SAP PS User manual
Published by Team of
SAP Consultants at
SAPTOPJOBS
Visit us at www.sap-topjobs.com
Copyright 2008-10@SAPTOPJOBS
All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form, or by any means electronic or mechanical including photocopying, recording or any information storage and retrieval system without permission in writing from SAPTOPJOBS
![Page 2: CJ2D - Create Project v1](https://reader030.fdocuments.net/reader030/viewer/2022013101/563db7e9550346aa9a8f1e6e/html5/thumbnails/2.jpg)
Create Project CJ2D
Definition:- There are different ways to create a project in PS. It can be created using
Project builder – CJ20N Project Planning board – CJ27 Structure planning – CJ2D Project Definition only – CJ06
Project contains Project definition, WBS element, Network and Activities. It is possible to create all at once or individually. Let us try to understand how to create project using CJ2D transaction code. Prerequisite:- Proper authorization to create project. Menu Path:- Logistics → Project system → Basic Data Project → Special Maintenance Functions Structure Planning
Create Project CJ2D Double click CJ2D
![Page 3: CJ2D - Create Project v1](https://reader030.fdocuments.net/reader030/viewer/2022013101/563db7e9550346aa9a8f1e6e/html5/thumbnails/3.jpg)
Click to find the next running number Enter the required series to find the next number in that series
![Page 4: CJ2D - Create Project v1](https://reader030.fdocuments.net/reader030/viewer/2022013101/563db7e9550346aa9a8f1e6e/html5/thumbnails/4.jpg)
Click
![Page 5: CJ2D - Create Project v1](https://reader030.fdocuments.net/reader030/viewer/2022013101/563db7e9550346aa9a8f1e6e/html5/thumbnails/5.jpg)
number proposed Click Enter project profile. Enter start and finish date Click
![Page 6: CJ2D - Create Project v1](https://reader030.fdocuments.net/reader030/viewer/2022013101/563db7e9550346aa9a8f1e6e/html5/thumbnails/6.jpg)
Click Enter project definition text. E.g.
![Page 7: CJ2D - Create Project v1](https://reader030.fdocuments.net/reader030/viewer/2022013101/563db7e9550346aa9a8f1e6e/html5/thumbnails/7.jpg)
Note:- this is same as explained already in other methods of project definition creation. Click Maintain the required data as per the project
![Page 8: CJ2D - Create Project v1](https://reader030.fdocuments.net/reader030/viewer/2022013101/563db7e9550346aa9a8f1e6e/html5/thumbnails/8.jpg)
Click and maintain detailed description if required. From the top of the menu goto WBS element
![Page 9: CJ2D - Create Project v1](https://reader030.fdocuments.net/reader030/viewer/2022013101/563db7e9550346aa9a8f1e6e/html5/thumbnails/9.jpg)
Maintain the WBS element as shown below
![Page 10: CJ2D - Create Project v1](https://reader030.fdocuments.net/reader030/viewer/2022013101/563db7e9550346aa9a8f1e6e/html5/thumbnails/10.jpg)
Select the row Click Enter start and finish date
![Page 11: CJ2D - Create Project v1](https://reader030.fdocuments.net/reader030/viewer/2022013101/563db7e9550346aa9a8f1e6e/html5/thumbnails/11.jpg)
Select the row and click at the bottom Maintain Basic data
![Page 12: CJ2D - Create Project v1](https://reader030.fdocuments.net/reader030/viewer/2022013101/563db7e9550346aa9a8f1e6e/html5/thumbnails/12.jpg)
Click Maintain the settlement rule asset as receiver.
![Page 13: CJ2D - Create Project v1](https://reader030.fdocuments.net/reader030/viewer/2022013101/563db7e9550346aa9a8f1e6e/html5/thumbnails/13.jpg)
Click Click and maintain entry as required
![Page 14: CJ2D - Create Project v1](https://reader030.fdocuments.net/reader030/viewer/2022013101/563db7e9550346aa9a8f1e6e/html5/thumbnails/14.jpg)
Click
![Page 15: CJ2D - Create Project v1](https://reader030.fdocuments.net/reader030/viewer/2022013101/563db7e9550346aa9a8f1e6e/html5/thumbnails/15.jpg)
Select the row Click Maintain scheduling
![Page 16: CJ2D - Create Project v1](https://reader030.fdocuments.net/reader030/viewer/2022013101/563db7e9550346aa9a8f1e6e/html5/thumbnails/16.jpg)
Click Click Maintain the data as shown below.
![Page 17: CJ2D - Create Project v1](https://reader030.fdocuments.net/reader030/viewer/2022013101/563db7e9550346aa9a8f1e6e/html5/thumbnails/17.jpg)
Click From the project definition using menu from the top as shown below, release the project
![Page 18: CJ2D - Create Project v1](https://reader030.fdocuments.net/reader030/viewer/2022013101/563db7e9550346aa9a8f1e6e/html5/thumbnails/18.jpg)
Click
![Page 19: CJ2D - Create Project v1](https://reader030.fdocuments.net/reader030/viewer/2022013101/563db7e9550346aa9a8f1e6e/html5/thumbnails/19.jpg)
SAP PS User manual
Published by Team of
SAP Consultants at
SAPTOPJOBS
Visit us at www.sap-topjobs.com
Copyright 2008-10@SAPTOPJOBS
All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form, or by any means electronic or mechanical including photocopying, recording or any information storage and retrieval system without permission in writing from SAPTOPJOBS
![Page 20: CJ2D - Create Project v1](https://reader030.fdocuments.net/reader030/viewer/2022013101/563db7e9550346aa9a8f1e6e/html5/thumbnails/20.jpg)