City of Winnipeg SOUTHWESTERN RAPID TRANSIT CORRIDOR Bidder Meeting October 16 th, 2009.
-
Upload
anabel-malone -
Category
Documents
-
view
219 -
download
0
Transcript of City of Winnipeg SOUTHWESTERN RAPID TRANSIT CORRIDOR Bidder Meeting October 16 th, 2009.
![Page 1: City of Winnipeg SOUTHWESTERN RAPID TRANSIT CORRIDOR Bidder Meeting October 16 th, 2009.](https://reader035.fdocuments.net/reader035/viewer/2022062323/5697c0211a28abf838cd2f6c/html5/thumbnails/1.jpg)
City of Winnipeg
SOUTHWESTERN RAPID TRANSIT CORRIDOR
Bidder Meeting
October 16th, 2009
![Page 2: City of Winnipeg SOUTHWESTERN RAPID TRANSIT CORRIDOR Bidder Meeting October 16 th, 2009.](https://reader035.fdocuments.net/reader035/viewer/2022062323/5697c0211a28abf838cd2f6c/html5/thumbnails/2.jpg)
Site Location
![Page 3: City of Winnipeg SOUTHWESTERN RAPID TRANSIT CORRIDOR Bidder Meeting October 16 th, 2009.](https://reader035.fdocuments.net/reader035/viewer/2022062323/5697c0211a28abf838cd2f6c/html5/thumbnails/3.jpg)
Field Investigations
- Klohn Krippen (2003) - Geotechnical• 4 deep test holes, 1 shallow• Groundwater monitoring• Laboratory testing
– AECOM (2009) - Geotechnical• 2 deep test holes ( rock coring)• Groundwater monitoring• Laboratory testing
– AECOM (2009) – Hydrogeological• Two test wells drilling• Field pump tests
![Page 4: City of Winnipeg SOUTHWESTERN RAPID TRANSIT CORRIDOR Bidder Meeting October 16 th, 2009.](https://reader035.fdocuments.net/reader035/viewer/2022062323/5697c0211a28abf838cd2f6c/html5/thumbnails/4.jpg)
Location of Test Holes
TW 2
TW 1
![Page 5: City of Winnipeg SOUTHWESTERN RAPID TRANSIT CORRIDOR Bidder Meeting October 16 th, 2009.](https://reader035.fdocuments.net/reader035/viewer/2022062323/5697c0211a28abf838cd2f6c/html5/thumbnails/5.jpg)
Soil Stratigraphy
![Page 6: City of Winnipeg SOUTHWESTERN RAPID TRANSIT CORRIDOR Bidder Meeting October 16 th, 2009.](https://reader035.fdocuments.net/reader035/viewer/2022062323/5697c0211a28abf838cd2f6c/html5/thumbnails/6.jpg)
Field and Lab Results
![Page 7: City of Winnipeg SOUTHWESTERN RAPID TRANSIT CORRIDOR Bidder Meeting October 16 th, 2009.](https://reader035.fdocuments.net/reader035/viewer/2022062323/5697c0211a28abf838cd2f6c/html5/thumbnails/7.jpg)
Groundwater Conditions–Clay : 2 m below ground, Elv. 231 m–Bedrock/Till : Elv. 224 to 226 m
–Impact on:• Excavation stability• Global stability• Seepage
![Page 8: City of Winnipeg SOUTHWESTERN RAPID TRANSIT CORRIDOR Bidder Meeting October 16 th, 2009.](https://reader035.fdocuments.net/reader035/viewer/2022062323/5697c0211a28abf838cd2f6c/html5/thumbnails/8.jpg)
Geotechnical Concerns
– Foundation type– Rebound, heave and settlement– Retaining walls– Base heave – Temporary shoring and excavation plan
![Page 9: City of Winnipeg SOUTHWESTERN RAPID TRANSIT CORRIDOR Bidder Meeting October 16 th, 2009.](https://reader035.fdocuments.net/reader035/viewer/2022062323/5697c0211a28abf838cd2f6c/html5/thumbnails/9.jpg)
Bearing capacity and foundation type
– Raft foundation – Design based on the concept of floating foundation– Bearing capacity and settlement pressure are defined
![Page 10: City of Winnipeg SOUTHWESTERN RAPID TRANSIT CORRIDOR Bidder Meeting October 16 th, 2009.](https://reader035.fdocuments.net/reader035/viewer/2022062323/5697c0211a28abf838cd2f6c/html5/thumbnails/10.jpg)
Rebound, Heave and Settlement
BRT - Heave Estimates for Excavations
223
224
225
226
227
228
229
230
231
0 25 50 75 100 125 150 175 200 225 250
Heave, mm
Excavati
on
Ele
vati
on
, m
elastic rebound
elastic rebound + sw ell @ 6 months
elastic rebound + sw ell @ 12 months
elastic rebound + ult sw ell
![Page 11: City of Winnipeg SOUTHWESTERN RAPID TRANSIT CORRIDOR Bidder Meeting October 16 th, 2009.](https://reader035.fdocuments.net/reader035/viewer/2022062323/5697c0211a28abf838cd2f6c/html5/thumbnails/11.jpg)
Retaining walls
- Reinforced Concrete U-shaped section - Reinforced Concrete Cantilever wall- Coulomb Theory- Design for surcharge from compaction during construction- Design for live load surcharge from Cooper E90 loading-
![Page 12: City of Winnipeg SOUTHWESTERN RAPID TRANSIT CORRIDOR Bidder Meeting October 16 th, 2009.](https://reader035.fdocuments.net/reader035/viewer/2022062323/5697c0211a28abf838cd2f6c/html5/thumbnails/12.jpg)
Clay
Till/Bedrock
FS = Wclay /γw h
Base heave
hWclay
![Page 13: City of Winnipeg SOUTHWESTERN RAPID TRANSIT CORRIDOR Bidder Meeting October 16 th, 2009.](https://reader035.fdocuments.net/reader035/viewer/2022062323/5697c0211a28abf838cd2f6c/html5/thumbnails/13.jpg)
FS against Base Heave
1.00
1.50
2.00
2.50
3.00
222.5 223.0 223.5 224.0 224.5 225.0 225.5 226.0 226.5
GWL in Bedrock Aquifer
FS
Excv 225.0
Excv 224.0
Excv 223.0
TYPICAL
EXTREME HISTORICAL
![Page 14: City of Winnipeg SOUTHWESTERN RAPID TRANSIT CORRIDOR Bidder Meeting October 16 th, 2009.](https://reader035.fdocuments.net/reader035/viewer/2022062323/5697c0211a28abf838cd2f6c/html5/thumbnails/14.jpg)
Temporary shoring and Excavation plan
– Cut and cover construction– Staged construction, Stage I and II– Site constrains:
• Limited space• Utilities• Private property• Proximity to CN tracks
– Excavations plan include:• Open excavation• Cantilever / Braced Shoring• Combination of shoring and open excavation
![Page 15: City of Winnipeg SOUTHWESTERN RAPID TRANSIT CORRIDOR Bidder Meeting October 16 th, 2009.](https://reader035.fdocuments.net/reader035/viewer/2022062323/5697c0211a28abf838cd2f6c/html5/thumbnails/15.jpg)
Temporary shoring and Excavation plan
– Excavation configurations• Open Excavation, up to 6 m cut• Other geometry < 6m cut
3
1
14
3
33
![Page 16: City of Winnipeg SOUTHWESTERN RAPID TRANSIT CORRIDOR Bidder Meeting October 16 th, 2009.](https://reader035.fdocuments.net/reader035/viewer/2022062323/5697c0211a28abf838cd2f6c/html5/thumbnails/16.jpg)
Temporary shoring and Excavation plan
– Excavation configurations• Braced Shoring up to 9.5 m
~ 9.5
4.6 Min
~ 5
![Page 17: City of Winnipeg SOUTHWESTERN RAPID TRANSIT CORRIDOR Bidder Meeting October 16 th, 2009.](https://reader035.fdocuments.net/reader035/viewer/2022062323/5697c0211a28abf838cd2f6c/html5/thumbnails/17.jpg)
Temporary shoring and Excavation plan
– Excavation configurations• Combination of Braced Shoring and Open excavation
4.6
3 - 5
2-3
1 37m bench
5 m Crane pad
varies 5 m Min.
varies 7 Max.
![Page 18: City of Winnipeg SOUTHWESTERN RAPID TRANSIT CORRIDOR Bidder Meeting October 16 th, 2009.](https://reader035.fdocuments.net/reader035/viewer/2022062323/5697c0211a28abf838cd2f6c/html5/thumbnails/18.jpg)
Temporary shoring and Excavation plan Lateral Loads from Surcharge
![Page 19: City of Winnipeg SOUTHWESTERN RAPID TRANSIT CORRIDOR Bidder Meeting October 16 th, 2009.](https://reader035.fdocuments.net/reader035/viewer/2022062323/5697c0211a28abf838cd2f6c/html5/thumbnails/19.jpg)
Temporary shoring and Excavation plan
Base Instability : analogous to bearing capacity
![Page 20: City of Winnipeg SOUTHWESTERN RAPID TRANSIT CORRIDOR Bidder Meeting October 16 th, 2009.](https://reader035.fdocuments.net/reader035/viewer/2022062323/5697c0211a28abf838cd2f6c/html5/thumbnails/20.jpg)
![Page 21: City of Winnipeg SOUTHWESTERN RAPID TRANSIT CORRIDOR Bidder Meeting October 16 th, 2009.](https://reader035.fdocuments.net/reader035/viewer/2022062323/5697c0211a28abf838cd2f6c/html5/thumbnails/21.jpg)
Global Stability
- Stress – stability coupled finite element analysis- Locally acceptable soil parameters- Account for excavation unloading - Model train loading- Design objective FS = 1.30
![Page 22: City of Winnipeg SOUTHWESTERN RAPID TRANSIT CORRIDOR Bidder Meeting October 16 th, 2009.](https://reader035.fdocuments.net/reader035/viewer/2022062323/5697c0211a28abf838cd2f6c/html5/thumbnails/22.jpg)
Stability output
![Page 23: City of Winnipeg SOUTHWESTERN RAPID TRANSIT CORRIDOR Bidder Meeting October 16 th, 2009.](https://reader035.fdocuments.net/reader035/viewer/2022062323/5697c0211a28abf838cd2f6c/html5/thumbnails/23.jpg)
Stability output
![Page 24: City of Winnipeg SOUTHWESTERN RAPID TRANSIT CORRIDOR Bidder Meeting October 16 th, 2009.](https://reader035.fdocuments.net/reader035/viewer/2022062323/5697c0211a28abf838cd2f6c/html5/thumbnails/24.jpg)
Stability output
![Page 25: City of Winnipeg SOUTHWESTERN RAPID TRANSIT CORRIDOR Bidder Meeting October 16 th, 2009.](https://reader035.fdocuments.net/reader035/viewer/2022062323/5697c0211a28abf838cd2f6c/html5/thumbnails/25.jpg)
Stress-Deformation Analysis
![Page 26: City of Winnipeg SOUTHWESTERN RAPID TRANSIT CORRIDOR Bidder Meeting October 16 th, 2009.](https://reader035.fdocuments.net/reader035/viewer/2022062323/5697c0211a28abf838cd2f6c/html5/thumbnails/26.jpg)
Stress-Deformation Analysis
![Page 27: City of Winnipeg SOUTHWESTERN RAPID TRANSIT CORRIDOR Bidder Meeting October 16 th, 2009.](https://reader035.fdocuments.net/reader035/viewer/2022062323/5697c0211a28abf838cd2f6c/html5/thumbnails/27.jpg)
Performance Monitoring Program
Instrumentation will be installed to monitor
– Displacement of railway tracks – Displacement of shoring system– Horizontal subsoil displacement– Excavation heave– Groundwater levels
![Page 28: City of Winnipeg SOUTHWESTERN RAPID TRANSIT CORRIDOR Bidder Meeting October 16 th, 2009.](https://reader035.fdocuments.net/reader035/viewer/2022062323/5697c0211a28abf838cd2f6c/html5/thumbnails/28.jpg)