long String Casing

Page 9: Class II Well Inspections · 2019-08-09 · Slimhole Class II Injection Well Completion. Dual Completion Class II Injection Well Completions. Types of Inspections • Routine or operational

3rd Step: Well Perforation

Tubing and Packer

Page 10: Class II Well Inspections · 2019-08-09 · Slimhole Class II Injection Well Completion. Dual Completion Class II Injection Well Completions. Types of Inspections • Routine or operational

Class IIInjection Well

Completion Method

Perforated Cased Hole

Page 11: Class II Well Inspections · 2019-08-09 · Slimhole Class II Injection Well Completion. Dual Completion Class II Injection Well Completions. Types of Inspections • Routine or operational

Conventional Class IIInjection Well Completion

Page 12: Class II Well Inspections · 2019-08-09 · Slimhole Class II Injection Well Completion. Dual Completion Class II Injection Well Completions. Types of Inspections • Routine or operational

Packerless Class II Injection Well Completion

Page 13: Class II Well Inspections · 2019-08-09 · Slimhole Class II Injection Well Completion. Dual Completion Class II Injection Well Completions. Types of Inspections • Routine or operational

Tubingless Class II Injection Well Completion

Page 14: Class II Well Inspections · 2019-08-09 · Slimhole Class II Injection Well Completion. Dual Completion Class II Injection Well Completions. Types of Inspections • Routine or operational

Slimhole Class II Injection Well Completion

Page 15: Class II Well Inspections · 2019-08-09 · Slimhole Class II Injection Well Completion. Dual Completion Class II Injection Well Completions. Types of Inspections • Routine or operational

Dual Completion Class II Injection Well Completions

Page 16: Class II Well Inspections · 2019-08-09 · Slimhole Class II Injection Well Completion. Dual Completion Class II Injection Well Completions. Types of Inspections • Routine or operational

Types of Inspections• Routine or operational• Drilling/Workover• Well logging/Testing• Frac job• Plugging and abandonment• Compliance and enforcement• Sampling• Citizen complaint

Page 17: Class II Well Inspections · 2019-08-09 · Slimhole Class II Injection Well Completion. Dual Completion Class II Injection Well Completions. Types of Inspections • Routine or operational

PREP for INSPECTIONS

• Well Construction (downhole & surface)• Operating Limits (pressures/rates/vol)• Site Access (locked/gated/etc.)• Equipment Needs (gauges/tools, PPE)• Operator contact information

Page 18: Class II Well Inspections · 2019-08-09 · Slimhole Class II Injection Well Completion. Dual Completion Class II Injection Well Completions. Types of Inspections • Routine or operational

Typical Operating and Monitoring Requirements• Injection pressure• Flow rate and cumulative volume• Fluid analysis• Annular pressure • Shut-in Equipment• Flowback (check valve)

Page 19: Class II Well Inspections · 2019-08-09 · Slimhole Class II Injection Well Completion. Dual Completion Class II Injection Well Completions. Types of Inspections • Routine or operational

Surface Equipment

FlowlinesWellheads / CellarsTanksPressure GaugesFlowmetersVolume MetersSCADA DevicesShut-In Devices

Page 20: Class II Well Inspections · 2019-08-09 · Slimhole Class II Injection Well Completion. Dual Completion Class II Injection Well Completions. Types of Inspections • Routine or operational

Wellheads and Gauges• CO2

Page 21: Class II Well Inspections · 2019-08-09 · Slimhole Class II Injection Well Completion. Dual Completion Class II Injection Well Completions. Types of Inspections • Routine or operational

Wellheads and Gauges• SWD

Page 22: Class II Well Inspections · 2019-08-09 · Slimhole Class II Injection Well Completion. Dual Completion Class II Injection Well Completions. Types of Inspections • Routine or operational

Wellheads• SWD

Page 23: Class II Well Inspections · 2019-08-09 · Slimhole Class II Injection Well Completion. Dual Completion Class II Injection Well Completions. Types of Inspections • Routine or operational

Wellheads• SWD

Page 24: Class II Well Inspections · 2019-08-09 · Slimhole Class II Injection Well Completion. Dual Completion Class II Injection Well Completions. Types of Inspections • Routine or operational

Wellsite

Page 25: Class II Well Inspections · 2019-08-09 · Slimhole Class II Injection Well Completion. Dual Completion Class II Injection Well Completions. Types of Inspections • Routine or operational

Wellsite

Page 26: Class II Well Inspections · 2019-08-09 · Slimhole Class II Injection Well Completion. Dual Completion Class II Injection Well Completions. Types of Inspections • Routine or operational

Wellsite

Page 27: Class II Well Inspections · 2019-08-09 · Slimhole Class II Injection Well Completion. Dual Completion Class II Injection Well Completions. Types of Inspections • Routine or operational

SCADA Systems

Page 28: Class II Well Inspections · 2019-08-09 · Slimhole Class II Injection Well Completion. Dual Completion Class II Injection Well Completions. Types of Inspections • Routine or operational

Flow Meters

Page 29: Class II Well Inspections · 2019-08-09 · Slimhole Class II Injection Well Completion. Dual Completion Class II Injection Well Completions. Types of Inspections • Routine or operational

Volume Counters

Page 30: Class II Well Inspections · 2019-08-09 · Slimhole Class II Injection Well Completion. Dual Completion Class II Injection Well Completions. Types of Inspections • Routine or operational

CombinationMeters

Page 31: Class II Well Inspections · 2019-08-09 · Slimhole Class II Injection Well Completion. Dual Completion Class II Injection Well Completions. Types of Inspections • Routine or operational

Shut-in Devices

Page 32: Class II Well Inspections · 2019-08-09 · Slimhole Class II Injection Well Completion. Dual Completion Class II Injection Well Completions. Types of Inspections • Routine or operational

Chart Recorders

Page 33: Class II Well Inspections · 2019-08-09 · Slimhole Class II Injection Well Completion. Dual Completion Class II Injection Well Completions. Types of Inspections • Routine or operational

Chart Recorders

Page 34: Class II Well Inspections · 2019-08-09 · Slimhole Class II Injection Well Completion. Dual Completion Class II Injection Well Completions. Types of Inspections • Routine or operational

Frac Pressures/Gradient

• Frac Gradient is presented in psi/ft• Reflects the frac pressure at depth• Best Measured with a Step Rate Test

Page 35: Class II Well Inspections · 2019-08-09 · Slimhole Class II Injection Well Completion. Dual Completion Class II Injection Well Completions. Types of Inspections • Routine or operational

Frac Pressures/Gradient

• Frac Pressure is the pressure at the formation face that causes the formation to fracture

• Two pressures contribute to the bottom hole pressure:– Hydrostatic head of the fluid column– Surface pressure (injection pressure)

Page 36: Class II Well Inspections · 2019-08-09 · Slimhole Class II Injection Well Completion. Dual Completion Class II Injection Well Completions. Types of Inspections • Routine or operational

Frac Pressures/Gradient

• Hydrostatic Head contribution:

Must know fluid contribution to psi– Depth– Specific Gravity

Page 37: Class II Well Inspections · 2019-08-09 · Slimhole Class II Injection Well Completion. Dual Completion Class II Injection Well Completions. Types of Inspections • Routine or operational

Frac Pressures/Gradient

• Hydrostatic Head contribution:

Ph = (SG) (0.433 psi/ft) (D ft)

Page 38: Class II Well Inspections · 2019-08-09 · Slimhole Class II Injection Well Completion. Dual Completion Class II Injection Well Completions. Types of Inspections • Routine or operational

Frac Pressures/Gradient

• Hydrostatic Head contribution:

Ph = (SG) (0.433 psi/ft) (D ft)

• For a 5000 ft well, with a SG = 1.003

Page 39: Class II Well Inspections · 2019-08-09 · Slimhole Class II Injection Well Completion. Dual Completion Class II Injection Well Completions. Types of Inspections • Routine or operational

Frac Pressures/Gradient

• Hydrostatic Head contribution:

Ph = (SG) (0.433 psi/ft) (D ft)

• For a 5000 ft well, with a SG = 1.003Ph = (1.003) (0.433) (5000)Ph = 2171 psi

Page 40: Class II Well Inspections · 2019-08-09 · Slimhole Class II Injection Well Completion. Dual Completion Class II Injection Well Completions. Types of Inspections • Routine or operational

Frac Pressures/Gradient

• If you know the frac gradient of your injection formation, the hydrostatic head contributes to that pressure, the remainder is added at the surface.

• If your frac gradient is 0.765 psi/ft, how much surface pressure can be added to the previous well example before frac?

Page 41: Class II Well Inspections · 2019-08-09 · Slimhole Class II Injection Well Completion. Dual Completion Class II Injection Well Completions. Types of Inspections • Routine or operational

Frac Pressures/Gradient

• For a 0.765 psi/ft frac gradient, the frac pressure at the formation face is:

Pf = (0.765 psi/ft)(5000 ft)• Pf = 3825 psi

• Ph = 2171 psi(from example)• Pmax = 3825 – 2171 = 1654 psi

Page 42: Class II Well Inspections · 2019-08-09 · Slimhole Class II Injection Well Completion. Dual Completion Class II Injection Well Completions. Types of Inspections • Routine or operational