CIVIL/MILITARY WORKSHOP FABCE ASM/ATFCM process Validation Plan Stjepan Varga Brussels, 20.09.2012.

19
CIVIL/MILITARY WORKSHOP FABCE ASM/ATFCM process Validation Plan Stjepan Varga Brussels, 20.09.2012

Transcript of CIVIL/MILITARY WORKSHOP FABCE ASM/ATFCM process Validation Plan Stjepan Varga Brussels, 20.09.2012.

Page 1: CIVIL/MILITARY WORKSHOP FABCE ASM/ATFCM process Validation Plan Stjepan Varga Brussels, 20.09.2012.

CIVIL/MILITARY

WORKSHOP FABCE

ASM/ATFCM process

Validation Plan

Stjepan Varga                                                

                

       Brussels, 20.09.2012

Page 2: CIVIL/MILITARY WORKSHOP FABCE ASM/ATFCM process Validation Plan Stjepan Varga Brussels, 20.09.2012.

IMPLEMENTATION PLAN

• Step approach• Distinction of ASM/ATFCM process and organisational enablers• GO/NO GO to move next step• Starting from national ASM/ATFCM integration process• Regional ASM/ATFCM process final goal• Organisational solution to be evaluated in due time• Timeframe to consider 2012-2015 for realistic implementation• Changes subject to validation before GO/NO GO decision.

Page 3: CIVIL/MILITARY WORKSHOP FABCE ASM/ATFCM process Validation Plan Stjepan Varga Brussels, 20.09.2012.

3

ATFCM/ASM Functional Models• Model A - Optimizing the current situation

• Role: Existing roles continue with additional FABCE Network management

• Model B - Optimizing the current situation, applying LEAD AMC

• Role: Existing roles continue with additional LAED AMC to support FABCE ASM management

• Model C - FABCE ATFCM coordination function, and national ASM

• Role: A FABCE Network ATFCM Centre

• Model D - FABCE ASM coordination function, and national ATFCM

• Role: FABCE Network ASM Centre

• Model E - FABCE ATFCM/ASM coordination function

• Role: FABCE Network Operations Centre

Page 4: CIVIL/MILITARY WORKSHOP FABCE ASM/ATFCM process Validation Plan Stjepan Varga Brussels, 20.09.2012.

4

Page 5: CIVIL/MILITARY WORKSHOP FABCE ASM/ATFCM process Validation Plan Stjepan Varga Brussels, 20.09.2012.

High Level Objectives

• Assess the feasibility of ASM/ATFCM coordination procedures at national level;

• Assess the feasibility of ASM/ATFCM coordination procedures at FAB level using national Structures

• Assess the feasibility of ASM/ATFCM coordination procedures at FAB level using Lead AMC Concept

• Assess the feasibility of ASM/ATFCM coordination procedures between national structure/Lead AMCs and NM

• Assess usability of different ASM planning and coordination tools, which could be applied in FAB CE operational environment;

Page 6: CIVIL/MILITARY WORKSHOP FABCE ASM/ATFCM process Validation Plan Stjepan Varga Brussels, 20.09.2012.

HU

SK

BiH

HRSL

AT

CZ

CZ YES – FL or AreasAT YES – FL or AreasSK YES – FL or AreasHU YES – FL or AreasSL YES – FL or AreasHR YES – FL or AreasBiH NO

Geographical ScopeGeographical Scope

Page 7: CIVIL/MILITARY WORKSHOP FABCE ASM/ATFCM process Validation Plan Stjepan Varga Brussels, 20.09.2012.

Procedures - Scope• D-7/D-2

• D-1 AUP

Page 8: CIVIL/MILITARY WORKSHOP FABCE ASM/ATFCM process Validation Plan Stjepan Varga Brussels, 20.09.2012.

FABCE – Potential Traffic on Night Segments if available H24

Traffic sample for Friday 14/10/2011

Numbers show flights on segment for the period 0500-2300

Page 9: CIVIL/MILITARY WORKSHOP FABCE ASM/ATFCM process Validation Plan Stjepan Varga Brussels, 20.09.2012.

NM

AAAAAAAA

AAAAAA

FPFPFPAMC

AMCAMCAMC

FMPFMPFMPFMP

FMPFMPFMP

MODEL AMODEL A

FAB AD

Page 10: CIVIL/MILITARY WORKSHOP FABCE ASM/ATFCM process Validation Plan Stjepan Varga Brussels, 20.09.2012.

Live trial positive feedback

– Communication– Coordination among actors – Harmonisation of UQ 863 publication – FAB CE administrator– Rotation principle for FAB CE administrator– General Systems support feasible

Page 11: CIVIL/MILITARY WORKSHOP FABCE ASM/ATFCM process Validation Plan Stjepan Varga Brussels, 20.09.2012.

Live trial issues• Procedures

– Respect timeline for uploading and publication– Respect of sequence of tasks – Confusion for weekend consolidation– Confusion for contingency procedure application (different procedures?)– Missed network coordination

• NOP Publications– Status publish for national files (FMP)– Wrong information in files– Wrong templates– Confusion for D-2/6 files– Inconsistency of information (FAB AUP vs EAUP)

• Systems– LARA connection – internet– NOP connection

Page 12: CIVIL/MILITARY WORKSHOP FABCE ASM/ATFCM process Validation Plan Stjepan Varga Brussels, 20.09.2012.

12

Page 13: CIVIL/MILITARY WORKSHOP FABCE ASM/ATFCM process Validation Plan Stjepan Varga Brussels, 20.09.2012.

NM

AAAAAAAA

AAAAAA

FPFPAMCAMC

AMCAMCAMC

FMPFMPFMPFMP

FMPFMPFMP

FATFCM

MODEL CMODEL C

Page 14: CIVIL/MILITARY WORKSHOP FABCE ASM/ATFCM process Validation Plan Stjepan Varga Brussels, 20.09.2012.

NM

AAAAAAAA

AAAAAA

FPFPAMCAMC

AMCAMCAMC

FMPFMPFMPFMP

FMPFMPFMP

FASM

MODEL DMODEL D

Page 15: CIVIL/MILITARY WORKSHOP FABCE ASM/ATFCM process Validation Plan Stjepan Varga Brussels, 20.09.2012.

AAAAAAAA

AAAAAA

FPFPAMCAMC

AMCAMCAMC

FMPFMPFMPFMP

FMPFMPFMP

NM

MODEL EMODEL E

FATFCMFASM

Page 16: CIVIL/MILITARY WORKSHOP FABCE ASM/ATFCM process Validation Plan Stjepan Varga Brussels, 20.09.2012.

High Level Objectives

• Assess the feasibility of ASM/ATFCM coordination procedures at FAB level using FAB ATFCM coordinator

• Assess the feasibility of ASM/ATFCM coordination procedures at FAB level using FAB ASM coordinator

• Assess the feasibility of ASM/ATFCM coordination procedures at FAB level using FAB ASM/ATFCM coordinator

• Assess the feasibility of ASM/ATFCM coordination procedures between FAB ASM/ATFCM coordinator and NM

Page 17: CIVIL/MILITARY WORKSHOP FABCE ASM/ATFCM process Validation Plan Stjepan Varga Brussels, 20.09.2012.

Operational scenario• CDRs cross borders• CDR synchronisation• CBAs• ATFM scenarios

– Alignment sector configurations/opening schemes– Alignment ATFM measures

• Level capping• Re-routings

Page 18: CIVIL/MILITARY WORKSHOP FABCE ASM/ATFCM process Validation Plan Stjepan Varga Brussels, 20.09.2012.

RTS Technical LayoutRTS Technical Layout

Predict, NOP

LARA, CIAM NOP

Predict, SIMEX, NOP

LARA, CIAM NOP

Predict, NOP

LARA, CIAM NOP

Predict, NOP

LARA, CIAM NOP

Predict, NOP

LARA, CIAM NOP

Predict, NOP

LARA, CIAM NOP

Predict, NOP

LARA, CIAM NOP

Predict, NOP

LARA, CIAM NOP

Predict, SIMEX, NOP

LARA, CIAM NOP

Page 19: CIVIL/MILITARY WORKSHOP FABCE ASM/ATFCM process Validation Plan Stjepan Varga Brussels, 20.09.2012.