Civil r 2013
-
Upload
rexdindigul -
Category
Documents
-
view
213 -
download
0
description
Transcript of Civil r 2013
Faculty of Civil Engineering
B.E. Civil Engineering
(R 2013) Semester III
CE6311
SURVEY PRACTICAL I
Requirements for a batch of 30 students
Sl.
Quantity
Quantity
Deficiency
Description of Equipment
required
available
No.
(R - A)
(R)
(A)
1.
Total Station
3
3
NIL
2.
Theodolites
6
6
NIL
3.
Dumpy level
6
6
NIL
4.
Plane table
6
6
NIL
5.
Pocket stereoscope
1
1
NIL
6.
Ranging rods
6 (set)
30 nos
NIL
7.
Leveling staff
6 (set)
10 nos
NIL
8.
Cross staff
6 (set)
10 nos
NIL
9.
Chains
6 (set)
10 nos
NIL
10.
Tapes
6 (set)
10 nos
NIL
11.
Arrows
6 (set)
5 10 nos
NIL
12.
Prismatic Compass
3
10
NIL
13.
Surveyor Compass
1
1
NIL
1
Faculty of Civil Engineering
B.E. Civil Engineering
(R 2013) Semester III
CE6312 COMPUTER AIDED BUILDING DRAWING
Requirements for a batch of 30 students
Sl.
Quantity
Quantity
Deficiency
Description of Equipment
required
available
No.
(R - A)
(R)
(A)
Computer system of Pentium IV or
30
1.
equivalent
45
Nil
2.
AUTOCAD
10
10
Nil
2
Faculty of Civil Engineering
B.E. Civil Engineering
(R 2013) Semester IV
CE6411 STRENGTH OF MATERIALS LABORATORY
Requirements for a batch of 30 students
Sl.
Quantity
Quantity
Deficiency
Description of Equipment
required
available
No.
(R - A)
(R)
(A)
1.
UTM of minimum 400 KN capacity
1
1
Nil
2.
Torsion testing machine for steel rods
1
1
Nil
3.
Izod impact testing machine
1
1
Nil
Hardness testing machine
Rockwell
1 each
4.
Vickers
(any 2)
1 each
Nil
Brinnel
5.
Beam deflection test apparatus
1
1
Nil
6.
Extensometer
1
1
Nil
7.
Compressometer
1
1
Nil
8.
Dial gauges
Few
3
Nil
9.
Le Chateliers apparatus
2
2
Nil
10.
Vicats apparatus
2
2
Nil
11.
Mortar cube moulds
10
10
Nil
3
Faculty of Civil Engineering
B.E. Civil Engineering
(R 2013) Semester IV
CE6412 HYDRAULIC ENGINEERING LABORATORY
Requirements for a batch of 30 students
Sl.
Quantity
Quantity
Deficiency
Description of Equipment
required
available
No.
(R - A)
(R)
(A)
Bernoullis theorem Verification
1
No.
1 No.
Nil
1.
Apparatus
Calculation of Metacentric height
1
No.
1 No.
Nil
2.
water tank Ship model with
accessories
Measurement of velocity
1
No.
1 No.
Nil
3.
Pitot tube assembly
Flow measurement
open channel flow
(i) Channel with provision for fixing
notches (rectangular, triangular &
1
Unit
4.
trapezoidal forms)
1 Unit
Nil
(ii) Flume assembly with provisions for
conducting experiments on
1
Unit
Hydraulic jumps, generation of
1 Unit
Nil
surges etc.
Flow measurement in pipes
(i)
Venturimeter,U tube manometer
fixtures like Valves, collecting tank
1
Unit
1 Unit
Nil
(ii)
Orifice meter, with all necessary
5.
fittings in pipe lines of different
1
Unit
1 Unit
Nil
diameters
(iii) Calibration of flow through orifice
1
Unit
1 Unit
Nil
tank with Provisions for fixing
orifices of different shapes,
collecting tank
(iv) Calibration of flow through mouth
pieceTank with provisions for
1
Unit
fixing mouth pieces Viz external
1 Unit
Nil
4
mouth pieces & internal mouth
piece Bordas mouth piece
Losses in Pipes
Major loss Friction loss
6.
Pipe lengths (min. 3m) of different
1 Unit
1 Unit
Nil
diameters with Valves and
pressure rapping & collecting tank
Minor Losses
Pipe line assembly with provisions
7.
for having Sudden contractions in
1 Unit
diameter, expansions Bends,
1 Unit
Nil
elbow fitting, etc.
Pumps
(i)
Centrifugal pump assembly
1 Unit
1 Unit
Nil
with accessories (single stage)
(ii)
Centrifugal pump assembly
1 Unit
1 Unit
Nil
8.
with accessories (multi stage)
(iii)
Reciprocating pump assembly
1 Unit
1 Unit
Nil
with accessories
(iv)
Deep well pump assembly set
1 Unit
1 Unit
Nil
with accessories
Turbine
(i)
Impulse turbine assembly with
1 Unit
1 Unit
Nil
fittings & accessories
9.
(ii)
Francis turbine assembly with
1 Unit
1 Unit
Nil
fittings & accessories
(iii)
Kaplan turbine assembly with
1 Unit
1 Unit
Nil
fittings & accessories
5
Faculty of Civil Engineering
B.E. Civil Engineering
(R 2013) Semester IV
CE6413
SURVEY PRACTICAL II
Requirements for a batch of 30 students
Sl.
Quantity
Quantity
Deficiency
Description of Equipment
required
available
No.
(R - A)
(R)
(A)
1.
Total Station
3
3
Nil
2.
Theodolites
6
6
Nil
3.
Dumpy level
6
6
Nil
4.
Plane table
6
6
Nil
5.
Pocket stereoscope
1
1
Nil
6.
Ranging rods
6
6
Nil
7.
Levelling staff
6
6
Nil
8.
Cross staff
6
6
Nil
9.
Chains
6
6
Nil
10.
Tapes
6
6
Nil
11.
Arrows
6
6
Nil
12.
Hand held GPS
3
3
Nil
6
Faculty of Civil Engineering
B.E. Civil Engineering
(R 2013) Semester V
CE6511 SOIL MECHANICS LABORATORY
Requirements for a batch of 30 students
Sl.
Quantity
Quantity
Deficiency
Description of Equipment
required
available
No.
(R - A)
(R)
(A)
1.
Sieves
2
2.
Hydrometer
2
3.
Liquid and plastic limit apparatus
2
4.
Shinkage limit apparatus
3
5.
Proctor compaction apparatus
2
6.
UTM of minimum of 20KN capacity
1
7.
Direct shear apparatus
1
8.
Thermometer
2
9.
Field density measuring device
2
10.
Triaxial shear apparatus
1
11.
Three gang consolidation test device
1
7
Faculty of Civil Engineering
B.E. Civil Engineering
(R 2013) Semester VI
CE6611 ENVIRONMENTAL ENGINEERING LABORATORY
Requirements for a batch of 30 students
Sl.
Quantity
Quantity
Deficiency
Description of Equipment
required
available
No.
(R - A)
(R)
(A)
1.
Oxygen analyzer
1
2.
Spectrophotometer
1
3.
Ion selective electrode
1
4.
Sodium Potassium Analyzer Flame
1
Photometer
5.
Gas Chromatography
1
6.
Atomic absorption spectroscopy (Ni,
1
Zn, Pb)
7.
Nephlo - turbidity meter
1
8.
BOD Analyser
1
9.
COD Analyser
1
10.
Jar Test Apparatus
1
8
Faculty of Civil Engineering
B.E. Civil Engineering
(R 2013) Semester VI
CE6612 CONCRETE AND HIGHWAY ENGINEERING LABORATORY
Requirements for a batch of 30 students
Sl.
Quantity
Quantity
Deficiency
Description of Equipment
required
available
No.
(R - A)
(R)
(A)
1.
Concrete cube moulds
6
2.
Concrete cylinder moulds
3
3.
Concrete Prism moulds
3
4.
Sieves
1Set
5.
Concrete Mixer
1
6.
Slump cone
3
7.
Flow table
1
8.
Vibrator
1
9.
Trovels and planers
1Set
10.
UTM 400 kN capacity
1
11.
Vee Bee Consistometer
1
12.
Aggregate impact testing machine
1
13.
CBR Apparatus
1
14.
Blains Apparatus
1
15.
Los - Angeles abrasion testing machine
1
16.
Marshall Stability Apparatus
1
9
Faculty of Civil Engineering
B.E. Civil Engineering
(R 2013) Semester VII
CE6711 COMPUTER AIDED DESIGN AND DRAFTING LABORATORY
Requirements for a batch of 30 students
Sl.
Quantity
Quantity
Deficiency
Description of Equipment
required
available
No.
(R - A)
(R)
(A)
1.
Models of Structures
1Each
2.
Computers Pentium IV
30
Analysis and Design Software -
3.
Minimum 5 use License
1
10