PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SR
Soil investigation
The contractor shall implemented of exploratory drilling and Notemechanical test in all types of soil with on site testing and theissuance of the final report which contain the test results andrecommendations of the foundation work.
01 Research and treatment for cavities
Implementation through a perforating exploratory(cavity probing) In all 1 M3
types of rock to determined the horizontal and vertical elongation of
cavities, the contractor will be responsible for treatment all cavities
By injection and treatment for all cavities and voids of rock with all
necessary work accordance with the technical specifications and
instructions of the Supervising engineer
SITE DEVELOPMENT
The bidder is advised to visit the site before quoting the rates in
order to get himself familiarized with the present site conditions
Site clearance and demolitions
02 Demolish and clear away existing structures, pavings, electrical
lighting, pavements or upstands, cut and plug or reroute existing
service lines or utilities inside property line, clear site of rubbish or
any impediments, loose top soil and as deemed necessary, for the
total site cluster number 2 (CL02) area, approximately (23360m2),
subject to engineer approval and as coordinated with public
pension agency as shown on drawing CL02- XC-01 1 Item
To Collection SR
RATEITEM D E S C R I P T I O N QTY UNIT
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
1 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
2/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
SITE GRADING
Bulk excavate over site on unclassified ground including all hard Noteand rock layers to reduced levels generally in cutting profiles the
work shall include clear away to approved disposals.
All additional excavation required for temporary works and spaces, Note
shoring, dewatering, removal of surplus excavated materials,
support, temporary spoil heaps and general compaction
EXCAVATION AND EARTHWORK
Necessary moving or transportation about the site excavation
material including handling to temporary stockpile or ultimate
disposal off site is to be included in the unit rate of excavation
SITE PREPARATION AND GRADING
01 Excavation oversite on unclassified ground including all hard and 50 M3
rock layers (if any) to reduced levels generally in cutting profiles
and forming depressions, falls and the like and clear away to
approved disposal tip.
02 Fill oversite with approved imported fill material according to site 2390 M3
soil report recommendation including compaction in making up
levels to required formations, embankments, contouring and the
like as per drawings and spec.
Note
Work on proposed structural built-up areas from part of the Work
pertaining to respective building or structure as measured
elsewhere.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
2 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
3/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
PAVING AND SURFACING
01 Supply and install precast concrete shotblasted pavers (beige color) 2900 M2
size 400x400x60mm thk. with photocatalytic titanium doxide coating
including 100mm thick cast-in-place concrete slab with A193-WWF
mesh reinforcement, 20mm thick cement mortar setting bed,
moisture barrier on compacted subgrade, 3mm water proofing
membrane on R.C. slab as per detail no A1 on drawing CL02-XL301
to suit required locations as shown on drawing CL02-XL101
02 Supply and install precast concrete shotblasted pavers (beige, & 132 M2
brown color) size 400x400x60mm thk with photocatalytic titanium
doxide coating including 100mm thick cast-in-place concrete slab
with A193-WWF mesh reinforcement, 20mm thick cement mortar
setting bed, polyethylene moisture barrier, compacted subgrade,3mm water proofing membrane on R.C. slab as per detail no. A5 on
drawing CL02-XL301 to suit required locations as shown on drawing
CL02-XL101
03 Supply and install precast concrete shotblasted pavers (beige, brown 36 M2
& grey color) size 400x400x60mm thk with photocatalytic titanium
doxide coating including 100mm thick cast-in-place concrete slab
with A193-WWF mesh reinforcement, 20mm thick cement mortar
setting bed, polyethylene moisture barrier, compacted subgrade,
3mm water proofing membrane on R.C. slab as per detail no. A6 on
drawing CL02-XL301 to suit required locations as shown on drawing
CL02-XL101
04 Supply and install precast concrete shotblasted pavers (beige & light 755 M2
beige color) size 400x400x60mm thk with photocatalytic titanium
doxide coating ,w./grey color granite band size 200x200x30mm thk
including 100mm thick cast-in-place concrete slab with A193-WWF
mesh reinforcement, 20mm thick cement mortar setting bed,
polyethylene moisture barrier, compacted subgrade, 3mm water
proofing membrane on R.C. slab as per detail no. B3 on drawing
CL02-XL301 to suit required locations as shown on drawing
CL02-XL101
05 Supply and install polished granite paving dark &light colors,size 512 M2
400x400x30mm thk w.\ granite band dark color, size200x200x30mm including 100mm thick cast-in-place concrete slab
with A193-WWF mesh reinforcement, 20mm thick cement mortar
setting bed, polyethylene moisture barrier, compacted subgrade,
3mm water proofing membrane on R.C. slab as per detail no. C2
on drawing CL02-XL301 to suit required locations as shown on
drawing CL02-XL101
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
3 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
4/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
PAVING AND SURFACING
01 Supply and install concrete screed with epoxy coat finish including 5230 M2
100mm/50mm thick cast-in-place concrete slab with A193-WWF
reinforcement mesh, polyethylene moisture barrier, compacted sub
grade, 3mm water proofing membrane on R.C. slab as per detail
no. D on drawing CL02-XL301 to suit required locations as shown
on drawing CL02-XL101
02 Supply and install 50mm thk rubber pavement green, blue , brown 259 M2
& red color including adhesive mixture,100mm thick cast-in-place
concrete slab with A193-WWF mesh reinforcement smooth finish,
polyethylene moisture barrier, compacted subgrade, 3mm water
proofing membrane on R.C. slab as per detail no. E4 on drawing
CL02-XL301 to suit required locations as shown on drawingCL02-XL101
03 Supply and install asphalt paving comprising 80mm bituminous 2130 M2
wearing course, bituminous prime coat, including granular base
course, 3mm water proofing membrane on R.C. slab as per detail
no. F on drawing CL02-XL301 to suit required locations as shown
on drawing CL02-XL101
04 Supply and install cast in place concrete paving with A193-WWF 354 M2
mesh reinforcement, smooth finish light grey color, 100mm thick
w.\ brick edge band size 200x200x60mm thick including 20mm
thick cement mortar setting bed, polyethylene moisture barrier,
compacted subgrade, 3mm water proofing membrane on R.C. slab
as per detail no. G7 on drawing CL02-XL301 to suit required
locations as shown on drawing CL02-XL101
EARTH MOUNT
05 Supply and formation of 500-1500 mm height earth mount including
compacted sub base layer, 100 mmm thick layer of sand and
gravel mix, and all required to complete and finish te work as
shown on drawing CL02- XL101, and as per detail no. 5 on drawing
CL02- XL302 and sections details on drawing CL02- XL303 775 M2
(Softscape and planting soil mix are measured elsewhere)(area
measured on plan)
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
4 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
5/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
CURBS AND EDGING
01 Supply and install precast concrete road curb, size 300X500X150 885 Mmm with exposed aggregate finish including bedding, haunching,
cast in place concrete base and concrete grout behind curb, 20mm
thick cement mortar setting bed, on R.C. slab as per detail no.1 on
drawing CL02-XL302 to suit required locations as shown on
drawing CL02-XL101
02 Supply and install precast concrete mowing edge, size 152 M
200X100X65 mm including concrete base, 20mm thick cement
mortar setting bed, cast in place concrete base on R.C. slab, as
per detail no. 2 on drawing CL02-XL302 to suit required locations
as shown on drawing CL02-XL101
SUNDRIES
TENSILE STRUCTURE
03 Supply and install tensile staructure comprising columns, tent
fabric, foundation, earthwork, and all required to compleet and fix
the work as shown on drawing CL02- XL101 and as per detail no. 6
on drawing CL02- XL302, and sections details on drawing CL02-
XL303 and as per manufacturer's recommendations and subject to
engineer's approoval to cover an area of 125 m2
.
Contractor shall submitt shop drawings for approval before supply 1 No.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
5 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
6/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
SITE SIGNAGE
Manufacturer's standard outdoor sings, letters and plaquesincluding fixings, finishes, accessories complete as per
details on drawing CL02-XC-04, CL02-XC-05 and as per
specifications
REGULATORY SIGNS
01 Ref. type R5-1 ( ENTRY PROHIBTED ) 8 No.
INFORMATIVE SIGNS
02 Ref. type I-1 (PARKING) 7 No.
03 Ref. type I-2 (ENTRY ) 7 No.
04 Ref. type I-3 (EXIT ) 6 No.
Manufacturer's standard outdoor signs, letters and plaques,
including fixings, accessories complete as per details on
drawing CL02-XL-602 to suit required locations as shown on
drawing CL02-XL-601 and as per specifications
05 Residential sign, as per detail (1) 10 No.
06 Directional sign, as per detail (2) 3 No.
07 Sports club building, as per detail (3) 2 No.
08 Sports club parking as per detail (4) 1 No.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
6 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
7/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
ROAD SIGNAGE & PAVEMENTMARKING
Thermoplastic paint for traffic marking on drive way atbasement/ground floor and ramps floor as per
Manufacturer's standard as shown on details on drawing
CL02-XC-05, to suit required locations as shown on drawing
CL02-XC-04, as per specification and as per engineer's
instructions
pavement marking
01 White edge line, ref. detail 2 230 M
02 Lane marking, as per detail (3) 210 M
03 Dotted line marking (give way line), ref. detail 7 550 M
04 Through traffic arrow, ref. detail 9-1 46 No.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
7 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
8/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
RAISED CONCRETE PLANTER
Supply and install concrete raised planter with granitecladding, including (Softscape and planting soil mix are
measured elsewhere), drainage layer, filter , membrane,
sealant and all required to compleet and finish the work as
per detail no. 3 on drawing CL02-XL302
01 Raised planter to suit required locations as shown on drawing
CL02- XL101 205 M2
RAISED CONCRETE PLANTER & WOODEN BENCH
02 Supply and install concrete raised planter with granite cladding,
and wooden bench, 50x75 mm interior wooden rails,comprisingconcrete walls, reinforced concrete slab with A 193 W.W.F
reinforcement mesh smooth finished, (Softscape and planting soil
mix are measured elsewhere), drainage layer, filter membrane,
water proofing membrane, protection board, sealant and all
required to compleet and finish the work as per detail no.4 on
drawing CL02- XL302, and sections details on drawing CL02-
XL303 to suit required locations as shown on drawing CL02- XL101 202 M2
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
8 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
9/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
LANDSCAPING
Palms including pit excavation, stakes and ties, soilplanting mix, mulching, filter membrane and drainage
layer all as details and planting schedule as per detail P1,
on drawing CL02-XL-401
01 P/Wf 7 No.
Trees including pit excavation, stakes and ties, soil
planting mix, mulching, filter membrane and drainage
layer all as details and planting schedule as per detail
P2 on drawing CL02-XL-401
02 T/Aa 2 No.
03 T/Af 12 No.
04 T/Po 4 No.
05 T/Tp 8 No.
Shrubs including planting, site excavation as required, soil
planting mix, mulching, filter membrane, screed sloped to
drain and drainage layer all as per details and planting
schedule as per detail P3,P5, on drawing CL02-XL-401
06 S/Hs 230 No.
07 S/Iha 35 No.
08 S/lo 26 No.
09 S/Ld 18 No.
10 S/Ob 10 No.
11 S/Pav 43 No.
12 S/Mc 203 No.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
9 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
10/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
LANDSCAPING
Ground cover including planting, site excavation asrequired, soil planting mix, mulching, filter membrane,
screed sloped to drain and drainage layer all as per details
and planting schedule as per detail P3, on drawing
CL02-XL-401
01 G/As 574 No.
02 G/Lm 723 No.
03 G/Ggp 1162 No.
04 G/Gr (Y) 942 No.
Lawn planting, including soil planting mix, filter membrane
and drainage layer, screed sloped to drain all as per details
and planting schedule as per detail P4,P6 on drawing
CL02-XL-401
05 L/Cd 2117 M2
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
10 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
11/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
PLUMBING INSTALLATION
WASTE AND DRAINAGE INSTALLATION
Supply, install and testing pipework, UPVC schedule 40, the
work shall include but not limited to fittings, supports, cast
iron pipes on roof for vent with caps, installation, all
associate works and all materials and equipments required
to complete and finish the work according to drawings,
specification and code of practices
01 75 mm dia. 30 M
02 100 mm dia. 110 M
03 150 mm dia. 67 M
Accesssories
04 Ground cleanout 75 mm dia, ref. FCO 1 No
Construction work for briks inspection chamber, the work
shall include bit not limited to earth work, plain concrete
for foundation BED, concrete channel at chamber DED with
standard cast iron manhole frame and double cover and all
materials and equipments required to complete and finish
the work according to specifications, drawings and code of
practice
05 Inspection chamber, ref. (WIC) 600x600mm 1 No
WASTE AND DRAINAGE INSTALLATION
Supply, installation and test drainage pipe work UPVC
schedule 80 the work shall include but not limited to fittings,
supports hangers, excavation, backfilling, cast iron pipes on
roof for vent with caps and all materials and equipment
required to complete and finish the work according to
specifiactions, drawings and code of practice
06 100 mm dia 80 M
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
11 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
12/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
Drainage installation to the external drainage network
Construction work for briks inspection chamber, the work shallinclude bit not limited to earth work, plain concrete for
foundation BED, concrete channel at chamber DED with
standard cast iron manhole frame and double cover, UPVC
pipework schedule 40 to nearest main sewer manhole and all
materials and equipments required to complete and finish the
work according to specifications, drawings and code of practice
01 Inspection chamber, ref. (IC) 600x600mm 2 No
02 Slow down chamber 9 No
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
12 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
13/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
POTABLE WATER INSTALLATION
Supply, install and testing pipework, UPVC Schedule 80 forpotable water the work shall include but not limited to
fittings, supports, all associate works and all materials and
equipments required to complete and finish the work
according to drawings, specification and code of practices
01 75 mm dia. 55 M
02 100 mm dia. 10 M
Supply, installation and test Packaged type constant
pressure booster potable water pumps, set of one duty and
one stand by pump, including piping and valving network
within pump chamber, complete with all controllers,accessories for automatic operateion and all associate
works as per code standard and as described on drawings
and specification
03 Ref. PWP CAP 3.14 KW 1 Set
04 Ref. CP CAP 0.5 HP 1 Set
Reinforced concrete under ground water tank and pump
room with proprietary cast iron manhole covers and frames
the work shall include but not limited to earthworks,
concrete works, sump pit, and submersible pump internal
lining and water proofing, access ladders, pipework andvalving, test main fold vent pipes, truck fill pipework with
back flow preventer, ventilating fan and duct work within
tank and pump room structure, and UPVC schedule 80
drainge pipe from submersible pump to the nearest sewer
manhole and all materials and equipments required to
complete and finish the work according to drawings,
specification and code of practices
05 Potable water tank CAP 83 M3 1 No.
06 Gray water tank CAP 25 M3 1 No.
07 Potable water tank CAP 173 M3 1 No.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
13 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
14/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
POTABLE WATER SUPPLY SYSTEM
Packaged type variable speed discharge pressure systemGray water lift pumps (one duty & one stand-by), including
piping and valves network within pump chamber, complete
with all controllers, accessories for automatic operation as
scheduled on drawing as per spec. section 15453
01 Gray water lift pumps CAP. 5.23 KW 1 Set
Allow for the design, supply and installation of packaged
type waste water treatment plant complete including filter,
chemical feeders, air blowers controls, wirings, piping and
all as associated works as per specifications section 02736
and scheduled on drawing
02 Packaged water treatment unit 1 Item
NON-POTABLE WATER INSTALLATION
Supply, install and testing pipework, UPVC Schedule 80 for
non-potable water the work shall include but not limited to
fittings, supports, all associate works and all materials and
equipments required to complete and finish the work
according to drawings, specification and code of practices
03 75 mm dia. 22 M
Accessories
04 Isolating & check valve assembly 75 mm dia. 2 No
05 Water metre assembly 50mm dia., ref. (WMA) 3 No
06 Back flow preventer assembly, ref. BFPA 3 No
Supply, install and testing pipework, UPVC Schedule 80 for
fire water the work shall include but not limited to
fittings, supports, all associate works and all materials and
equipments required to complete and finish the work
according to drawings, specification and code of practices
07 100 mm dia. 15 M
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
14 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
15/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
FIRE WATER UTILITIES
Supply, installation and test Electrically driven horizontalsplit case centrifugal fire pump, including piping network
and valving within pump chamber,complete with all
controllers, accessories for automatic operateion and all
associate workks as per code standard and as scheduled on
drawings and specification
01 Ref. FP1 CAP 75 KW electrically driven 1 No
02 Ref. FP2 CAP 75 KW fuel diesel driven 1 No
Supply, installation and test Electrically driven peripheral
turbine Jockey pump, including piping network and valving
within pump chamber, complete with all controllers,
accessories for automatic operateion and all associate
workks as per code standard and as scheduled on drawings
and specification
03 Ref. JP CAP 5 KW 1 No
IRRIGATION WATER INSTALLATION
Supply, install and testing pipework, UPVC Schedule 80 for
Irrigataion water the work shall include but not limited to
fittings, supports, all associate works and all materials and
equipments required to complete and finish the work
according to drawings, specification and code of practices
04 20 mm dia. 115 M
05 25 mm dia. 140 M
06 32 mm dia. 170 M
07 40 mm dia. 160 M
08 50 mm dia. 370 M
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
15 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
16/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
IRRIGATION WATER INSTALLATION
Accessories
01 Supply and installation irrigation controller as detailed on drwings 1 No.
and as per specifications
02 Supply and installation bubbler for trees 10 No.
03 Supply and install bubbler for shrubs, ground cover and 869 No.
succulents
04 Supply and installation spray lawn sprinkler 60 No.
05 Gate valve W/valve box 20 mm dia., 1 No.
06 Gate valve W/valve box 25 mm dia., 1 No.
07 Gate valve W/valve box 32 mm dia., 1 No.
08 Gate valve W/valve box 40 mm dia., 2 No.
09 Gate valve W/valve box 50 mm dia., 6 No.
Supply and installation remote control valve assembly
including piping complete with valve box, Y-strainer,
accessories and all associated works as detail on drawing
and as per specifications section 02810
10 Ref. RCV 20mm dia. 1 No.
11 Ref. RCV 25mm dia. 1 No.
12 Ref. RCV 32mm dia. 2 No.
13 Ref. RCV 40mm dia. 3 No.
14 Ref. RCV 50mm dia. 9 No.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
16 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
17/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIESEL FUEL STORAGE TANK INSTALLATION
Allow for underground fiberglass diesel fuel storage tankwith required capacity including concrete anti-flotation
pad, heavy duty traffic type manhole ring and cover,
pipework, valves duplex diesel fuel transfer pumps, steel
ladder, pea gravel bed, earthworks, fixings and accessories
all as detailed on drawings
01 Proprietary tank units CAP. 5675 Lit. 1 No.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
17 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
18/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
SITE DEVELOPMENT
Collection
Sheet -1
Sheet -2
Sheet -3
Sheet -4
Sheet -5
Sheet -6
Sheet -7
Sheet -8
Sheet -9
Sheet -10
Sheet -11
Sheet -12
Sheet -13
Sheet -14
Sheet -15
Sheet -16
Sheet -17
To Bill Summary SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
18 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
19/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 2 - SITE WORK
SITE GRADING
All additional excavation required for temporary works and spaces,
shoring, dewatering, removal of surplus excavated materials,
support, temporary spoil heaps and general compaction Note
EXCAVATION AND EARTHWORK
Necessary moving or transportation about the site excavation Note
material including handling to temporary stockpile or ultimate
disposal off site is to be included in the unit rate of excavation
Excavation in natural land consisting of solid rock formation,cracked rocks, bolders and natural contoured soil, temporary
earthwork supports, dewatering ( if any ) as per
specifications sections 02200
01 Excavation for foundations commencing from existing grade level 82460 M
Backfilling
02 Approved selected imported fill material including compaction in 1100 M
making up levels around and over foundations, beds and the like as
per spec. sections 02200
03 Approved fill material selected from excavated material including M price only
compaction as per specification section 02200
Drainage layer
04 100 mm thick compacted coarse gravel to underside of slabs on 18 M
grade as per specification section 02200
Soil treatment application for termite control
05 To subgrades of slabs and along periphery of building The work 21170 M
shall include all materials and equipments required to completeand finish the work according to specifications and code of
practice
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
19 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
20/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 2 - SITE WORK
TRAFFIC MARKING DIMENSION
Thermoplastic paint for traffic marking on parking pavement
as detail 11 shown on drawing CL-GA-901 and specification
01 Straight arrows 93 No.
02 Straight & curved arrows 1 No.
03 Parking lane marking 3817 M
04 Parking lane marking at site 175 M
05Handicapped marking on floor
16 No.
06 ENTRY (text) 5 No.
07 NO ENTRY (text) 8 No.
08 EXIT (text) 3 No.
09 Lane numbers 493 No
To Collection SR
To Collection
Sheet 19
sheet 20
To Bill Summary SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
20 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
21/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 3 - CONCRETE
CONCRETE WORK
CONCRETE TYPES
Include in Unit Rates for concrete of the following types and
locations:
20 Mpa
a) Blinding concrete
b) Catch basins and side walks Note
40 Mpa
a) Footings
b) Columns and R.C. walls
c) Floor and roof slabs, beams, girders, stairs
d) Concrete topping or structural screed
e) Slab on grade
f) water tanks
Water stops including junction accessories are not measured
separately The cost of water stop items are to be included in the
unit rates of the related concrete items
To Collection
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
21 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
22/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 3 - CONCRETE
Plain insitu concrete, 20 Mpa, cement type V as per drawingsand specifications section 03300
01 Screed, 50mm thick 1085 M
02 Blinding beds, 100mm thick 2170 M
Supply and placing Insitu reinforced concrete, 40 Mpa
cement type V including formwork and steel reinforcements
conforming to ASTMA615and A185 and all requiments to
finish the work according to drawings as per specifications
sections 03100, 03200 & 03300 , and code of practice in:
03 Raft foundation various thickening including depression areas, 13605 M
sump pits and elevators pits and electrical cables trench
04 Retaining walls 775 M
05 Reinforced concrete for tanks 351 M3
06 Slab on grade 125 mm thick with A193WWF mesh reinforcement 3 M
including thickening
To Collection
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
22 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
23/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 3 - CONCRETE
CONCRETE WORK
Supply and placing of Insitu reinforced concrete, 40 Mpa
type I cement including formwork and steel reinforcements
conforming to ASTM A615 and A185 and all requirements to
finish the work according to the drawings,as per
specifications sections 03100, 03200 & 03300,and code of
practice
01 Columns 436 M
02 Shear wall 270 M
03 Beams 35 M
04 Suspended flat slabs, 300mm thickening including drop panel 2790 M
05 Suspended flat slabs, 320mm thickening including drop panel 1539 M
06 Suspended flat slabs, 380mm thickening including drop panel 1002 M
07 Ramps 120 M
08 Stairs including landings 66 M
PRECAST CONCRETE
Precast concrete wheel stopper including dowels, grouting
and accessories for complete installation as per detail 21 on
drawing CL-GA-901 and specification
09 Precast concrete wheel stopper including fixings 493 No.
10 Ditto,but at site 60 No.
To Collection
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
23 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
24/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 3 - CONCRETE
CONCRETE WORK
Sundries
01 Allow for reinforced concrete equipment pads including upstand 8 M
surrounds and anti-vibration accessories as required
02 Allow for expansion joint, fillers, back rods and sealants at 955 M
expansion joints of concrete as required.
03 150mm thick raised slabs, Handicapped`s ramps and curbs to suit 4569 M
required areas as per detail 10,14, 20 on drawing CL-GA-901
To Collection
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
24 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
25/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 3 - CONCRETE
Collection
Sheet - 21
Sheet - 22
Sheet - 23
Sheet - 24
To Bill Summary SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
25 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
26/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 4 - MASONRY
UNIT MASONRY
Supply and fix concrete masonry blocks in courses with
cement lime mortar including concrete lintels over
openings , horizontal and vertical reinforcement, fixings,
fillers, sealants and grout to complete the work according
to specifications and drawings
01 200 mm thick wall 655 M
02 200 mm thick wall one hour fire rated 181 M
03 Ditto, but two hour fire rated 428 M
To Bill Summary SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
26 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
27/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 5 - METALS
EXPANSION JOINT
Supply and install expansion joint including extruded
aluminum assemblies, fillets, accessories, fixing and
sealants as per detail1 on drawing CL-GA-902. Price includes
all required to thoroughly completet the work according to
code of practice and as per specification
01 Per linear meter, expansion joint for floor and ceiling as per detail 955 M
1CL-GA-902
Steel cover as per details on drawings
02 To suit electrical cable trench 60 M2
03 Per number, supply and install steel bollard comprising 150
mm dia. painted finish steel pipe filled with concrete,
including fixings, finishing, and all associated and required to
thoroughly complete the work as per detail no.19 on drawing
CL- GA-901 and as per specifications and supervisor
engineer's instructions
04 Per number, Bollards, exposed height 750 24 No
mm high
05 Supply and install 30mm depth panted galvanized cast iron
gratings including 40x40mm steel angle, medium gauge
galvanized gutter slope to drain and all required for fixing
and finisheng as per detail no.13 on drawing CL-GA-901 and 20 M
specificatons
To Bill Summary SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
27 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
28/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 7 - THERMAL AND MOISTURE PROTECTION
Water proofing and moisture protection as per specificationsection 07100
01 Membrane waterproofing to suit "wet room" areas including upturn 43 M
to abutting walls or upstands concrete screed and all required
material and equipments to complete the work as per details
shown on drawing, according to specifications and code of practice
02 Membrane waterproofing to suit concrete wall and foundation 24855 M2
03 Protection board to suit concrete walls 3500 M2
Vapour barrier
04 Vapour barrier to underside of slabs, beds, and the like, 18 M
specifications section 07100
To Bill Summary SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
28 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
29/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 8 - DOORS AND WINDOWS
DOOR SETS
Supply and install all doors to suit masonry openings and approved Note
samples including fixings, decorations, frames, architrave,
hardwares and saddles and all required materials and equipments
to complete and finish the work as detailed on drawing VL-GA-02
and according to specifications and code of practice
TYPE A : 44mm thick painted wood door door including
frames and decortion as per drawings and specification
01 TypeA1, single leaf door, size 800x2150mm 11 No.
TYPE B : 44mm thick painted hollow metal insulated
door including door grill (where required)
02 Type B1, single leaf door, size 900x2150mm and 45 minute 4 No.
fire rated
03 Type B3, single leaf door, size 800x2150mm and 45 minute 1 No.
fire rated
04 Type B5, single leaf door, size700x2150mm 5 No.
05 Type B6, double leaves door, leaf size 950x2400mm and 45 minute 1 No.fire rated
TYPE C : 44mm thick fully louvered paneled hollow metal.
door motorized adjustable louvers panel working upon signal
from fire alarm system for generator including frames
including frames and decoration as per drawings and
specifications
06 Type C1, double leaves door, leaf size 950x2400mm and 45 minute 9 No.
fire rated
07Type C2, double leaves door, leaf size1050x2400mm and 45 minute 1 No.fire rated
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
29 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
30/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 8 - DOORS AND WINDOWS
DOOR SETS
TYPE D : 44mm thick paneled hollow metal door with 6 mm
thick wired glass fixed vision panel including frames and
decoration as per drawings and specifications
01 Type D2, single leaf door, size900x2150mm 3 No.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
30 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
31/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 8 - DOORS AND WINDOWS
Collection
Sheet - 29
Sheet - 30
To Bill Summary SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
31 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
32/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 9 - FINISHES
INTERNAL FINISHES
Flooring including respective types of bounding materials,
concrete screed sub-floor of required thickness, (if any)
accessories for complete installations as per ID drawing
and specification
01 Epoxy paint on cement screed , ref.EC 325 M
02 Anti carbonation Porcelain epoxy coating for pavement , ref.AEC 4569 M
03 Multi component epoxy coating on concrete screed for drive way & 12988 M
turns , ref.MEC
04 Ceramic floor tiles size 600x600mm , ref.CR1 198 M
05 Ceramic floor tiles size 300x300mm , ref.CR2 18 M
Finishings : bases including sand-cement backing mortar
and grout
06 100 mm high Ceramic tiles base , ref. B03 215 M
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
32 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
33/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 9 - FINISHES
INTERNAL FINISHES
Finishings : walls including metal angle beads and lathing at
junctions of differing backgrounds
01 Cement plaster to suit walls 8420 M
02 Paint on cement plaster ,ref. W01 8420 M
03 Non toxic epoxy paint on structure ,ref. W07 2139 M
04 Ceramic wall tiles ,ref. W03 105 M
Finishings : ceilings
05 Cement plaster to suit ceiling 18058 M
06 Paint on cement plaster, ref.C01 18058 M
07 Metal tiles 600x600mm Ref. C05 40 M
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
33 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
34/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 9 - FINISHES
Collection
Sheet - 32
Sheet - 33
To Bill Summary SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
34 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
35/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 10 -SPECIALTIES
CORNER & COLUMN GUARD
Corner guards install at 600 high from finish floor heavy duty
rubber guard bumper, including all associated works, as per
detail 18 shown on drawing CL-GA-901 and as specification
01 To suit column location as required 442 No
ALUMINUM SAND TRAP LOUVERS
Supply and installation fixed anodized aluminum sand trap
louvers panels on anodized aluminum frames including
fixings and including frames and decoration as per drawing
CL - GA- 802 and specifications
02 Ref.L02, size1800x3200mm . 1 No.
03 Ref.L03, size2500x3200mm . 2 No.
04 Ref.L04, size2500x3400mm . 3 No.
05 Ref.L05, size2500x1500mm . 6 No.
06 Ref.L06, size2500x2300mm . 2 No.
07 Ref.L07, size700x450mm . 2 No.
08 Ref.L08, size400x700mm . 6 No.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
35 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
36/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 10 -SPECIALTIES
SIGNAGE
Manufacturer's standard indoor signs, letters and plaques
including fixings, finishes, accessories complete as per
interior design drawings CL02-i901 to CL02-i910 and all
required materials and equipments to complete and finish
the works according to specifications, drawings and code of
practice
01 Ref. type S01 23 No
02 Ref. type S02 9 No
03 Ref. type S09 3 No
04 Ref. type S10 102 No
05 Ref. type S11 14 No
06 Ref. type S12 22 No
07 Ref. type S13 1 No
TOILET AND BATH ACCESSORIES
Supply and installation of following
toilet and bath accessories as per
schedule including fixings andtrims as shown on drawings and
specification
08 Ref. FM2, Clear glass mirror with stainless steel frame, size 400 x 5 No
600 mm
09 Ref. RH, Single robe hook 10 No
10 Ref. SDH, Wall mounted soap dish and holder . 5 No
11 Ref.SH1 wall mounted shower head . 5 No
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
36 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
37/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 10 -SPECIALTIES
Collection
Sheet - 35
Sheet - 36
To Bill Summary SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
37 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
38/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 14 - CONVEYING SYSTEMS
AUTOMATED WASTE COLLECTION SYSTEM
Supply and provide all required to construct, test and operate
automated waste collection system, consisting of the following
items:-
01 Discharge valve room with basement floor including all required works 10 No.
as detailed on drawing no. STM - ITCCP2 - TD - 008. Contractor shall
perform all required coordination with other trade to ensure proper
installation and operation of the complete system to transport waste
from tower chute to pipe networks as shown on drawings STM -
ITCCP2 - TD - 001 to 007 and 015, 016 and according to
manufacturer's standards and specifications
02 Full Vacuum Load station including required earthworks, concrete 1 No.
works, masonry and electromechanical works for the vacuum room
and PAI service box located at the end of pipe work including all
required works as detailed on drawing no. STM - ITCCP2 - TD - 010
and 011. Contractor shall perform all required coordination with other
trade to ensure proper installation and operation of the complete
system to transport waste kitchen areas to pipenetworks as shown
on drawings STM - ITCCP2 - TD - 001 to 007 and according to
manufacturer's standards and specifications
PIPE WORK
Supply and installation of Automated waste collection systempiping. Item shall include the earth works, insulation,
,concentric reducer, puddle flanges ,inspection covers and all
required materials and equipments to complete the transport
pipe line from DV rooms , outdoor load stations and full
vacuum load stations to waste plant
03 508mm under/above ground transport pipe 975 M
RC MANHOLE
Supply and install cast insitu or precast reinforced concrete
manhole ,the item shall include excavation, backfill insulation
,inspection cover and all required to complete the work.
04 RC manhole to suit required location in sitesas shown on drawings 20 No.
STM - ITCCP2 - TD 001 to 016
To Bill Summary SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
38 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
39/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 15 - MECHANICAL
PLUMBING INSTALLATIONS
SANITARY FIXTURES
Supply and install sanitary fixtures, water mixers and
accessories, as selection schedule, the work shall include
but not limited to necessary fittings, trims, valves, traps,
spouts and all materials and equipment required to
complete and finish the work according to specifiactions,
drawings and code of practice
01 Floor mounted water closet with f lush tank, ref. (WC) 5 No
02 Lavatory without pedistal, ref. LAV 5 No
03 Counter top one bowel sink, ref. 03 3 No
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
39 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
40/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 15 - MECHANICAL
PLUMBING INSTALLATIONS
WASTE AND DRAINAGE INSTALLATION
Supply, installation and test drainage pipe work UPVC
schedule 40 the work shall include but not limited to fittings,
supports hangers, excavation, backfilling, cast iron pipes on
roof for vent with caps and all materials and equipment
required to complete and finish the work according to
specifiactions, drawings and code of practice
01 32 mm dia 310 M
02 40 mm dia 85 M
03 50 mm dia 380 M
04 75 mm dia 820 M
05 100 mm dia 1700 M
06 150 mm dia 1415 M
Supply, installation and test drainage pipe work UPVC
schedule 80 the work shall include but not limited to fittings,
supports hangers, excavation, backfilling, cast iron pipes on
roof for vent with caps and all materials and equipment
required to complete and finish the work according tospecifiactions, drawings and code of practice
07 100 mm dia 175 M
Accessories
08 Floor drain, 50 mm dia., ref. (FD) 32 No.
09 Parking drain, 150mm dia., ref. PD 50 No.
10 Cleanout, 50 mm dia., ref. (CO) 3 No.
11 Cleanout, 75 mm dia., ref. (CO) 61 No.
12 Cleanout, 100 mm dia., ref. (CO) 126 No.
13 Cleanout, 150 mm dia., ref. (CO) 14 No.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
40 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
41/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 15 - MECHANICAL
PLUMBING INSTALLATIONS
WASTE AND DRAINAGE INSTALLATION
Accessories
01 Floor cleanout 50mm dia., ref. (FCO) 18 No.
02 Floor cleanout 100mm dia., ref. (FCO) 1 No.
03 Floor cleanout 150mm dia., ref. (FCO) 1 No.
04 Gully trap, ref. GT 2 No.
05 Trench drain outlet, 100mm dia., ref. TDO 4 No.
06 Running trap 32mm dai., 10 No.
Reinforced concrete sump pit including internal lining,
proprietary galvanized steel manhole cover and frame,
guide bar, lifting chain and all associated works, valves
pipework within sump pit chamber as detailed on drawings
(concrete work & earthwork, waterproofing measured
elsewhere)
07 Sump pit 8 No.
Submersible pumps (one duty and one stand-by) includingassociated valves, pipework, valves controllers and
accessories within sump pit chamber as described on
drawings (sump pit measured separately)
08 Ref. SP1 capacity 1.5 HP 8 Set
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
41 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
42/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 15 - MECHANICAL
PLUMBING INSTALLATIONS
POTABLE WATER INSTALLATION
Supply, installation and test pipework, plypropylene
for potable water the work shall include but not limited
to installation, fittings, insulation for hot pipework,
valves, supports and all materials and equipment
required to complete and finish the work according to
specifications, drawings and code of practice
01 15 mm dia. 58 M
02 20 mm dia. 758 M
03 25 mm dia. 195 M
04 50 mm dia. 740 M
05 63 mm dia. 220 M
06 75 mm dia. 60 M
07 100 mm dia. 245 M
NON-POTABLE WATER INSTALLATION
Supply, installation and test pipework, plypropylenefor non-potable water the work shall include but not limited
to installation, fittings, insulation for hot pipework,
valves, supports and all materials and equipment
required to complete and finish the work according to
specifications, drawings and code of practice
08 20 mm dia. 25 M
09 50 mm dia. 1550 M
10 63 mm dia. 215 M
11 75 mm dia. 500 M
12 100 mm dia. 330 M
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
42 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
43/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 15 - MECHANICAL
PLUMBING INSTALLATIONS
HOT WATER INSTALLATION
Supply, installation and test pipework, plypropylene
for hot water the work shall include but not limited to
installation, fittings, insulation for pipework, valves,
supports and all materials and equipment required to
complete and finish the work according to specifications,
drawings and code of practice
01 15 mm dia. 55 M
02 20 mm dia. 10 M
Accessories
03 Water meter assembly 63mm dia., 10 No.
04 Isolating valve 20 mm dia., ref. (IV) 7 No.
05 Isolating valve, 25 mm dia, ref. (IV) 9 No.
06 Isolating valve, 50 mm dia, ref. (IV) 24 No.
07 Isolating valve, 75 mm dia, ref. (IV) 20 No.
08 Isolating valve, 100 mm dia, ref. (IV) 1 No.
09 IV & CV assembly 50 mm dia., 2 No.
10 IV & CV assembly 100 mm dia., 5 No.
11 Hand spray with flexible hose and wall hook, ref. (HS) 5 No.
12 Wall mounted shower head with mixer, ref SH 4 No.
13 Hose bib, 20mm dia., ref. )HB) 48 No.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
43 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
44/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 15 - MECHANICAL
PLUMBING INSTALLATIONS
Supply, install, testing and commissioning electrical water
heaters the work shall include but not limited to short
length pipework, valves, supports, controls, fixings,
accessories and all associate works and all materials and
equipments required to complete and finish the work
according to drawings, specification and code of practices
01 Ref. EWH- 1 3 No
Drainage installation
Reinforced concrete gray water tank with proprietary
medium duty cast iron manhole cover and frame, includingsump pit, submersible pumps, internal lining, access ladder
vent pipework within tank as detailed on drawing (Concrete
work, earthwork & water proofing measured elsewhere)
02 Gray water tank CAP. 41 m3 1 No
03 Gray water tank CAP. 44 m4 1 No
04 Gray water tank CAP. 70 m5 1 No
Packaged type variable speed discharge pressure system
Gray water lift pumps, including piping and valves network
within pump chamber, complete with all controllers,accessories for automatic operation as scheduled on
drawing as per spec. section 15453
05 Gray water lift pumps CAP. 5 KW 2 Set
06 Gray water lift pumps CAP. 6 KW 1 Set
Allow for the design, supply and installation of packaged
type waste water treatment plant complete including filter,
chemical feeders, air blowers controls, wirings, piping and
all as associated works as per specifications section 02736
and scheduled on drawing
07 Packaged water treatment unit. Cap. 41 m3/day 1 No.
08 Packaged water treatment unit. Cap. 44 m3/day 1 No.
09 Packaged water treatment unit. Cap. 70 m3/day 1 No.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
44 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
45/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 15 - MECHANICAL
PLUMBING INSTALLATIONS
Packaged type duplex unit discharge pressure system
potable water lift pumps, (one duty & one stand by)
including piping and valves network within pump chamber,
complete with all controllers, accessories for automatic
operation as scheduled on drawing and specification
section 15453
01 Circulating potable water pump CAP. 7.17 KW 2 Set
02 Circulating potable water pump CAP. 0.5 HP 2 Set
Reinforced concrete under ground water tank and pump
room with proprietary cast iron manhole covers andframes, including internal lining access ladders, pipework
submersible pump, ventilating fans with exhaust and fresh
air pipework, valves, vent pipes and truck fill pipework as
detailed on drawings (concrete work & earthwork, water
proofing measured elsewhere)
02 Potable Water tank CAP. 263 M3 1 No.
03 Potable Water tank CAP. 265 M3 1 No.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
45 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
46/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 15 - MECHANICAL
FIRE WATER UTILITIES
Supply, installation and test Pipework, UPVC class 5
including fittings, trenching, back fill supports system and
all associate works as per code standard
01 25 mm dia. 2705 M
02 32 mm dia. 675 M
03 40 mm dia. 875 M
04 50 mm dia. 265 M
05 100 mm dia. 1505 M
06 150 mm dia. 430 M
Accessories
07 Pendent sprinkler head 70 No
08 Upright sprinkler head 1260 No
09 Side wall sprinkler head 15 No
10 100mm Fire departement valve , ref. FDV 26 No
11 Floor control valve assembly 150mm dia., ref. FCVA 4 No
12 Fire department connection, 2 way fire department inlet
connection type with gate and check valve 100mm dia. 4 No
13 Back folw preventer assembly, 150mm dia., ref. BFPA 1 No
14 Supervisory switch 150mm dia., 1 No
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
46 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
47/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 15 - MECHANICAL
FIRE WATER UTILITIES
Supply, install, testing and commissioning proprietary
integrated fire hose reel and fire extinguisher cabinet the
work shall include but not limited to fire extinguisher, hose
reel nozzle, fixings, isolating valve 40 mm dia., trims and
all associate works and all materials and equipments
required to complete and finish the work according to
drawings, specification and code of practices
01 Ref. FHC 12 No
Supply, install, testing and commissioning portable
multipurpose fire extinguisher the work shall include butnot limited to fixing to wall, all associate works and all
materials and equipments required to complete and finish
the work according to drawings, specification and code of
practices
02 Ref. PFE 3 No
03 Ref. CO2 10 No
CO2 system
Supply, install and test CO2 cylinders including pipe work,
black steel seamless for CO2 fittings, supports valves,
regulators, sleeves, as shown on drawings and as per
specification
04 CO2 cylinders CAP 45 KG 52 No.
05 Control panel 22 No.
06 Remote manual release 22 No.
07 Abort switch 22 No.
08 Alarm bell 22 No.
09 4-port nozzle 22 No.
10 Ioization detector 22 No.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
47 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
48/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 15 - MECHANICAL
PLUMBING INSTALLATION
DIESEL FUEL STORAGE TANK INSTALLATION
Allow for underground fiberglass diesel fuel storage tank
with required capacity including concrete anti-flotation
pad, heavy duty traffic type manhole ring and cover,
pipework, valves duplex diesel fuel transfer pumps, steel
ladder, pea gravel bed, earthworks, fixings and accessories
all as detailed on drawings
01 Proprietary tank units CAP. 1890 Lit. 1 No.
02 Proprietary tank units CAP. 2800 Lit. 2 No.
To Collection SR
Collection
Sheet -39
Sheet -40
Sheet -41
Sheet -42
Sheet -43
Sheet -44
Sheet -45
Sheet -46
Sheet -46
Sheet -47
Sheet -48
To Bill Summary SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
48 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
49/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 15B - MECHANICAL
HVAC INSTALLATIONS
CHILLED WATER SYSTEM
Supply, install and test black steel pipework including
fittings thermal insulation, valves, gagues, strainers,
flexible connections and accessories as per required
drawings and spec. sections15050 to 15140 ,15510
01 15 mm dia. 175 M
02 20 mm dia. 40 M
03 25 mm dia. 70 M
04 32 mm dia. 65 M
05 40 mm dia. 30 M
06 100 mm dia. 280 M
07 150 mm dia. 185 M
08 200 mm dia. 450 M
09 300 mm dia. 260 M
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
49 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
50/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 15B - MECHANICAL
HVAC INSTALLATIONS
Isolating valves
01 300 mm dia. 2 No.
02 200 mm dia. 4 No.
03 40 mm dia. 10 No.
04 32 mm dia. 10 No.
Check valve
05 40 mm dia. 5 No.
06 32 mm dia. 5 No.
BTU meter
07 40 mm dia. 5 No.
08 32 mm dia. 5 No.
Supply, install, test and commission, Fan coil units ducted
type including control valves, pressure & temperature,
gauge, Y-strainer mounting and fixing as per drawings and
specifications section 15781
09 Ref. FCU-02, 4 KW cooling capacity 5 No.
10 Ref. FCU-03, 2.4 KW cooling capacity 5 No.
11 Ref. FCU-04, 5.1 KW cooling capacity 5 No.
12 Ref. FCU-05, 4.4 KW cooling capacity 5 No.
13 Ref. FCU-06, 1.5 KW cooling capacity 3 No.
14 Ref. FCU-07, 2.7 KW cooling capacity 6 No.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
50 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
51/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 15B - MECHANICAL
HVAC INSTALLATIONS
Supply and install of A/C unit room air conditioning type
with wooden frame as detailed on drawing and
specifications
01 Ref. RAC-01, 3.5 KW nominal coolling capacity 21 No.
Supply, install, test and commission DX- ducted split unit
including control, pipes and fixing as per drawings and
specifications
02Ref. FCU-01/ACC-01, 4KW capacity 3 No.
Supply, install, test and commission, Ventilating fans as
details on drawings and specifications, section 15860
03 Ref. PEF- 01, 13500/22500 LPS capacity with exh. Duct and 6 No.
CAP. On roof
04 Ref. EF- 02, 50 LPS capacity 3 No.
05 Ref. EF- 03, 1335 LPS capacity 3 No.
06 Ref. EF- 04, 135 LPS capacity 3 No.
07 Ref. EF- 05, 105 LPS capacity 3 No.
08 Ref. EF- 06, 80 LPS capacity 11 No.
09 Ref. EF- 07, 160 LPS capacity 4 No.
10 Ref. EF- 08, 55 LPS capacity 10 No.
11 Ref. EF- 09, 30 LPS capacity 1 No.
12 Ref. EF- 10, 40 LPS capacity 1 No.
13 Ref. EF- 11, 30 LPS capacity 4 No.
14 Ref. EF- 12, 40 LPS capacity 2 No.
15 Ref. BIF- 12, 3480 LPS capacity 23 No.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
51 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
52/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 15B - MECHANICAL
HVAC INSTALLATIONS
Supply, install, test and commission, Supply air round
ceiling diffusers with opposed blade volume damper
including frame trims & insulated plenum box as detailed
on drawing and specification, section 15860
01 Ref. SD1 5 No.
02 Ref. SD2 20 No.
Supply, install, test and commission, Supply air tegister
as detaild on drawings and specification
03 Ref. SR1/RR1 6 No.
Supply, install, test and commission, door grille
as detailed on drawings and specification
04 Ref. DG1 2 No.
05 Ref. DG2 10 No.
06 Ref. DG3 18 No.
Supply and install exhaust register as detailed on
drawing and specification, section 15891
07 Ref. ER1 12 No.
Supply and install Galvanized steel sheet rectangular
ductwork, including supports and volume damper ,
and bill mouth opening as per drawings and
specification, section 15891
08 Various gauges 950 Kg
Supply and install Duct insulation
09 Thermal semi-rigid insulation to rectangular ductwork 245 M
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
52 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
53/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 15B - MECHANICAL
HVAC INSTALLATIONS
Supply, install and operations supply motorized damber
door louver as detailed on drawing and specifications
01 Size 2200 x 950 mm 3 No.
Supply, install, test and commission, Supply air square
ceiling diffusers as detailed on drawing and specification,
section 15860
02 Ref. SD 1/A,B,C 15 No.
Supply, install, test and commission, return air round
ceiling diffusers as detailed on drawing and specification,
section 15860
03 Ref. RD 1 5 No.
04 Ref. RD 2 20 No.
Supply, install, test and commission, return air square
ceiling diffusers as detailed on drawing and specification,
section 15860
05 Ref. RD 1/A,B,C 15 No.
Supply, install and test generator exhaust ductwork with
canvass connection
06 To suit generator room 3 No.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
53 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
54/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 15B - MECHANICAL
HVAC INSTALLATIONS
Collection
Sheet - 49
Sheet - 50
Sheet - 51
Sheet - 52
Sheet - 53
To Bill Summary SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
54 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
55/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 16 - ELECTRICAL
MEDIUM VOLTAGE INSTALLATION
MVSWGR (medium voltage switchgear)
Supply , install , testing and commissioning 13.8 KV, 3 phase,
60 Hz,SF6 MVSWGR with 2 cells including all associated works
to complete installation as per drawings and specifications.
The contractor shall prepare sketches and details for approval
from SEC and shall make arrangement and required
coordination with supervising engineer to complete the work
01 Ref (MVSWGR/CL-2) 1 No
RING MAIN UNIT
Only installation, testing and commissioning for 13.8 KV, 3
phase, 60 Hz SF6 ring main unit including all associated works
for complete installation as per drawings and specifications and
required coordination (supply will be by client)
02 Ring Main Units , ref (RMU1-CL2 ,RMU2-CL2& RMU3-CL2) 3 No
Supply , install, testing and commissioning of the following
equipment including grounding, all accessories and necessary
works required for installation as per SEC regulation and as
shown on the drawings and as described in specifications andrequired coordination
03 Dry type transformer 1600 KVA, 13.8KV -400/230V, 3PH, 60HZ , ref 3 No
(TR1-CL2 , TR2-CL2 &TR3-CL2)
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
55 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
56/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 16 - ELECTRICAL
MEDIUM VOLTAGE INSTALLATION
Supply , install and test medium voltage copper Cables 15KV/
XLPE/STA/PVC, between medium voltage equipments as
shown on drawings and coordination with other disciplines
shall be conducted during work execution as per technical
specifications, drawings and by making arrangement with
supervising engineer to achieve the work to the best possible
and specifications
01 Medium voltage cable comprising 3 core 70 mm CU / XLPE /STA/ 15 M
PVC, cables route from RMU up to transformers
02 Medium voltage cable comprising 3 core 300 mm CU / XLPE /STA/ 510 M
PVC, cables
Smart Metering System
Supply, installation , testing and commissioning of Smart
Metering System comprising of M-bus master controller ,M-bus
IP router, complete with soft ware, including electronic
KWH meter, interface with water meter& digital BTU meter,
M-bus & 1 pair twisted cable # 22 AWG for each meter,
and the necessary connection to TCP/IP net work and
all associated works required as shown on drawing and as
described in specifications
To suit Building Smart Metering System as required to form a Note
complete and fully operative system to link all project buildings
with the existing data center at phase (1)
03 Electronic KWH meters 12 No
04 M-bus master controller complete with software 12 No
05 M-bus IP router 12 No
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
56 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
57/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 16 - ELECTRICAL
MAIN AND SUB-MAIN POWER
Sub-Main Circuit: supply , install , testing and commissioning
600/1000V XLPE multicore copper cable in conduit or cable
tray (measured elsewhere ) , including earth cable, junction
boxes, connection for feeders and various power loads as
shown on drawings and coordination & integration with other
systems shall be conducted during work execution as per
technical specifications, drawings and by making arrangement
with supervising engineer to achieve the work to the best
possible and specifications
01 4C-10mm2-CU/XLPE/PVC+10mm2G/ cable trench 236 M
02 4C-10mm2-CU/XLPE/PVC+10mm2G/ cable trench 5 M
03 4C-50mm2-CU/XLPE/PVC+25mm2G/ cable tray 682 M
04 4C-95mm2-CU/XLPE/PVC+50 mm2G / cable tray 10 M
05 4C-95 mm2-CU/XLPE/PVC+ 50 mm2G / cable trench 5 M
06 4C-95mm2-CU/XLPE/PVC+50mm2G/ 1 x110mm UPVC conduit 21 M
07 2(4C-120mm2-CU/XLPE/PVC)+120mm2G / cable tray 121 M
08 2(4C-150mm2-CU/XLPE/PVC)+150mm2G / cable tray 198 M
09 2(4C-150mm2-CU/XLPE/PVC)+150mm2G / cable trench 10 M
10 4C-185mm2-CU/XLPE/PVC+95mm2G / cable trench 10 M
11 2(4C-185mm2-CU/XLPE/PVC) / cable tray 12 M
12 4C-185mm2-CU/XLPE/PVC / 1 x110mm UPVC conduit 18 M
13 2(4C-185mm2-CU/XLPE/PVC) / 2 x110mm UPVC conduit 15 M
14 2(4C-185mm2-CU/XLPE/PVC)+185mm2G / cable tray 364 M
15 2(4C-185mm2-CU/XLPE/PVC)+185mm2G / cable trench 5 M
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
57 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
58/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 16 - ELECTRICAL
MAIN AND SUB-MAIN POWER
Sub-Main Circuit: supply , install , testing and commissioning
600/1000V XLPE multicore copper cable in conduit or cable
tray (measured elsewhere ) , including earth cable, junction
boxes, connection for feeders and various power loads as
shown on drawings and coordination & integration with other
systems shall be conducted during work execution as per
technical specifications, drawings and by making arrangement
with supervising engineer to achieve the work to the best
possible and specifications
01 4C-240mm2-CU/XLPE/PVC+120mm2G / cable tray 121 M
02 4C-240mm2-CU/XLPE/PVC+120mm2G / cable trench 5 M
03 2(4C-240mm2-CU/XLPE/PVC)+240mm2G / cable tray 125 M
04 2(4C-240mm2-CU/XLPE/PVC)+240mm2G / cable trench 29 M
05 4C-300mm2-CU/XLPE/PVC+150mm2G / cable tray 198 M
06 3(4X1C-630mm2)-CU/XLPE/PVC / cable trench 30 M
The following items listed below shown in drawing AP05 - E701 ,
AP07 - E701 &SF03 - E701(inside each apartment building
AP05, AP07 &SF03.)
07 4C-10mm2-CU/XLPE/PVC+10 mm2G/ cable tray 100 M
08 4C-10mm2-CU/XLPE/PVC+10mm2G/ 50mm UPVC conduit 100 M
09 4C-50mm+1C-25mmG-CU/XLPE/PVC/ cable tray 50 M
10 4C-70mm+1C-35mmG-CU/XLPE/PVC / cable tray 50 M
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
58 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
59/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 16 - ELECTRICAL
MAIN AND SUB-MAIN POWER
Supply and install an Emergency Power Generating Sets
including associated Generator Control Panel . In addition to
circuit breakers, pads, supports, controls, daily and diesel fuel
with necessary connections to earth as per the manufacture
including all necessary equipment, accessories and associated
works, as shown on drawings and as described in
specifications. sections
01. - , , , , , , .
1 No
02
. - , , , , , , .
1 No
03. - , , , , , , .
1 No
MAN / HAND HOLE
Supply, install, testing and commissioning reinforced concrete
manholes and hand holes connected via UPVC conduit,
complete with hand hole bolted type metal cover, drain pipe
outlet, including trenching and backfilling for UPVC conduits
for power and communication cables in UPVC conduit, tapes, ,
grounding, all as required to suit locations as shown on
drawings and coordination & integration with other systems
shall be conducted during work execution as per technicalspecifications, drawings and by making arrangement with
supervising engineer to achieve the work to the best possible
and specifications
04 Power manhole (1800x1800x1800mm) ( Ref.PMH). 14 No
05 Power hand hole (900x900x900mm) ( Ref.PHH). 3 No
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
59 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
60/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 16 - ELECTRICAL
MAIN AND SUB-MAIN POWER
Supply , install , testing and commissioning of panel boards
including grounding, circuit breakers, grounding, fixings,
markers units and all associated works as required and shown
on drawings and coordination & integration with other systems
shall be conducted during work execution as per technical
specifications, drawings and by making arrangement with
supervising engineer to achieve the work to the best possible
and specifications
01 Ref. MDP-P1 1 No
02 Ref. DP51 5 No
03 Ref. DP52 5 No
04 Ref. DPS5 5 No
05 Ref. PPSD 5 No
06 Ref. DPSB1 1 No
07 Ref. PPSB1 1 No
08 Ref. SLP2B ( listed in bill of site lighting package ) 1 No NIC
09 Ref. EDPSB1 with ATS (built-in ) 1 No
10 Ref. EPSB1 1 No
11 Ref. EPMSB1 1 No
12 Ref. EPMSB1A 1 No
13 Ref. EMDP1 1 No
14 Ref. EDPS5 with ATS (built-in ) 5 No
15 Ref. EPSD 5 No
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
60 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
61/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 16 - ELECTRICAL
MAIN AND SUB-MAIN POWER
Supply , install , testing and commissioning of panel boards
including grounding, circuit breakers, grounding, fixings,
markers units and all associated works as required and shown
on drawings and coordination & integration with other systems
shall be conducted during work execution as per technical
specifications, drawings and by making arrangement with
supervising engineer to achieve the work to the best possible
and specifications
01 Ref. MDP-P2 1 No
02 Ref. DP71 5 No
03 Ref. DPS7 5 No
04 Ref. EPSF 5 No
05 Ref. DP72 5 No
06 Ref. DPSB2 1 No
07 Ref. PPSB2 1 No
08 Ref. SLP2A ( listed in bill of site lighting package ) 1 No NIC
09 Ref. PPT 3 No
10 Ref. EDPSB2 with ATS (built-in ) 1 No
11 Ref. EPSB2 1 No
12 Ref. EPMSB2 1 No
13 Ref. EPMSB2A 1 No
14 Ref. EMDP2 1 No
15 Ref. EDPS7 with ATS (built-in ) 5 No
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
61 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
62/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 16 - ELECTRICAL
MAIN AND SUB-MAIN POWER
Supply , install , testing and commissioning of panel boards
including grounding, circuit breakers, grounding, fixings,
markers units and all associated works as required and shown
on drawings and coordination & integration with other systems
shall be conducted during work execution as per technical
specifications, drawings and by making arrangement with
supervising engineer to achieve the work to the best possible
and specifications
01 Ref. EPSF 5 No
02 Ref. MDP-P3 1 No
03 Ref. EMDP3 1 No
04 Ref. MCC ( supplied and installed by others ) 1 No NIC
05 Ref. EPP1 1 No
06 Ref. EPP2 1 No
Supply , install , testing and commissioning of circuit breaker
including cables, conduits, fittings, supports, fixings, tapes,connections enclosures and all necessary works required to
suit the locations shown on drawings and coordination &
integration with other systems shall be conducted during work
execution as per technical specifications, drawings and by
making arrangement with supervising engineer to achieve the
work to the best possible and specifications
07 200AT /250AF Rating. 1 No
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
62 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)
63/79
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL02)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 16 - ELECTRICAL
MAIN AND SUB-MAIN POWER
Sub-Main circuit :Supply , install, Power & Communication
distribution galvanized steel cable trays, including fittings,
supports and all accessories as described on drawing
Coordination with other disciplines shall be conducted during
work execution as per technical specifications, drawings and
by making arrangement with supervising engineer to achieve
the work to the best possible and specifications
01 200 mm wide 600 M
02 300 mm wide 1600 M
03 400 mm wide 150 M
04 400 mm wide double layer 200 M
05 600 mm wide 25 M
06 800 mm wide 50 M
07 800 mm wide double layer 140 M
08 900 mm wide 30 M
09 1000 mm wide 25 M
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
63 / 79
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL02 (MAY 2012)