Civil r 2013

download Civil r 2013

If you can't read please download the document

description

Syllabus

Transcript of Civil r 2013

Faculty of Civil Engineering

B.E. Civil Engineering

(R 2013) Semester III

CE6311

SURVEY PRACTICAL I

Requirements for a batch of 30 students

Sl.

Quantity

Quantity

Deficiency

Description of Equipment

required

available

No.

(R - A)

(R)

(A)

1.

Total Station

3

3

NIL

2.

Theodolites

6

6

NIL

3.

Dumpy level

6

6

NIL

4.

Plane table

6

6

NIL

5.

Pocket stereoscope

1

1

NIL

6.

Ranging rods

6 (set)

30 nos

NIL

7.

Leveling staff

6 (set)

10 nos

NIL

8.

Cross staff

6 (set)

10 nos

NIL

9.

Chains

6 (set)

10 nos

NIL

10.

Tapes

6 (set)

10 nos

NIL

11.

Arrows

6 (set)

5 10 nos

NIL

12.

Prismatic Compass

3

10

NIL

13.

Surveyor Compass

1

1

NIL

1

Faculty of Civil Engineering

B.E. Civil Engineering

(R 2013) Semester III

CE6312 COMPUTER AIDED BUILDING DRAWING

Requirements for a batch of 30 students

Sl.

Quantity

Quantity

Deficiency

Description of Equipment

required

available

No.

(R - A)

(R)

(A)

Computer system of Pentium IV or

30

1.

equivalent

45

Nil

2.

AUTOCAD

10

10

Nil

2

Faculty of Civil Engineering

B.E. Civil Engineering

(R 2013) Semester IV

CE6411 STRENGTH OF MATERIALS LABORATORY

Requirements for a batch of 30 students

Sl.

Quantity

Quantity

Deficiency

Description of Equipment

required

available

No.

(R - A)

(R)

(A)

1.

UTM of minimum 400 KN capacity

1

1

Nil

2.

Torsion testing machine for steel rods

1

1

Nil

3.

Izod impact testing machine

1

1

Nil

Hardness testing machine

Rockwell

1 each

4.

Vickers

(any 2)

1 each

Nil

Brinnel

5.

Beam deflection test apparatus

1

1

Nil

6.

Extensometer

1

1

Nil

7.

Compressometer

1

1

Nil

8.

Dial gauges

Few

3

Nil

9.

Le Chateliers apparatus

2

2

Nil

10.

Vicats apparatus

2

2

Nil

11.

Mortar cube moulds

10

10

Nil

3

Faculty of Civil Engineering

B.E. Civil Engineering

(R 2013) Semester IV

CE6412 HYDRAULIC ENGINEERING LABORATORY

Requirements for a batch of 30 students

Sl.

Quantity

Quantity

Deficiency

Description of Equipment

required

available

No.

(R - A)

(R)

(A)

Bernoullis theorem Verification

1

No.

1 No.

Nil

1.

Apparatus

Calculation of Metacentric height

1

No.

1 No.

Nil

2.

water tank Ship model with

accessories

Measurement of velocity

1

No.

1 No.

Nil

3.

Pitot tube assembly

Flow measurement

open channel flow

(i) Channel with provision for fixing

notches (rectangular, triangular &

1

Unit

4.

trapezoidal forms)

1 Unit

Nil

(ii) Flume assembly with provisions for

conducting experiments on

1

Unit

Hydraulic jumps, generation of

1 Unit

Nil

surges etc.

Flow measurement in pipes

(i)

Venturimeter,U tube manometer

fixtures like Valves, collecting tank

1

Unit

1 Unit

Nil

(ii)

Orifice meter, with all necessary

5.

fittings in pipe lines of different

1

Unit

1 Unit

Nil

diameters

(iii) Calibration of flow through orifice

1

Unit

1 Unit

Nil

tank with Provisions for fixing

orifices of different shapes,

collecting tank

(iv) Calibration of flow through mouth

pieceTank with provisions for

1

Unit

fixing mouth pieces Viz external

1 Unit

Nil

4

mouth pieces & internal mouth

piece Bordas mouth piece

Losses in Pipes

Major loss Friction loss

6.

Pipe lengths (min. 3m) of different

1 Unit

1 Unit

Nil

diameters with Valves and

pressure rapping & collecting tank

Minor Losses

Pipe line assembly with provisions

7.

for having Sudden contractions in

1 Unit

diameter, expansions Bends,

1 Unit

Nil

elbow fitting, etc.

Pumps

(i)

Centrifugal pump assembly

1 Unit

1 Unit

Nil

with accessories (single stage)

(ii)

Centrifugal pump assembly

1 Unit

1 Unit

Nil

8.

with accessories (multi stage)

(iii)

Reciprocating pump assembly

1 Unit

1 Unit

Nil

with accessories

(iv)

Deep well pump assembly set

1 Unit

1 Unit

Nil

with accessories

Turbine

(i)

Impulse turbine assembly with

1 Unit

1 Unit

Nil

fittings & accessories

9.

(ii)

Francis turbine assembly with

1 Unit

1 Unit

Nil

fittings & accessories

(iii)

Kaplan turbine assembly with

1 Unit

1 Unit

Nil

fittings & accessories

5

Faculty of Civil Engineering

B.E. Civil Engineering

(R 2013) Semester IV

CE6413

SURVEY PRACTICAL II

Requirements for a batch of 30 students

Sl.

Quantity

Quantity

Deficiency

Description of Equipment

required

available

No.

(R - A)

(R)

(A)

1.

Total Station

3

3

Nil

2.

Theodolites

6

6

Nil

3.

Dumpy level

6

6

Nil

4.

Plane table

6

6

Nil

5.

Pocket stereoscope

1

1

Nil

6.

Ranging rods

6

6

Nil

7.

Levelling staff

6

6

Nil

8.

Cross staff

6

6

Nil

9.

Chains

6

6

Nil

10.

Tapes

6

6

Nil

11.

Arrows

6

6

Nil

12.

Hand held GPS

3

3

Nil

6

Faculty of Civil Engineering

B.E. Civil Engineering

(R 2013) Semester V

CE6511 SOIL MECHANICS LABORATORY

Requirements for a batch of 30 students

Sl.

Quantity

Quantity

Deficiency

Description of Equipment

required

available

No.

(R - A)

(R)

(A)

1.

Sieves

2

2.

Hydrometer

2

3.

Liquid and plastic limit apparatus

2

4.

Shinkage limit apparatus

3

5.

Proctor compaction apparatus

2

6.

UTM of minimum of 20KN capacity

1

7.

Direct shear apparatus

1

8.

Thermometer

2

9.

Field density measuring device

2

10.

Triaxial shear apparatus

1

11.

Three gang consolidation test device

1

7

Faculty of Civil Engineering

B.E. Civil Engineering

(R 2013) Semester VI

CE6611 ENVIRONMENTAL ENGINEERING LABORATORY

Requirements for a batch of 30 students

Sl.

Quantity

Quantity

Deficiency

Description of Equipment

required

available

No.

(R - A)

(R)

(A)

1.

Oxygen analyzer

1

2.

Spectrophotometer

1

3.

Ion selective electrode

1

4.

Sodium Potassium Analyzer Flame

1

Photometer

5.

Gas Chromatography

1

6.

Atomic absorption spectroscopy (Ni,

1

Zn, Pb)

7.

Nephlo - turbidity meter

1

8.

BOD Analyser

1

9.

COD Analyser

1

10.

Jar Test Apparatus

1

8

Faculty of Civil Engineering

B.E. Civil Engineering

(R 2013) Semester VI

CE6612 CONCRETE AND HIGHWAY ENGINEERING LABORATORY

Requirements for a batch of 30 students

Sl.

Quantity

Quantity

Deficiency

Description of Equipment

required

available

No.

(R - A)

(R)

(A)

1.

Concrete cube moulds

6

2.

Concrete cylinder moulds

3

3.

Concrete Prism moulds

3

4.

Sieves

1Set

5.

Concrete Mixer

1

6.

Slump cone

3

7.

Flow table

1

8.

Vibrator

1

9.

Trovels and planers

1Set

10.

UTM 400 kN capacity

1

11.

Vee Bee Consistometer

1

12.

Aggregate impact testing machine

1

13.

CBR Apparatus

1

14.

Blains Apparatus

1

15.

Los - Angeles abrasion testing machine

1

16.

Marshall Stability Apparatus

1

9

Faculty of Civil Engineering

B.E. Civil Engineering

(R 2013) Semester VII

CE6711 COMPUTER AIDED DESIGN AND DRAFTING LABORATORY

Requirements for a batch of 30 students

Sl.

Quantity

Quantity

Deficiency

Description of Equipment

required

available

No.

(R - A)

(R)

(A)

1.

Models of Structures

1Each

2.

Computers Pentium IV

30

Analysis and Design Software -

3.

Minimum 5 use License

1

10